Группа Всемирного банка · Staff Appraisal Report

Tunisia - Third Water Supply Project

Тунис Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Report No. 369a-TUN Appraisal of the FILE COPY Third Water-Supply project of Tunisia May 6, 1974 EMENA Projects Department Not for Public Use Document of the International Bank for Reconstruction and Development International Development Association This report was prepared for offiial use onfly by the 8ank Croup. It may not be putbhshed. quoted or cited without Bank Group authorization. The Bank Croup dues not> atrept responsibility for the acc~uracy or completeress of the report. CURRENCY EQUIVALENTS Currency Unit = Dinar = 1000 millimes US$1 = D 0.435 D 1 = US$ 2.3 D 1 million = US$ 2.3 million ABBREVIATIONS 1 kilometer (km) = 0.621 miles 1 millimeter (mm) = 0.03937 1 liter (1) = 0.264 US gallons 1 liter per capita per day (l/cd) 1 cubic meter (m3) = 264 US gallons 1 liter per second (lsec) = 22,800 US gallons per day 1 cubic meter per second (mW/sec) = 22.8 million US gallons per day ACRONYMS SIDA Swedish International Development Authority SONEDE Soci

Основные сведения
Тип документа Staff Appraisal Report
Дата принятия
Страна Тунис
Источник Всемирный банк