43365 Dated February 6, 2008 KYRGYZ REPUBLIC: Bishkek and Osh Urban Infrastructure Project PROCUREMENT PLAN - GOODS AND WORKS for 2008-2009 Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Signature Completion Review No: bidding docs Awd. Roads Archa-Beshik, Ak-Orgo, Ak-Ordo W NCB 616,000 04/04/2008 03/28/2008 04/04/2008 05/19/2008 06/27/2008 07/11/2008 07/31/2008 07/31/2009 PR Kalys-Ordo, Dordoi W NCB 490,286 04/11/2008 04/04/2008 04/11/2008 05/26/2008 07/04/2008 n/a 08/04/2008 08/04/2009 Kasym, Jenish, Tynchtyk W NCB 389,714 04/18/2008 04/11/2008 04/18/2008 06/02/2008 07/25/2008 n/a 08/15/2008 08/15/2009 Kara-Jigach, Altyn-Ordo, Jany-Kyrgyzstan W NCB 905,143 04/25/2008 04/11/2008 04/25/2008 06/09/2008 07/29/2008 n/a 08/28/2008 08/28/2009 Water Supply Rehabilitation of pumping station #5 W NCB 600,000 04/11/2008 04/04/2008 04/11/2008 05/26/2008 06/30/2008 n/a 07/30/2008 07/30/2009 Construction of Dostuk water main W NCB 424,514 04/04/2008 04/01/2008 04/04/2008 05/19/2008 06/24/2008 n/a 07/24/2008 07/24/2009 Construction of Dostuk distribution network W NCB 04/04/2008 04/01/2008 04/04/2008 05/19/2008 06/24/2008 n/a 07/24/2008 07/24/2009 340,466 Construction of Kalinin water main and W NCB 04/18/2008 04/11/2008 04/18/2008 06/02/2008 07/14/2008 n/a 08/13/2008 08/13/2009 water tanks in Kalinin (2*200m3) 454,629 Construction of Kalinin distribution network W NCB 04/18/2008 04/11/2008 04/18/2008 06/02/2008 07/14/2008 n/a 08/13/2008 08/13/2009 492,039 Rehabilitation of pumping station #4 and W NCB 04/25/2008 04/11/2008 04/25/2008 06/09/2008 07/18/2008 n/a 08/15/2008 08/15/2009 construction of Turan watermain and Turan distribution network 238,795 Reconstruction of Kontrreservuar W NCB 04/25/2008 04/11/2008 04/25/2008 06/09/2008 07/18/2008 n/a 08/18/2008 08/18/2009 headworks 285,714 Pilot irrigation project in Kara-Jigach W NCB 428,571 04/11/2008 04/04/2008 04/11/2008 05/26/2008 07/07/2008 n/a 08/06/2008 08/06/2009 Equipment for ARIS and MPUs 04/20/2008 04/13/2008 04/20/2008 35 Computer, Office Equipment and Furniture G Shopping 50,200 10/05/08 24/05/08 n/a 07/06/08 07/07/08 36 Vehicle G Shopping 14,000 04/20/2008 04/13/2008 04/20/2008 10/05/08 24/05/08 n/a 07/06/08 06/08/08 TOTAL GOODS AND WORKS 5,730,072 Dated January 6, 2008 KYRGYZ REPUBLIC: Bishkek and Osh Urban Infrastructure Project PROCUREMENT PLAN - CONSULTANT SERVICES for 2008-2009 Bid Bid Ref Type Method Total Bid Exp. Finaliz. Short Request RFP Invitat. Technical Eval.Of Final Receipt Award of Contract Prior Review No: Est. (US$) Of Of List For Issued To Sel. Proposal Technical Eval. Of Draft Contract/ Completion Interest TOR Of Cons. Proposals Firm Opening Proposal Report Contract Signature ARIS Staff (Individuals) 02.07.2008 CS INDV 118,100 02/06/08 01/04/08 22/06/08 n/a n/a n/a n/a n/a 02/07/08 12/07/08 15/07/09 15.07.2008 MPU Bishkek Staff 02.07.2008 CS INDV 37,200 02/06/08 01/04/08 22/06/08 n/a n/a n/a n/a n/a 02/07/08 12/07/08 15/07/09 15.07.2008 MPU Osh Staff 02.07.2008 CS INDV 22,800 02/06/08 01/04/08 22/06/08 n/a n/a n/a n/a n/a 02/07/08 12/07/08 15/07/09 15.07.2008 Preparation of detailed designs (Multiple contracts depending on 15.07.2008 CS CQ 155,000 29/05/08 15/05/08 18/06/08 06/18/08 06/25/08 06/25/08 n/a n/a 15/07/08 25/07/08 31/01/09 the proposals of Municipalities) 4.08.2008 Audit 14.12.2008 CS CQ 6,300 03/11/08 20/10/08 17/11/08 11/17/08 11/24/08 11/24/08 n/a n/a 14/12/08 24/12/08 30/04/09 30/12/2008 Total 339,400
Группа Всемирного банка · Procurement Plan
Kyrgyz Republic - Bishkek and Osh Urban Infrastructure Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк