Группа Всемирного банка · Environmental Assessment

China - Sichuan Urban Development Project : environmental assessment (Vol. 7 of 9) : Suining environmental management plan

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 Sichuan Urban Development Project (SUDP) Financed by The World Bank Loan Suining Environmental Improvement Project (Infrastructure Construction in Xining District ) Environmental Management Plan Sichuan Research Institute of Environmental Protection (SRIEP) E1245 v 7 Page 2 Oct. 2005 Contents Preface Objective of Environmental Management Plan 1.0 INTRODUCTION 1.1 Source of the project 1.2 Contents of Project and major components of construction 2.0 Objects of Environmental Protection and Scope of the EIA 2.1 Objects of Environmental Protection 2.2 Scope of the EIA 3.0 Standards for the EA 3.1 Soil and Water Losses / Soil Erosion 3.2 Standard for Water Quality 3.3 Standard for Ambient Air 3.4 Acoustic Environment Standard 4.0 Environmental Impact of Project 4.1 Analysis on Impact Sources 4.2 Analysis on Environmental Impact in Construction Phase 4.3 $QDO\VLV\03RQ Environmental impact in operation phase 5.0 Management Plan of Environmental Protection 5.1 Objectives of Environmental Management 5.2 Environmental Management Department 5.3 Environmental Management in Construction Phase 5.4 Environmental Supervision 5.5 Environmental Management in Operation Phase 5.6 Environmental Monitoring Program 5.7 Cost Estimate Page 3 Preface This Environmental Management Plan is compiled based on the Environmental Impact Assessment Report for Suining Environmental Improvement Project (Infrastructure Construction in Xining District) Financed by The World Bank Loan and adjustment/amendment to the Report. As an individual document, this Plan involves all actions and activities taken during the construction and operation phases of the proposed project so as to protect the environment in the proposed project area. It will serve as the principle and framework for implementation of control measures, management and monitoring of environment during construction and operation phases. This plan is composed of four parts: 1) General description; 2) Potential impact brought about by the proposed project; 3) Environmental management plan; 4) Environmental monitoring plan. Objective of Environmental Management Plan Environmental management is one component of project management and a key link for carrying out the environmental protection effectively during the implementation of project. The objective or purpose of environmental management is to guarantee the implementation of all the environmental or mitigation measures so as to control or alleviate the adverse effects on the environment, and to promote the balanced and coordinated development of local socio-economy and eco-environment. The proposed Suining Environmental Improvement Project (Infrastructure Construction in Xining District ) Financed by The World Bank Loan is designed in accordance with management regulation of infrastructure construction and is reviewed and assessed strictly according to relevant standard and specifications. All these undertakings are aimed at minimizing potential negative impact on social economy and environment through proactive mitigation measures of environmental protection. Page 4 1 INTRODUCTION 1.1 Source of the project Suining City is located in the central part of Sichuan Basin, and is the joint between provnical capital Chengdu and one of the four municipalities with a provincial status, Chongqing.According to the Master Plan of Suining City, the highlight of

Основные сведения
Тип документа Environmental Assessment
Дата принятия
Страна Китай
Источник Всемирный банк