Группа Всемирного банка · Environmental Assessment

China - Third Integrated Agriculture Intensification Loan Project : environmental assessment (Vol. 7 of 8) : Integrated pest management (IPM) plan

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 WORLD BANK FUNDED CHINA IRRIGATED AGRICULTURE INTENSIFICATION III PROJECT INTEGRATED PEST MANAGEMENT (IPM) PLAN PREPARED BY STATE OFFICE OF COMPREHENSIVE AGRICUTURAL DEVELOPMENT (SOCAD) JANUARY 2005 E1114 v 7 Page 2 Table of Contents 1. Significance of the IPM 2. Cropping situation and irrigation ways in the project areas 3. Measures planned to be undertaken for IPM in the project areas 3.1 Results of the China Irrigated Agriculture Intensification II Project 3.2 Guidelines for IPM of the China Irrigated Agriculture Intensification III Project 3.3 IPM techniques proposed to be employed in the project areas 4. IPM plan of the project areas 4.1 General design of the IPM plan 4.2 Components and investment plan of the IPM 4.3 Implementing organizations 4.4 Monitoring and evaluation Page 3 1. Significance of the IPM China Irrigated Agricultural Intensification III Project is to be located in the densely populated and economically developed eastern part of the country, which is also the main producing area of grains, cotton, oil seeds and cash crops. Following the social and economic development and the improvement of the people

Основные сведения
Тип документа Environmental Assessment
Дата принятия
Страна Китай
Источник Всемирный банк