E1 072 Volume 1 1 Fuz7hou1 Wobrld Bank Financedl Jinshan Central Bus Depot Pro.ject Environmental Impact Assessment Prepared for: Fuzhou Municipal Engineering Development and Construction Corporation and Fuzhou Muncipal Transport Commission Prepared by: Guangzhou Research Institute of Environmental Protection . March, 2005 -~ ~~~ ~~ ~~~ ~~ ~~~~~ ~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project Prepared for: Fuzhou Municipal Transport Commnission Prepared by: Guangzhou Research Institute of Environmental Protection (GRIEP) Legal representative: Luo Jiahai General technical superintendent: Cui Xia Project Manager: Xu Guanfu Coordination Unit: Fujian Provincial Radiation Environment Monitoring Station (FREMS) EA Team: Environmental Name Tittle Assessment Responsible Content Signature Certificate No. General, Natural Enviornment Profile, Xu Senior A28020052 Current Ambient Air Guanfu Engineer Conditions and Impact Assessment Current Status of Water Peng Engineer A28020044 Environment, Impact Lin Assessment, Risk Evaluation Current Status of Sound Environment, Impact Wang Senior A28020024 Assessment, and Weide Engineer Environment Monitoring Plan Lu YanAssistant A8208 Public Participation, Lu Yan ir A28020058 Alternative Proposal Wang Engineering Analysis, Junbo Engineer A28020039 Mitigation Measures and Junbo___ ____________ __________________ Feasiblilty Analysis Technical Review: Environmental Name Tittle Assessment Responsible Content Signature Certificate No. Luo Senior A28020001 Review Jiahai Engineer Zhang Senior A28020016 Revew Jinhong Engineer A GRIEP and FREMS March 2001 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project Table of Content I GENERAL ...............................................................................6 1.1 REASONS AND PURPOSE FOR THE PROJECT REPORT ................................................................. 6 1.1.1 Necessity and reasons for the project construction .................................... ......................... 6 1.1.2 Purpose of assessment .........................................................................6 1.2 PREPARATION REFERENCES ............................................................................7 1.3 APPLICABLE LAWS AND REGULATIONS FOR ASSESSMENT ....................................................... 7 1.4 ASSESSMENT STANDARDS ............................................................................9 1.5 ASSESSMENT OF THE ENVIRONMENTAL FUNCTIONAL DISTRICTS OF THE PLANNED PROJECT AREA AND THE EXECUTION STANDARDS ........................................................................... 9 1.5.1 Functional districts of sound environnment ........................................................................ 9 1.5.2 Functional districts of ambient air ........................................................................ 10 1.5.3 Functional districts of water environment and execution standards ............ ..................... 10 1.6 SCOPEOFASSESSMENT ........................................................................... 10 1.7 MAIN TECHNOLOGIES AND MEASURES FOR THE ASSESSMENT ............................................... 10 1.8 SELECTION OF ASSESSMENT FACTORS ........................................................................... I1 1.9 CLASSES OF ASSESSMENT ...........................................................................1 I 1.9.1 Classification measures stipulated in OP4. 01 of World Bank ............... ............................ 11 1.9.2 Classification of domestic environmental impact assessment ............................................ 11 2 OVERVIEW OF THE PROJECT AND PROJECT ANALYSIS .13 2.1 OVERVIEW OF THE PROJECT ...13 2.1.1 Property of the project ..13 2.1.2 Construction location and land acquisition ..13 2.1.3 Contents and scale of the project ..13 2.2 ENGINEERING ANALYSIS OF THE PROJECT . ............................................ 6 2.2.1 General plane layout ...... ........................................ 16 2.2.2 Water system ..... ......................................... 16 2.2.3 Analysis of main pollutant sources .......... ................................... 17 2.2.4 Hazard analysis of the gasolineeum and gas station ............................................ 21 3. ENVIRONMENTAL CONDITION IN THE INFLUENCE AREA OF THE PLANNED PROJECT ................................................. 23 3.1 NATURAL ENVIRONMENT ............................................... 23 3.1.1 Location .23 3.1.2 Geological and topographicalfeatures .23 3.1.3 Weather and climate .23 3.1.4 Hydrological geology .24 3.1.5 Soil .25 3.1.6 Water basin and hydrologic general conditions .25 3.1.7 Seismic general condition .26 3.2 STATUS QUO AND PLANNING OF THE SOCIETY IN FUZHOU . .26 3.2.1 Urban character .................. 26 3.2.2 Geological position .................. 26 GRIEP and FREMS March 200O Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 3.2.3 Economic and social status quo of Fuzhou City and Nantai lsland ............ ...................... 27 3.3 OVERALL PLAN OF FUZHOU CITY .................................................................. 29 3.3.1 Development objectives of Fuzhou City ............................................. 29 3.3.2 Development scale of Fuzhou City ............................................. 30 3.3.3 Development planning of Nantai Island ............................................. 31 3.3.4 Functional arrangement ............................................. 32 3.4 Status and Development Planning of Municipal Traffic ............................................. 33 3.4.1 Status and problems of road traffic in Fuzhou City ..................... ........................ 33 3.4.2 The goal of traffic development ............................................. 34 3.4.3 Survey of Public transport ............................................. 36 3.5 Sensitive Protected Goals Surrounding Proposed Bus depot ............................................ 39 4 STATUS MONITORING AND ASSESSMENT OF ENVIRONMENT QUALITY ...41 4.1 Status Monitoring and Assessment of Environment Quality . .41 4.1.1 Location of monitoring points ..41 4.1.2 Monitoring items ..41 4.1.3 Sampling time and analysis methods of monitoring items . .41 4.1.4 Assessment standard ..41 4.1.5 Monitoring results and assessment of environmental air . . 42 4.2 Monitoring and Assessment of Noise Status ..42 4.2.1 Monitoring method.. 42 4.2.2 Setting monitoring points ..42 4.2.3 Monitoring time ..43 4.2.4 Assessment standard of sound environment status . .43 4.2.5 Monitoring results and assessment of sound environment status . .43 4.3 Status Assessment of Water Environment Quality . .43 4.3.1 Assessment methods ..44 4.3.2 Assessment of water environment status ..... 44 5 ASSESSMENT OF ENVIRONMENTAL IMPACT IN CONSTRUCTION PERIOD. 46 5.1 Noise Impact Analysis during Construction Period .46 5.2 Impact Analysis and Mitigation MITIGATION MEASURES of Environmental Air Quality during Construction Period .48 5.2.1 Analysis of atmosphere pollution source during construction period .48 5.2.2 Impact analysis of atmosphere environment during construction period .48 5.3 Impact Assessment of Ecological Environment during Construction Period .49 5.4 Impact Assessment of Water Environment during Construction Period .49 6 ENVIRONMENTAL IMPACT ASSESSMENT IN OPERATION PERIOD .50 6.1 Analysis of Impact on Air Environment ..................................... 51 6.1.1 Analysis of the source of pollution ..................................... 51 6.1.2 Mode of atmospheric diffusion ..................................... 51 6.1.3 Parameters of atmospheric diffusion ..................................... 52 6.1.4 Wind speed and wind direction on ground surface ..................................... 53 6.1.5 Predicted results and assessment ..................................... 53 GRIEP and FREMS March 200 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 6.2 Environmental Impact Assessment of Water ................................................................ 55 6.3 Enwironmental Impact Assessment of Noise during Operation Period [P 1] ................... 56 7 IMPACT ANALYSIS OF ELECTROMAGNETIC ENVIRONMENT .................................. 60 7.1 Contents and Methods of Special Assessment and Impacted Sensitive Targets ................. 60 7.1.1 Contents of special assessment ................................................................ 60 7.1.2 Assessment standard ................................................................ 60 7.2 Measuring Results of Power-Frequency Electromagnetic Field in the Project Site .......... 61 7.2.1 Monitoring instrument ............................................................. 61 7.2.2 Monitoring conditions ................... 62 7.2.3 Layout of monitoring points ................... 62 7.2.4 Monitoring results ............ 64 7.3 Impact Analysis of Power-Frequency Electromagnetic Field ........................................... 66 7.3.1 The power-frequency electric field's impact on personnel ..............................................,.66 7.3.2 The power-frequency magnetic field 's impact on personnel ............................................. 66 7.3.3 The power-frequency magneticfield's impact on CRT display ......................................... 67 7.4 ANALYSIS OF IMPACT ON RADIO INTERFERENCE . .67 7.4.1 Categories of communications equipment .67 7.4.2 Intensity of receiving signal of interfered communications equipment .67 7.5 RISK IMPACT ASSESSMENT ON THE TRANSFORMER SUBSTATION AND HIGH-VOLTAGE TROLLY WIRE 70 7.6 CONCLUSION AND MITIGATION MEASURES .70 7.6.1 Conclusion ............ 70 7.6.2 MITIGATIONMEASURES .71 7.6.3 Suggestion ........... 71 8 RISK ANALYSIS AND BUILDING PRELIMINARY PLAN FOR EMERGENCY . ........... 72 8.1 CATEGORIES OF ACCIDENTS AND RISK ANALYSIS ................................................................. 72 8.1.1 Risk analysis offueling .................................................................... . 73 8.2 KEY POINTS OF EMERGENCY TREATMENT .............................................. ...................... 74 8.3 DIVISION OF WORK FOR EMERGENCY TREATMENT .................................................................. 74 8.4 EMERGENCY TREATMENT AND EMERGENCY PLAN FOR THE MAJOR ACCIDENTS ...................... 75 8.4.1 Emergency treatment for the engineering project .......................................... , 75 8.4.2 Emergency treatment in reservoir area .......................................... 77 8.4.3 Preliminary plan for emergency of social rescue .......................................... 79 8.4.4 Brief summary .......................................... 80 9 IMPACT MITIGATION MEASURES .......................................... 83 9.1 MITIGATION MEASURESS FOR SEWAGE TREATMENT AND FEASIBILITY ANALYSIS ......... 83 9.2 MITIGATION MEASURESS FOR WASTE GAS TREATMENT ......................... ....................... 85 9.3 PREVENTION AND MITIGATION FOR NOISE ...................................................................... 85 9.4 MITIGATION MEASURESS FOR DANGEROUS ARTICLES .86 9.5 POLLUTION PREVENTION MEASURES DURING PROJECT CONSTRUCTION .87 9.6 ESTIMATION OF INVESTMENT FOR ENVIRONMENTAL PROJECT .92 10 PUBLIC PARTICIPATION .94 GRIEP and FREMS March 2004 Enviromnental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 10.1 PURPOSE AND MEANING OR PUBLIC PARTICIPATION .............................................. 96 10.4 FIRST PUBLIC PARTICIPATION SURVEY .............................................. 96 10.4.1 Investigation Method and Content ........................................................... 96 10.4.2 Statistics and analysis offindings of public opinions ..................................................... 97 10.5 SECOND PUBLIC PARTICIPATION SURVEY .............................................. 99 10.5.1 Supporting opinions for construction of the Project . ................................................... 100 10.5.2 Issues worried by the interviewees .......................................................... 100 10.6 BRIEF SUMMARY ON PUBLIC PARTICIPATION OPINIONS ..... 101 11 ENVIRONMENTAL MANAGEMENT AND MONITORING PLAN ................................. 102 11.1 ENVIRONMENTAL MANAGEMENT ........... ................................................ 102 11.1.1 Environmental management agency .......................................................... 102 11.1.2 Environmental management responsibilities ........................................... 102 11.1.3 Personnel training ........................................... 105 11.2 ENVIRONMENTAL MONITORING PLAN . . . ........................................ 106 11.2.1 Monitoringpoints ............................................ 106 11.2.2 Items,frequencies and durations ........................................... 106 11.2.3 Monitoring data analysis and management ........................................... 107 12 MAIN CONCLUSIONS OF ASSESSMENT ...........................................1 09 12.1 NECESSITY OF PROJECT .109 12.2 ASSESSMENT ON THE CURRENT STATUS OF ENVIRONMENTAL QUALITY .109 12.3 ASSESSMENT ON THE ENVIRONMENTAL IMPACT DURING THE OPERATION PERIOD .110 12.4 ASSESSMENT ON ELECTROMAGNETIC ENVIRONMENTAL IMPACT .111 12.5 RISK ANALYSIS AND EMERGENCY SCHEME . 12 12.6 ANALYSIS OF MITIGATION MEASURES FOR POLLUTION MITIGATION . 12 12.7 PUBLIC PARTICIPATION .11........................ 113 12.8 . 114 GRIEP and FREMS March 20O Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 1. General 1.1 Reasons and Purpose for the Project Report 1.1.1 Necessity and reasons for the project construction Urban public transport is a crucial component of city transportation system, and public service including public transport plays an important role in the quality of life for citizens in the city. During the period of the "Ninth Five-Year Plan", the economy in Fuzhou City has growed rapidly, the urban city scale has been expanded, and the urban population has increased substantially, resulting in fundamental changes in demands in public transport. With the guidance of the policies of "Make a great change in three years" and "Give priority to public transport" of the municipal government of Fuzhou, the public transport sector starts a speedy improvement. However, planning and construction of the stations, maintaining yards, hub station, and the first and last bus stops of the public transport system lack integration and sufficiency. These factors restrict the further development and continued improvement of the public transport services. Therefore, the municipal government of Fuzhou has decided to increase the investment in upgrading the city's public transport system. Construction of Jinshan Central Bus Depot using a World Bank loan is one of the efforts to supplement for the public transport stations in downtown and the new city areas so as to improve the service and quality of public transport. The Jinshan Bus Depot project is located in Pushang Industrial Zone on the Nantai Island in the city's suburb. Opposite to Pushang Road is the planned Jinshan residential area, to the west is Jinshan Park, and to the north is a substation and Pushang long-distance bus station. In accordance with stipulations in Measures for Environmental Impact Assessment of People's Republic of China, State Council of PRC No. 253 Regulations on the Administration of Project Environmental Protection, and The World Bank Operational Manual- Environmental Assessment (OP4.01), environmental impact assessment must be carried out for projects. In June of 2004, authorized by Fuzhou Traffic Committee, Guangzhou Research Institute of Environmental Protection (Certificate No. of environment assessment: GHPZJZ 2802) undertakes the preparation of the Environmental Impact Assessment Statement of Jinshan Central Bits Depot of Fuzhou City. 1.1.2 Purpose of assessment The project will undoubtedly solve the increasingly serious problem of maintenance of buses in Fuzhou. However, whether the construction and operation period will harm the natural and social environment or not is under attention. This assessment aims at as per regulations and standards like Environmental Protection Law of People's Republic of China, carrying out investigation on the environmental quality status of atmosphere, sewage and noise etc. in the planned area of the project, analyzing the pollutants in the project, sufficiently understanding and objectively assessing impacts on the natural, social and economical environments and putting forward mitigation GRIEP and FREMS 6 March 200O Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project measures of environment influence and plans for pollution control so as to realize the harmonious development of economic advancement and environmental protection in the construction and operation of the project, and to give full play to the benefits of the project. 1.2 Basis of EA (1) State Council No.253, Regulations on the Administration of Project Environmental Protection Nov., 1998; (2) Law of the People's Republic of China on the Environmental Impact Assessment (executed from Sep. 1, 2003); (3) HUAN JIAN (1993) No. 324 Notice on Strengthening Management Upon Environmental Impact Assessment of Projects Funded by International Financial Organizations; (4) The World Bank Operational Policies - Environmental Assessment (OP4.01); (5) The World Bank Operational Policies - Natural Habitats (OP4.04): (6) The World Bank Operational Policies - Cultural Properties (OP4. 11); (7) Letter of Trust by Fuzhou Municipal Development Planning Commission to Guangzhou Research Institute of Environmental Protection for Preparation of the Environmental Impact Statement on Parking Area Construction of Fuzhou Jinshan Central Bus Station (8) Projet Proposal on Parking Area Construction of Fuzhou Jinshan Central Bus Station (Including Feasiblitly Study Report); (9) Outline of Environmental Impact Assessment on the World Bank Financed Parking Area Construction of Fuzhou Jinshan Central Bus Station; (10) Minutes of Meeting on Technical Evaluation of the Outline of Environmental Impact Assessment upon Parking Area Construction of Fuzhou Jinshan Central Bus Station (Oct.27-29, 2004) 1.3 Applicable Laws and Regulations for Assessment (1) Environmental Protection Law of the People's Republic of China (Dec.1989); (2) Law of the People' s Republic of China on the Prevention and Control of Enviromnental Noise Pollution (Oct. 1996); (3) Law of the People' s Republic of China on the Prevention and Control of Atmospheric Pollution (Amended on Apr.2000); (4) Law of the People' s Republic of China on the Prevention and Control of GRIEP and FREMS 7 March 200O Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project Water Pollution (Amended on May 1996); (5) Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste (Oct.1995) (6) Notice on Publication of the "Sites for Project Environmental Protection (The 1 st Batch) (Natioanl Envionmental Protection Bureau [2001 ]No. 17); (7) Provisions on the Environmental Administration of Electromagnetic Radiation (Mar.25,1997); (8) Technical Specification for Environmental Impact Assessment of Electromagnetic Radiation in 500kV Supertension Power Transmission and Transformation Projects (HJ/T 24-1998); (9) Guideline on Environmental Protection Administration of Radiation- Procedure and Standard for Environmental Impact Assessment of Electromagnetic Radiation (HJ/T 10.3-1996) (10) Guideline on Environmental Protection Administration of Radiation- Monitoring Instrument and Methods for Electromagnetic Radiation (HJ/T 10.2-1996); (11) Regulations of Fujiang Province on Environmental Protection 2002; (12) Overall Planing of Fuzhou City (1995-2010); (13) Regulations of Fuzhou Municipality on Environmental Protection 2002; (14) Urban Environment Planning of Fuzhou City (Sep. 2001); (15) Environment Planning of Nantai Island of Fuzhou City (Sep.2000); (16) Measures of Fuzhou MunicipalityforManagement upon Urban Afforestation and Greening (2001); (17) Procedure for Measurement of Environmental Noise in Urban Area (GB/T14623-93) (18) Industrial Standard of People's Republic of China on Environmental Protection-Technical Guidelines for Emvironmental Impalct Assessment (HJ/T2.1 -2.3-93); (19) Technical Guidelines for Environmental Impact Assessment (Sound Environment)(HJ/T2.4 - 1995) (20) Technical Guidelines for Environmental Impact Assessment (Non-pollution Ecological Impact) (HJ/T19-1997) GRIEP and FREMS 8 March 200O Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 1.4 Assessment Standards (1) Category II and VI standards in Standard of Environmental Noise of Urban Area (GB3096-93); (2) Noise limit in various construction phasts in Noise Limits for Construction Site (GB12523-96); (3) Catogory II standards in Ambient Air Quality Standard (GB3095-1996) and the amendment; (4) Limits and Measurement Methods for Wmissions from Light-duty Vehicles( I ) (GB18352.1-2001); (5) Limits and Measurement Methods for Wmissions from Light-duty Vehicles ( II ) (GB 18352.2-2001) (6) The second section of Limits and Measurement Method for Exhaust Pollutants from Compression Ignition (C.I.) Engines of Vehicles (GB17691-2001) (7) Limits and measurement methods for exhaust emissions from positive ignition (PI) engines of vehicles and vehicles equipped with PI Engines (GB 14762-2002) (8) Category III standard in Environmental Quality Standard for Surface Water (GB3838-2002) (9) Control Standards for Total Quantity of Pollutant Discharge in Minjiang River (DB35/321-2001); (10) Class III standard in Integrated Wastewater Discharge Standard (GB8978-96); (11) Technical Regulations on Environmental Impact Assessment of Electromagnetic Radiation Produced by 500kv Ultrahigh Voltage Transmission and Transfer Power Engineering (HJ/T24-1998); and (12) Information Technology Equipment--Immunity Characteristics--Limits and Methods of Measurement (GB/T17618-1998). The limit to noise immunity is lA/mzl.26gT. 1.5 Assessment of the Environmental Functional Districts of the Proposed Project Area and the Applicable Standards 1.5.1 Functional districts for noise According to the regulations of Urban Environment Planning of Fuzhou City, the functional districts in the assessment scope of sound environment are mainly Category II district and Category VI district, and thus the noise GRIEP and FREMS 9 March 2009 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project environmental quality shall apply Category II and Category VI standards specified in GB3096-93. Thereinto, the west and north sides of Jinshan Central Bus Depot are roads. The west and north peripheries are Category VI districts, and the east and south peripheries are Category II districts. The standard values of environmental noise in these functional districts are detailedly shown in Table 1.5-1. Table 1.5-1 Noise Standard Unit: dB(A) Class Day Night Peripheries Reference 4 70 55 West and North Standard of Environmental 2 60 50 East and South Noise of Urban Area (GB3096-93) 1.5.2 Functional districts for ambient air In accordance with related contents in Urban Environment Planning of Fuzhou City, the whole area of the assessment scope of ambient air in this project can be classified as Category II functional districts of ambient air, and shall apply the standard for Category II stipulated in Ambient Air Quulity Standards and the revised edition. The detailed standard values are shown in Table 1.5-2. Table 1.5-2 Standards of Ambient Air Quality Unit: mg/mr3 Factors for Sampling Time Density Reference surveillance and Linit assessment CO lHour 10.00 Ambient Air Quality Standards NO2 IHour 0.24 (GB3095-1996) Category II PMo0 24Hours 0.15 standard 1.5.3 Functional districts of water environment and applicable standards The project sewage shall be discharged into Jinshan Sewage Treatment Plant and the final reception water body is Beigang in reference with the Category III standard of GB3838-2002. 1.6 Scope of Assessment (1) Atmospheric environment: peripheries within 200m of the borderline of the selected area of the project; (2) Sound environment: the scope within Im of the borderline of the maintenance yard. 1.7 Main Approach and Methodology for the Assessment The environmental impact assessment will be carried out according to the stipulations of HUAN JIAN [1993] No. 324, the requirements of The World Bank Operational Manual- Environmental Assessment (OP4.01) and the GRIEP and FREMS 10 March 2069 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project technical guidelines and criteria about assessment issued by the Environmental Protection Bureau of the country. On the basis of the first-hand investigation and survey of the project area, set up sampling locations of ambient air and noise for regular monitoring and experimental analysis. In combination with the monitoring data of the area in recent years, accurately determine the environmental quality status of the area. Adopt relevant mathematical models to carry out environmental impact assessment and bring forward corresponding measures for pollution control. 1.8 Selection of Assessment Factors As per the sewage features of projects, the following factors are selected for assessment: (1) Atmospheric environment: Status quo: PM,o, NO2; Impact forcast: NO2, hydrocarbon (not include C04), CO. (2) Sound environment: noise during construction and operation period (3) Water environment: for status quo, pH value, COD, BOD, DO, gasolineeum, and NH3-N 1.9 Classes of Assessment 1.9.1 Classification measures stipulated in OP4.01 of World Bank In accordance with the classification measures stipulated in The World Bank Operational Manual- Environmental Assessment (OP4.01), and as per the pollution characteristics of projects, source intensity of the pollutants and the environmental status of the project area, a comprehensive environmental assessment is required for the project construction of Jinshan Central Bus Depot of Fuzhou, which is classified as Category A. . 1.9.2 Classification of domestic environmental impact assessment Different from that of the World Bank, the environmental impact assessments in China as per the technical guidelines of environmental impact assessment in China are classified into three classes. Around Jinshan Central Bus Depot is an office building, employees' boarding house, maintenance yard, and gasolineeum and gas station. The sewages therefrom are respectively discharged into the oil traps and then into the municipal sewage pipe networks outside the station. The final destination of the sewages is Jinshan Sewage Treatment Plant, and the final reception water body is Beigang. The water environment of Beigang applies Category III standard of GB3838-2020 and the environmental impact assessment is determined as Class III. After the completion of the project, there will be a relatively little impact on the sensitive points of sound environment. As per the related regulations in Technical Guideline for Environmental Impact Assessment (sound environment) (HJ/T2.4 - 1995), the sound environmental impact assessment of GRIEP and FREMS 11 March 20t3 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project the project is defined as Class III. According tQ the stipulations in Technical Guideline for Environmental Impact Assessment (ambient air) (HJ/T2.2 - 93), the air environment impact assessment is determined as Class III. GRIEP and FREMS 12 March 201 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 2 Project Description and Analysis 2.1 Overview of the Project 2.1.1 Project nature The project of Jinshan Central Bus Depot of Fuzhou is one of the World Bank financed projects in Fuzhou. The total investment therein is RMB 91,910,340 Yuan, 35% of which comes from the financing of the World Bank. 2.1.2 Location and land acquisition The project is located to the north of Pushang Industrial Zone, to the north is Pushang Road, to the east is the substation, to the south is Gaozhai and Geyu Village (including Hongjiang Road under planning) and to the east is Hongwan Road in plan. The specific location is shown in Fig. 2.1 - 1. The project will take up a total area of 12.288 hectares of various kinds of lands (including parts of the roads), among which, area of buildings is 42.15mu, pond area 3mu, nursery garden 104.19mu, and the others are grassland or empty area. 2.1.3 Contents and scale of the project The project of Jinshan Central Bus Depot, after completion, can hold 324 buses. It has a dispatching center of public transport, a junction station, a maintenance yard, gasolineeum and gas station, and employees' boarding houses etc. The project will be divided into two phases for construction. 2.1.3.1 Construction content in Phase I (1) The present public transport lines of the new area of Jinshan have 218 buses. And the newly-developed lines are 9 lines, with 176 added buses. The parking of these buses is urgent to be resolved. Therefore, the first task shall be the construction of public transport station, and the scale shall hold 200 buses. (2) Buses will feed gasolineeum or gas at least once a day, usually before parking at night or before starting in the morning. Therefore the gasolineeum and gas station shall be simultaneously constructed with the station. In order to avoid repeated investment and construction, it is better to finish the gasolineeum and gas station for only one time which can satisfy the supply for 300 buses both at night and in the daytime. Part of the station can be operated towards external businesses. (3) It is necessary to prepare a repair shop in the station of public transport for the repair of vehicles operating every day. The scale shall be adapted to the land scale of Phase I and the service condition. The floor plan of Phase I project is shown in Fig. 2.1-2. For the main economic indexes of Phase I project, see Table 2.1 -1. GRIEP and FREMS 13 March 20t Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project Table 2.1-1 Economic Indexes of Phase I Project Quantity Unit (hectare) Total area of* land 4.34 Hectare acquisition Land of station (200 buses) 2.23 Hectare Land of repair shop 0.25 Hectare Land of gasolineeum and 0.54 Hectare gas station Office building of the gas 348 mr station Washing workshop 3 Set Afforestation area 0.41 Hectare 2.1.3.2 Construction content of Phase II (1) On the basis of Phase I project, properly extend the station in order to satisify the requirements of bus parking for the medium and long term of Jinshan new area. The scale shall be able to hold 300 buses. (2) With the development of the new area of Jinshan, and the increase of public transport lines, it is important to carry out supplementary construction of the first and last bus stops. For the present, there are only two initial and final stations in Jinshan Exhibition City and Industrial Zone. A majority of buses are parked along the road. In Pushang District, the Pushang Industrial Zone has been completed. Jinshan residential area to the north of Pushang Road is under development and construction. It is obvious that there will be a certain amount of passenger flows in the block in the next few years. Therefore, the construction of initial and final stations in combination with the station shall be carried out to meet the requirement of the passenger flows, and to balance the layout of the network of public transport lines. After completion of Pushang Bridge, the first and last bus stop shall be upgraded as a junction station in connection with the University City and the downtown area. 8 lines are planned for the station. (3) The key in Phase II project is to construct the elementary maintenance yard and repair shop in the station, so that the first and second maintenance of buses shall be completed in the station and meanwhile the repair work of 300 buses shall be finished in the station. (4) In 2010, there will be 2880 buses for public transport in Fuzhou. With the increase of buses and public transport lines in operation, the dispatching by man cannot meet the requirements. Therefore, the construction of a modernized dispatching and control center for public transport becomes urgent and will be beneficial to the promotion of service level and work efficiency of public transport as well as to the maintaining of sustainable development of city traffic. (5) In the station, build some boarding houses for the employees so as to provide a place for the drivers and stewards of the buses in wee hours to GRIEP and FREMS 14 March 20*4 Environtnental impact Assessment for Fuzhou Jinshan Central Bus Deport Project rest at night. (6) To eliminate the impact on the surrouding environment, it is required to increase the afforestation rate of the field in Phase II project. The floor plan of Phase II project is shown in Fig. 2.1-3. Refer to Table 2.1-2 for the main economic indexes of Phase II project. Table 2.1-2 Economic Indexes of Phase II Project Quantity Unit Dispatching and Dispatching and control center 10262 mn control zone Dispatching room 115 m2 Dispatching equipment 342 set Waiting zone Comprehensive building 420 mn_ Lounge hall 1600 mn Service room in lounge hall 8 Ticket room, boiled water supply room, tool room and 106 rn2 supplementary workshop Bus depot and Repair shop 7032 m2 maintenance zone Maintaining shop 5018 m Maintaining equipment 342 4i Bus depot of buses 15873 m_ Gasolineeum and Gasolineeum and gas house 1705 m! gas station Office building 348 ni Underground store house of 499 m2 gasolineeum and gas Filling equipment 342 set Washing workshop Washing workshop 4 set Auxiliary and living Boarding house of employees 3380 m' facilities Auxiliary stores 1200 m!_ Lodge 100 m 2 W.C. 32 m2 Afforestation 17630 m 2.1.3.3 Project profile after completion of Phase I and Phase II The assessment object is the general content of Phase I and Phase II. (1) 3-5m width of green belt along the roads surrounding the field, and green belts around the dispatching center and employees' dormitory buildings (2) A capacity of 300 buses of the bus depot scale (3) Departure of 100 shifts of the 8 lines every hour in the junction station (4) Maintenance of about 38 buses in the maintenance yard every day (5) Gas filling of 19500m3 for 300 buses in the bus depot every day, and the extemal business: 7800m3 gas filling for passing-by taxies in the gasolineeum and gas station. GRIEP and FREMS 15 March 205 EnvironmTental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project Table 2.1-3 Project Profile S/N Project Name Basic Data 1 Capacity of the bus depot (bus) 300 2 Daily power consumption (kwh) 5201.07 3 Daily water consumption (mn/d) 440 4 Fixed number of employees (persons) 100 5 Total investment of the project 12014.82 (RMB10,000 Yuan) 2.2 Engineering Analysis of the Project 2.2.1 General plane layout The spatial arrangement of the station: office block, residential area, bus depot, initial and final station, gasolineeum and gas station and maintenance yard. The details are shown in Fig. 2.1-2. The office block and residential area are the most populous areas inside the station, located at the northwest of the field, and close to Jinshan Park, providing a good environment for recreation, work and living of people. The first and last bus stop is located at the southwest of the field, a best and convenient position for the passengers of Jinshan Industrial Zone and the long-distance passenger station. The arrangement of the bus depot makes it convenient for buses to stop in any berth. 2.2.2 Water system 2.2.2.1 Supply system The municipal supply net feeds water into the pipeline in the station. The designed daily maximum supply is 440m3. 2.2.2.2 Drainage system Separate system for rain and sewage is adopted for drainage. Rain water above the buildings is discharged by means of internal drainage method. The fecal sewage of the office buildings and the boarding houses, after processed in the treatment tank, is discharged into the municipal sewage network; sewages of the eatery, washing workshop, gas station, maintenance and cleaning are piped into the separate oil traps for pre-treatment and then discharged into the municipal drainage networks. The total amount of drainage is 357.7m3/d. 2.2.2.3 Fire-fighting system Fire hydrant systems are installed in the office buildings, boarding houses and the garage. Automatic sprinkler system is adopted in the garage. For fire-fighting subareas in the garage, prepare fire-proof roll screens. Conserve fire fighting water in the water tank of the maintenance workshop and comprehensive building. In the fire pump room of the garage, set up fire water pond to ensure the water supply of the hydrant system. GRIEP and FREMS 16 March 20O0 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 2.2.3 Analysis of main pollutant sources 2.2.3.1 Status quo and exhaust condition of buses The public transport system in Fuzhou has various sorts of vehicles in operation, of which, a large proportion are vehicles with diesel engine. It is shown in Table 2.2-1 and Table 2.2-2 that the models and exhaust conditions of the public buses. The standard of pollutant exhaust in Table 2.2-2 are GB14761.5-93 Emission Standard for Pollutants at Idle Speed from Vehicle with Gasoline Engine and GB14761.6-93 Emission Standard for Smoke at Free Acceleration from Vehicle with Diesel Engine, and the inspected data of the exhaust emission for vehicles with gasoline engine is at idle speed, while that of the vehicles with diesel engine is at free acceleration. Table 2.2-1 Models of Public Buses Vehicle Cyclinder capacity Rated Oil Actual oil Vehicle Cycdeldef capacity consumption consumption Category Model of engine (l) ( 1Okm) (1/100km) Vehicle CAIOC (Jiefang) 5550 with CA6102Q (Jiefang) 5560 30.5 29.91 gasoline - engine EQ6102Q (Dongfeng) 5420 Vehicle CY6102BQ 5785 with diesel (Chaoyang) 23 22.34 engine 6BT5.9 (Cunmins) 5880 Table 2.2-2 Emission Condition of Waste Gas of Public Vehicles in Operation Emission standard Actual inspected data Vehicle category CO Hydrocarbon Vehicle CO Hydrocarbon (%) (ppm) catogory (%) (ppm) Gasoline New 4.5 1200 Gasoline 1.2-2.0 300-600 engine Old 5.0 1500 engine Diesel engine 4.5-5FSN Diesel engine 2-3FSN Notes: new vehicles refer to vehicles after July 1, 1995, those before are old ones. 2.2.3.2 Analysis of main air pollutant sources After the completion and putting into use of the station, the emission thereof mainly comes from the exhaust of motor vehicles and the soot from the eatery. 1) Exhaust of motor vehicles in the station There are 300 berths for motor vehicles in the station. Pollutants in the exhaust of them are mainly nitrogen oxides, CO, hydrocarbon and black smoke, which are diversified with the diversity of the categories of the vehicles and the driving speed thereof. Table 2.2-3 Comprehensive Emission Factors of Heavy Duty Gasoline Cars and Heavy Duty Vehicles with Diesel Engine Operating Hea duty gasoline cars Heavy dutv diesel vehicles condition iHC CO NO HC | CO NOQ 30km/h (g/km) 12.72 81.25 6.28 2.47 7.15 12.82 GRIEP and FREMS 17 March 20AY Enviromnental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project 10kmn/h (g/km) 26.85 195.28 5.59 4.27 16.10 18.69 5kn/h (g/km) 37.76 256.35 5.41 4.99 20.60 21.24 Idle speed 1.34 9.50 0.01 0.30 0.50 0.33 300 berths are planned in this station, for parking of public buses at night. In the junction station, there are altogether 100 shifts of the 8 lines every hour, thus there are 1900 buses/times/d coming into or leaving the bus depot. The running speed is 5hm/h, average idle speed time is 5min and the average running distance is 400m. Therefore, the average emission of air pollutants of each vehicle coming into and leaving the bus depot shall be calculated as per the following fornula: Si=(Eig E L+Iig - T) Fg+(Eid+Iid - T)Fd Thereinto, Eig is the comprehensive emission factor of heavy duty gasoline cars; lig is the emission factor of heavy duty gasoline cars at idle speed; Fg is the proportion of gasoline cars; Eid is the comprehensive emission factor of heavy duty diesel vehicles; Iid is the emission factor of heavy duty diesel vehicles at idle speed; and Fd is the proportion of diesel vehicles. The proportion of gasoline vehicles is 40% and that of the diesel vehicles is 60%. Therefore the average emission amounts of each vehicle entering and exiting the bus depot are: HC10.82g, CO 66.45g, and NOx 6.97g. The average emission of air pollutants in the bus depot is shown in Table 2.2-4. Suppose that the turnover vehicle flow at peak hours in the station is 100 buses/times/h, the source intensity of air pollutants in the station at peak hours is shown in Table 2.2-4. Table 2.2-4 Air Pollutants from Motor Vehicles in the Station HC. CO NOx Emission factor per vehicle 10.82 66.45 6.97 (g) Daily emission (kg/d) 20.56 126.26 13.24 Emission at peak hours (g/s) 0.30 1.85 0.19 2) Waste gas from the eatery There are 100 employees in the station. Gas cooker units are to be installed in the eatery. Oil gas is planned to be used. There are two cooking stoves with a smoke emission of 2000m3/h. To be calculated as 3 hours of operation per day, the smoke emission from the eatery will be 12000m3/d. 2.2.3.3 Analysis of main water pollutants 1) Main souces of drainage out of the bus depot: a. Sewage from washing the vehicles in the washing workshop; GRIEP and FREMS 18 March 20O Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project b. Washing water in the maintenance workshop; c. Sewage in the waiting zone; d. Sewage from office building and domestic sewage; e. Sewage from the eatery. Table 2.2-5 Condition of Production of Sewage Functional area Scale Calculation Amount of sewage coefficient (m3/d) Domestice sewage 100 people 0.315m /d * person 31.5 of employees _______e_h__e__tie_6 Washing workshop 60 vehicles/d 1 m3/vehicle time 60 Maintenance 12050 m' 0.02 m3/ m2 * d 241.0 workshop Waiting zone 2020 mr 0.01 m3/ m2 d 20.2 Eatery 100 people, 3 meals 0.05 m3/person * meal 15 Working sewage of 100 people 0.05 m3/d * person 5 employees Total 357.7 m /d Table 2.2-5 Production and Discharge Condition of Pollutants Vegetable Sewage CODcr BOD5 SS Gasolineeum and animal oil Domestic sewage 250 150 180 -- 28 (31.5m /d) Maintenance workshop 300 100 200 150 -- (240.1m3/d) Sewage of washing (60 . 250 80 150 20 m3/d) (Dmngs/L)y Waiting zone 20 10 0 (20.2m 3/d) 280 180 200 Eatery 400 250 200 150 (15m3/d) Working sewage of 200 120 150 -- 20 employees (5 m /d) Required density of 500 300 400 30 100 connector (mg/L) Domestic Discharge sewage density 250 150 180 -- 28 (31.5m /d) (mg/L) Maintenance workshop 300 100 200 30 -- (240.1m3/d) l GRIEP and FREMS 19 March 209Y Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project Sewage of washing (60 250 80 150 20 rr3/d) Waiting zone 280 180 200 -- (20.2m3/d) 280_180_20 Eatery(15 400 250 200 100 Working sewage of 200 120 150 20 employees (5 20 10 10- m3/d) 2) Collection of initial rain water and the pollutants therein Because of the incoming and leaving of vehicles in the bus depot, there must be some leakage or drop of pollutants. In case of raining, those pollutants will be brought into the rivers with the rain. These are pollutants of non-point source pollution. In order to eliminate these kinds of pollutants, it is planned to collect the initial rain water in the first 1 5min for process in biochemical pond and then the rain water is discharged with other kinds of sewage. The pollutant parameters of water quality of the initial rain water in the maintenance yard are mainly BOD5, CODIr, gasolineeum and suspended matters etc. The production of initial rain water can be estimated as per the formula: Initial rain water discharge amount (t/d) = annual average quantity of precipitation in the project area (m) X runoff coefficient X gathering area (mi2) X 10%/annual precipitation days. The runoff coefficient is 0.8, the annual quantity of precipitation is 1354mm, the gathering area is 122,400m2, and the annual precipitation days are 150 days. Table 2.2-6 Initial Rain Water Pollutants Before rocess Initial rain water Gasolinee CODc, B SS Density 70.0 200 60 50 Quantity 88.4m3/d mg/L Production 6.2 17.68 5.30 4.42 kg/d I__ _ _ _ _ _ I__ _ _ _ _ Sewage of the project, in case of meeting the requirements of connectors, shall be discharged into the municipal sewage pipeline network to be treated in Jinshan Sewage Treatment Plant. As per Table 2.2-5, sewage in need of pre-treatment is the oily sewage from the maintenance and repair workshop, and the quantity thereof is 240. 1m3/d. 2.2.3.4 Noise source The noise of this project mainly comes from the spare generator room, the air GRIEP and FREMS 20 March 209 Environmental Impact Assessment for Fuzhou Jinshan Central Bus Deport Project compressor plant, and operation of machine in maintenance and repair shop as well as the noises of the public buses. The levels of the noises from various sources are: generator 105 1 lOdB(A), air compressor75 - 85dB(A), machines and equipment 80-90dB(A), and the public buses 79'82dB(A). Noises in the construction period mainly come from the construction machinery and the noise value thereof is 86- 112dB(A). 2.2.3.5 Solid waste The solid waste of this project is mainly the production waste residue in the bus depot and the domestic garbage of the workers. The production waste residue, to be calculated as per 10kg for each maintenance vehicle, 38 vehicles per day, will be about 0.38t/d, and will be 138.7t per year; the domestic garbage, to be calculated as per 0.5kg/person/d, will be 0.05t/d and 18.25t per year. 2.2.4 Hazard analysis of the gasolineeum and gas station 2.2.4.1 Function and scale of the gasolineeum and gas station Oil tanks and gas tanks are to be installed in the gasolineeum and gas station, supplying gasoline, diesel and CNG. There will also be automatic weighing devices. Therefore the station can admit the operations of gasolineeum or gas filling of several vehicles simultaneously. (1) Physical property of the stored oil 90# Lead-free gasoline Flammable liquid, colorless to light yellow, with a special odor, highly volatile; relative density 0.8, boiling point 37.8
Группа Всемирного банка · Environmental Assessment
China - Fuzhou Urban Transport Project : environmental impact assessment (Vol. 11 of 14) : environmental impact assessment - Jinshan Central Bus Depot
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Environmental Assessment
Страна
Китай
Источник
Всемирный банк