Page 1 Environmental Management Plans for Central Heating Network Project for Gas Facilities of Yingkou Economic Technical Development Zone Loaded from World Bank Design Unit Unit: Huayuan Thermal Heating Company ltd. Yingkou Economic Technical Development Zone Aug 2007 E1714 V2 Page 2 CATALOG 1 GENERAL SITUATION OF THE PROJECT..................................................................................3 1.1 G ENERAL B ACKGROUND .................................................................................................................3 1.2 N AME , N ATURE AND C ONSTRUCTION S ITE OF THE P ROJECT ...........................................................4 1.3 C ONTENTS OF THE PROJECT .............................................................................................................4 2 DESIGN BASIS....................................................................................................................................5 2.1 P ERFORMANCE CRITERIA .................................................................................................................5 2.1.1 Environmental quality standard............................................................................. 5 2.1.2 Discharge Standard for Pollutants......................................................................... 5 2.2 D ESIGN B ASIS ..................................................................................................................................6 3 POLLUTANT DISCHARGE..........................................................................................................6 3.1 W ASTE W ATER .................................................................................................................................6 3.2 S OLID WASTE ...................................................................................................................................6 3.3 P OLLUTANT REDUCTION BY THE NEWER FOR THE REPLACEMENT OF THE OLD ONE ..........................6 4 ANALYSIS OF THE ENVIRONMENTAL IMPACT.......................................................................7 4.1 S TATUS Q UO OF E NVIRONMENT Q UALITY .......................................................................................7 4.2 E NVIRONMENTAL I MPACT A NALYSIS IN O PERATION P ERIOD ...........................................................7 4.3 E NVIRONMENTAL I MPACT A NALYSIS IN C ONSTRUCTION P ERIOD .....................................................8 4.3.1Analysis of the Impact on the Air Environment..................................................... 8 4.3.2Analysis of the Impact on the Water Environment................................................. 8 4.3.3 Analysis of solid waste environmental impact...................................................... 8 4.3.4 Analysis of Acoustic environmental impact.......................................................... 8 4.3.5 Analysis of traffic impact...................................................................................... 8 4.3.6 Analysis of the impact on Ecological Environment.............................................. 9 5ENVIRONMENT IMPACT MITIGATION MEASURES................................................................9 6 ORGANIZATION ARRANGEMENT.............................................................................................15 7 MONITORING PLAN AND ORGANIZATION ARRANGEMENT............................................16 8 REPORTING SYSTEM....................................................................................................................19 8.1 M ONITORING R EPORT ....................................................................................................................19 8.1.1Category and Content of Monitoring Report........................................................ 19 8.1.2 Submitting Time and Monitoring Report Accepter............................................. 19 8.1.3 Feedback Requirement of Monitoring Report..................................................... 19 8.2 R ECORDS AND EMP E XECUTION A NNALS .....................................................................................19 8.2.1 Record system..................................................................................................... 19 Page 3 8.2.2EMP Execution Reports....................................................................................... 20 9TRAINING PLAN ..............................................................................................................................20 10 PUBLIC PARTICIPATION PLAN ................................................................................................20 10.1 P UBLIC PARTICIPATION PLAN ........................................................................................................21 10.2 C HANNELS FOR COMPLAINS OF DISSENSION ................................................................................21 11 EMP...............................................................................................................................................22 1 General Situation of the Project 1.1 General Background Yingkou Economic Technical Development Zone ( YETDZ for short) is a state- level economic technical development area, set up in 21 st Oct. 1992, approved by state government, and belonged to Yingkou City, Liaoning Province, with a total square of 258.8km 2 . YETDZ has a building area of 9,760,000m 2 , and most of the buildings are not energy saving building. In winter, there is about 5,431,100m 2 needs heating. At the present time, most buildings in YETDZ are heated by middle-sized and small boiler rooms. These boilers are low in efficiency, and have much more chimneys. The dust removal equipments of these boilers are mostly ceramics multi-tube dust cleaners, which are low in efficiency, energy waste and without desulphurization equipment. Because of the interval heating of boiler rooms, energy is greatly wasted. All these could cause great pollution to city environment. Due to the increased quantity to be conveyed of coal, ash, and dregs, it increases city traffic pressure and pollution. What's more, the coal, ash and dregs take much building site and green area, which greatly affects the city view and environmental quality of YETDZ . Due to the problems mentioned above, it is inevitable to adopt central heating. After the carrying out of the project, central heating will greatly enhance heating efficiency, save energy and solve the problem that low-quality water would erode pipes. Meanwhile, the discharge amount of smoke dust, SO 2, NO X , CO 2 will be decreased, as well as the quantity to be conveyed of coal slag. Traffic pressure and exhausted gas will be also lightened. All these will better the environmental condition of Yingkou City. Page 4 1.2 Name, Nature and Construction Site of the Project Name of the project: Central Heating Network Project in Yingkou Economic Technical Development Zone Loaned from Word Bank , Construction site: Yingkou Economic Technical Development Zone Project investment & Construction time: 370,438,000 181,063,000 loaned from World Bank, and the rest 51.12% from self-financing Construction duration of the project: Aug. 2007

Основные сведения
Тип документа Environmental Assessment
Дата принятия
Страна Китай
Источник Всемирный банк