Page 1 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) 20.11 12fi\11fi Water Treatment Plant 150,000 m3/d water plant 11caron\1a 136.7 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 2008.6-2008.12 12fi\11ffl Water Transmission pipeline D 500-800mm, DI pipe, 50,397M ccent\11ffhungarumlaut 145.6 495.3 6.7 10.1 90 : 1&% No No Prior 2008.6 2008.7-2010.10 12fi\11ffi Water distribution network - Tiexi area D 50-500mm DI pipe, 50,937M 1hungarumlautffl 158.3 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 2008.6-2009.10 12fi\11ff\10$ Water distribution network - Tiedong area D 50-500mm DI pipes, 16630M 1flhungarumlaut 170.8 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 2009.6-2010.6 12fi\11ff\10% Water distribution network - Lishan area D 50-600mm DI pipes, 30375M 1hungarumlauthungarumlaut 179.7 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 2009.6-2010.6 12fi\11breve Water-meter system upgrading-A 2,215 water meter chambers/pipe replacement 11fflhungarumlaut 188.6 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 2008.6-2009.10 12fi\11caron Water-meter system upgrading-B 2,585 water meter chambers/pipe replacement 11caron\1a 197.5 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 2009.6-2010.10 e\11\1ahungarumlaut 12fflfi\11fi Water Treatment Plant Equipment for 150,000 m3/d water plant 11ffdotaccent ICB No No Prior 2008.9 2008.10-2009.4 12fflfi\11ffl Water-meter -A 30,000 sets 1ffiffi ICB No No Prior 2008.5 2008.6-2008.10 12fflfi\11ffi Water-meter -B 35,000 sets 1brevebreve ICB No No Prior 2009.5 2009.6-2009.10 12fflfi\11ff Equipment of leakage testing, Lab. device, vehicle & office (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, PCs, printer, photocopier, etc. 1ffff NCB No No Post 2008.4 2008.4-2008.10 reve\11hungarumlautfi Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 1. Civil Work 2. Equipment & Material Anshan Water Supply 3. Subtotal 418600LMC21pp.xls 1 12/17/2007 Page 2 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 9.71 HWS/1.1 Water Transmission pipeline D 300-900mm DI/steel pipes, 12,800 m 2.41 NCB No No Post 2008.6 2008.6-12 HWS/1.2 Distribution network - south area D 200-600mm DI/steel pipes, 29,745m 2.00 NCB No No Post 2008.6 2008.7-11 HWS/1.3 Distribution network - north area D 200-1,200mm DI/steel pipes, 31,586m 3.05 NCB No No Post 2008.4 2008.5-11 HWS/1.4 Water-meter system upgrading 1,700 water-meter chambers/pipe replacement 1.28 NCB No No Post 2008.6 2008.7-2009.8 HWS/1.5 Enlarging of civil works for Yuhuangshan & Zhongyangpu water plants 40,000 m3/d to100,00 m3/d for Yuhaungshan plant; 20,000 m3/d to 30,000 m3/d for Zhongyangpu plant 0.96 NCB No No Post 2008.8 2008.9-2009.11 2.76 HWS/21.1 Equipment supply & installation of Yuhuangshan and Zhongyangpu plants 40,000 m3/d to100,00 m3/d for Yuhaungshan plant; 20,000 m3/d to 30,000 m3/d for Zhongyangpu plant 0.93 ICB No No Prior 2008.10 2008.11 -2009.10 HWS/21.2 Procurement of water-meter 25,000 sets 1.49 ICB No No Prior 2008.5 2008.6-2008.11 HWS/21.3 Equipment of leakage testing, Lab. device, Engineering vehicle & Office equipment (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, Engineering vehicles/bus, Office equipment, etc. 1ffiff\03 NCB No No Post 2008.4 2008.4 -2009.6 12.46 3. Subtotal 2. Equipment & Material Haicheng Water Supply 1. Civil Work 418600LMC21pp.xls 2 12/17/2007 Page 3 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) f\11fidotaccent FWW/1.1 Upgrading of drainage networks in Wanghua area; Wastewater collection pipeline work in Liujia area Wanghua area: D=300-1,200mm reinforced concrete pipe, eve 149.9 263.2 6.7 3.4 90 : \0f ifi m; Liujia area: D=500-900mm drainage pipe, 3,550 149.9 413.5 6.7 6.7 90 : P\03 11flffl NCB No No Post 2008.3 2008.4-10 FWW/1.2 Wastewater collection pipeline in Guchengzhi area; Upgrading of drainage systems in Zhanqian & Gongyuan areas & Changnab open ditch Guchengzhi: D=300-1500mm reinforced concrete pipe, 9,048m; Zhanqian & Gongyuan: D=300-1200mm RCP, 6,558m; Changnan open ditch: 9,770m. 1caronffl NCB No No Post 2008.6 2008.7-11 FWW/1.3 River-dyke rehabilitation (0 - 0+360) Dyke-filling:92,000 m 3 ,Roads:90,000 m 2 , Bridge: 8,280m 2 e\11hungarumlautff NCB No No Prior 2008.3 2008.4-11 FWW/1.4 River-dyke rehabilitation (0+360 - end) 580,000 m 3 dyke-filling, 120,000 m 2 roads, 22km sewer \11caronfi NCB No No Prior 2009.3 2009.4-2010.10 f\11fidotaccent Fushun Wastewater 1. Civil Work 2. Subtotal 418600LMC21pp.xls 3 12/17/2007 Page 4 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) e\11dotaccentffl\03 FSW/1.1 New sanitary landfill construction and existing dump upgrading 250,000 m3 soil/stone excavation, 250,000 m3 earth filling, 188,000 m3 membrane, leakage/gas collection works, etc. e\11dotaccentffl\03 NCB No No Prior 2009.3 2009.4-2009.10 1\1adotaccent\03 FSW/21.1 Equipment of solid waste backfill, transportation & Lab. Device Package A: compressor (2) 1\1adotaccent\03 ICB No No Prior 2009.6 2009.7-10 Package B: bulldozer (2), excavator (2) Package C: chemical spreading vehicle (1), sludge collection vehicle (5), wangon (1) Package D: vehicles of compressing (17), self-unload (3 sets, 8T), van (1), wangon (1) Package E: Lab. Devices 1ffifl\03 FSW/31.1 Consulting service of sanitary landfill 1ffifl\03 QCBS 11hungarumlautfl\03 3. Technical assistance 1. Civil Work 2. Equipment/material Fushun Solid Waste . Subtotal 418600LMC21pp.xls 4 12/17/2007 Page 5 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 30.79 YWW/1.1-A Wastewater interceptor & collection pipeline for Qinghua street D=300-1,200mm, L=20.21km 11ffiff\03 NCB No No Post 2009.10 2009.11-2010.5 YWW/1.1-B Interceptor of Donghuan road D=300-2,000 x 2,200mm,L=15.17km 1hungarumlauthungarumlaut\03 NCB No No Post 2009.4 2009.5-2009.10 YWW/1.2-A Wastewater collection pipeline from Haibin road to No. 14 pumping station D=1,100-2,000 x 2,200mm. L=7.21km 11dotaccentbreve\03 NCB No No Post 2009.4 2009.5-10 YWW/1.2-B Wastewater collection pipeline from No. 14 pumping station to Donghuan road D=1,100-2,000 x 2,200mm, L=9.67km 1ff\1a\03 NCB No No Post 2009.4 2009.5-10 YWW/1.3 Interceptor of Liaobian district D=700-2,200 x 2,200mm, L=11.46km 1dotaccentdotaccent\03 NCB No No Post 2008.4 2008.5-2009.10 YWW/1.4 Interceptor from the Plant to Donghuan road DN=1,600mm, L=3.4km 1fl\1a\03 NCB No No Post 2008.4 2008.4-10 YWW/1.5 Civil work of pumping station 6 new pumping stations 1brevebreve\03 NCB No No Post 2008.4 2008.5-2009.6 YWW/1.6 Civil work of W.W.T 100,000 m3/d wastewater treatment plant n\11caronff\03 NCB No No Prior 2009.3 2009.4-2010.8 arumlaut\11flffl\03 YWW/21.1 Equipment supply and installation of W.W.T 100,000 m3/d wastewater treatment plant e\11caroncaron\03 ICB No No Prior 2009.4 2009.6-2010.11 YWW/21.2 Equipment supply and installation of pumping stations 8 pumping stations 11ffi\1a\03 ICB No No Prior 2009.7 2009.8-2010.12 YWW/21.3-A Vehicles for W.W.T YWW/21.3-B Lab. Devices for W.W.T YWW/21.4 Office equipment for W.W.T 1flff\03 NS No No Post 2010.2 2010.3-2010.6 39.81 2010.5 2010.6-2010.11 No No Yingkou Wastewater 1hungarumlautbreve\03 ICB Prior 1. Civil Work 2. Equipment & Material 3. Subtotal 418600LMC21pp.xls 5 12/17/2007 Page 6 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 27.04 DI pipe, DN800-500, 12,371m UPVC pipe, DN400-200, 19,528m DI pipes, DN800-500, 5,149m UPVCpipe, DN400-200, 30,895m DI pipe, DN500, 9,147m UPVC pipe, DN400-200, 37,740m YWS/1.4 - A Transportation pipeline (1) DI pipe, DN1200mm L=12.00KM 1breveff NCB No No Post 2008.1 2008.1-11 YWS/1.4 - B Transportation pipeline (2) DI pipe, DN1200mm L=12.00KM 1breveff NCB No No Post 2008.1 2008.1-11 YWS/1.4 - C Transportation pipeline (3) DI pipe, DN1200mm L=7.30KM 11\1a\1a NCB No No Post 2008.1 2008.1-11 YWS/1.5 Water treatment plant 70,000 m3/d WTP 11hungarumlautffi NCB No No Post 2007.11 2007.12-2008.11 11hungarumlautbreve YWS/21.1 Water treatment plant equipment supply & installation (70,000 m3/d) 11fiffi ICB No No Prior 2007.12 2008.1-12 YWS/21.2 Equipment of leakage testing, Lab. device, vehicle & office (it may be splited in several bids according to the detailed requirement) pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, PCs, printer, photocopier, etc. 1dotaccentffl NCB No No Post 2008.6 2008.7-12 31.00 No No NCB 11ffcaron NCB No lfldotaccent\11ffi lfldotaccent\11ffi lfldotaccent\11ffi Post Post No lfl ccent 158.8 750.4 6.7 3.4 90 : \11 158.8 753.8 6.7 3.4 90 : ff 158.8 757.1 6.7 3.4 90 : \10 l Post lfl ccent 141.1 750.4 6.7 3.4 90 : \11 141.1 753.8 6.7 3.4 90 : ff 141.1 757.1 6.7 3.4 90 : \10 l No No lfl ccent 176.6 750.4 6.7 3.4 90 : \11 176.6 753.8 6.7 3.4 90 : ff 176.6 757.1 6.7 3.4 90 : \10 l NCB YWS/1.2 Distribution network (2) 1brevebreve YWS/1.1 3. Subtotal 2. Equipment & Material Distribution network (1) 11ffl\1a YWS/1.3 Distribution network (3) Yingkou Water Supply 1. Civil Work 418600LMC21pp.xls 6 12/17/2007 Page 7 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 4.26 YSW/1.1 Sanitary backfill plant 1.0726 million m3 earth/stone excavation,165,000 m2 membrane, leakage/gas collection work, access , etc. 3.65 NCB No No Post 2008.1 2008.2-2008.10 YSW/1.2 Sealing of existing pump Sealing work (56,800 m3 earth work, anti-leakage/gas leading), etc 0.61 NCB No No Post 2008.10 2008.10 - 2009.9 1.88 YSW/21.1 Equipment of landfill plant and transportation bulldozer (2), compossor (2), excavator (2), solid waste collection vehicles (25) 1.83 ICB No No Prior 2008.5 2008.6 - 2008.10 YSW/21.2 Office equipment & Lab. Devices 0.05 NCB No No Post 2008.8 2008.9 -2008. 12 6.13 1. Civil Work 2. Equipment & Material 3. Subtotal Yingkou Solid Waste 418600LMC21pp.xls 7 12/17/2007 Page 8 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 18.70 PWW/1.1 Drainage pipe upgrading for Xinghongtai district FRP, DN800-2,000, 4,880m; RC culvert B x H 2,400
Группа Всемирного банка · Procurement Plan
China - Second Liaoning Medium Cities Infrastructure Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Китай
Источник
Всемирный банк