Report No. 423a-CM FILE COPY Appraisal of a Second Railway Project Cameroon June 13, 1974 Western Africa Projects Department Ports, Railways, & Aviation Division Not for Public Use M Document of the International Bank for Reconstruction and Development International Development Association This report was prepared for officiai use only by the Bank Croup. it may not be published, quoted or cited without Bank Group authorization. The Bank Croup does not accept responsibility for the accuracy or completeness of the report. Carrency Equivalents Currency Unit - CFA franc (CFAF) us$1.00 = CFA! 250 CFA? 1 million = Us$j, Oo. FisCal Year: July 1 - June 30 sy sm of Weights and Measures: Metrio Nbtric BritishAUS eouivalents 1 meter (r) = 3.28 feet (ft) 1 kilojuter (lm) = 0.62 mile (mi) 1 kilogram (kg) 2.2 pounds (lb) i metric ton (m ton) - 2,24 pounds (lb) Abbreviations and A
Группа Всемирного банка · Staff Appraisal Report
Cameroon - Second Railway Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Staff Appraisal Report
Страна
Камерун
Источник
Всемирный банк