Группа Всемирного банка · Procurement Plan

China - Xining Flood Control and Watershed Management Project : procurement plan

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 Contract 10 4 yuan Million USD I Works revehungarumlautfl\1a\11fifl hungarumlaut\11breveffl e\1a A Flood Control Works e\1adotaccentbrevehungarumlaut\11fibreve arumlautfi\11caronbreve l a Urban District flcaroncaronffl\11fiff efi\11fflfi 138.7 641.2 9.1 9.6 90 : fifi 1 WMW between Inlet of Chaoyang Hydro-Power Plant of Beichuanhe river and Menyuan Bridge ccentdotaccentfflcaron\11fficaron i\11dotaccentfi Works NCB 0:\10fflflfifl\10flfi 2 GLW of Beichuanhe River e\1afflhungarumlaut\11hungarumlautcaron arumlaut\11fflff Works NCB 0:\10fflflfifl\10flffl 3 GLW of Nanchuanhe River otaccent\1abreve\11fficaron 1brevecaron Works NCB 0:\10fflflflhungarumlaut\10flffi 4 WMW on Nanchuanhe river between Yuanding bridge and aqueduct of Jiefang Channel ldotaccentfi\11carondotaccent 1\1acaron Works NCB 0:\10fflflflhungarumlaut\10flff 5 WMW of Huangshui River between Railway Bridge and Haihu bridge ndotaccentcaronhungarumlaut\11flfl \11brevefi Works NCB 0:\10fflflfifi\10flbreve 6 GLW of Huangshui River ccentflffi\11dotaccentff 1fflbreve Works NCB 0:\10fflflfifi\10flcaron 7 Xichuanhe River Wetland Park iffffl\11ffi\1a 11ffidotaccent Works NCB 0:\10fflflflhungarumlaut\10fl\1a 8 GMW of Huoshaogou Stream ccentffi\1a\11fiff 1fflbreve Works NCB 0:\10fflflflhungarumlaut\10fldotaccent 9 GMW of Baojiagou stream and Daaigou stream efflffl\11brevecaron 1dotaccentffi Works NCB 0:\10fflflfifl\10flhungarumlaut 10 Gully Control Works of New Chengnan District lbreve\11caron\1a 1fi\1a Works NCB 0:\10fflflfifi\10fifl 11 GMW in Economic Development District arondotaccent\11fflfi 1ffbreve Works NCB 0:\10fflflfiffl\10fifi b Datong County ifidotaccentffi\11caronbreve i\11flcaron 490.5 643.1 10.1 10.5 90 : fifi 1 Waterway Management for Urban Section of Dongxia River iflfi\11\1affi 11fiff Works NCB 0:\10fflflflhungarumlaut\10flfi 2 Gully Management works for Yuanshuer ungarumlautffi\11ffhungarumlaut 1ffff Works NCB 0:\10fflflfifl\10flffl 3 Vegetation works for Urban Section of Dongxia River ngarumlautfi\11brevefl 1\1acaron Works NCB 0:\10fflflfifl\10flffi Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 571.6 392.6 12.0 6.0 90 : fi Page 2 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 4 WMW for Beichuanhe River nfihungarumlautbreve\11hungarumlautfi \11ficaron Works NCB 0:\10fflflfifl\10flff 5 Gully Management works for Qiaoergou flbreve\11\1afi 1\1afl Works NCB 0:\10fflflfifl\10flbreve 6 Vegetation Works for Beichuanhe River fffl\11caroncaron 1\1afl Works NCB 0:\10fflflfifi\10flcaron 7 Gully management works for Dameidonggou otaccent\11dotaccentcaron 1flcaron Works Shopping 0:\10fflflfifl\10fl\1a 8 Gully management works for Xiaomeidonggou aron\11caroncaron 1flff Works Shopping 0:\10fflflfifl\10fldotaccent 9 Gully management works for Hujigou effl\1a\11\1acaron 1\1ahungarumlaut Works NCB 0:\10fflflflhungarumlaut\10flhungarumlaut 10 Gully management works for Maojiagou ndotaccenthungarumlaut\11fflfi 1fibreve Works NCB 0:\10fflflfiffl\10fifl 11 Gully management works for Miaogou n\1affl\11fibreve 1fiffl Works NCB 0:\10fflflfifi\10fifi c HuangYuan County dotaccentcaronff\11fflff a\11caroncaron n 1 Waterway management of Huangshui River ccentffihungarumlaut\1a\11dotaccentffi i\11caronffl Works NCB 0:\10fflflfifl\10flfi 2 Gully management Works of Bohanggou dotaccent\11dotaccentfi 1fflffl Works NCB 0:\10fflflflhungarumlaut\10flffl 3 Vegetation works of Huangshui River l\1afi\11hungarumlautffl 11flhungarumlaut Works NCB 0:\10fflflfifl\10flffi 4 Gully management Works of Lasagou & Yangjiagou dotaccent\11caronfl 1caronhungarumlaut Works NCB 0:\10fflflfifl\10flff 5 Gully management Works of Heladagou iffi\11ffl\1a 1\1affl Works NCB 0:\10fflflfifi\10flbreve 6 Gully management Works of Quanerwangou ngarumlautffi\11dotaccentfl 1ffiffl Works NCB 0:\10fflflfiffl\10flcaron d HuangZhong County ffhungarumlaut\11fiffi 1\1affl 397.9 645.8 10.1 5.3 90 : ffl 1 Zhaojiazhuang GMW otaccentdotaccent\11flffi 1fidotaccent Works NCB 0:\10fflflflhungarumlaut\10flfi 2 Jiaomugou GMW aronfi\11fifl 1breveff Works NCB 0:\10fflflflhungarumlaut\10flffl B Water Quality Improvement Works ebreveffldotaccent\11\1affi ccent\11ffidotaccent n a Urban District fi\1a\11hungarumlautcaron n\11flbreve 447.8 643.6 9.1 4.8 90 : ff 1 Trunk sewer works of Nanchuanhe River in Urban District ahungarumlautcaron\11fifl 11carondotaccent Works NCB 0:\10fflflflhungarumlaut\10fiffl 2 Trunk sewer works in Urban area of Beichuanhe River ccentffiffl\11\1aff 1fflhungarumlaut Works NCB 0:\10fflflfifl\10fiffi 3 Wastewater networks of Huangshui River ffibreve\11brevehungarumlaut 1brevebreve Works NCB 0:\10fflflfifi\10fiff 571.6 392.6 12.0 6.0 90 : ffl Page 3 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 4 Reforming of Sewer and Drainage Network Works for Xiaoqiao reveffi\11breveffi 1breveffi Works NCB 0:\10fflflfiffl\10fibreve b Datong County hungarumlautffl\11hungarumlauthungarumlaut 1dotaccentbreve 180.2 645.8 10.1 5.3 90 : fi 1 Main pipes of Waste Water Collection in Datong County hungarumlautffl\11hungarumlauthungarumlaut 1dotaccentbreve Works NCB 0:\10fflflfifi\10fiffl c HuangZhong County i\1a\11\1adotaccent 1ffdotaccent 216.9 645.8 10.1 5.3 90 : fi 1 Trunk sewer works of Huangzhong County i\1a\11\1adotaccent 1ffdotaccent Works NCB 0:\10fflflfifl\10flffi C Watershed Management Works ffidotaccentfl\11caroncaron ron\11fflffi l a Erosion Control Works otaccentfflffi\11fihungarumlaut l\11ffidotaccent ron 1) Urban District iffdotaccent\11fflff 1hungarumlautcaron 266.6 645.8 10.1 5.3 90 : ffi 1 Huoshaogou Watershed Management Works dotaccentffi\11brevecaron 11fflfi Works NCB 0:\10fflflflhungarumlaut\10ficaron 2 Baojiagou & Daaigou Watershed Management Works icaron\11hungarumlautffi 1\1afi Works NCB 0:\10fflflfifl\10fi\1a 3 Dujiagou Watershed Management Works lffl\1a\11\1abreve 11flff Works NCB 0:\10fflflfifi\10fidotaccent 2) Datong County ron\1afl\11fldotaccent 11\1affl n 1 Hujigou Watershed Management Works ronffi\11brevehungarumlaut 1fflff Works NCB 0:\10fflflflhungarumlaut\10fiffi 571.6 392.6 12.0 6.0 90 : ffi Page 4 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 2 Dameidonggou Watershed Management Works fidotaccent\11caronffi 1brevecaron Works NCB 0:\10fflflfifl\10fiff 3 Qiaoergou Watershed Management Works ffi\11ffl\1a 1fi\1a Works NCB 0:\10fflflfifl\10fibreve 4 Dongxiagou Watershed Management Works n\1afl\11\1affl 1fifi Works NCB 0:\10fflflfifi\10ficaron 5 Miaogou Watershed Management Works ifi\11ff\1a 1ffibreve Works NCB 0:\10fflflfifi\10fi\1a 6 Maojiagou Watershed Management Works taccentffl\11fffi 1fflhungarumlaut Works NCB 0:\10fflflfiffl\10fidotaccent 3) Huangyuan County evefi\1a\11carondotaccent 11ffibreve 470.3 645.8 10.1 5.3 90 : ff 1 Bohanggou Watershed Management Works nhungarumlautff\11fldotaccent 1flff Works NCB 0:\10fflflflhungarumlaut\10fl\1a 571.6 392.6 12.0 6.0 90 : ff Page 5 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 2 Lasagou Watershed Management Works nfi\1a\11fifl 1hungarumlaut\1a Works NCB 0:\10fflflfifl\10fldotaccent 3 Heladagou Watershed Management Works ibreve\11fflhungarumlaut 1fflffl Works NCB 0:\10fflflfifi\10flhungarumlaut 4 Quanwangou Watershed Management Works i\11fflfi 1fiffl Works NCB 0:\10fflflfiffl\10fifl 4) Huangzhong County dotaccent\1a\11fidotaccent 11ffibreve 278.1 645.8 10.1 5.3 90 : ffi 1 Huoshaogou Watershed Management Works eficaron\11flffi 1\1a\1a Works NCB 0:\10fflflflhungarumlaut\10flff 2 Fengtaigou Watershed Management Works lbreve\11breveff 1fiff Works NCB 0:\10fflflfifl\10flbreve 3 Lushaergou Watershed Management Works aronbreve\11caronfi 1ffff Works NCB 0:\10fflflfifi\10flcaron b Livelihood Activities revebreve\1a\11ff\1a 11dotaccentcaron 490.3 645.8 10.1 5.3 90 : ff 1 Livelihood Activities for Urban Districts taccentff\11dotaccentff 1ffldotaccent Works Community Participation 0:\10fflflfifl\10fihungarumlaut e Page 6 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 2 Livelihood Activities for Datong County ccentbrevedotaccent\11caron\1a 1ffldotaccent Works Community Participation 0:\10fflflfifl\10fihungarumlaut 3 Livelihood Activities for Huangyuan County flhungarumlaut\11\1ahungarumlaut 1flhungarumlaut Works Community Participation 0:\10fflflfifl\10fifi 4 Livelihood Activities for Huangzhong County otaccentff\11fi\1a 1fflfi Works Community Participation 0:\10fflflfifl\10fl\1a D Institution Capacity Building iffidotaccent\11brevecaron 11fflbreve 450.7 643.6 9.1 4.8 90 : fi a Urban District iffidotaccent\11brevecaron 11fflbreve 462.9 643.6 9.1 4.8 90 : fi 1 River & Watershed Management Center iffidotaccent\11brevecaron 11fflbreve Works NCB 0:\10fflflfifl\10fflfl II Goods \1a\1a\11hungarumlauthungarumlaut n\11dotaccentffi a A Flood control & Management works affidotaccent\11flffl 11\1affi ccent n Page 7 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 1 Precipitation and Runoff Information Collection Equipment 1affi\11dotaccentfi 1ffffi Goods 131.5 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10flfi 2 Flood Info. Communication Equipments Purchasing and Debugging flffi\11flcaron 1brevefi Goods 170.6 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10flffl 3 Works & Disaster Info. Collection System Purchasing and Debugging taccentffi\11fffi 1fflhungarumlaut Goods 216.4 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10flffi 4 Computer Networks Purchasing and Debugging flfi\11brevehungarumlaut 1brevefl Goods 262.0 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10flff 5 DLP System Purchasing and Debugging arondotaccent\11hungarumlauthungarumlaut 1ffffl Goods 294.7 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10flbreve 6 Video Meeting System Purchasing and Debugging \1a\11\1abreve 1fi\1a Goods 334.0 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10flcaron 7 Flood Warning Publication System Purchasing and Debugging ifl\11breveffi 1ffiffi Goods 384.7 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10fl\1a 8 Un-Interrupted & Lightning-Protected Power Supplier taccent\11dotaccenthungarumlaut 1fldotaccent Goods SLQJ 0*\10fflflfifl\10fldotaccent B Institution Capacity Building flhungarumlaut\11flfl 11flhungarumlaut 437.5 643.6 9.1 4.8 90 : ff 1 Office Equipment for Project Management a\11fffl 1fl\1a Goods SLQJ 0*\10fflflflhungarumlaut\10flhungarumlaut 2 Office Equipment for Project Management nff\11caronfl 1fifl Goods 499.4 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifi\10fifl 3 Traffic Equipments for Project Management ncaronbreve\11flfl 1hungarumlauthungarumlaut Goods 536.3 575.2 10.1 15.1 90 : 1&% 0*\10fflflflhungarumlaut\10fifi 571.6 392.6 12.0 6.0 90 : \1a Page 8 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 4 Traffic Equipments for Project Management nffiffl\11flfl 1hungarumlautff Goods 135.1 575.2 10.1 15.1 90 : 1&% 0*\10fflflfifl\10fiffl C Watershed Management iffifl\11hungarumlautcaron 11flfi e 1 Livelihood Activities for Urban Districts ccentbreve\11brevehungarumlaut 1fiffi V Community Participation 0*\10fflflfifl\10fiffi 2 Livelihood Activities for Datong County e\1a\1a\11flcaron 1dotaccent\1a V Community Participation 0*\10fflflfifl\10flfi 3 Livelihood Activities for Huangyuan County afl\11fihungarumlaut 1fflbreve V Community Participation 0*\10fflflfifl\10flfi 4 Livelihood Activities for Huangzhong County ngarumlautcaron\11hungarumlautfl 1\1acaron V Community Participation 0*\10fflflfifl\10flfi 5 Huoshaogou Watershed in Huangzhong County 1fflffl 1flflffl V Community Participation 0*\10fflflfifl\10flffl III Consultant lfiffi\11brevefi 1dotaccentfi ron A QBS ifi\11flfl 1ffhungarumlaut 03 1 Integration of Flood Forecasting & Warning System, Forming of the Data Bank, Developing of Info Processing Software. fi\11fl 1fflffl Consultant QBS 0&\10fflflfifl\10flfi 2 Development of Flood Forecasting and Control Programming System afl\11fl 1ffl\1a Consultant QBS 0&\10fflflfifl\10flffl B CQS hungarumlaut\11\1afl 1\1affl e\03 1 Research on Project Management Mechanism ccentbreve\11flffi 1fiff Consultant CQS 0&\10fflflfifl\10flffi 2 Research on Soil Erosion Mechnism ccenthungarumlaut\11hungarumlautfi 1fiff Consultant CQS 0&\10fflflfifl\10flff ccent Page 9 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 3 Probe in Environment Monitoring nff\11dotaccentffl 1fifl Consultant CQS 0&\10fflflfifl\10flbreve 4 Research on Flood Forecasting & Warning Techniques breve\11flfi 1fidotaccent Consultant CQS 0&\10fflflfifi\10flcaron 5 Research on Maintenance and Management of Flood Control Facilities arumlautff\11hungarumlautffi 1fibreve Consultant CQS 0&\10fflflfiffl\10fl\1a C IC f\1a\11flfl 1fffl ccent\03 1 Financial Management & Procurement Consultant ngarumlaut\11caronfl 1fldotaccent Consultant IC 0&\10fflflflhungarumlaut\10fldotaccent 2 Environment Management Consultant otaccent\11dotaccentfl 1flbreve Consultant IC 0&\10fflflflhungarumlaut\10flhungarumlaut 3 Professional Translater i\11flfl 1flbreve Consultant IC 0&\10fflflflhungarumlaut\10fifl 4 Water Conservancy Tech. Consultant l\11dotaccentfl 1flffi Consultant IC 0&\10fflflfifl\10fifi 5 Watershed Management Tech. Consultant reve\11caronfl 1flff Consultant IC 0&\10fflflfifl\10fiffl 6 Project Management \11flfl 1flcaron Consultant IC 0&\10fflflfifl\10fiffi 7 Water Resources Management a\11caronfl 1flffi Consultant IC 0&\10fflflfifl\10fiff 8 FFW Technicques fi\11caronfl 1flbreve Consultant IC 0&\10fflflfifl\10fibreve D SOE lflbreve\11dotaccentfi 11fflfi 322.5 643.6 9.1 4.8 90 : fi 1 Training Courses, Study-Tours, Workshops lflbreve\11dotaccentfi 11fflfi Consultant SOE 0&\10fflflflhungarumlaut\10ficaron ccentffiffihungarumlautdotaccent\11caronfl ifi\11fibreve arumlautfl Remarks: **prior--contracts subjecting to post revirew but treated as prior review. FFWS--Flood Forecasting and Warning System WMW--Waterway Management Works GMW--Gully Management Works GLW--Green Landscape Works FFW--Flood Forecasting and Warning arumlaut Page 10 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 571.6 389.5 12.0 12.0 90 : fifl Page 11 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 571.6 389.5 12.0 12.0 90 : fifi Page 12 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. l Page 13 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. i Page 14 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. 571.6 389.5 12.0 12.0 90 : fiff Page 15 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. eve Page 16 Contract 10 4 yuan Million USD Procurement Plan of Xining Flood Control and Watershed Management Project Estimated Investment Disbursement Account Procurement Method Contract No. ron Page 17 Waterway Management works in length of 7.78 km with with the embankment of 14.98 km (7.24 km for left bank and 7.74 km for right bank),1 set of river across, 3 sets of temporary vehicle bridges, and 14 sets of subsiding culverts, and paving 10.22 km of graveled road. prior Feb. 2010 Forming Re-vegetated ground, roads/paths, and plaza, in total area of 110 hm 2 , Re-vegetation of 2.4hm 2 prior Feb. 2010 Forming Re-vegetated ground, roads/paths, and plaza, in total area of 0.52km 2 , and 1 set of rubber Dam, Re-vegetation of 4.14hm 2 . post Dec. 2009 Waterway management works in length of 9.45 km, 3 sets of bank- cross building, 8 sets of subsiding culverts, and 14.83 km of graveled road. prior July,2009 Aug. 24, 2009 2696.52 Hunan Wangxin Construction Group Company 7.42 km of Waterway Management works with the embankment of 14.8 km (7.4 km for both banks), 1 set of river across, 1 set of temporary vechicle bridge, 4 sets of subsiding culverts, and 14.84 km of graveled road. prior Feb. 2011 Re-vegetation belt in length of 3.0 km and in area of 2.4 hm 2 post Feb. 2011 Re-vegetation ground, roads/paths, and plaza, in total area of 1.1km 2, , a rubber dam post Feb. 2011 To build 1.103 km of drainage, inclined motar levee on both sides of 2.014 km, reinforced concrete culvert 100m. post Oct. 2009 To build 2.63 km of drainage post Feb. 2010 To build 2 km of culvert and repair the No. 2 pool of Xigou gully. post Feb.2011 To build 1.9 km of drainage, 3 sets of chute and 5 sets of temporary vehicle bridges, pave graveled road fof 1.34 km. post Feb. 2012 Waterway Management works in length of 3.44 km, 6.862 km of embankment. prior Otc. 2009 Gully management works in length of 1.581km post Feb. 2010 Embankment road 6.862 km, sidewalk of 2 m, vehicle road of 4 m, re- vegetated green belt 2 m post Feb. 2010 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor a Page 18 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor Embankment in length of 18.767 km and Waterway management in length of 11.35 km 1 set of River-across bridge and 5 small-sized buildings, and 18.767 km of embankment road. prior Feb. 2010 Gully management works in length of 2.71km post Feb. 2010 Re-vegetated green belt in area of 3.7hm 2 . post Feb. 2011 Waterway Managing works in length of 0.345 km prior Feb. 2010 Gully Management works in length of 450 m post Feb. 2010 Gully management works in length of 2.456 km post Oct. 2009 Gully Management works in length of 2.067 km post Feb. 2012 Gully Management works in length of 4.233 km post Feb. 2011 Waterway Management works of 14.12 km, embankment of 27.926 km, 2 sets of River-Crossing, 34.96 km of embankment road prior Feb. 2010 Gully Management works of 1.02 km, 2 sets of temporary vehicle- bridges prior Dec. 2009 Re-vegetation in area of 3.0 hm 2 post Feb. 2010 Gully Management of 3.55 km post Feb. 2010 Gully Management of 1.82 km, and 1 set of temporary vehicle- bridges post Feb. 2011 Gully Management of 1.1 km. post Feb. 2012 Gully sides lining in length of 4.3 km prior Dec. 2009 To build 1.56 km of RC box culvert post Dec. 2009 To pipe 25.28 km of sewer channel, and to build 450 sets of manholes, 34 dripping wells prior Dec. 2009 To pipe 14.27 km and to build 308 sets of manholes post Feb. 2010 To pipe 13.8 km and to build 279 sets of manholes, 2.26 km of sewer channel, 34 sets of manholes, and 14.47 km of graveled roads. post Feb. 2011 taccent Page 19 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor To pipe 571 m of Sewer-Rainfall drainage and to build 21 sets of manholes in Tianjun Road, to pipe 963 m of Sewer-Rainfall drainage and to build 36 sets of manholes in Chaidamu Road, to pipe 506 m of Sewer-Rainfall drainage and to build 21 sets of manholes in Qilian Road. post Feb. 2012 To Pipe 10.507 km of channel, and to build 163 sets of manholes. post Feb. 2011 To pipe of drainge of 1.7 km, channel of 293 m post Feb. 2010 To manage 10.51 km 2 of the watershed in Huoxi Village ( water conservation forest of 344.3 hm2, vegetation recovery of 707.1 hm2) ,to build 154 sets of check dams, 450 m of gully-head protection, 2 sets of signs prior Oct. 2009 To manage 2.36 km 2 of the watershed in Paojiazhai village ( afforestation of 34.6 hm2, vegetation recovery of 201 hm2) 22 sets of check dams, 300 m of gully-head protection, 2 sets of signs ), In Mafang Village: manage 1.7 km2, 75 check dam, 400 m of gully-head protection, afforestation of shrubs of 40 hm2, mixed forest of 33.7 hm2, vegetation recovery of 96.7 hm2, 3 sets of signs. post Feb. 2010 To manage 7.08 km 2 of Dujiazhuang, Shangxigou, Xinzhuang of Xiaxigou Villages, Mojiagou,Wangjiazhuang and Quan'erwan by means of 46 hm 2 of terrace, 415 sets of check dams, 850 m of gully- head protection, 5 km field accessing-paths, reinforcing 6 sets of dam/pool , afforesting 200 hm 2 of shrub, and 461.67 hm 2 of rotational grazing and 4 sets of signs. post Feb. 2011 To manage an area of 0,99 km 2 of the watershed in Hujigou Village (12.27 hm 2 of terrace, 15 km of accessing-path, 86.46 hm2 of water conservation forest), tobuild 26 sets of check dams, water conserving gully-head protection of 100m, and 2 sites of gully-head protection, 1set of warping dam. prior Oct. 2009 ngarumlaut Page 20 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor To manage 4.42 km 2 of the watershed in Dameidong, Meidonggou, Xiaomeidong, Bai'ai, Yuanshu'er villages, including 36 hm 2 of terraces, 10 km of accessing path, 83 sets of check dams, 850 m of gully head protection, 1 set of pool, 50 m of protection slope, 179.87 hm 2 of shrub plantation, and 226.48 hm 2 of rotational grazing, 7 sets of signs post Feb. 2010 To manage 2.21 km 2 of the watershed in Qiaoergou, songlin villages by means of building 7 sets of check dams and 1 set of warping dam, forming 100 m of gully-head protection, afforesting 36.1 hm 2 of shrubs, and rotational grazing on 184.9 hm 2 , 5 sets of signs post Feb. 2010 To managing 2.96 km2 of Liujiazhuang, Erma and Yuandongzi villages, including 40 hm2 of terraces, 10 km of field access paths, 117 sets of check dams, 50 m of gully-head protection, 73.64 hm2 of shrub Afforestation, 59.9 hm2 of arbor afforestation, and 122.21 hm2 of rotational grazing, 6 sets of signs post Feb. 2011 To manage 12.21 km 2 of the watershed in Shangmiao and Xiamiao villages by terracing 28 hm 2 , 7 km of accessing paths, building 24 sets of check dams, 150 m of gully head protection works, afforesting 193.2 hm 2 of shrub, and rotational grazing on 1000 hm 2 , 8 sets of signs post Feb. 2011 To manage 1.93 km 2 of the watershed in Maojiazhai Village by means of terracing 26.67 hm 2 of slopping farmland, building 6 km of filed accessing path, building 50 sets of check dams, forming 150m of gully-head protection works, and afforesting 166.1 hm 2 of shrubs. post Feb. 2012 To manage 4.4 km 2 of the watershed in Bohang, Nalong, Huendong and Shangquan villages by means of 288.69 hm 2 terraces, 87.3 hm2 of water conservation forest, 63.63 hm2 of rotational grazing land), 20 sets of check dams, 6 sets of warping dams, 2 sets of signs post Dec. 2009 l Page 21 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor To manage 5.62 km 2 of the watershed in Yongxing and Guanghua villages by means of 15 sets of check dams, 360 m of gully-head protection, afforestation of 178.5 hm 2 of shrubs and 127.9 hm 2 of arbor trees, and 255.25 hm 2 of rotational grazing, 1 set of sign post Feb. 2010 To manage 5.11 km 2 of the watershed in Hela Village, including 4.9 hm 2 of terraces, 12 km of field accessing paths, 15 sets of check dams, 1 set of warping dam, 127.5 hm 2 of shrubs afforestation, and 379 hm 2 of rotational grazing, 1 set of sign post Feb. 2011 To manage 1.99 km 2 of the watershed in Wanfeng and Quanerwan villages be means of 15 sets of check dams, 93.14 hm 2 of shrub plantation, and 105.84 hm 2 of rotational grazing, 1 set of sign post Feb. 2012 To manage 16.75 km 2 of the watershed in Paojiazhai, Zhangliyao, Qingshan, Kongjia and Shuitan villages, by 106.1 hm 2 of terraces, 10 km of field access paths, 16 sets of check dams, 2 sets of pools, afforestation of 427.2 hm 2 of shrubs and 1.78 hm 2 of arbor trees, and 1141.5 hm 2 of rotational grazing, 3 sets of sign prior Oct. 2009 To manage 13.84 hm 2 of the watershed in Fengtai and Yangjuan villages, by means of 206.87 hm 2 of terraces, 15 km of field accessing paths, 67 sets of check dams, afforestation of 361.07 hm 2 of shrubs and 36.54 hm 2 of arbor trees, and 779.04 hm 2 of rotational grazing. post Feb. 2010 To manage 6.27 hm 2 of the watershed in Qingyi, Qinger, Angzang and Zhaojiazhuang villages, by means of afforesting 219.44 hm 2 of shrubs and 41.17 hm 2 of arbor trees, and 366.5 hm 2 of rotational grazing, 2 sets of sign. post Feb. 2011 To form 75 sheds (20-40 ) and 176 pieces of methane-generating pits in Huoshaogou watershed, 154 check dams; 101 pieces of sheds of (20-40 ) and consolidating 1.5 km of road in Dujiagou Watershed. post Mar. 2010 i Page 22 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor To form 65 sheds (20-40 ) and 48 pieces of methane-generating pits in Maojiagou watershed; to form 35 pieces of green house in size of 0.5 mu, 20 pieces of sheds (20-40 ) , 100 pieces of methane- generating pits, consolidating of 3 km in Hujigou Watershed; to form 140 pieces of sheds(20-40 ) and 82 pieces of methane-generating pits in Dameidonggou Watershed; to form 125 sheds (20-40 ) and to consolidate 4 km of road in Qiaoergou Watershed; to form 130 sheds (20-40 ) , 61 pieces of methane-generating pits and to consolidate 5 km of road in Dongxia Watershed; to form 153 sheds (20-40 ) and 204 pieces of methane-generating pits in Miaogou watershed. post Mar. 2010 To form 191 pieces of cattle sheds (20-40 ) and 168 pieces of pigsties (20-40 ) in Bohanggou Watershed; to form 118 pieces of cattle sheds (20-40 ) and 85 pieces of pigsties (20-40 ) , and to consolidate 5.1 km of roads in Lasagou watershed, to form 119 pieces of cattle shed (20-40 ) and 20 pieces of sheep pens(20-40 ) in Heladagou watershed; 106 pieces of cattle sheds (20-40 ) , 59 pieces of pigsties (20-40 ) and 50 pieces of sheep pens o(20-40 ) in Quanwangou watershed. post Mar. 2010 To form 99 cattle sheds of 20 m 2 , 69 pigsties (20-40 ) and 103 sheep pens (20-40 ) , to consolidate 8 km of roads, and 5 methane- generating pits in Huoshaogou watershed of Huangzhong County; to form 42 cattle sheds(20-40 ) , 55 pigsties (20-40 ) and 141 sheep pens (20-40 ) , and to consolidate 12 km of roads in Fengtaigou watershed; to form 87 cattle sheds(20-40 ) , 58 pigsties (20-40 ) , and 11 sheep pens (20-40 ) in Lusha'ergou watershed. post Mar. 2010 Beichuanhe and Huangshuihe Management Stations, River Management Center, FFW Center, Training Center, and Monitoring Center. Relevant Flood Control Warehouse, and one set of Critical Meteorological Factors Observing Station. prior Feb. 2010 fl Page 23 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor Procurement of 79 sets of pluviometer, 25 sets of nilometer, auxiliary rainfall information & relevant meteorology equipments, and training, installation and aftersale services. prior Dec. 2010 81 sets of telemetry terminal, 85 sets of GSM communication module, 81 pieces of solar power, 5 sets of spare parts, service tools, training, installation and aftersale services. prior Dec. 2010 Purchasing, installing, developing, and debugging of Information system of Facilities, Disasters, and Rainfall, including automatic video monitoring system on Urban section of Huanshui River and Ninghu sluice. post Dec. 2010 Procurement Municipal Center of FFW and network equipments for three counties, optical-fibre circuit, Fitment of Equipment rooms, training, installation and aftersale services. prior Dec. 2010 Procurement of Digital Light Procession system of FFW, training, installation and aftersale services. prior Dec. 2010 Purchasing and installing and debugging of Video communication system connecting 3 agencies such as FFW Center and Weather Forecasting Agency, and installation services. post Dec. 2010 FFW information publication equipments for 26 main villages and towns, 25 sets of PDA FFW querying equipments, developing and debugging and training of relevant software, installation and aftersale services. prior Dec. 2010 Purchasing and installing of 25 sets of UPS and 4 sets of Lightening Protection system. prior Dec. 2010 9 sets of desktop computer, 13 sets of laptops, 4 sets of fax, 5 sets of printers(A4), 5 sets of printers(A3), 5 sets of copier, 4 sets of scanner, 6 sets of DC and DV respectively. prior Dec. 2009 20 sets of computer (desktop & laptop integration), 4 sets of fax, 20 sets of printers(A4), 8 sets of printers(A3), 4 sets of copier, 4 sets of scanner, 2 sets of DC and DV respectively. post Aug. 2011 2 set of van, 3 off-road vehicles for conducting flood prevention & fighting, 1 off-road vehicle, 4 vehicles for urban usage, 5 off-road vehicles of flood prevention & fighting prior Nov. 2009 fi Page 24 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor 2 vans, 10 off-road vehicles, 4 off-road vehicles for watershed management, 1 cart vehicle, and 3 all-terrain vehicles for flood control. prior Sept. 2010 195 solar cookers for Huoshaogou Watershed, 400 solar cookers and 2265 pieces of sheep for Dujiagou watershed. post Mar. 2010 To purchase 40 cattle and 268 solar cookers for Hujigou Watershed; 60 cattle and 360 solar cookers for Maojiagou Watershed; 115 cattle and 900 sheep and 669 solar cookers for Qiaoergou Watershed; 130 cattle and 400 sheep and 375 solar cookers for Dongxiagou Watershed; 240 cattle,1800 shee, 1015 solar cookers for Dameidonggou Watershed, 48 cattle and 300 sheep and 650 solar cookers for Miaogou Watershed. post Mar. 2010 To purchase 191 cattle, 62 calves, and 37 sheep for Bohanggou Watershed; 10 calves and 232 sheep for Lasagou Watershed; 12 cattle, 10 calves and 133 sheep for Quanwangou Watershed. post Mar. 2010 34 cattle and 274 sheep for Fengtaigou Watershed; 270 cattle, 1987 sheep and 52 solar cookers for Huoshaogou Watershed in Huangzhong County; 308 cattle and 694 sheep for Lushaergou Watershed. post Mar. 2010 To purchase 13 Sets of Hey Cutter post Mar. 2010 Integration of the FFW system, Development of Information Querying and Analyzing system, Foundation of Information Data Bank of Facilities, Runoff, Disaster, and socio-economics. prior Oct. 2010 Programming of Flood Warning and Treatment, developing of Warning and Forecasting models by flood at gullies, and developing of the relevant software. prior Oct. 2010 To probe into an Optimized Project Management Mechanism Favoring the Project Implementation. prior Apr. 2010 Role and Mechanism of Participatory Watershed Management in soil erosion control. prior Apr. 2010 f Page 25 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor Role of Environment Monitoring & Evaluation in Project Decision. prior Apr. 2010 Study on Flood Warning & Forecasting Techniques From Gullies. prior Apr. 2011 Sustainable Mechanism in Maintaining Flood Control Facilities. prior Apr. 2012 Consultant on Financial affairs and Procurement procedures prior Dec. 2009 Consultant on Environment Management post Dec. 2009 Professional Translater post Dec. 2009 Consultant on hydro-technics techniques. post Mar. 2010 Consultant on watershed management techniques. post Mar. 2010 Consultant project management post Mar. 2010 Consultant on Water Resources Management post Mar. 2010 Consultant on Flood Forecasting & Warning techniques. post Mar. 2010 Training organized by PMO, study tour, farmers' training and workshops, see annex reve Page 26 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor aron Page 27 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor 1a Page 28 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor otaccent Page 29 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor ungarumlaut Page 30 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor l Page 31 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor i Page 32 Commencement Date Contract Value Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Contractor fl Page 33 fi Page 34 f Page 35 reve Page 36 aron Page 37 1a Page 38 otaccent Page 39 ungarumlaut Page 40 571.6 389.5 12.0 12.0 90 : fffl Page 41 571.6 389.5 12.0 12.0 90 : fffi Page 42 l Page 43 i Page 44 571.6 389.5 12.0 12.0 90 : ffff Page 45 eve Page 46 ron Page 47 a Page 48 taccent Page 49 ngarumlaut Page 50 efl Page 51 efi Page 52 effl Page 53 effi Page 54 eff Page 55 ebreve Page 56 ecaron Page 57 e\1a Page 58 edotaccent Page 59 ehungarumlaut Page 60 nfl Page 61 nfi Page 62 nffl Page 63 nffi Page 64 nff Page 65 nbreve Page 66 ncaron Page 67 n\1a Page 68 ndotaccent Page 69 nhungarumlaut Page 70 l Page 71 i Page 72 fl Page 73 fi Page 74 f Page 75 reve Page 76 aron Page 77 1a Page 78 otaccent Page 79 ungarumlaut Page 80 ccentfl Page 81 ccentfi Page 82 ccentffl Page 83 ccentffi Page 84 ccentff Page 85 ccentbreve Page 86 ccentcaron Page 87 ccent\1a Page 88 ccentdotaccent Page 89 ccenthungarumlaut Page 90 arumlautfl Page 91 arumlautfi Page 92 arumlautffl Page 93 arumlautffi Page 94 arumlautff Page 95 arumlautbreve Page 96 arumlautcaron Page 97 arumlaut\1a Page 98 arumlautdotaccent Page 99 arumlauthungarumlaut Page 100 fl Page 101 fi Page 102 ffl Page 103 ffi Page 104 ff Page 105 breve Page 106 caron Page 107 \1a Page 108 dotaccent Page 109 hungarumlaut Page 110 fl Page 111 fi Page 112 ffl Page 113 ffi Page 114 ff Page 115 breve Page 116 caron Page 117 \1a Page 118 dotaccent Page 119 hungarumlaut Page 120 lfl Page 121 lfi Page 122 lffl Page 123 lffi Page 124 lff Page 125 lbreve Page 126 lcaron Page 127 l\1a Page 128 ldotaccent Page 129 lhungarumlaut Page 130 ifl Page 131 ifi Page 132 iffl Page 133 iffi Page 134 iff Page 135 ibreve Page 136 icaron Page 137 i\1a Page 138 idotaccent Page 139 ihungarumlaut Page 140 fl Page 141 fi Page 142 ffl Page 143 ffi Page 144 ff Page 145 breve Page 146 caron Page 147 \1a Page 148 dotaccent Page 149 hungarumlaut Page 150 evefl Page 151 evefi Page 152 eveffl Page 153 eveffi Page 154 eveff Page 155 evebreve Page 156 evecaron Page 157 eve\1a Page 158 evedotaccent Page 159 evehungarumlaut Page 160 ronfl Page 161 ronfi Page 162 ronffl Page 163 ronffi Page 164 ronff Page 165 ronbreve Page 166 roncaron Page 167 ron\1a Page 168 rondotaccent Page 169 ronhungarumlaut Page 170 afl Page 171 afi Page 172 affl Page 173 affi Page 174 aff Page 175 abreve Page 176 acaron Page 177 a\1a Page 178 adotaccent Page 179 ahungarumlaut Page 180 taccentfl Page 181 taccentfi Page 182 taccentffl Page 183 taccentffi Page 184 taccentff Page 185 taccentbreve Page 186 taccentcaron Page 187 taccent\1a Page 188 taccentdotaccent Page 189 taccenthungarumlaut Page 190 ngarumlautfl Page 191 ngarumlautfi Page 192 ngarumlautffl Page 193 ngarumlautffi Page 194 ngarumlautff Page 195 ngarumlautbreve Page 196 ngarumlautcaron Page 197 ngarumlaut\1a Page 198 ngarumlautdotaccent Page 199 ngarumlauthungarumlaut Page 200 lfl Page 201 lfi Page 202 lffl Page 203 lffi Page 204 lff Page 205 lbreve Page 206 lcaron Page 207 l\1a Page 208 ldotaccent Page 209 lhungarumlaut Page 210 ifl Page 211 ifi Page 212 iffl Page 213 iffi Page 214 iff Page 215 ibreve Page 216 icaron Page 217 i\1a Page 218 idotaccent Page 219 ihungarumlaut Page 220 flfl Page 221 flfi Page 222 flffl Page 223 flffi Page 224 flff Page 225 flbreve Page 226 flcaron Page 227 fl\1a Page 228 fldotaccent Page 229 flhungarumlaut Page 230 fifl Page 231 fifi Page 232 fiffl Page 233 fiffi Page 234 fiff Page 235 fibreve Page 236 ficaron Page 237 fi\1a Page 238 fidotaccent Page 239 fihungarumlaut Page 240 ffl Page 241 ffi Page 242 fffl Page 243 fffi Page 244 fff Page 245 fbreve Page 246 fcaron Page 247 f\1a Page 248 fdotaccent Page 249 fhungarumlaut Page 250 revefl Page 251 revefi Page 252 reveffl Page 253 reveffi Page 254 reveff Page 255 revebreve Page 256 revecaron Page 257 reve\1a Page 258 revedotaccent Page 259 revehungarumlaut Page 260 aronfl Page 261 aronfi Page 262 aronffl Page 263 aronffi Page 264 aronff Page 265 aronbreve Page 266 aroncaron Page 267 aron\1a Page 268 arondotaccent Page 269 aronhungarumlaut Page 270 1afl Page 271 1afi Page 272 1affl Page 273 1affi Page 274 1aff Page 275 1abreve Page 276 1acaron Page 277 1a\1a Page 278 1adotaccent Page 279 1ahungarumlaut Page 280 otaccentfl Page 281 otaccentfi Page 282 otaccentffl Page 283 otaccentffi Page 284 otaccentff Page 285 otaccentbreve Page 286 otaccentcaron Page 287 otaccent\1a Page 288 otaccentdotaccent Page 289 otaccenthungarumlaut Page 290 ungarumlautfl Page 291 ungarumlautfi Page 292 ungarumlautffl Page 293 ungarumlautffi Page 294 ungarumlautff Page 295 ungarumlautbreve Page 296 ungarumlautcaron Page 297 ungarumlaut\1a Page 298 ungarumlautdotaccent Page 299 ungarumlauthungarumlaut Page 300 lfl Page 301 lfi Page 302 lffl Page 303 lffi Page 304 lff Page 305 lbreve Page 306 lcaron Page 307 l\1a Page 308 ldotaccent Page 309 lhungarumlaut Page 310 ifl Page 311 ifi Page 312 iffl Page 313 iffi Page 314 iff Page 315 ibreve Page 316 icaron Page 317 i\1a Page 318 idotaccent Page 319 ihungarumlaut Page 320 flfl

Основные сведения
Тип документа Procurement Plan
Дата принятия
Страна Китай
Источник Всемирный банк