Page 1 EAREP I Project -Progress followup on procurement steps Indicate below the dates of submission/resubmission to IDA and date of IDA response at each step Goods: Proc Item To IDA IDA response To IDA IDA response 22-Aug-06 07-Dec-06 19-Mar-07 21-Dec-06 26-Apr-07 21-Jun-07 19-Jul-07 29-Jul-07 16-May-07 06-Jul-07 28-Mar-07 20-Apr-07 19-Oct-07 31-May-07 07-Jun-07 16-May-07 19-Jul-07 23-Aug-07 29-Aug-07 06-Sep-07 09-Sep-07 19-Sep-07 16-Sep-07 27-Sep-07 Medium and low voltage Poles (concrete) 22-Aug-06 30-Aug-06 04-Apr-07 18-Apr-07 19-Sep-06 22-Sep-06 02-Oct-06 14-Oct-06 13-Oct-06 15-Oct-06 29-Nov-06 29-Nov-06 15-May-07 22-May-07 30-Aug-07 14-Sep-07 16-Sep-07 01-Oct-07 16-Oct-07 27-Oct-07 Medium voltage Poles (wooden) 28-Dec-06 25-Jan-07 19-May-07 07-Aug-07 04-Oct-07 17-Jan-07 13-Feb-07 Distribution transformers 6 7 8 Insulators Conductors 17 substation Overhead line Accessories 5 MV and LV switch gear 1 2 3 4 3 4 8 Bid Preparation: 1 2 BER: Page 2 26-Mar-07 07-Apr-07 16-May-07 18-Jul-07 19-Jul-07 25-Jul-07 26-Jul-07 10-Aug-07 14-Aug-07 16-Aug-07 04-Oct-07 16-Oct-07 Vehicles 30-Apr-07 05-May-07 09-May-07 24-May-07 equipment 9 Page 3 Indicate below the dates of submission/resubmission to IDA and date of IDA response at each step Consultant Selection: EOI & RFP Short list selection Consultant selection To IDA IDA response To IDA IDA response To IDA 02-Apr-06 09-Apr-06 20-Oct-06 09-Dec-06 21-Dec-06 13-Dec-06 02-Apr-07 14-Aug-07 27-Sep-07 18-Oct-07 GIS Training 29-Sep-06 19-Oct-06 Study of income opportunities from electricity 09-May-06 02-Oct-06 10-Jun-06 09-Oct-06 29-Sep-06 20-Oct-06 Monitoring and Evaluation program 11-May-06 11-Aug-06 11-Sep-06 11-Sep-06 02-Feb-07 02-Feb-07 Second Base line (Pilot) servey 14-Sep-07 Supervision Consultant for High Voltage substation and distribution lines Improving project excution and commercial activities Strengthening technical planning ,design and Exectuion of Rural electrification Assessing the barriers to connection for poorer customers Base line and comparison survey related to the assessment of Hosehold's Barriers to connection and CFL Delivery mechanism(First Base line Survey) Study on Economic and Financial Analysis of UEAP's Program Page 4 Page 5 Consultant selection IDA response 03-May-07 19-Oct-07 Page 6 Page 7 Country/Organisation: Ethiopia / Electric Power Corporation Project/Programme: Project Ethiopia: Electricity Access (Rural) Expansion Project I Loan #: Contract Type Description* Selection Method Lumpsum or Time-Based Estimated Amount in US$ '000 Prior/Post Review Plan vs. Actual Prep & Submission by Ex Ag No- objection Date On-line UNDB Gateway Nat Press Lead-time before shortlist Submission Date No- objection Date Plan vs. Actual Invitation Date Submission/ Opening Date Submission Evaluation Report (T) No- objection Evaluation Report (T) Opening Financial Proposals Submission Eval Report (T) (F) No-objection Eval Report (T) (F) Plan vs. Actual Negotiations Submission Draft Contract No-objection Negotiations Contract Amount in US$ '000 Contract ward Contract Signature Plan vs. Actual Mobilization Advance Payment Commencement Date Final Report Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 1 - 1,5 wks Plan 2 wks 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks Plan Actual Actual Actual Actual List of Contracts Note: If Post-Review, No-objection Dates are not needed QCBS Lumpsum 300.00 Prior Plan 01-Apr-07 15-Apr-07 25-Apr-07 09-May-07 23-May-07 06-Jun-07 Plan 10-Jun-07 25-Jul-07 08-Aug-07 22-Aug-07 05-Sep-07 19-Sep-07 Plan 03-Oct-07 10-Oct-07 24-Oct-07 300.00 31-Oct-07 10-Nov-07 Plan 08-Dec-07 15-Dec-07 03-May-08 Actual Actual Actual Actual QCBS Lumpsum 200.00 Prior Plan 01-Apr-07 15-Apr-07 25-Apr-07 09-May-07 23-May-07 06-Jun-07 Plan 10-Jun-07 25-Jul-07 08-Aug-07 22-Aug-07 05-Sep-07 19-Sep-07 Plan 03-Oct-07 10-Oct-07 24-Oct-07 200.00 31-Oct-07 10-Nov-07 Plan 08-Dec-07 15-Dec-07 05-Apr-08 Actual Actual Actual Actual QCBS Lumpsum 200.00 Prior Plan 01-Apr-07 15-Apr-07 25-Apr-07 09-May-07 23-May-07 06-Jun-07 Plan 10-Jun-07 25-Jul-07 08-Aug-07 22-Aug-07 05-Sep-07 19-Sep-07 Plan 03-Oct-07 10-Oct-07 24-Oct-07 200.00 31-Oct-07 10-Nov-07 Plan 08-Dec-07 15-Dec-07 08-Mar-08 Actual Actual Actual Actual QCBS Lumpsum 150.00 Prior Plan 11-Dec-06 25-Dec-06 04-Jan-07 18-Jan-07 01-Feb-07 15-Feb-07 Plan 19-Feb-07 05-Apr-07 19-Apr-07 03-May-07 17-May-07 31-May-07 Plan 14-Jun-07 21-Jun-07 05-Jul-07 150.00 12-Jul-07 22-Jul-07 Plan 19-Aug-07 26-Aug-07 13-Jan-08 Actual Actual Actual Actual QCBS Lumpsum 100.00 Prior Plan 01-Apr-07 15-Apr-07 25-Apr-07 09-May-07 23-May-07 06-Jun-07 Plan 10-Jun-07 25-Jul-07 08-Aug-07 22-Aug-07 05-Sep-07 19-Sep-07 Plan 03-Oct-07 10-Oct-07 24-Oct-07 100.00 31-Oct-07 10-Nov-07 Plan 08-Dec-07 15-Dec-07 03-May-08 Actual Actual Actual Actual QCBS Lumpsum 250.00 Prior Plan 01-Apr-07 15-Apr-07 25-Apr-07 09-May-07 23-May-07 06-Jun-07 Plan 10-Jun-07 25-Jul-07 08-Aug-07 22-Aug-07 05-Sep-07 19-Sep-07 Plan 03-Oct-07 10-Oct-07 24-Oct-07 250.00 31-Oct-07 10-Nov-07 Plan 08-Dec-07 15-Dec-07 03-May-08 Actual Actual Actual Actual QCBS Lumpsum 300.00 Prior Plan 15-Aug-06 29-Aug-06 08-Sep-06 22-Sep-06 06-Oct-06 20-Oct-06 Plan 24-Oct-06 08-Dec-06 22-Dec-06 05-Jan-07 19-Jan-07 02-Feb-07 Plan 16-Feb-07 23-Feb-07 09-Mar-07 300.00 16-Mar-07 26-Mar-07 Plan 23-Apr-07 30-Apr-07 17-Sep-07 Actual Actual Actual Actual QCBS Lumpsum 100.00 Prior Plan 15-Apr-06 29-Apr-06 09-May-06 23-May-06 06-Jun-06 20-Jun-06 Plan 24-Jun-06 08-Aug-06 22-Aug-06 05-Sep-06 19-Sep-06 03-Oct-06 Plan 17-Oct-06 24-Oct-06 07-Nov-06 100.00 14-Nov-06 24-Nov-06 Plan 22-Dec-06 29-Dec-06 20-Apr-07 Actual Actual Actual Actual Supervision Engineer QCBS Time-Based 1,000.00 Prior Plan 26-Sep-06 10-Oct-06 20-Oct-06 03-Nov-06 10-Nov-06 17-Nov-06 Plan 21-Nov-06 05-Jan-07 19-Jan-07 24-Jan-07 31-Jan-07 07-Feb-07 Plan 21-Feb-07 28-Feb-07 07-Mar-07 1,000.00 14-Mar-07 24-Mar-07 Plan 03-Apr-07 10-Apr-07 09-Apr-10 Actual 01-Nov-07 08-Nov-07 1,000.00 15-Nov-07 25-Nov-07 Plan 05-Dec-07 12-Dec-07 11-Dec-10 Total Cost 2,600.00 Plan Plan 2,600.00 Plan Actual Actual Actual 233102.7778 705045 41589.49083 291126.4358 Strengthened learning dynamics Study on Economic and Financial Analysis of UEAP's Program Study on improved targeting of (tariff) subsidies Study to strengthen CFL delivery mechanisms Monitoring and Evaluation program Norm Duration of Proc Steps Strengthening technical planning, design and Execution of Rural Electrification Improving project excution and commercial activities Assessing the barriers to connection for poorer customers(EEA) Proposal Evaluation Technical (T) & Financial (F) for projects approved before May Negotiations Contract Finalization Contract Implementation Request for Expression of Interest (when required) Preparation Request for Proposals Short List Consultant Proposals Page 8 Final Cost 300,000.00 200,000.00 200,000.00 150,000.00 100,000.00 250,000.00 300,000.00 100,000.00 1,000,000.00 2,600,000.00 Page 9 Country/Organisation: Ethiopia / Electric Power Corporation Project/Programme: Loan #:4200ET BASIC DATA Spec Proc Notice Advert Contract Finalization Delivery Starts Last date of Final Delivery Norm Duration of Proc Steps Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks 1 wk 1.5-3 wks List of Contracts 1 1 Lot Plan 10-Sep-07 01-Oct-07 01-Jan-08 12-Apr-08 Actual 10-Sep-07 30-Oct-07 30-Jan-08 11-May-08 2 1 Lot Plan 24-Sep-07 24-Oct-07 18-Nov-07 25-Nov-07 16-Dec-07 06-Jan-08 05-May-08 03-Aug-08 Actual 10-Nov-07 05-Dec-07 12-Dec-07 02-Jan-08 23-Jan-08 22-May-08 20-Aug-08 3 2 Lots Plan 28-Aug-07 02-Oct-07 27-Oct-07 03-Nov-07 24-Nov-07 15-Dec-07 13-May-08 13-Oct-08 Actual 16-Oct-07 10-Nov-07 17-Nov-07 08-Dec-07 29-Dec-07 27-May-08 27-Oct-08 4 1 Lot Plan 07-Sep-07 21-Sep-07 05-Oct-07 15-Oct-07 31-Dec-07 04-Feb-08 29-Feb-08 07-Mar-08 28-Mar-08 18-Apr-08 16-Aug-08 13-Dec-08 Actual 05-Nov-07 19-Nov-07 03-Dec-07 13-Dec-07 28-Feb-08 03-Apr-08 28-Apr-08 05-May-08 26-May-08 16-Jun-08 14-Oct-08 10-Feb-09 5 4 Lot Plan 15-Oct-07 19-Nov-07 14-Dec-07 21-Dec-07 11-Jan-08 01-Feb-08 31-May-08 27-Sep-08 Actual 24-Oct-07 28-Nov-07 23-Dec-07 30-Dec-07 20-Jan-08 10-Feb-08 09-Jun-08 06-Oct-08 6 3 Lot Plan 30-Aug-07 24-Sep-07 01-Oct-07 22-Oct-07 12-Nov-07 09-Jul-08 13-Feb-09 28-Oct-07 04-Nov-07 25-Nov-07 16-Dec-07 12-Aug-08 19-Mar-09 7 3 Lot Plan 10-Sep-07 24-Sep-07 08-Oct-07 18-Oct-07 03-Jan-08 07-Feb-08 03-Mar-08 10-Mar-08 31-Mar-08 21-Apr-08 18-Sep-08 24-Jul-09 Actual 04-Oct-07 18-Oct-07 01-Nov-07 11-Nov-07 27-Jan-08 02-Mar-08 27-Mar-08 03-Apr-08 24-Apr-08 15-May-08 12-Oct-08 17-Aug-09 10 2 Lots Plan 29-Oct-07 03-Dec-07 28-Dec-07 04-Jan-08 25-Jan-08 15-Feb-08 13-Aug-08 09-Feb-09 Actual 19-Nov-07 24-Dec-07 18-Jan-08 25-Jan-08 15-Feb-08 07-Mar-08 03-Sep-08 02-Mar-09 Notes: 1- ICB, NCB, IS, or IAPSO may be used for these items and also that the packages may split as needed. Procurement plan version 4 Prepared: November 1, 2007 EAREP I procurement status -updated as of November 1, 2007 Contract Implementation Bidding Period Bid Evaluation On-line UNDB Gateway Nat Press Bid Closing- Opening Bid Invitation Date Arrival Date Contract Signature Date of Opening LC Date Contract Award Submission Bid Eval Rpt No- objection Date 17 substation equipment Overhead line Accessories Insulators Conductor Medium voltage Poles (wooden) Medium and low voltage Poles (concrete) Distribution transformers MV and LV switch gear Draft Bid Documents, including specs and quantities, draft SPN Plan vs. Actual Prep & Submission by Ex Agency Description* Package Number Lot Number EAREP I No- objection Date Page 10 Country/Organisation: Ethiopia / Electric Power Corporation Project/Programme: Loan #:4200ET Spec Proc Notice Advert Contract Implementation Delivery Starts Last date of Final Delivery If Prequalification 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 wk 1.5-3 wks add 7-13 wks List of Contracts 9 1 Lot Plan 01-Mar-07 15-Mar-07 29-Mar-07 08-Apr-07 24-Jun-07 24-Jul-07 10-Aug-07 31-Aug-07 21-Sep-07 19-Jan-08 17-Feb-08 Actual 30-Nov-07 14-Dec-07 28-Dec-07 07-Jan-08 24-Mar-08 23-Apr-08 10-May-08 31-May-08 21-Jun-08 19-Oct-08 17-Nov-08 11 1 lot Plan 06-Dec-06 26-Dec-06 25-Jan-07 11-Feb-07 04-Mar-07 25-Mar-07 23-Jul-07 10-Aug-07 Actual 02-Nov-07 17-Nov-07 11 1 lot Plan 25-Jan-07 08-Feb-07 22-Feb-07 04-Mar-07 20-May-07 19-Jun-07 06-Jul-07 27-Jul-07 17-Aug-07 15-Dec-07 02-Jan-08 Actual 02-Feb-08 16-Feb-08 01-Mar-08 11-Mar-08 27-May-08 26-Jun-08 13-Jul-08 03-Aug-08 24-Aug-08 22-Dec-08 09-Jan-09 12 1 lot Plan 01-Mar-07 15-Mar-07 29-Mar-07 08-Apr-07 24-Jun-07 24-Jul-07 10-Aug-07 31-Aug-07 21-Sep-07 19-Jan-08 19-Feb-08 Actual 01-Feb-08 15-Feb-08 29-Feb-08 10-Mar-08 26-May-08 25-Jun-08 12-Jul-08 02-Aug-08 23-Aug-08 21-Dec-08 21-Jan-09 13 3 lots Plan 15-Feb-07 25-Feb-07 11-Mar-07 17-Mar-07 01-May-07 31-May-07 17-Jun-07 08-Jul-07 21-Sep-07 19-Jan-08 18-Feb-08 Actual 16 3 lots Plan 15-Mar-07 25-Mar-07 15-Mar-07 14-Apr-07 01-May-07 22-May-07 06-Jun-07 04-Oct-07 03-Nov-07 Actual 30-Oct-07 11-Nov-07 18-Nov-07 22-Nov-07 07-Dec-07 14-Dec-07 17 3 lots Plan 15-Mar-07 25-Mar-07 24-Apr-07 24-May-07 10-Jun-07 01-Jul-07 12-Jun-07 10-Oct-07 09-Nov-07 Actual 30-Oct-07 11-Nov-07 18-Nov-07 22-Nov-07 07-Dec-07 14-Dec-07 18 1 lot Plan 15-Mar-07 25-Mar-07 08-Apr-07 14-Apr-07 03-Jun-07 03-Jul-07 20-Jul-07 10-Aug-07 22-Jul-07 19-Nov-07 19-Dec-07 Actual 15-Dec-08 25-Dec-08 08-Jan-09 14-Jan-09 05-Mar-09 04-Apr-09 21-Apr-09 12-May-09 13-Dec-07 11-Apr-08 11-May-08 19 3 Plan 04-Apr-07 18-Apr-07 02-May-07 12-May-07 18-Jul-07 17-Aug-07 03-Sep-07 24-Sep-07 15-Oct-07 12-Feb-08 14-Mar-08 Actual 01-May-08 15-May-08 29-May-08 08-Jun-08 14-Aug-08 13-Sep-08 30-Sep-08 21-Oct-08 11-Nov-08 11-Mar-09 11-Apr-09 20 2 Plan 04-Apr-07 18-Apr-07 02-May-07 12-May-07 18-Jul-07 17-Aug-07 03-Sep-07 24-Sep-07 15-Oct-07 12-Feb-08 14-Mar-08 Actual 01-May-08 15-May-08 29-May-08 08-Jun-08 14-Aug-08 13-Sep-08 30-Sep-08 21-Oct-08 11-Nov-08 11-Mar-09 11-Apr-09 21 1 Plan 04-Apr-07 18-Apr-07 02-May-07 12-May-07 18-Jul-07 17-Aug-07 03-Sep-07 24-Sep-07 15-Oct-07 12-Feb-08 14-Mar-08 Actual 01-May-08 15-May-08 29-May-08 08-Jun-08 14-Aug-08 13-Sep-08 30-Sep-08 21-Oct-08 11-Nov-08 11-Mar-09 11-Apr-09 22 1 Plan 04-Apr-07 14-Apr-07 29-May-07 28-Jun-07 15-Jul-07 05-Aug-07 26-Aug-07 24-Dec-07 23-Jan-08 Actual 01-May-08 11-May-08 25-Jun-08 25-Jul-08 11-Aug-08 01-Sep-08 22-Sep-08 20-Jan-09 19-Feb-09 Total Cost Notes: 1- ICB, NCB, IS, or IAPSO may be used for these items and also that the packages may split as needed. Procurement plan version 4 Prepared: November 1, 2007 Contract Finalization Norm Duration of Proc Steps Draft Bid Documents, including specs and quantities, draft SPN Bidding Period Bid Evaluation Prep & Submission by Ex Agency Date Contract Award Date Contract Signature BASIC DATA Spool Insulator Plotter, photo copier and fax CFL KWH meters Light Vehicle (Pick-ups and Sedan) Computers and Printers Networking Devices and accessories Cables, Insulated wire and Insulated tape Automatic ckt breaker with cover and Arial Fuse Street light CFL Al/Cu clamp Arrival of Goods Description* Package Number Lot Number Plan vs. Actual Opening of Let of Credit Submission Bid Eval Rpt EAREP I procurement status -updated as of November 1, 2007 EAREP I No- objection Date On-line UNDB Gateway Nat Press Bid Invitation Date Bid Closing- Opening
Группа Всемирного банка · Procurement Plan
Ethiopia - Electricity Access (Rural) Expansion Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Эфиопия
Источник
Всемирный банк