Agreed by the Recipient, dated .......... 2006 KYRGYZ REPUBLIC: Small Towns Infrastructure and Capacity Buiding Project (CREDIT NUMBER 4016-KG/GRANT NUMBER H139-KG) ORIGINAL ACTIVITIES UNDER THE PROJECT DATA UPDATED PROCUREMENT PLAN - GOODS AND WORKS for 2005-2006 Rid No Bid Ref Type No of packages Method Contract Poce Specdic Bidder Draft In,tat Bid Bid Recomnd Contract Contract Poor Review (US$) Procurem Short Bidding To Opening Eoal For S,gnat-re No.ce List Docs Ridder Repod Ctr Awd Completion Natyn 1 East' Welmeld rehabildation W 1 NCB 446,517 07/25/2005 N/A 07/15/2005 07/25/2005 09/08/2005 11/04/2005 11/09/2005 11/21/2005 1 year PR Tash-Kumvr 2 Sewerage system Const,uc.ton W 1 NCB 324.286 08/15/2005 N/A 08/10/2005 08/15/2005 09/22/2005 11/25/2005 12/21/2005 01/23/2006 1 year PR Stroitel' road rehabilitation 3 Equipment for mrn.cmpal seroices G 1 Shopping 28,771 N/A 03/01/2006 02/27/2006 03/01/2006 15/03/06 03/30/2006 04/04/2006 04/18/2006 06/20/2006 Uzoien__ _ _ _ _ _ _ _ _ 4 Well field rehabdiatian and Chlonation W 1 NCB 188.706 08/01/2005 N/A 07/29/2005 08/01/2005 09/15/2005 11/22/2005 11/30/2005 12/08/2005 1 year PR u____'nd mohbiEt/t tic Talas _ Well field rehabil/ation 5 Chlornation unit rehabilitation W 1 NCB 293,085 01/02/2006 N/A 12/16/2005 01/02/2006 02/16/2006 03/20/2006 03/30/2006 04/27/2006 1 year PR Sewage pumping station rehabi/daton Waste water treatment pond Kyzyl Kiya _ _ Ku/ushtan' well field rehabiddatin_ 6 Kulushtan' pumping station rehati/datimn W 1 NCB 594,776 01/06/2006 N/A 12/30/2005 01/06/2006 02/22/2006 03/24/2006 04/03/2006 05/04/2006 1 year PR Chlonnabton unit rehabititation Distrbution network Tokmok Pmmzone' Well field rehabilitation 7 Chtonnation und rehabildation W 1 NCB 490,169 01/13/2006 N/A 01/06/2006 01/13/2006 02/28/2006 03/31/2006 04/10/2006 05/11/2006 1 year Water tower constrction Cholpon Ala Water intake 0 finration plant a Water main to reservoir W 1 NCB 272,410 01/03/06 N/A 16/02/06 01/03/06 15/04/06 17/05/06 29/05/06 29/06/06 1 year Chlonnation and rehabilitation 9 Equipment for munidpal services G 1 Shopping 66,071 NIA 15/03/06 13/03/06 15/03/06 29/03/06 13/04/06 18/04/06 02/05/06 04/07/06 Jalalabat Submersible pumps 10 Water tower construction W 1 NCB 422,250 25/11/06 N/A 15/11/06 29/11/06 15/01/07 14/02/07 28/02/07 30/03/07 1 year Production water meters; I_I 11 Equipment for municipal services G 1 Shopping 73,213 N/A 29/03/06 27/03/06 29/03/06 12/04/06 27/04/06 02/05/06 16/05/06 18/07/06 Balykchy Submersible pumps 2-nd and 3-nd stage pump stations 12 Water distribution system W I NCB 295,130 29/11/06 N/A 15/11/06 29/11/06 15/01/07 14/02/07 28/02/07 30/03/07 1 year Production water meters Desinfection facitd,es 13 Equipment for municipal senrices G . Shopping 54,541 N/A 12/04/06 10/04/06 12/04/06 26/04/06 11/05/06 16/05/06 30/05/06 01/08/06 14 Equipment for municipal services G 1 Shopping 58,120 N/A 26/04/06 24/04/06 26/04/06 10/05/06 25/05/06 30/05/06 13/06/06 15/08/06 Kant Submemible pumps Rehabildation of well 15 2-nd and 3-nd stage pump stations W 1 NCB 427,250 06/12/06 N/A 22/11/06 06/12/06 22/01/07 21/02/07 07/03/07 06/04/07 1 year Water distrbution system Production water meters Desinfection facilities 16 Equipment for municipal services G 1 Shopping 36,542 N/A 10/05/06 08/05/06 10/05/06 24/05/06 08/06/06 13/06/06 27/06/06 0/29/2006 Kara-Suu 2-nd and 3-nd stage pump stations Submersible pumps Rehabiltation of well 17 Water tower constuction W 1 NCB 314,770 06/12/06 N/A 22/11/06 06/12/06 22/01/07 21/02/07 07/03/07 06/04/07 1 year Desinfection facilities Production water metem; WWater distinbution system Bld No Bid Ret Type No o. packages Method Contract Price Specific Bidder Draft Inoitat Bid Bid Recomnd Contract Contract Prior Review (US$) Procurem Shod Bidding To Opening Eva/ Fpr Signature Notice List Docs Bidder Report Ctr Awd Completion 18 Eq.opmetftor muncipal serices G 1 Shopping 25,170 N/A 10/05/06 08/05/06 10,05/0S 24/05/06 08/0i/06 13/06/06 27/06/0S 29/08/06 Mailuu-Suu 2-nd and 3-nd stage pomp stations Water treatment plant 19 Production water meters, W 1 NCB 430,400 13/12/0S N/A 29/11/06 13/12/06 29/01/07 28/02/07 14/03/07 13/04/07 1 year Sewer pumps Rehatilitation of sewerage system 20 Equapment tai mmnrcrpa semices G 1 Shopping 82 841 N/A 24/05/06 22/05/S0 24/05/0S 07/06/06 22/06/06 27/06/06 11/07/06 12/09/06 _____ Uzcien w 1 NCB 491,056 13/12/06 N/A 29/11/06 13/12/06 29/01/07 26/02/07 14/03/07 13/04/07 1 year 21 Resercoir co-struct-n 22 Equipment tar municipat services G 1 Shopping 29,842 N/A 07/06/06 05/06/06 07/06/06 21/06/06 06/07/06 11/07/06 25/07/06 26/S9/06 ARIS _ _ _ 23 CFmputer Office Equipment and G 1 20,520 N/A 10/01/06 10/01/0S 16/01/06 30/01/06 13/02/06 17/02/06 03/03/06 03/04/10 24 Vehicles G 1 30,000 N/A 17/07/05 17/07/05 20/07/05 05/08/05 15/08/05 19/08/05 24/08/05 24/11/05 = = 25 ARIS Building W 1 84,135 N/A 31/01/06 31/01/06 06/02/06 20/02/06 06/03/06 10/03/06 24/03/O6 23/05/0S 26 PIAP Support G 1 18,500 N/A 07/02/06 07/02/SB 13/02/06 27/02/0S 13/03/06 17/03/06 31/03/06 30/05/0O (TOTAL GOODS AND WORKS _____ _____ ____ 7,485,662 __________________ Agreed by the Recipient, dated January ....... 2006 KYRGYZ REPUBLIC. Small Towns Infrastructure and Capacity Baiding Project (CREDIT NUMBER 4016-KG/GRANT NUMABER H139-KG) ORIGINAL ACTIVITIES UNDER THE PROJECT DATA PROCUREMENT PLAN - CONSULTANT SERVICES for 2005-2006 B o Bid Ref Type Method Total Bid Lop Final,z Short Request RFP Iritrat Technical Evai Of Final Receipt Aweard of ContraM- Prior Review No Est jUss, Of Of List For Issueo To Sel Proposai TechcQzv Evai Of Draft Cont,act/ Co mpletio Interent TOR Of Cons Proposals Firm Opening Proposal Report Contract Signature 1Project Management CcnsuItant CS QChS 936 6414 09/12f04 02f03/05 03/03/05 02/03/05 03/03/OS n/a 13/04/OS 23/04/05 t 3/05105 29/06/O5 12/OP/OS 20/0/1 0 1Prior Review 4 PIAP Preparation CS OCBS 182 000 05/04/05 01/04/05 06/07/05 O5/O7/OS 06/07/05 n/a -17/08/OS 20i.uPrOS 26/09105 15/11/05 17/11ifO5 30f07/06 Prior Review SDptyIC cuBP Dielo o CS INDV 7,800 18/03/05 15/03/05 12/04/05 n/a n/a h/a n/a n/a 19/04/05 27/04/OS 17/05/OS 03/05/06 PirRve 6 Lamyer CS INOV 6000e 16/03/05 15/03/05 12/04/05 n/a n/a n/ a n/a n/a 19/04/OS 02/05/05 17/05/05 23105/06 Prior Review 7 Disbursement Specialist CS INDV 66840 18/03/05 t5/03/05 12/04/OS n/a n/a n/a n/a s/a 19/04f05 12/05/05 17/05/05 01/06/06 O Senior Accountant CS INOV 3 720 t8/OS/OS t5/03/05 12/04/05 n/a n/a n/a n/a v/a 19/04/05 27/04/05 17/05/05 10/05/06 9 Procurement Specialist CS INOV 6 640 18/03/05 15/03/05 12/04/05 n/a n/a n/a n/a n/a t9/04/05 07/O5/05 171OS/OS 03/05/06 _____ and c Procuremn CS INDV 2 400 09/06/05 15/07105 18/07/05 nf a n/a n/a n/a rv/a 26/07/05 06/06/OS 08/OS/OS 08/08/06 11 Capacity Bui/ding Specialist CS INOV 6 600 18/03/05 15/03/05 12/04/OS n/a n/a n/a nla nla 19/04/OS 02/05/OS 17/OS/OS 03/05/06 12 MIS/IT Specialist CS INOV 6 840 09/06/05 15/03/05 05/07/05 n/a n/a n/a n/a n/a 11/07/OS 13/OP/OS 13/OP/OS 18/07/06 13 Small Grants Specialist CS INOV 6,360 16/03/OS 15/03/OS 12/04/OS n/a n/a n/a n/a n/a 19/04/OS 02/OS/OS 17/OS/OS 11/05/06 14 Infrastructure Engineer CS INDV 6 600 18/03/05 15/03/05 12/04/05 n/a n/a n/a n/a n/a 19/0-4/05 03/OS/OS 17/OS/OS 10/05/06 Prier Review 15 infrastructur Enqtneer CS IND 6 600 18103105 5/03/05 12104/05 n/a nla nla n/a /a 19/04105 0310/05 03/06/05 0316/06PrrorrReview 26 Bease Asurvey Iostin CS COD 40,000 07/03/05 2010,2/06 22/103/05 n/a nl a/ 05/4/0 n/a n/a n/a010 219/04/06 26/104/05 25070/06 13 Hntedroeotger ure izgnCS ICBV 30.000 070/6 200/8/0303/06101027/00/0506l 27/030 n/a 26/a0 26/5/0 09/06/06 23/0606 07/07/06 10/105/06 PirRve 14 U'Interree Fiaca aaeet CS COD 10000 1803/04/06 5203104/0 120/04/05 n/a n/a 03/5/0 n/a h/a 19/0 50/6 1/60 70/6PirRve 54 UTehiit l Msnaemento TorNaring C S CON1D00 2 70/091/06 22/02/05 17/102/05 n/a n/a 27/2/0 n/a n/a n0/1a0 27/1103/6 040 2 8/15 04/0605 Prior Review 16 WTerhia dsinfevisor Toraizin CS COD 26000 06/07/06 361/07/06 26/107/06 n/a n/a 05/8/0 n/a na 301/05 04/09/06 14/9/6/11/0 6 0I0 Prior Review 17 Pumps uiiainTiin CS co 50000 04/08/06 30/08/065 25/08/06 n/a n/a 04/09/06 n/a n/a I n/a 03/010/06 13/010/06 13/2/02/6PirRve 9PMechratinical Denigineer s CS INDS 90.400 03/02/06 13010/06 17/02/6 2103/n/a n7/030 n/a 26/040 n6/a50 03/03/06 21703/06 371/03/06 315/12/06 Prior Review 10BEseturical En erCS IND 54000 03/02/06 1301/206 17/02/06 n/a n/a n/a1010 n/a n/a 03030 17/03/06 31/03/06 3/25/0716PirRve 14 UdiVtFiacaMaaent CS CO 40,000 27/09/06 20/104/06 15/104/06 n/a n/a 235/1006 n/a n/a n/a 24/116/06 0412/06( 307/06/07 Prior Review DevelopyMagenteof so raretn support0 2110 2120 7020 l 2/20 la na na 210/6 0/4/6 2/40 Prior Review 12 trdsnecinTann CS CO 60,000 24/03/06 22/02/06 24/04/06 n/a n/a 04/05/06 n/a n/a n/a 01/06/06 14/06/06 13/09/06 PirRve 7PorpP usiiainTann S cQ 500 0/80 0016 2180 / na 0190 / l / 31/6 1/00 31/6PirRve TPota emnl tanigfo-SG C -D L5, 984 __ __ _ n__ _a _ ___ ___ n__ _a _ n__ _a n__ _a n__ _a _ n__ _a _ __ __ n__ ___ n__ _a 31_ ___03__06
Группа Всемирного банка · Procurement Plan
Kyrgyz Republic - Small Towns Infrastructure and Capacity Building Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк