41521 Vietnam Mekong Transport & Flood Protection Project (Additional Financing) Draft Bid Documents, If Post-Review, No-objection Dates are not needed Spec Proc Credit #: Cr. 3448-VN BASIC DATA including specs and quantities, draft SPN Notice Bidding Period Bid Evaluation Contract Finalization Contract Implementation Advert Estimated Procure Pre-or Prior or Prep & No- On-line Bid No- Contract Date Date Description* Package Lot Prior / Post Plan vs. Submission UNDB Bid Closing- Submission Completion Defects Number Number Amount in ment Post objection Invitation Bid Eval objection Amount Contract Contract Start Date US$ m Post Method Qualifica Actual by Ex Gateway Opening Date Liability tion Review Agency Date Nat Press Date Rpt Date in US$m Award Signature Norm Duration of Proc If Prequalification Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks Steps add 7-13 wks Actual Actual ICB 1 13.00 Prior ICB Post Prior Plan 16-Sep-07 30-Sep-07 14-Oct-07 21-Oct-07 16-Dec-07 13-Jan-08 27-Jan-08 Plan 10-Feb-08 09-Mar-08 06-Apr-08 06-Apr-10 06-Apr-11 Ganh Hao Bridge Actual Actual MDIN - Tra Vinh NCB 1.1 1 1.20 Prior NCB Post Prior Plan 01-Jul-07 15-Jul-07 29-Jul-07 05-Aug-07 04-Sep-07 25-Sep-07 09-Oct-07 Plan 23-Oct-07 13-Nov-07 11-Dec-07 10-Dec-08 08-Jun-09 Pronvince Road No. 911 Actual Actual MDIN - Tra Vinh NCB 1.1 2 1.60 Prior NCB Post Prior Plan 01-Jul-07 15-Jul-07 29-Jul-07 05-Aug-07 04-Sep-07 25-Sep-07 09-Oct-07 Plan 23-Oct-07 13-Nov-07 11-Dec-07 10-Dec-08 08-Jun-09 Pronvince Road No. 911 Actual Actual MDIN - Binh Duong NCB 1.2 1 2.20 Prior NCB Post Prior Plan 16-Jul-07 30-Jul-07 13-Aug-07 20-Aug-07 19-Sep-07 10-Oct-07 24-Oct-07 Plan 07-Nov-07 28-Nov-07 26-Dec-07 25-Dec-08 23-Jun-09 Province Road No 742 Actual Actual MDIN - Hau Giang NCB 1.3 1 1.90 Prior NCB Post Prior Plan 16-Jul-07 30-Jul-07 13-Aug-07 20-Aug-07 19-Sep-07 10-Oct-07 24-Oct-07 Plan 07-Nov-07 28-Nov-07 26-Dec-07 25-Dec-08 23-Jun-09 Province Road No. 927 Actual Actual MDIN - Kien Giang NCB 1.4 1 2.00 Prior NCB Post Prior Plan 1-Feb-08 15-Feb-08 29-Feb-08 07-Mar-08 06-Apr-08 27-Apr-08 11-May-08 Plan 25-May-08 15-Jun-08 13-Jul-08 13-Jul-09 09-Jan-10 Province Actual Actual MDIN - Kien Giang NCB 1.4 2 2.00 Prior NCB Post Prior Plan 1-Feb-08 15-Feb-08 29-Feb-08 07-Mar-08 06-Apr-08 27-Apr-08 11-May-08 Plan 25-May-08 15-Jun-08 13-Jul-08 13-Jul-09 09-Jan-10 Province Actual Actual MDIN - Kien Giang NCB 1.4 3 1.60 Prior NCB Post Prior Plan 1-Feb-08 15-Feb-08 29-Feb-08 07-Mar-08 06-Apr-08 27-Apr-08 11-May-08 Plan 25-May-08 15-Jun-08 13-Jul-08 13-Jul-09 09-Jan-10 Province Actual Actual Total Cost 25.50 Plan Plan 0.00 Actual Actual 0.00 Fill gray cells only! MTFP-2007.xls Vietnam Draft Bid Documents, If Post-Review, No-objection Dates are not needed Spec Proc Loan #: BASIC DATA including specs and quantities, draft SPN Notice Bidding Period Bid Evaluation Contract Finalization Contract Implementation Advert Prep & Estimated Procure Pre-or Prior or Submissio No- On-line Bid Bid Submissio No- Contract Date Date Opening Arrival Inspection Description* Package Lot Prior/Po Post Plan vs. UNDB n Amount of Number NumberAmount in ment Post n objection Invitation Closing- objection Contract Contract of Final US $ st Method Qualific Actual Gateway Bid Eval in Let of ation Review by Ex Date Date Opening Date Award Signature Goods Acceptance Agency Nat Press Rpt US$'000 Credit Norm Duration of Proc If Prequalification Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks 1 wk 1.5-3 wks Steps add 7-13 wks Actual Plan Actual Plan Actual Plan Actual Plan Actual Total Cost 0.00 Plan 0.00 Actual 0.00 Fill gray cells only! Procurement Plan-Consultants 2 Vietnam Mekong Transport & Flood Protection If Post-Review, No-objection Dates are not needed Request for EOI (where required) Credit #: Cr. 3448-VN Contract Preparation Short Consultant Proposal Evaluation and Negotiation for Projects after May 2002 Type Basic Data Request for Proposals List Proposals Technical (T) & Financial (F) and Negotions (N) Draft Contract Contract Finalization Contract Implementation Lumpsum Estimated Prior/ Prep & On-line Lead-time Submission/ Submission No-objection Opening Preparation No- Contract Mobilization Description* Selection Plan vs. No-objection UNDB Submission No-objection Invitation Negotiations Submission Contract Contract Draft Final Final Method or Amount Post Submission before Opening Evaluation Evaluation Financial Eval Report objection Amount in Advance Time-Based in US$ Review Actual by Ex Ag Date Gateway Date Date Date (N) Date Award Signature Report Report Cost Nat Press shortlist Date Report (T) Report (T) Proposals (T) (F) Date US$ '000 Payment Norm Duration of Proc Steps Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks Plan 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks Actual Actual List of Contracts Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Total Cost - Plan Plan 0.00 0.00 - Actual Actual 0.00 0.00 Fill gray cells only! West Africa Power Pool Procurement Plan - April 20, 2005
Группа Всемирного банка · Procurement Plan
Vietnam - Mekong Transport and Flood Protection Project - additional financing : procurement plan (2007)
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк