3 45783 of 1 etaD ot derrucni 0 0 0 0 0 0 0 0 erutidnepxE 17 tcartnoC fo noitelpmoC fo etaD 16 NOV'2009 AUG'2008 MAY'2008 DEC'2008 JAN'2010 JAN'2010 JAN'2010 APR'2009 .ON ecnerefeR knaB dlroW 15 & ZIP & & LTD, CHINA INDIA INDIA Contractor/ 14 INDIA INDIA INDIA GUPTA, DEEPAK, of Code SIEMENS & INDIA OF GERMANY BHEL INDIA LTD, OF BHEL, ABB, ABB, ABB, Nationality JV L&T JV Name AG, SIEMENS XIANGFAN, APAR & No. 2317 13 2318 2342 2374 2426 2428 2430 Contract C-46002-S656- 1/2316, C-46014-L679-1/ 2408 C-13802-L179-1/ C-13804-S119A-1/ C-33021-S119A-1/ C-33022-S119A-1/ C-33023-S919A-1/ C-33025-L075-1/ 2449 (Date/ 12 02.03.07 24.12.07 29.01.08 29.01.08 29.01.08 21.02.08 Contract Signed Value/ Currency) 25.04.07 02.07.07 to ** ** ** No (Date) 11 '(1st Stage) Stage) NA 20.04.06 Stage) 15.02.07 15.12.06 19.02.07 N.A. N.A. 11.10.07 11.10.07 11.10.07 N.A. Bank's Objection Contract Award (2nd (2nd 25.09.2008) Award (Date/ 10 '(1st Stage) Stage) ON 22.02.06 Stage) 31.01.07 07.12.06 25.01.07 09.08.07 22.08.07 22.08.07 22.08.07 31.10.07 (2nd (2nd (AS Contract decided Value/ Currency) 26.03.07 22.05.07 on LOAN 9 Stage) Stage) Stage) 08.12.05 15.01.07 29.11.06 17.01.07 (2nd 26.10.06 13.06.07 13.06.07 13.06.07 20.06.07 Opened (Date) '(1st (2nd 22.12.06 20.02.07 Bids in PSDP-IV for (Date) Bid 8 Stage) Stage) Stage) 30.09.05 15.12.06 First 18.12.06 01.08.06 16.03.07 16.03.07 16.03.07 18.04.07 '(1st (2nd 30.10.06 Adjustment (2nd UNDER Invitation 15.05.06 21.11.06 Bank. to ** ** ** No PLAN 7 World by 21.09.05 N.A. N.A. 09.02.07 09.02.07 09.02.07 N.A. Bank's Objection Bidding Documents (Date) ** approved 6 as Bid 09.09.05 02.05.06 N.A. 18.12.06 18.12.06 18.12.06 15.04.07 Preparation of Document (Date) PROCUREMENT of documents 5 ICB (S+I) ICB (S) ICB (S) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S) Method ICB/NCB procurement review 0.60 1.15 prior $) (in 4 335.90 10.73 21.98 19.26 6.15 on 22.30 Estimated Cost Million (1$=Rs.40.5) based & Ballia PKG- kV T1 ready BALIA at ROD T/L (GEB), Sub- 400 are Tower AT LONG (FOR Sub-station and ZERDA SUBSTATIONS (New) and Aurangabad (for awarded 3 Package SCHEME (SET-B) (New) Parli Sub-stations (SET-D) yet review Works/Goods PKG-C1 PACKAGE 400kV kV Not- of Pune A Sholapur C ALONGWITH of (MSEB) Package post Terminal COMPOSITE GWALIOR, KANKROLI 400 STATIONS & PACKAGE-B are NYA Bhiwadi KN KV SYSTEM (MBD) Package-U Description HVDC and 210 INSULATORS INSULATOR A1) 400 AGRA EXTENSION SCHEME-II SYSTEM 400/220kV PACKAGE- 400/220kV station Extension (MSEB), Kolhapur PACKAGE- SCHEME-II Conductor T2) BIPOLE TRANSMISSION XXX XXI XXII documents Applicable, STRENGTHENING NO.- NO.- NO.- REGION REGION These Not- HVDC ** NA 2 CONVERTOR WEST- No. MW BHIWADI DOCUMENT DOCUMENT DOCUMENT Package 2500 BIPOLE & C-46002-S656-1 C-46014-L679-1 NORTH CORRIDOR C-13802-L179-1 C-13804-S119A-1 WESTERN STRENGTHENING BID C-33021-S119A-1 C-33022-S1919A-1 C-33023-S119A-1 WESTERN STRENGTHENING BID C-33025-L075-1 BID 1 3 4 1 1.1 1.2 2 2.1 2.2 3.1 3.2 3.3 4.1 S. No. 3 of 2 etaD ot derrucni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 erutidnepxE 17 tcartnoC fo noitelpmoC fo etaD 16 FEB'2009 FEB'2009 MAY'2009 MAY'2009 MAY'2009 AUG'2009 AUG'2009 AUG'2009 MAY'2009 AUG'2009 JAN'2010 NOV'2009 OCT'2009 JULY'2009 .ON ecnerefeR knaB dlroW 15 ZIP & & CHINA CHINA INDIA INDIA INDIA LTD., INDIA ASTER, A INDIA ASTER, A INDIA Contractor/ 14 INDIA INDIA TATA TELE, of Code SPIC-SMO, & INDI SPIC-SMO, & INDI INDIA of INDIA of KALPATARU of WSI, KEC, JV Nationality JV INDIA POWER, JV INDIA BHEL, CROMPTON PROJECTS ASTER SIEMENS, Name NANJING, NANJING, STERLITE, STERLITE, STERLITE, GREAVES No. 13 1/2422 2379 Contract C-46201-L195A- C-33025-L079-1/ 2440 C-33026-L079-1/ 2442 C-33006-L195A-1/ 2348 C-33007-L195A-1/ 2350 C-33008-L195A-1/ 2350 C-33006-L175-1/ 2446 C-33007-L175-1/ 2447 C-33008-L175-1/ 2448 C-33006-L179-1/ 2438 C-33007-L179-1/ 2439 C-33009-S117- 1/2565 C-33009-S119A-1/ 2444 C-46202-L195A-1/ (Date/ 12 20.02.08 20.02.08 14.05.07 15.05.07 14.05.07 20.02.08 20.02.08 20.02.08 19.02.08 19.02.08 04.07.08 20.02.08 18.01.08 10.07.07 Contract Signed Value/ Currency) to ** ** ** No (Date) 11 NA NA N.A. N.A. 05.04.07 05.04.07 05.04.07 04.01.08 04.01.08 04.01.08 23.10.07 23.10.07 22.05.08 N.A. Bank's Objection Contract Award Award (Date/ 10 26.12.07 26.12.07 14.02.07 14.02.07 14.02.07 31.10.07 31.10.07 31.10.07 21.09.07 21.09.07 06.05.08 22.08.07 02.08.07 27.02.07 Contract decided Value/ Currency) on 9 15.06.07 15.06.07 02.02.07 02.02.07 02.02.07 29.05.07 29.05.07 29.05.07 31.05.07 31.05.07 07.03.08 29.05.07 05.02.07 05.02.07 Opened (Date) Bids (Date) 8 17.04.07 17.04.07 28.10.06 28.10.06 28.10.06 11.04.07 11.04.07 11.04.07 11.04.07 11.04.07 08.06.07 11.04.07 22.11.06 22.11.06 Invitation Bank. to ** ** ** No 7 World NA NA by N.A. N.A. 11.01.07 11.01.07 11.01.07 28.03.07 28.03.07 28.03.07 28.03.07 28.03.07 15.02.08(*) N.A. Bank's Objection Bidding Documents (Date) approved 6 as Bid 13.04.07 15.04.07 29.11.06 29.11.06 29.11.06 21.12.06 21.12.06 21.12.06 21.12.06 21.12.06 05.06.07 27.11.06 28.04.06 28.04.06 Preparation of Document (Date) of I) I) documents 5 ICB (S) ICB (S) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S) ICB (S) ICB (S) ICB (S) ICB (S) + + ICB ICB ICB (S+I) ICB (S+I) Method ICB/NCB (S (S procurement review prior $) (in 4 1.96 1.33 22.63 20.00 18.43 18.10 18.00 17.33 2.29 3.88 7.51 8.86 on 14.04 21.01 Estimated Cost Million (1$=Rs.40.5) based - - & - - kV T1) T2) line line -234 W1) W2) W3) W1) W2 Korba TL TL ready line 400 kV (MPSEB) are Tower Tower Tower Tower Tower 2 Tower Tower 1 and W1 W (for (for (for 400 Damoh, Bhopal A Raigarh- A2 awarded 3 (for (for (for (for Rourkela- Bina, kV STRENGTHENING yet Works/Goods W3- Package review 400kV kV Not- of Korba-Birsinghpur Birsinghpur-Damoh Damoh-Bhopal Package X1 Package X2 Package X3 400 Ranchi Rourkela post Package Package Package- Package- Package Package of D/C D/C D/C 400 and D/C PACKAGE- D/C PACKAGE- Reactor are NYA kV kms. kV kms. kV Package (MBD) (MBD) PACKAGE-Y2 CORRIDOR KV kms KV kms Description Insulator PACKAGE-V1 Insulator PACKAGE-V2 400 227 400 254 400 kms. Conductor PACKAGE- Conductor PACKAGE- Conductor PACKAGE- Insulator PACKAGE-Y1 Insulator W3) Shunt Extension Gwalior, (NTPC) Sub-stations 400 170 400 220 XXIII XXIV XXV XXXIII XXXIV I documents Applicable, NO.- NO.- NO.- NO.- NO.- NO.- These Not- TRANSMISSION ** NA 2 No. WEST- DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT Package C-33025-L079-1 C-33026-L079-1 BID C-33006-L195A-1 C-33007-L195A-1 C-33008-L195A-1 BID C-33006-L175-1 C-33007-L175-1 C-33008-L175-1 BID C-33006-L179-1 C-33007-L179-1 BID C-33009-S117-1 BID C-33009-S119A-1 EAST SCHEME BID C-46201-L195A-1 C-46202-L195A-1 1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 5 5.1 5.2 S. No. 3 of 3 etaD ot derrucni 0 0 0 0 0 0 0 0 0 erutidnepxE 17 tcartnoC Documents. fo noitelpmoC 09 fo etaD 16 JULY'2009 JAN'2009 NOV'2009 SEPT'08 SEPT'08 NOV'08 NOV'08 AUG'2009 OCT' Bidding to .ON ecnerefeR knaB dlroW 15 ction Obje ZIP No & & INDIA MAN India LTD, TELE, BIRLA, INDIA Unitech, ASTER, CHINA Contractor/ 14 B&C TATA & TATA & India India Bank's of Code of INDIA INDIA T&D, of Abengoa, & of of JV KEC, JV of JV GURGAON Nationality ICOMM ADITYA Projects Structures, JV Spain date Name AREVA Projects NANJING, SIEMENS the the No. 13 than 2381 2334 2336 2452 Contract earlier C-46203-L195A-1/ C-46201-L179- 1/2451 C-46204-S119A-1/ 2436 C-46801-L195A-1/ 2352 C-46802-L195A-1/ 2354 C-46803-L195A-1/ C-46804-L195A-1/ C-46801-L179-1/ 2616 C-46806-S119A-1/ is (Date/ 12 invitation 10.07.07 22.02.08 18.02.08 15.05.07 15.05.07 30.03.07 30.03.07 12.08.08 26.02.08 bid Contract Signed Value/ Currency) of to No date (Date) 11 NA NA NA NA NA NA NA NA NA the Bank's Objection Contract Award Therefore, Award (Date/ 10 27.02.07 02.08.07 22.08.07 27.02.07 27.02.07 27.02.07 27.02.07 24.06.08 26.09.07 Review". Contract decided Value/ Currency) "Prior on 9 05.02.07 14.06.07 25.05.07 07.02.07 07.02.07 09.02.07 09.02.07 27.02.08 24.05.07 under Opened (Date) Bids covered (Date) 8 be to 22.11.06 27.04.07 06.03.07 21.11.06 21.11.06 24.11.06 24.11.06 28.05.07 07.03.07 Invitation Bank. ecidedd to ** ** ** No 7 NA NA NA NA NA NA wasit World by N.A. N.A. N.A. Bank's Objection Bidding Documents (Date) approved 6 subsequently, as Bid 28.04.06 26.04.07 05.03.07 17.11.06 17.11.06 21.11.06 21.11.06 22.05.07 05.03.07 Preparation of Document (Date) of I) I) However, documents 5 ICB (S+I) ICB (S) + + ICB (S ICB (S+I) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S) ICB Method ICB/NCB (S procurement review Review". prior $) (in 4 "Post 19.77 5.65 15.13 19.61 16.33 14.12 18.92 3.17 on 19.57 Estimated Cost Million (1$=Rs.40.5) Bank's based - kV kV TL TL A3 A4 400 & TL World ready 400 400 Tower and 1A Baripada- are A2 the Tower Baripada Siliguri Raipur- Sub-stations and A3 (for Ranchi, SCHEME-I Jamshedpur- Mendhasal- Mendhasal- PACKAGE- PACKAGE- (for Durgapur, kV kV awarded under 3 Raipur yet kms 400 400 of review Works/Goods 400kV kV kms of Raigarh of Durgapur PACKAGE- Jamshedpur PACKAGE- Baripada Baripada A4) 400kV covered Not- 400 & of Mendhasal post D/C PACKAGE- Package-C A3) Sub-stations & D/C kms D/C kms D/C 127.5- D/C 127.5- Package-D A3 kV S/Stns. was are NYA KV kms KV 181- KV 135- KV KV Jamshedpur, 400 renovation Description 400 225 Insulator A1,A2 Extensions Rourkela, Raigarh 400 TL 400 TL 400 (Part-I) 400 (Part-II) Insulator A1,A2, Extensions kV and and Purnea III V STRENGTHENING I II VI VII package the documents Applicable, NO.- NO.- NO.- NO.- NO.- NO.- These Not- 2 REGION invitation ** NA No. bid of DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT time Package C-46203-L195A-1 BID C-46201-L179-1 BID C-46204-S119A-1 EASTERN BID C-46801-L195A-1 C-46802-L195A-1 BID C-46803-L195A-1 C-46804-L195A-1 BID C-46801-L179-1 BID C-46806-S119A-1 the 1 5.3 5.4 5.5 6 6.1 6.2 6.3 6.4 6.5 6.6 At S. No. (*)
Группа Всемирного банка · Procurement Plan
India - Fourth Power System Development Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Индия
Источник
Всемирный банк