China - Hunan Urban Development Project : resettlement action plan (Vol. 6 of 6) : Resettlement plan for corridor component (Zhuzhou section)

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

RP211 Volume 6 World Bank Loan Hunan Urban Development Project Corridor Component (Zhuzhou Section) Resettlement Action Plan Prepared by Hunan Provincial CZT Economic Integration Office Mar. 2004 z ', a World Bank Loan Hunan Urban Development Project Corridor Component (Zhuzhou Section) Resettlement Action Plan Prepared by Hunan Provincial CZT Economic Integration Office Mar. 2004 Approval: Shou Xian Qing Check: Xie Zeng Li Compile: Zhang Tao Xia Ji Hong Major participators: Fang Xia Song Qing Gang Liu Yan Hui Li Shao Hua Peng Yi Wu Wei CONTENT 1. SUMMARY 1-1 1 1 PROJECT BACKGROUND 1-1 1.2 SCOPE AND CONTENTS OF THE PROJECT 1-2 1.2.1 GEOGRAPHIC POSITION OF THE REGION 1-2 1.2.2 SCOPE AND CONTENTS OF THE PROJECT 1-2 1.2.3 PROJECT COST ESTIMATES AND CONSTRUCTION SCHEDULE 1-4 1.2.4 SOCIAL AND ECONOMIC BENEFITS OF THE PROJECT 1-5 1.3 PROJECT AFFECTED SCOPE 1-5 1.4 DEVELOPMENT OF RESETTLEMENT ACTION PLAN 1-6 1.4.1 PREPARATIONBASISAND TARGETS 1-6 1.4.2 METHODOLOGY FOR PREPARATION 1-7 2. PROJECT IMPACT 2-1 2.1 MEASURES FOR AVOIDING OR MINIMIZING LAND REQUISITION AND 2-1 RELOCATION 2.1.1 MEASURE IN DESIGN STAGE 2-1 2.1.2 MEASURES IN CONSTRUCTION STAGE 2-2 2.2 PHYSICAL INDEXES AFFECTED BY THE PROJECT 2-2 2.2.1 POPULATION AFFECTED BY THE PROJECT 2-7 2.2.2 LAND AFFECTED BY THE PROJECT 2-7 2.2.3 HOUSES AFFECTED BY THE PROJECT 2-17 2.2.4 IMPACT ON ENTERPRISES/UNITS 2-25 2.2.5 IMPACT ON COMMERCE 2-29 2.2.6 IMPACT ON SPECIAL FACILITIES 2-32 2.2.7 CULTURAL RELICS AND VULNERABLE GROUPS AFFECTED BY THE PROJECT 2-32 2.3 PROJECT IMPACT ANALYSIS 2-35 3. NATURAL AND ECONOMIC SURVEY IN THE PROJECT AFFECTED ZONE 3-1 3.1 NATURALAND ECONOMIC SUREY IN ZHUZHOU 3-1 3.1.1 NATURAL CONDITIONS 3-1 3.1.2 SOCIAL AND ECONOMIC CONDITIONS 3-3 3.2 SOCIAL AND ECONOMICAL SURVEY OF TIANYUAN DISTRICT AND ZHUZHOU 3-5 COUNTY 3.2.1 SOCIAL AND ECONOMICAL SURVEY OF TIANYUAN DISTRICT 3-5 3.2.2 SOCIALAND ECONOMICAL SURVEY OF ZHUZHOU COUNTY 3-6 3.3 SOCIAL AND ECONOMICAL SURVEY OF TOWNS AND VILLAGES AFFECTED BY 3-8 THE PROJECT 3.4 BASIS ECONOMIC CONDITION OF RESETTLERS' FAMILIES AFFECTED BY THE 3-13 PROJECT 3.4.1 PURPOSES 3-13 3.4.2 SURVEY CONTENT 3-13 3.4.3 THE METHODS AND PROCESS OF INVESTIGATION 3-14 3.4.4 SOCIAL AND ECONOMIC SITUATION IN PROJECT ZONE 3-14 3.4.5 LIVING STANDARD IN PROJECT ZONE 3-16 3.4.6 PUBLIC INFRASTRUCTURE IN PROJECT AREA 3-17 3.5 SOCIAL ECONOMIC IMPACT OF LAND ACQUISITION AND RELOCATION ON THE RELOCATES 3-17 4. LAW FRAMEWORK AND POLICIES 4-1 4.1 MAIN LAWS, STATUTE AND POLICIES OF CHINA FOR RESETTLEMENT 4-1 4.1.1 RELATED LAWS AND STATUTES 4-1 4.1 .2NATIONAL LAWS AND STATUTES 4-1 4.1.3 HUNAN PROVINCIAL LAWS AND STATUTES 4-5 4.2 RELATED POLICIES OF WORLD BANK 4-29 4.3. POLICIES TARGET OF THE PROJECT 4-31 4.3.1 COMPENSATION QUALIFICATION 4-31 4.3.2 COMPENSATION PRINCIPLES 4-32 ii 4.3.3 COMPENSATION BASIS AND CRITERIA FOR LAND REQUISITION 4-33 4.3.4 RESIDENTIAL HOUSE AND ITS AFFILIATED BUILDING RELOCATION 4-47 COMPENSATION BASIC AND CRITERIA 4.3.5 COMPENSATION BASIS AND CRITERIA FOR AFFECTED ENTERPRISE AND 4-50 COMMERCIAL 4.3.6 AFFECTED INFRASTRUCTURE COMPENSATION BASIS AND CRITERIA 4-53 4.3.7 AFFECTED SPECIAL FACILITIES COMPENSATION BASIS AND CRITERIA 4-53 4.3.4 OWNERSHIP SHEET 4-54 5. RESETTLEMENT MEASURES 5-1 5.1 RESETTLEMENT STRATEGY 5-1 5.1.1 RESETTLEMENT TARGETS 5-1 5.1.2 RESETTLEMENT PRINCIPLES AND GUIDELINES 5-1 5.2 RESETTLEMENT' LIVING RESTORATION PLAN 5-5 5.2.1 THE RESETTLEMENT WAY ALTERNATIVES 5-5 5.2.2 PRINCIPLE AND PROCEDURES OF RESETTLEMENT POINTS ALTERNATIVE 5-5 5.2.3 PLAN OF HOUSE RELOCATION AND RECONSTRUCTION 5-6 5.2.4 INFRASTRUCTURE AND SPECIAL FACILITIES 5-19 5.2.5 HELP IN THE PROCESS OF RESETTLEMENT 5-21 5.3 RESETTLERS' PRODUCTION RESETTLEMENT PLAN 5-22 5.3.1 RESETTLERS' PRODUCTION RESETTLEMENT TAKES 5-22 5.3.2 TARGETS OF RESETTLEMENTAND PRODUCTION RESETTLEMENT 5-22 5.3.3 ENVIRONMENT CAPACITY ANALYSIS 5-30 5.3.4 AGRICULTURAL RESETTLEMENT SCHEME 5-37 5.3.5 NON-AGRICULTURAL RESETTLEMENT SCHEME 5-38 5.3.6 RESTORATION MEASURES OF RESETTLERS ECONOMIC INCOME 5-42 5.3.7 COMPARISON AND ANALYSIS OF RESETTLERS' ECONOMIC INCOME LEVELS BEFORE AND AFTER PHYSICAL RELOCATION 5-46 5.4 COMMERCIAL RESTORATION SCHEME 5-47 5.5 RESTORATION SCHEME OF THE AFFECTED ENTERPRISES 5-48 iii 6 ORGANIZATIONS AND RESPONSIBILITIES 6-1 6.1 ORGANIZATIONS PARTICIPATING RESETTLEMENT PLANNING 6-1 6.2 ORGANIZATIONS AND RESPONSIBILITIES OF RESETTLEMENT 6-1 IMPLEMENTATION AND MANAGEMENT 6.2.1 ORGANIZATIONS 6-1 6.2.2 RESPONSIBILITIES 6-3 6.3 SUPERVISION ORGANIZATION 6-8 6.4 RESETTLEMENT MANAGEMENT SYSTEM 6-8 6.5 STAFFING AND FACILITIES FOR RESETTLEMENT ORGANIZATIONS 6-9 6.5.1 STAFFING 6-9 6.5.2 FACILITIES 6-9 6.6 TRAINING 6-11 6.6.1 TRAINING PLAN OF RESETTLEMENT MANAGEMENT STAFF 6-11 6.6.2 RESETTLEMENT PRODUCTION SKILL TRAINING PLAN 6-11 6.7 IMPROVING MEASURES FOR ORGANIZATION 6-12 7. PUBLIC PARTICIPATION AND HARMONIZATION WITH RESIDENTS IN 7-1 THE HOST SITES 7.1 PUBLIC PARTICIPATION STRATEGY 7-1 7.2 PUBLIC PARTICIPATION APPROACH AND MEASURES 7-1 7.2.1 PARTICIPATION AND CONSULTATION APPROACH 7-1 7.2.2 MEASURES FOR PARTICIPATION AND CONSULTATION 7-2 7.3 PUBLIC PARTICIPATION IN PREPARATION OF RESETTLEMENT PLANNING 7-2 REPORT 7.4 PUBLIC PARTICIPATION PLAN DURING RESETTLEMENT REPORT 7-6 IMPLEMENTATION 7.4.1 PARTICIPATION IN HOUSE RECONSTRUCTION 7-6 7.4.2 PARTICIPATION IN PRODUCTION RESETTLEMENT 7-7 7.4.3 PARTICIPATION IN THE USAGE MANAGEMENT FOR LAND COMPENSATION 7-7 FEE USEAGE 7.4.4 PARTICIPATION IN PROJECT CONSTRUCTION 7-7 iv 7.5 Women's Participation 7-7 7.6 HARMONIZATION WITH RESIDENTS IN THE HOST SITES 7-8 8. APPEAL PROCEDURES 8-1 8.1 POTENTIAL COMPLAINED PROBLEMS AND RESOLUTIONS 8-1 8.2 APPEAL CHANNELS AND PROCEDURES 8-2 9. ENVIRONMENTAL PROTECTION AND MANAGEMENT 9-1 9.1 NEEDS FOR ENVIRONMENTAL PROTECTION 9-1 9.2 DISMANTLING AND CLEANING UP 9-1 9.3 ENVIRONMENT MANAGEMENT IN THE RESETTLEMENT AREA 9-1 10. MONITORING AND EVALUATION 10-1 10.1 INTERNAL MONITORING 10-1 10.1.1 INTERNAL MONITORING ORGANIZATION 10-1 10.1.2 INTERNAL MONITORING PURPOSES 10-1 10.1.3 INTERNAL MONITORING CONTENT 10-1 10.1.4 INTERNAL MONITORING RESPONSIBILITIES 10-2 10.2. EXTERNAL MONITORING 10-2 10.2.1 INDEPENDENT MONITORING AND EVALUATION ORGANIZATION 10-2 10.2.2 PURPOSE OF INDEPENDENT MONITORING 10-2 10.2.3 INDEPENDENT MONITORING AND EVALUATION CONTENT 10-3 10.2.4 INDEPENDENT MONITORING AND EVALUATION METHOD 10-4 10.2.5 INDEPENDENT MONITORING AND EVALUATION WORKING PROCEDURE 10-6 10.2.6 MONITORING EVALUATION PERIOD, FREQUENCY AND CRITERIA 10-7 10.3 RESETTLEMENT EVALUATION 10-7 11. COMPENSATION COST ESTIMATES 11-1 v 11.1 COST ESTIMATE NARRATIVE 11-1 11.1.1 RESETTLEMENT COMPENSATION COST 11-1 11.1.2 SPECIAL FACILITIES COMPENSATION COST 11-2 11.1.3 OTHER COST 11-8 11.1.4 BASIC CONTINGENCY 11-8 11.1.5 RELEVANT TAXES 11-8 11.1.6 TOTAL INVESTMENT ESTIMATED 11-9 11.2 BALANCE OF LAND COMPENSATION COST AND PRODUCTION 11-9 RESETTLEMENT INVESTMENT 11.3 FUND USE 11-15 11.4 FUND MANAGEMENTANDAUDITING 11-16 12. RESETTLEMENT IMPLEMENTATION SCHEDULING 12-1 12.1 PRINCIPLES FOR SCHEDULING 12-1 12.2 SCHEDULE 12-2 12.2.1 RESETTLEMENT IMPLEMENTATION SCHEDULE 12-2 12.2.2 YEARLY FUND USE PLAN 12-2 13. ANNEX 13-1 APPENDIX APPENDIX 1 ANNEX-1 APPENDIX 2 ANNEX-3 APPENDIX 3 ANNEX-6 APPENDIX TABLE APPENDIX FIGURE vi ~~~A: ~ WA Drawig I l Schematic Drawing of y i* I l Geographical Location f- !<21 o uf Project Region ) (7^ 1t 8 . .c. ! I . ^ ... ] .... ...... .. _~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ l~~~~~~~~~~~~~~~t Resettlement Action Plan for Comdor Component (Zhuzhou Section) 1. Summary 1.1 Project Background The construction of economic zones along rivers has been a dominant trend of economy development in China and some developed countries and regions. The rapid development of several economic zones along rivers in the world, like Rhine Economic Zone, Seine Economic Zone, Changjiang Delta Economic Zone and Zhujiang Delta Economic Zone has greatly supported the developing of towns and villages along the rivers, most of which have been the economic centers of their countries or regions. It is explicitly pointed out in national the Tenth Five-year Developing Program that inland areas should take every advantage of their geographic positions and comprehensive resources to speed up the economic development. Focusing on the regions having main transportation lines on land and water, the role of central cities shall be fully played, while cultivating new economic increasing programs and zones at the same time. It can be expected that promoting the economic zones' development is one focus of the increasing developing strategies during the tenth five years in China. And here Xiangjiang ecologic economy zone is facing a rare chance. The three cities of Changsha, Zhuzhou and Xiangtan, located in the east of Hunan province, form a city group like a Chinese character "ping", attaching to each other, along the lower reach of Xiangjiang River. And the distances between each two of them never exceed 45km. In August 2001, the provincial planning office in Hunan entrusted Obermeyer Consulting Engineers (Germany) to prepare the conceptual plan of Xiangjiang ecologic economy zone in CZT (namely, Changsha, Zhuzhou and Xiangtan). Obviously, the geologic position of this region is ideal: being close to the golden watercourse of Changjiang in the north, it not only abuts with Wuhan economic circle and connects with Changjiang economic stripe, but also has Guangdong and Guangxi as its neigbours in the center of the transition between Wuhan economic circle and the economic zone in Zhujiang delta. It would be expected that it will be a golden economic region receiving multi-fold economic radiation, a real "golden" delta area. The project of roads in Xiangjiang ecologic economy zone functioned as flood controlling and sight seeing has become one of the first proved projects on cities developing strategies (CDS) supported by the World Bank in China, being one of the seven major intensive habitations' construction supported specially by national "tenth five-year developing program". Following the market economy rules, the big mingle of the three cities (CZT) will be made through the integrations in infrastructures, markets, industries and cities to galvanize Hunan economy and make CZT developing the nuclear of Hunan economy development, 1-1 Resettlement Action Plan for CorTidor Component (Zhuzhou Section) the clustering area of high technology and modern ecologic city networks, finally influence and promote surrounding area and the whole province's economic development. Along Xiangjiang River, Xiangjiang ecologic economy zone has a road through these three cities (CZT), and it starts from the Yueliang Island Bridge in the north to Kongzhou Bridge of Zhouzhou in the south, extending for 128km, including more than 100 mountains and 15 islands, and connecting 3 major cities and 12 small towns. Being one of main parts in CZT economy integration program, it will become an well spaced economy entity with mature infrastructures and special landscape, which has combined the ecologic development in different fields: landscape, industries, cities and towns developing, culture and custom, high technology, recreation and tourism, and communication and flood controlling. While the preparation of the Xiangjiang scenery band was operating, the three cities would initiate the construction of Xiangjiang economic and scenery band, with the start of the building of flood controlling scenery zone along the river. The theme of a High starting point, high strict standard, and high level" in this project, one part of the whole planning of Xiangjiang ecologic economy zone, will greatly promote the economic zone's fame. Moreover, the construction of this project will provide unlimited business chances for Zhuzhou city, which can easily bring an all-round development of several economies along the Xiangjiang River, readjust its industrial structures and contribute much to its economy and the construction of ecologic scenery and flood controlling projects. 1.2 Briefing on the Project 1.2.1 Geographic Position of the Region Situated in the east of Hunan province and the mid-lower part of Xiangjiang River, Zhuzhou city is on the west part of Luoxiao Mountain Chains, laying on a slant part between Nanling Mountain and Jianghan plain. Its urban area forms a triangle with Changsha city and Xiangtan city. The general terrain of it is inclining from the south-east highland to the lower in north west, in which the south of Chaling and Yandi County have the most mountainous area, while others are mainly plains and hills. Among the whole acreage, mountain accounts for 39.6%, hills 21.61%, hillock 19.61%, plain 14.96%, and water area 4.2%, forming a graph of 'more mountains and water area, few farmland and towns" The specific geographic position can be found in attached drawing 1. 1.2.2 Scope and Contents of the Project This project belongs to the first lot construction works in Xiangjiang ecologic economy 1-2 Resettlement Action Plan for Corridor Component (Zhuzhou Section) zone funded by the World Bank, which goes through the urban area of Zhuzhou city and villages along Zhuzhou county, including the flood controlling work, ecologic scenery project and road works (more details in tablel.2-1). 1) Flood and Water-logging Control Work According to the whole planning of Zhuzhou urban area and county, the flood preventing and controlling work in this project includes: western bank levee in Zhuzhou city, 14.013km in length; 23.43km2 protection area; 7.734km flood controlling levee in Zhuzhou M2 county; and 28.222km protection area. And the standard adapted in the flood controlling levee construction of urban area in the western bank reaches 100 years level, while that of rural area in the city's western bank and works in Zhuzhou county is 50 years level. As for flood controlling, the standard adopted is 24 hours draining out for a 24 hours maxim storm in 10 years. 2) Ecologic Environment and Landscapes The ecologic environment and landscapes in this project mainly consist of urban area and the county. Ecologic greenland and public open touring and recreation greenland will be collocated along the west bank of Xiangjiang, with a total area of 1 km2. 3) Road Works The road has a total length of 29.950km through the west bank of Xiangjiang, starting from the 400 m in the lower reach of Shifeng Bridge to No.3 Xiangjiang Bridge in Quchi, the south part of the city, and from Leidashi town in Zhuzhou county, and Liujia island to the navigation and electrical hinges in Kongzhou island. The section from the starting point to No.3 Xiangjiang Bridge in Quchi, a total length of 12.989km, employs city secondary main Class I standard. The road has a design driving velocity of V=50km/h, and a roadbed width of 50cm. The bridge culvert design load: city-A class. The section from Xiangjiang No.3 Bridge to the joint of Tianyuan Region and Zhouzhou county (K12+989-K20+404), and the section in Zhuzhou county K20+404-K29+950), has a length of 16.961 km. The flood preventing and controlling levee will be built along the river, combining road and levee. While the road along Xiangjiang river will be built on the levee, adapting the second-class road standard: 12m of the roadbed, 9m in width, and the pitch concrete pavement in the whole route. 1-3 Resettlement Action Plan for Corridor Component (Zhuzhou Sec,fon) Main construction contents of the project Table 1.2-1 Serial number Content Unit Index 1 Flood prevention and controlling km 21.747 works 1.1 Zhuzhou city urban section km 14.013 1.2 Zhuzhou county section km 7.734 2 Road project km 29.950 2.1 Zhuzhou city urban section km 20.404 2.2 Zhuzhou county section km 9.546 3 Gardens and scenery project ha2 10,000 3.1 Zhuzhou city urban section ha2 6,720 3.2 Zhuzhou county section ha2 3,280 1.2.3 Project Cost Estimates and Construction Schedule According to the Feasibility Study Report on the Flood Control Landscape Corridor Component along Xiangjiang River prepared by the Hunan Provincial International Engineering Consulting Corp., the estimated total investment is about 765.3154 million yuan, in which resettlement investment accounts for 189.6226 million. In the schedule, the initial work would be finished in three years: by the end of 2002, the pre-feasibility analysis and official approving could be finished; from January to October in 2003, the feasibility analysis would be accomplished; shop drawing designing and biding for constructions would last from February to October, 2004; and in November, 2004 the construction will start and finish in October, 2006. The whole process totals to 29 months, and will be put into use on December 1 st, 2007. 1-4 Resettlement Action Plan for Comdor Component (Zhuzhou Section) 1.2.4 Social and Economic Benefit of the Project The building of this project will greatly improve the flood preventing and controlling ability along Xiangjiang River, reduce the damage by flood, and provide protection for people's life and their properties as much as possible. Moreover, those traveling resources of famous persons and landscape in the region will be better exploited, presenting a picturesque landscape, excellent ecosystem and best habitation environment region along Xiangjiang River, which will surely become a economic region full of vigor. In addition, it will effectively promote Zhuzhou city's economy development, playing an active role in enlarging city developing space, the development of infrastructures supporting, improvement of city rank, increasing investment and businesses of the region, and tourism developing. According to the economic analysis and evaluation in the feasibility report on this project, the project accumulative net value (ENPV) is 582,46 million yuan, the interior financial yield (EIRR) is 18.82%, the ratio of benefit and cost (EBCR)reaches 1.826, and the payback period (including 2 years building time) for the investment is 9.4 years. All financial indexes present a good condition. With the disadvantage of a cost increase of 10% and 10% decrease of benefits, a susceptive analysis has been made, while all evaluation indexes still remained good condition, with an interior benefits rate of 15.61%, proving a strong risk resisting ability of national economy. 1.3 Project Affected Scope The land occupying in this project includes the land for the surface, roadbed, greenland and nursery works in the flood preventing and controlling scenery road. Those area belonging to the project land acquiring plan and having construction works, which will badly influence residents' production and life and can not be recovered, will be in the scope of land acquiring and residents removing work. At this stage, the scope of land acquiring and residents removing follows the recommended plan decided by the project Feasibility Study Report and on site investigation, which involves Zhongshan Road office of Tianyuan region, Tanshan office, Majiahe town, Qunfeng town in Zhuzhou city, and 24 1-5 Resefflement Action Plan for Corridor Component (Zhuzhou Section) villages and 85 villager groups in Leidashi town of Zhuzhou county. While the final scope may have part readjustment with further designing works. 1.4 Development of Resettlement action plan 1.4.1 Preparation Basis and Targets 1.4.1.1 Design Basis 1) The tenth five-year developing program of Hunan national economy and society development and future planning to 2015 2) The tenth five-year development of Zhuzhou city and Zhuzhou county national economy and society development and future planning to 2015 3) Zhuzhou city and Zhuzhou county urban integral layouts (2001-2020) 4) The annual statistics in Zhuzhou city and Zhuzhou county (2000-2002) 5) The focused study on strategic direction of Zhuzhou city environment protection and ecology system construction and works on the "tenth five-year plan" 6) Intemational consulting on conceptual planning of Xiangjiang ecologic economy zone (composed by Obermeyer Consulting Engineers (Germany)) 7) The collective planning scheme for the developing and construction of Xiangjiang ecologic economy zone ( composed by China city planning and designing institute) 8) Road planning for Pinjiang road and roads along Xiangjiang River in Zhuzhou. 9) Planning scheme for Xiangjiang landscape zone in Zhuzhou city (composed by Xiamen University) 10) The Feasibility Study Report on Flood Control Landscape Corridor Component(FCLCC) along Xiangjiang River, one CZT cities developing program (The headquarter of irrigation works and water and electricity reconnaissance and designing institute in Hunan) 1-6 Resettlement Action Plan for Conidor Component (Zhuzhou Section) 1.4.1.2 Policy Basis 1 ) Relevant national laws and regulations 2) Local laws and regulations in Hunan province 3) The World Bank Involuntary Resettlement Implementation Operational Policy OP/BP4. 12 1.4.1.3 The Target of Preparation (1) The construction, technical and economic measures employed shall avoid or reduce the number of land acquisition and relocation as much as possible; while the relocation is unavoidable, effective measures shall be made to diminish the influence of land acquisition and relocation to the local residents' production and daily life. (2) Social economic investigation and relevant relocation program of the resettlers will be made during the preparation of the project. (3) The relocation of resettlers will base on the physical indexes and compensation criteria, targeting to improve or at least rehabilitate resettlers' original living standard. (4) Further development of the resettlers is highly recommenced. The relocation of people in village will be guided by those more developed second and third industries, on the basis of land exploit. (5) Encourage resettlers and existing residents in the host site to participate the planning of resettlement and planning Scheme; (6) Resettlers will be given prior consideration for relocation in the old community. (7) Both resettlers and existing residents will benefit from this project. 1.4.2 Methodology for Preparation Hunan Provincial Changzhutan Economic Integration Office, with participation of related units, resettlement consultant unit as well as government at all levels jointly organizes resettlement action plan work. In June 3rd to Oct. 15th in 2003 with the active cooperation 1-7 Resettlement Action Plan for Conidor Component (Zhuzhou Sec. on) of government at all levels in project zone, dedicated people perform physical indexes in the scope affected by land acquisition, and full investigation Stat. of resettlers' household basic conditions, adapt sampling survey investigate their willingness. Meanwhile, holding a resettlement coordination meeting with the participation of the employers, the designers, government at all levels affected and the resettlement representatives, they listened to the opinions of various parties, discussed resettlement scheme, the ways of resettlement living restoration, compensation by adapting law framework and criteria etc., then proposed initial resettlement planning program. In line with the established policies of our country, law and statute and requirements of the World Bank for resettlement, they performed reasonability analysis and feasibility study analysis for how townships at all levels (street office) in project zone affected, improved and perfected in accordance with the suggestions of technical assistance experts of the BANK and consultant experts of Mott MacDonald Company after their reading and observation on site, completed preparation of resettlement action plan report at last. It was checked and approved by local government in project zone. I-8 Resettlement Action Plan for Corridor Component (Zhuzhou Section) 2 Project Impact 2.1 Measures for Avoiding or Minimizing Land Requisition and Relocation. 2.1.1 Measures in Design Stage. Since Project initiation, in order to minimize Impact on the local social economy due to the project construction, the plan of flood control landscape road has been revised and optimized many times and it has been subject for the special technical justification. The main aim of optimized plan is minimizing land requisition, resettlement and Relocation; reducing construction coats and convenient construction. 1) During the project planning and designing, when in the comparison of optimized plans, Impact on the local social economy due to the project construction shall be taken account of as much as possible, as the key factor in comparison of plan optimizing, 2) The route orientation should use the existential embankment as much as possible and it should reduce the occupation areas in design. It is better to go along the hill and choose the area with few inhabitations at the foot of the hill in order to avoid house relocation and good-irrigated cultivated land occupation. In the town district with dense population, the route orientation has to steer clear of the high and multi-storey buildings to reduce the relocation of houses. 3) In the designing, the plan is optimized for many times through field survey and plan comparing. Such as the section between Baisha Zhou, Leidashi Town and Benlu Porcelain Factory, through plan comparing, the route adopted now can minimize more than 10000m2 relocated houses comparing with the former plan. 4) The construction plan shall be optimized, time limit for the project shall be shortened and the period for house relocation and construction shall be properly arranged in order to minimize the resettlers' property cost. For example, Lhe period for house relocation and rebuilding is usually chosen in slack season and land occupation is usually arranged after harvest. 5) The inconvenience brought to local residents' life and production due to the 2-1 Resettlemei;t Action Plan for Corridc, Component (Zhuzhou Section) construction of flood control landscape road shall be taken fully account of in planning. Generally speaking, considering the convenience of local residents' life and production, make sure the damage of infrastructure and special facilities such as canal system and pump station due to the constructioi. of flood control lanidscape road coulu be restored, guaranteeing the normal performance of infrastructure and special facilities. 2.1.2 Measures in Construction Stage The occupied land of this project is distributed in a linear shape along the Xiangjiang River and has little influence on the local industry and agriculture production, people's daily life and social economy. However, in order to reduce the effects of project implementation on the area, it is necessary to pay attention to construction site layout and selection of construction schemes so as to avoid unnecessary land requisition and house relocation. 2.2 Physical Indexes Affected by the Project In June-July, 2003, in accordance with project land occupation area determined by design, investigation persons have made overall survey and record of population, kinds of land and its area structure and area and attached facilities of houses and quantity of forest and fruit trees. The land occupation and house relocation of this project revolves 24 villages (neighborhood committee) and 85 villagers' groups including the Chongshan Road Office in Tianyuan District Zhuzhou City, Taishan Road Office, Majiahe Town, Qunfeng Town and Leidashi Town in Zhuzhou County. The Summary Table of Physical Indexes of Land Requisition and Relocation for this Project is show in Table 2.2-1. 2-2 Table 2.2-1 L.- nd Acquisition and Relocation Physical Indexes Summary Affected Table for FCLCC (Zhuzhou Section) Tianyuan District Zhuzhou County Item Unit Total Subtotal Office Taishancu Majiahe Town Town Enterprise Subtotal Leidashi Enterprise 1. Population 1)Acquisition Land Relocat on Impact No. of Household No. 991 719 258 193 141 110 17 272 272 Population No. 2943 2000 682 506 453 353 6 943 943 2)Relocation House Settlement Relocation Household No. 848 591 255 106 125 88 17 257 257 ResSettlement Household No. 781 524 242 78 118 80 6 257 257 Settlement Population No. 2521 1620 675 243 410 286 6 901 901 3)Production Settlemcnt Population No. 791 671 50 297 171 153 120 120 4)1mpact Enterprise Staff Population No. 1151 1110 1110 41 41 Production Interruption Affect Staff No. 209 206 206 3 3 Population 5) Total population affected No. 4094 3110 682 506 453 353 1116 984 943 41 2, House and Appendix '3 uilding 1)House m' 180001.91 100546.23 44220.34 14939.66 24989.37 15788.29 28531.19 43617.15 43617.15 7915.91 (1)Non-residence m' 35838.53 27922.62 7915.91 Steel and Concrete Structure m' 3934.40 3934.40 Brick and Concrete Structure m' 25595.21 19830.67 5764.54 Brick and Timber Structure m' 5623.52 3747.25 1876.27 Earth and Timber Structure m' 132.00 132.00 Sundry ' juse m' 553.40 410.30 143.10 (2)Resident ml 144163.38 100546.23 44220.34 14939.66 24989.37 15788.29 608.57 43617.15 43617.15 2-3 Table 2.2-1 Land Acquisition and Relocation Physical Indexes Summary Affected Table for FCLCC (Zhuzhou Section) Tianyuan District Zhuzhou County Item Unit Total Subtotal Songshaniu Taishaniu Majiahe Town Qunfeng Enterprise Subtotal Leidashi Enterprise Office Office Town Town Brick and Concrete Structure mX 81053.57 47983.00 19986.80 4342.79 15465.72 8183.97 3.72 33070.57 33070.57 Brick and Timber Structure mt 37849.35 32052.20 18511.33 5769.13 4356.82 2886.93 527.99 5797.15 5797.15 Earth and TimberStructure m. 5258.55 3560.23 74.00 486.33 1607.06 1392.84 1698.32 1698.32 Sundry House m' 20001.91 16950.80 5648.21 4341.41 3559.77 3324.55 76.86 3051.11 3051.11 2)Appendix Building (1)Sunning Ground M. 33474.50 20919.01 8870.72 761.53 6730.24 4556.52 12555.49 10385.22 2170.27 Cement Ground ml 31018.11 20726.52 8691.84 747.13 6730.24 4517.19 40.12 10291.59 8866.82 1424.77 Earthern Ground M, 2496.51 232.61 178.88 14.40 39.33 2263.90 1518.40 745.50 (2)Bounding Wall m, 7196.24 5036.82 2377.39 108.71 1472.83 579.01 498.88 2159.42 1691.60 467.82 (3)Protective Bank m3 1048.41 387.54 122.94 97.72 75.82 91.06 660.87 420.85 240.02 (4)Well well 224 187 96 11 47 33 37 37 Earth Well well 163 127 49 8 42 28 36 36 Pressure Well well 61 60 47 3 5 5 1 1 (5)Pond set 49 18 17 1 31 29 2 (6)Water Tank set 9 6 6 3 3 3, Land mu 1289.40 916.22 85.14 210.29 258.18 240.40 122.21 373.18 368.44 4.74 1)Collective Land mu 1162.45 794.01 85.14 210.29 258.18 240.40 368.44 368.44 (1)Cultivated Land mu 432.68 357.27 18.98 77.75 119.92 140.62 75.41 75.41 Paddy Field mu 156.67 106.30 2.01 42.38 61.91 50.37 50.37 Dry Land mu 3.83 3.19 3.19 0.64 0.64 Vegetable Land mu 272.18 247.78 18.98 75.74 77.54 75.52 24.40 24.40 (2)Pond mu 35.87 29.24 1.21 14.50 6.79 6.74 6.63 6.63 2-4 Table 2.2-1 Land Acquisition and Relocation Physical Indexes Summary Affected Table for FCLCC (Zhuzhou Section) Tianyuan District Zhuzhou County Item Unit Total Subtotal Songshanlu Taishaniu Qunfeng Leidashi Enterprise Subttal Office Office Majiahe Town Ton Enterprise Subtotal Town Etrrs (3)Orchard mu 11.21 4.65 2.33 1.18 1.14 6.56 6.56 (4)Forest Land mu 127.39 101.48 8.36 60.19 25.74 7.19 25.91 25.91 Production Forest mu 23.95 23.95 23.95 Timber mu 103.44 101.48 8.36 60.19 25.74 7.19 1.96 1.96 (5)Residential Land mu 122.25 79.52 18.30 12.82 27.70 20.70 42.73 42.73 (6)Road Use Land mu 82.39 28.63 4.15 9.99 10.78 3.71 53.76 53.76 (7)Other Use Land mu 146.45 100.47 22.75 1221 36.40 29.11 45.98 45.98 (8)Waste Land mu 204.21 92.75 9.06 22.83 29.67 31.19 111.46 111.46 2)Stated -owned Land mu 126.95 122.21 122.21 4.74 4.74 Enterprise /Unit Use Land mu 126.95 122.21 122.21 4.74 4.74 3)Temporary Use Land 1503.76 1498.75 378.59 1120.16 5.01 5.01 (1)Economy Forest Land mu 487.49 487.49 151.44 336.05 (2)Timber mu 749.37 749.37 189.29 560.08 (3)Waste Land mu 266.90 261.89 37.86 224.03 5.01 5.01 4, Scatter Tree 1)Fruiter No. 5098 4614 1745 1164 878 343 484 484 484 Mature Tree No. 2018 1846 501 864 224 85 172 172 172 Young-Tree No. 3080 2768 1244 300 654 258 312 312 312 2)Mixed Tree No. 2948 2482 533 35 501 947 466 466 466 5, Tomb No. 5 5 5 6, Special Facility 1)Road Facility 2-5 Table 2.2-1 Land Acquisition and Relocation Physical Indexes Summary Affected Table for FCLCC (Zhuzhou Section) Tianyuan District Zhuzhou County Item Unit Tota Subotal Songshanlu Taishanlu QufegLeidashi Itl Subtotal Office Office Majiahe Town Town Enterprise Subtotal Town Enterprise Cement Pavement m' 18749.93 10443.18 9561.56 674.97 87.36 119.29 8306.75 8306.75 Simple Highway km 7.52 3.13 0.9 0.68 0.53 1.02 4.39 4.39 Tractor Road km 2.04 2.04 0.17 0.63 0.28 0.96 2)Power Transimission Line High Voltag Line km 5.26 4.35 3.16 0.88 0.19 0.12 0.91 0.91 Low Voltage Line km 7.86 5.03 0.85 0.82 2.18 1.18 2.83 2.83 Transformer Facility set 19 16 6 7 2 1 3 3 3)Telecommunication Line km 7.07 4.63 1.49 1.53 1.34 0.27 2.44 2.44 4)Cable TV Line km 5.91 4.36 1.49 1.53 1.34 1.55 1.55 5)Canal km 2.87 0.89 0.49 0.34 0.06 1.98 1.98 2-6 Resettlement Action Plan for Coridor Component (Zhuzhou Section) 2.2.1 Population Affected by the Project. 1) Population Affected by land requisition and house relocation: Through on-the-spot investigation and statistical data, the land requisition and house relocation of the project will influence 991 households with 2943 persons, among which 143 households with 422 persons production resettlers; 732 households with 2152 persons housing resettlers; 116 households with 369 persons production and housing resettlers, totally 848 households with 2521 persons have to remove, among which 781 households are housing relocation, and 791 persons are in production resettlement. The situation of population Affected by land requisition and relocation is listed in the Table 2.2-2. 2) Staff and worker of units and enterprises Affected by the Project: In accordance with investigation, 1151 persons in enterprises and units will be Affected by this project, of which the retired is 400 persons, the coming off sentry duty is 300 persons, the existing staff is 451 persons, among them 209 staff and workers are actually Affected by production and business interruption and reconstruction of enterprises. 3) Population affected by the project: the project affected the total population is 4094 persons. 2.2.2 Land Affected by the Project. 1) Permanent Land Occupation. The permanent land occupation of the project has fully been investigated taking the group as a unit. The investigators drew the boundary line at site against the 1:500 topographic map, then measured the map with computer and calculated the land area. The construction of this project needs permanent land occupation 1289.40mu, including state land 126.95mu (the units occupied land are included in collective land), collective land 1162.45mu (including farmland 432.68mu, garden land 11.21mu, pond 35.87mu, timber forest 103.44mu, economic forest 23.95mu, residential site 122.25mu, road land 82.39mu, other use land 146.45mu and waste land 204.21mu). The situation of permanent land occupation of the whole project is shown in Table 2.2-3. 2-7 Table 2.2-2 Residence Investigation Within Acquisition and Relocation Scope of FCLCC(Zhuzhou Section) Village Total Acquisition no Relocation Retocation no Acquisition and Need Relocation (Administer Acquisition Relocation Need Production District Town (Office) Office, _ Resettlement Resident Bric and Brick Earth Population Committee) Household Population Household Population Household Subtotal Concrete Brick Eard Populat Plon Timber WoodI Tianyuan 719 2000 128 380 498 1329 93 291 591 1620 671 District_ Zhuzhou City 258 682 3 7 242 632 13 43 255 675 50 Z o n e P l a n nnih u A Donghu Ad 64 172 2 5 60 160 2 7 62 167 12 Lianhua Administer 134 370 1 2 126 349 7 19 133 368 21 ______ ~~~~~Office Daping Administer 60 140 56 123 4 17 60 140 17 _____ ~~~~~~Office ___ Taishanlu Office 193 506 87 263 96 209 10 34 106 243 297 Xiejia Village Resident 12 34 12 34 12 34 0 Committee Binjiang Resident 33 99 33 99 33 99 0 Committee Taiyuan Resident 4 10 4 10 4 10 0 Committee Xujiachong Administer 21 50 11 36 10 14 10 14 36 ______ __________ Office Zhangjiayuan Administer 123 313 76 227 37 52 10 34 47 86 261 ______ __________ Office 2-8 Table 2.2-2 Residence Investigation Within Acquisition and Relocation Scope of FCLCC(Zhuzhou Section) Village Total Acquisition no Relocation Relocation no Acquisition and Need Relocation (Administer Acquisition Relocation Need Production District Town (Office) Office, Resettlement Resident Bikad Bik ErhPplto Committee) Household Population Household Population Household Subtotal Bcrck te and Bc arth Population CoceeTimber Wood Zhuzhc, Boat- 17 6 17 6 17 6 0 Making Factory Zhangjiayuan Majiahe Town Administer 141 453 16 43 84 282 41 128 125 410 171 Office I_ _ _ _ _ _ _ _ _ _ Country Zaoshi Village 50 149 2 5 35 100 13 44 48 144 49 Nantang Village 55 193 5 12 42 158 8 23 50 181 35 Qiantang Village 36 111 9 26 7 24 20 61 27 85 87 Qunfeng Town 110 353 22 67 59 200 29 86 88 286 153 Hehua Village 48 137 6 16 19 55 23 66 42 121 82 Gaotai ling 14 45 11 34 1 3 2 8 3 11 42 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ V illag e _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ Changling 4 14 4 14 0 0 14 _ _ _ _ _ _ _ _ ________ V illag e _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ Xiangyun Village 31 111 29 104 2 7 31 111 7 13 46 1 3 10 38 2 5 12 43 8 Zhuzhou 272 943 15 42 234 823 23 78 257 901 120 Leidashi Town 272 943 15 42 234 823 23 78 257 901 120 Qingshijie Resident 30 110 30 110 30 110 0 Committee 2-9 Table 2.2-2 Residence Investigation Within Acquisition and Relocation Scope of FCLCC(Zhuzhou Section) Village Total Acquisition no Relocation Relocation no Acquisition and Need Relocation (Administer Acquisition Relocation Need Production District Town (Office) Office, Resettlement Resident ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Brc ad Brick Earth Population Committee) Household Population Household Population Household Subtotal Bricknc and and Population CoceeTimber Wood Gongdaojie Resident 61 218 61 218 61 218 0 Committee Cangshajie Resident 80 241 80 241 80 241 0 Committee Shengtang 10 37 5 12 3 18 2 7 5 25 19 ______________ V illage _ _ _ _ __ _ _ _ __ _ _ __ _ _ _ _ Shengli Village 22 85 2 6 16 64 4 15 20 79 21 Longtang 14 46 13 45 1 1 14 46 1 _ _ _ _ _ _ _ ______ _______ V illag e __ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ Chengwei 12 46 3 10 4 20 5 16 9 36 26 ______________ V illage Xiashi Village 22 88 1 1 20 84 1 3 21 87 4 Panshi Village 21 72 4 13 7 23 10 36 17 59 49 Total 991 2943 143 422 732 2152 116 369 848 2521 791 2-10 Table 2.2-3 Residence Investigation Within Road Relocation Scope of FCLCC(Zhuzhou Section) Unit: mu Village Cultivated Land Brick and Timber County Town (Administer Brick and Resident Road Enterprise Other Waste Office, Total Pdy DySubtotal Cocee o0y Ln s ad Use Ln (District) (Office) Resident Subtotal PFaielddy LDr Vegetable Concrete Timber EcFonresmty Land LUasned Use Land Land Land Committee) and Country Panshi Village 87.42 29.02 23.04 5.98 1.71 3.03 1.10 1.47 1.59 14.68 22.20 12.62 Qingshijie Resident 39.63 9.66 2.31 10.66 17.00 Committee Gongdaojie Resident 34.86 14.10 4.30 1.36 15.11 Committee Cangshajie Resident 21.46 7.94 6.07 0.96 6.49 Committee Total 126.95 126.95 Tianyuan 122.21 122.21 District Zhuzhou Boat- 44.15 44.15 _ Making Factory _ Zhuzhou Municipal 6.60 6.60 Tianxin Building 6.0.0 Co.Ltd Zhuzhou Municipal 2.70 2.70 ChangchenglInk- making Co. Ltd West River Office Zhuzhou Municipal Port 5.99 5.99 Administive Department General Co. 2-13 Table 2.2-3 Residence Investigation Within Road Relocation Scope of FCLCC(Zhuzhou Section) Unit: mu Village Cultivated Land Brick and Timber County Town (Administer BikadResident Road Enterprise Other Waste (District) (Offic) Office, Total Paddy Dry VSubtotal Bonrick andoY an Use us ad Use Land Resident Subtotal VFied Land egetable Concrete Timber Forest Lnd d Use Land Committee) Fil ad Land Frs adLn Zhuzhou Xinshi Water Supply 5.77 5.77 Co. Ltd I Zhuzhou Municipal Wood 3.09 3.09 Co. Zhuzhou Municipal Tianyuan District 4.80 4.80 Xiangfeng Sand Pit Zhuzhou Municipal 27.80278 Drought Fighting 27.80 Sand Pit Hunan Yandi 18.00 18.00 Self-education 1 Zhuzhou Municipal Zhangjiayuanxuji 3.31 3.31 agang Mingli Sand Pit Zhuzhou 4.74 4.74 Leida Petro Station of 0.68 0.68 Zhuzhou County Petro Branch Co. 2-14 Table 2.2-3 Residence Investigation Within Road Relocation Scope of FCLCC(Zhuzhou Section) Unit: mu Village Cultivated Land Brick and Timber (Administer ~~~~~~~~~~~~~~~~Road Other County Tow, (Adminiser ToauttlBrick and Resident UeEnterprise Ue Waste j~ ~ ~ ~ ~ ~fie Toa DAd Subota Useboa iPaeid iad\Vge<S< (District) (0 [ice) Resident Subtotal Paddy Dr Vegetable Concrete Timber EconomY Ln Land Use Use d Land Land Committee) ~~Field Land Land ForestLadan 1. Cultivated Land 1162.45 432.68 156.67 3.83 272.18 11.21 35.87 103.44 23.95 122.25 82.39 146.45 204.21 Tianyuan 794.01 357.27 106.30 3.19 247.78 4.65 29.24 101.48 79.52 28.63 100.47 92.75 District Songs F n 85.14 18.98 18.98 2.33 1.21 8.36 18.30 4.15 22.75 9.06 Donghu Ad 26.60 4.89 4.89 0.89 9.82 1.86 6.41 2.73 AdmnistehruOffice 29.30 8.47 8.47 0.32 0.54 4.62 2.10 8.38 4.87 AdapiniseOfc Administger Ofce 29.24 5.62 5.62 2.33 7.82 3.86 0.19 7.96 1.46 Taishancu 210.29 77.75 2.01 75.74 14.50 60.19 12.82 9.99 12.21 22.83 Binjiang Resident 25.13 0.08 17.91 4.82 0.13 1.76 0.43 Committee Taiyuan Resident 12.20 0.60 0.08 11.52 Committee uAdmniatcehOffce 45.81 16.47 2.01 14.46 3.27 15.42 2.01 0.91 6.19 1.54 Zhangjiayuan 127.15 61.28 61.28 11.15 26.86 5.99 8.35 4.18 9.34 Administer Office 2-1 1 Table 2.2-3 Residence Investigation Within Road Relocation Scope of FCLCC(Zhuzhou Section) Unit: mu Village Cultivated Land Brick and Timber County Town (diitrBckadResident Ra Enterprise Ohr Waste (District) (Office) Ofc, TtlPdy DySboa Concrete Tme Economy Ln s s Land Use Land Res(h o iden)t Tob Subtotal Field Land Vegetable Timber Forest Land Land Land Committee) Land MajiT 258.18 119.92 42.38 77.54 1.18 6.79 25.74 27.70 10.78 36.40 29.67 Towni Country Zaotang Village 120.00 49.33 26.53 22.80 0.52 2.02 20.80 10.09 6.97 16.38 13.89 Nantang Village 67.75 20.71 5.19 15.52 0.42 4.10 4.70 11.36 3.16 11.13 12.17 Qiantang Village 70.43 49.88 10.66 39.22 0.24 0.67 0.24 6.25 0.65 8.89 3.61 Qunfeng 240.40 140.62 61.91 3.19 75.52 1.14 6.74 7.19 20.70 3.71 29.11 31.19 Count_ Hehua Village 125.38 80.97 22.70 2.60 55.67 4.96 1.90 8.31 1.68 8.99 18.57 Gaotai ling 44.87 25.99 22.51 3.48 1.78 0.27 0.28 7.07 9.48 _________ Village Changling 13.30 7.28 7.28 0.03 5.56 0.43 ______ ___ __ ______ V illage _ _ _ __ _ _ _ Xiangyun 31.61 14.27 5.53 0.59 8.15 0.15 5.29 5.03 0.88 3.90 2.09 _________ ________ V illage ___I__I_I__I Xiangbin Village 25.24 12.11 3.89 8.22 0.99 7.09 0.84 3.59 0.62 Zhuzhou 368.44 75.41 50.37 0.64 24.40 6.56 6.63 1.96 23.95 42.73 53.76 45.98 111.46 Leidashi 368.44 75.41 50.37 0.64 24.40 6.56 6.63 1.96 23.95 42.73 53.76 45.98 111.46 _ _ _ _ County__ __ _ ___ _ _ City and Shntg Town Vihllengtan 41.50 13.36 6.18 0.11 7.07 2.55 1.46 0.42 8.39 0.54 14.78 Planning ViIlIaIe Shengli Village 30.93 8.38 2.09 6.29 2.15 0.08 2.11 4.02 6.44 7.75 Longtang Village 20.59 1.79 1.06 0.73 0.15 0.11 9.05 0.80 1.61 0.74 6.33 VCillage 68.49 19.57 16.13 0.53 2.91 1.76 11.97 2.46 7.91 2.38 22.44 Xiashi Village 23.55 3.29 1.87 1.42 1.65 0.86 3.64 4.47 0.70 8.94 2-12 Table 2.2-3 Residence Investigation Within Road Relocation Scope of FCLCC(Zhuzhou Section) Unit: mu Village Cultivated Land Brick and Timber County To-, (Administer BikaRedntRoad Enepie Other Wat County ~ice) Office, Total Pdy DySubtotal Bricke andReidnt entrrs Use Wat (District) (T

Основные сведения
Тип документа Resettlement Plan
Дата принятия
Страна Китай
Источник Всемирный банк