Группа Всемирного банка · Resettlement Plan

China - Guangdong Pearl River Delta Urban Environment Project : resettlement action plan (Vol. 6 of 22) : Solid waste disposal center project : tables

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

`40 L td(gTh j\,tSj e05A_ e compensation for temporary relocation attached table: 13.3.8-1 *_____________________ ___________ ___________ ___________ ___________ Un it: yuan/M 2 _Grade I Grade 2 Grade 3 Grade 4 IGrade 5 Grade 6 Factoray buildings and warehouses50 40 30 201 10 6 warehouses Housings 20 18 16 14, 12 8 Stop-loss attached table: 13.3.9-1 Unit: yuan/M2 Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Factoray buildings and warehouses ~~60 48 36 24 14 7 warehouses RP202 VOL. 6 Compensation for business loss after relocation of commercial houses with preporty right attached table: 13.3.10 Unit:yuan/M2 Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 First floor 960 800 650 510 390 300 Located in Second floor 840 700 580 460 360 280 CBD Above third floor 720 600 500 420 330 260 First floor 840 690 560 450 350 270 Located r g Second floor 720 600 490 390 310 250 Above third floor 600 500 420 350 290 230 . First floor 720 560 460 370 300 240 Located In Second floor 600 500 410 330 270 220 accesses__ Above third floor 480 410 350 290 240 200 *0 *0 * Cost for temporary land borrowing attached table: 13. 3. 8-4 Unit:yuan/M2 |Grade I Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Monthly rent 7 6 6 5 5 4 Paddy field Compensation for standing crop 5 5 5 5 5 5 Rehabilitation cost 6 6 6 6 6 6 Monthly rent 7 6 6 5 5 4 Vegatable land Compensation for standing crop 6 6 6 6 6 6 Rehabilitation cost 6 6 6 6 6 6 Monthly rent 6 6 5 5 4 4 Dry land Compensation for standing crop 5 5 5 5 5 5 Rehabilitation cost 6 6 6 6 6 6 Monthly rent 6 6 5 5 4 4 Orchard Compensation for standing crop 5 5 5 5 5 5 Rehabilitation cost 6 6 6 6 6 6 Monthly rent 6 5 5 4 4 3 Grassland Compensation for standing crop 3 3 3 3 3 3 Rehabilitation cost 5 5 5 5 5 5 Land used for transportation Monthly rent 8 7 6 6 5 5 Compensation for standing crop 0 0 0 0 0 0 Land used for village, factories Monthly rent 9 8 8 7 7 6 and mines Compensation for standing crop 0 0 0 0 0 0 _ ~ ~ ~ ~ ~ _ __ _ _ _ _ Motl 9en 8 8 7 7 Curtilage/parking area Monthly rent 9_ 9__ _ _7 7 _ _________________________ Compensation for standing crop 0 0 0 0 0 0 Vacant land in commercial area Monthly rent 11 10 9 8 7 6 Compensation for standing crop 0 0 0 0 0 0 Pound Monthly rent 7 6 6 5 5 4 Compensation for standing crop 6 6 6 6 6 6 Monthly rent 5 4 4 3 3 2 Unused land Compensation for standing crop 0 0 0 0 0 0 _Rehabilitation cost 3 3 3 3 3 3 Note: 1. Fruit trees and seedings in orchards will be compensated separately; 2. Compensation and rehabilitation of the standing crop will be paid only once; 3. Rehabilitation of non-agriculture and pounds will be carried out by the project owner; 4. Land classification is carried out according to the usage of land; 5. Rental and rehabilitation standard for special land will be reported and handled separately. Indices for cost estimateof telecommunicaq6M d ik93'1-7 (p_i_p_(pipeline) Unit: yuan/m 090 No. Type of pipe (PVC) 2 4 6 8 10 12 16 20 24 30 36 42 Unit cost 63.33 40.58 36.52 33.73 31.66 28.23 26.54 25.08 24.63 23.49 22.58 22.40 Other cost 6.33 4.06 3.65 3.37 3.17 2.82 2.65 2.51 2.46 2.35 2.26 2.24 Cost for safety measures 0.06 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 Cost for design (including 1.90 1.22 1.10 1.01 0.95 0.85 0.80 0.75 0.74 0.70 0.68 0.67 survey) Compensation for 6.33 4.06 3.65 3.37 3.17 2.82 2.65 2.51 2.46 2.35 2.26 2.24 pavement ,\ Reserve fund 3.17 2.03 1.83 1.69 1.58 1.41 1.33 1.25 1.23 1.17 1.13 1.12 Management cost of the 2.43 1.56 1.40 1.30 1.22 1.08 1.02 0.96 0.95 0.90 0.87 0.86 project owner JI Total 83.56 53.54 48.19 44.50 41.77 37.25 35.02 33.09 32.50 30.99 29.79 29.56 _ Explanation 1/2 Indices for cost estimate4f telecommunicaatl6d 6Rk-3*117 __________ (pipeline) Unit: yuan/m 050 032 48 56 WTL __L * 22-30 21.91 14.30 5.11 fAA-L

Основные сведения
Тип документа Resettlement Plan
Дата принятия
Страна Китай
Источник Всемирный банк