Page 1 1 2 3 4 6 7 8 9 10 11 Ref. No. Description Type Contract No. No. of packages Proc. Method Review by Bank Prior/Post Preperation BD/RFP date Expected Bid-Open. Date/Proposal Submission Date Conctract signed date Contract completion date WORKS (INCLUDING SUPPLY & INSTALLATION) 1 Rehabilitation of Water Network Works MUG-W1 1 NCB POST July 2007 September 2007 November 2007 September 2008 2 Construction of Sewerage Network and Pumping Stations (Package 1) Works MUG-W2 1 NCB POST July 2007 October 2007 December 2007 October 2008 3 Construction of Sewerage Network and Pumping Stations (Package 2) Works MUG-W4 1 NCB POST August 2007 November 2007 January 2008 November 2008 4 Construction of Wastewater Treatment Plant and Discharge Works (S&I) MUG-W3 1 ICB PRIOR September 2007 December 2007 February 2008 December 2009 Works Sub-Total GOODS 1 Procurement of equipment, hardware, software for Institutional Strengthening, water network, sewerage network and treatment plant G MUG-G1 multiple ICB/NCB/ Shopping PRIOR / POST October 2007 August 2009 Goods Sub-Total CONSULTANT'S SERVICES AND TRAINING 1 Preparation of EIA Report for WWTP C MUG-C1 1 CQ POST April 2007 September 2007 2 Preparation of Conceptual Design for Treatment Plant, Review of the Sewerage Network Design and Preparation of Bidding Documents and Construction Supervision C MUG-C2 1 QCBS PRIOR December 2006 February 2007 May 2007 December 2009 3 CANCELLED C MUG-C3 multiple 4 Consultancy Services for Project Implementation Management and Training C MUG-C4 / 1 multiple Individual POST June 2007 December 2009 Consultancy Services for Project Implementation Management for Selection of MUG-C2 Consultant C MUG-C4 / 2 1 SSS PRIOR 5 CANCELLED C MUG-C5 multiple Consultant Sub-Total TOTAL a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. b) The works contracts to cost less than Euro 7,5 million each may be procured through NCB. Bank
Группа Всемирного банка · Procurement Plan
Turkey - Municipal Services Project : procurement plan for Mugla
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Турция
Источник
Всемирный банк