Группа Всемирного банка · Integrated Safeguards Data Sheet

China - Shi-Zheng Railway Project

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2389 Date ISDS Prepared/Updated: 09/26/2006 I. BASIC INFORMATION A. Basic Project Data Country: China Project ID: P099062 Project Name: China: Shi-Zheng Railway Task Team Leader: John Carter Scales Estimated Appraisal Date: November 20, 2006 Estimated Board Date: July 26, 2007 Managing Unit: EASTR Lending Instrument: Specific Investment Loan Sector: Railways (100%) Theme: Public expenditure, financial management and procurement (P) IBRD Amount (US$m.): 300.00 IDA Amount (US$m.): 0.00 GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: BORROWER 3,600.00 3,600.00 B. Project Objectives [from section 2 of PCN] The development objective of the Project is to meet growing freight and passenger market demand in the railway corridor between Shijiazhuang and Handan, while substantially improving the level of service offered to customers. C. Project Description [from section 3 of PCN] The project will finance a 200-km section of the planned 2,100-km high-speed railway line from Beijing to Guangzhou. The construction of this railway has already started at the southern end, and the entire project is expected to be completed by 2010. Construction on the Bank-financed section is expected to begin in October 2006. The new line will consist of two tracks running generally parallel, but not within the same right- of-way, as an existing railway line. In order to enable a higher operating speed the alignment is generally straighter. As the terrain is generally flat, no tunnels will be constructed. As much as possible, the preferred alignment avoids densely populated areas, coal mines, and sites of cultural and historic importance. Some new railway stations will be constructed where none currently exist. Page 2 D. Project location (if known) The railway alignment is from Shijiazhuang, Hebei province to Handan in Hebei province just north of the border with Henan border. E. Borrower

Основные сведения
Тип документа Integrated Safeguards Data Sheet
Дата принятия
Страна Китай
Источник Всемирный банк