Группа Всемирного банка · Resettlement Plan

China - Guangdong Pearl River Delta Urban Environment Project : resettlement action plan (Vol. 7 of 22) : Resettlement policy attached tables

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

I Table of Contents RP202 VOL. 7 i Volume 2 Policy Attached Table -Attached Table 2.4.9 -Attached Table 2.4 Volume 5 Affached Table of Chapter 2 to 11 (Continued) -Dashadi -2.1.4.2AC -2.1 .4.2ACBD -2.1 .4.2BD -2.1 .5.2AC -2.1 .5.2ACBD -2.1 .5.2BD -3.1.1.1 -3.1.1.2 -3.1.1.3 -3.1.1 -3.1.2.1 -3.1.2.2 -3.1.2.3 -3.1.2 -3.1.3.1 -3.1.3.2 -3.1.3.3 -4.1.1.2 -4.1.2.2 -4.1.3.2 -5.1.1.2 -5.1.2.2 -5.1.3.2 -6.1.1.2 -7.1.1ACBD -7.1.4 -7.1.5 -7.1.6 -7.1.7 -8.1.4 -8.1.5 -8.1.6 -8.1.7 -Liede WWTS (phase l1l) -1.7.1 -1.71 Area of land borrowed -1.7.1 Area of land equisition -1.7.2 -1.7.3 -1.7.4 2 ;I -10.1 -1 1.1 -2.1.3.2AC -Liede WWTS (phase 111) -- continued -2.1.3.2ACBD -2.1.3.2BD -2.1.4.2AC -2.1.4.2ACBD -2.1.4.2BD -2.1.5.2AC -2.1.5.2ACBD -2.1.5.2BD -3.1.1.1 -3.1.1.2 -3.1.1.3 -3.1.1 -3.1.2.1 -3.1.2.2 -3.1.2.3 -3.1.2 -3.1.3.1 -3.1.3.2 -3.1.3.3 -4.1.1.2 -4.1.2.2 -4.1.3.2 -5.1.1 -5.1.2 -5.1.3 -6.1.1 -7.1.1ACBD -7.1.4 -7.1.5 -7.1.6 -7.1.7 -8.1.4 -8.1.5 -8.1.6 -8.1.7 -Sewage Networks -1.7.1 -1.7.2 -1.7.3 -1.7.4 -10.1.1 3 -Sewage Networks (continued) -10.1.2 -10.1.3 -10.1.4 -11.1 -2.1.3.1.1BD -2.1.3.2.1AC -2.1.3.2.2BD -2.1.3.2AC -2.1.3.2BD -2.1.3.4.AC -2.1.3.4.BD -2.1.3.AC -2.1.3.BC -2.1.4 AC -2.1.4 BD -2.1.4.1.AC -2.1.4.1.BD -2.1.4.2.AC -2.1.4.2.BD -2.1.4.3AC -2.1.4.3BD -2.1.4.4.AC -2.1.4.4.BD -2.1.5.1.BD -2.1.5.2.AC -2.1.5.2.BD -2.1.5.3AC -2.1.5.3BD -2.1.5.4.BD -3.1.1.2.1 -3.1.1.2.2 -3.1.1.2.3 -3.1.1.3.1 -3.1.1.3.2 -3.1.1.3.3 -3.1.1.4.1 -3.1.1.4.2 -3.1.1.4.3 -3.1.1 -3.1.2.1.1 -3.1.2.1.2 -3.1.2.1.3 -3.1.2.2.1 -3.1.2.2.2 4 -3.1.2.2.3 -3.1.2.3.1 -3.1.2.3.2 -Sewage Networks (continued) -3.1.2.3.3 -3.1.2.4.1 -3.1.2 -3.1.3.1.2 -3.1.3.2.2 -3.1.3.2.3 -3.1.3.3.1 -3.1.3.3.2 -3.1.3.3.3 -3.1.3.4.1 -3.1.3.4.2 -3.1.3.4.3 -4.1.1.1.2 -4.1.1.2 -4.1.1.3 -4.1.1.4 -4.1.2.2 -4.1.2.3 -4.1.2.4 -4.1.3.2 -4.1.3.3 -4.1.3.4 -5.1.1.1 -5.1.1.2 -5.1.1.3 -5.1.1.4 -5.1.2.2 -5.1.2.3 -5.1.2.4 -5.1.3.1 -5.1.3.2 -5.1.3.3 -5.1.3.4 -6.1.1.1 -6.1.1.2 -6.1.1.3 -6.1.1.4 -7.1.1.2 -7.1.1.3 -7.1.4 -7.1.5 -7.1.6 5 -Sewage Networks (continued) -7.1.7 -8.1.4 -8.1.5 -8.1.6 -8.1.7 -Solid Waste Disposal Center Project -Compensation Standard For Land -Indices For Cost Of Works (Pipeline) -Other Compensation 1 Volume 6 Attached Table of Chapter 18 -Dashadi -Dashadi AC -18.1.11AC -18.1.2.4AC -18.1.2.7.1.1 AC -18.1.2.7.1.2AC -18.1.2.7.1AC -18.1.2.8AC -18.1AC -1 8.3.2.10.1AC-1 -18.3.2.10.1 AC-2 -18.3.2.10.2.AC -18.3.2,13.AC -1 8.3.2.7.2.AC -1 8.3.2.9AC -Dashadi BD -18.1.11 BD -18.1.2.4.BD -18.1.2.7.1.1 BD -18.1.2.7.1.2BD -18.1.2.7.1.BD -18.1.2.8BD -18.1.BD -18.3.2.10.1 BD-1 -1 8.3.2.10.1 BD-2 -1 8.3.2.10.2.1BD -18.3.2.13BD -1 8.3.2.7.2.BD 6 -Liede WWTS (Phase 11I) Project -Liede WWTS (Phase 11i) Project AC -18.1.1 1AC -18.1.2.4AC -18.1.2.7.1.1 AC -18.1.2.7.1.2AC -18.1.2.7.1AC -18.1.2.8AC -18.1AC -18.3.2.10.1AC-1 -18.3.2.10.1 AC-2 -18.3.2.10.2.AC -1 8.3.2.13AC -18.3.2.7.2.AC -1 8.3.2.9AC -Liede WWTS (Phase 11I) Project BD -18.1.11BD -18.1.2.4BD -18.1.2.7.1.1BD -18.1.2.7.1.2BD -18.1.2.7.1 BD -18.1.2.8BD -18.1 BD -18.3.2.10.1 BD-1 -18.3.2.10.1BD-2 -18.3.2.10.2.BD -18.3.2.13BD -18.3.2.7.2.BD -Sewage Networks -Datansha -Datansha AC -18.1.1 1ACO -18.1.2.4AC -18.1.2.7.1.1AC1 -18.1.2.7.1.2AC -18.1.2.7.1 AC -18.1.2.8AC -18.1AC -18.3.2.10.1.1AC-1 -18.3.2.10.1.1AC-2 -18.3.2.10.2.1 AC -18.3.2.13AC - 1 8.3.2.7.2.1 AC 7 -Datansha AC (continued) -18.3.2.9.1 AC -Datansha BD -18.1.11.1BD -18.1.1 BD -18.1.2.4.1 BD -18.1.2.7.1.1.1 BD -18.1.2.7.1.1BD -18.1.2.7.1.2.1 BD -18.1.2.8.1 BD -18.3.2.10.1.1 BD-1 -18.3.2.10.1.1 BD-2 -18.3.2.10.2.1 BD -18.3.2.13.1 BD -18.3.2.7.2.1 BD -Liede WWTS Phase I and 11 -Liede WWTS Phase I and 11 AC -18.1.11.4AC -18.1.2.4.4AC - 18.1.2.7.1.1.4AC - 18.1.2.7.1.2.4AC -18.1.2.7.1.4AC -18.1.2.8.4AC -18.1.4AC -18.3.2.10.1.4AC-1 -18.3.2.10.1.4AC-2 -18.3.2.10.2.4AC -18.3.2.13.4AC -1 8.3.2.7.2.4AC -1 8.3.2.9.4AC -Liede WWTS Phase I and 11 BD -18.1.11.4BD -18.1.2.4.4BD -18.1.2.7.1.1.4BD -18.1.2.7.1.2.4BD -18.1.2.7.1.4BD -18.1.2.8.4BD -18.1.4BD -18.3.2.10.1.4BD-1 -18.3.2.10.1.4BD-2 -18.3.2.10.2.4BD -18.3.2.13.4BD 8 -Liede WWTS Phase I and 11 BD (continued) -18.3.2.7.2.4BD -Lijiao -Lijiao AC -18.1.11.2AC -18.1.2.4.2AC -18.1.2.7.1.1.2AC -18.1.2.7.1.2.2AC -18.1.2.7.1.2AC -18.1.2.8.2AC -18.1.2AC -18.3.2.10.1.2AC-1 -18.3.2.10.1.2AC-2 -18.3.2.10.2.2AC -18.3.2.13.2AC -1 8.3.2.7.2.2AC -1 8.3.2.9.2AC -Lijiao BD -18.1.11.2BD -18.1.2.4.2B0D -18.1.2.7.1.1.2BD -18.1.2.7.1 .2.2BD -18.1.2.7.1..2BD -18.1.2.8.2BD -18.1.2BD -18.3.2.10.1.2BD-1 -18.3.2.10.1.2BD-2 -18.3.2.10.2.2BD -18.3.2.103.2BD -18.3.2.7.2.2BD -Xilang -Xilang AC -18.1.11.3AC -18.1.2.4.3AC -18.1.2.7.1.1.3AC - 18.1.2.7.1 .2.3AC -18.1.2.7.1..3AC -18.1.2.8.3AC -18.1..3AC -18.3.2.10.13.3AC-1 -18.3.2.10.1.3AC-2 -18.3.2.10.2.3AC -18.3.2.103.3AC 9 -Xilang AC (continued) -1 8.3.2.7.2.3AC -1 8.3.2.9.3AC -Xilang BD -18.1.11.3BD -1 8.1 .2.4.3BD -18.1.2.7.1.1 .3BD -18.1 .2.7.1 .2.3BD -18.1.2.7.1 .3BD -1 8.1 .2.8.3BD -1 8.1 .3BD -18.3.2.10.1 .3BD-1 -18.3.2.10.1 .3BD-2 -18.3.2.1 0.2.3BD -18.3.2.1 3.3BD -1 8.3.2.7.2.3BD Volume 7 Attached Table of Chapter 13 -Dashadi -Compensation standard for land -Compensation standard for building -Compensation standard for the pitch of buildings -Indices for cost of works (pipeline) -Other Compensation1 -Other Compensation2 -Liede WWTS Phase (III) -Compensation standard for land -Compensation standard for building -Compensation standard for the pitch of buildings -Indices for cost of works (pipeline) -Other Compensationl -Other Compensation2 -Sewage networks -Compensation standard for land -Compensation standard for building-datansha -Compensation standard for building-Liede WWTS (phase I and 11) -Compensation standard for building-Lijiao -Compensation standard for building-Xilang -Compensation standard for the pitch of buildings -Indices for cost of works (pipeline) -Other Compensationl -Other Compensation2 10 General table of the total quantity of the land requisition and land borrowing by . ta-c-ed table 2. 4.9. 1 area for the sewage pipe network of the project District Baiyun District Fangcun District Haizhu District Hu ngpu District Area of Area of Area of land Area of Area of Area of Area of Area of land land requisitio land land land land land requisition borrowing Total area n borrowing Total area requisition borrowing Total area requisition borrowing Total area Grade 1 1,043.85 3,136.98 4,180.83 - - - 4,124.37 10,488.78 14,613.15 Grade I - - - 2,612.68 8,405.56 11,018.24 18,170.72 58,458.78 76,629.50 Grade 1 47,592.97 140,875.44 188,468.41 821.67 2,055.43 2,877.11 33,251.26 109,816.23 143,067.49 85,586.40 278,532.73 364,119.13 Grade 1 31,156.06 92,285.93 123,441.99 17,599.33 40,325.41 57,924.74 15,630.03 50,027.76 65,657.79 35,406.62 104,374.53 139,781.16 Grade I - - - 16,611.62 51,054.99 67,666.61 21,625.57 71,052.68 92,678.24 41,809.06 127,489.49 169,298.55 Grade 1 66,434.35 219,222.09 285,656.44 - - - 37,579.59 120,635.59 158,215.19 5,342.78 16,796.22 22,139.00 Total 146,227.23 455,520.44 601,747.67 37,645.31 101,841.40 139,486.70 130,381.54 420,479.82 550,861.36 168,144.86 527,192.98 695,337.84 Page I of 2 General table of the total quantity of the land requisition and land borrowing by f e t k d ti . t ~~~~~~~~~~~~~~~~~~~~~attached table 2. 4. 9. 1 ----area- -far h-eh -s-evag -p-ipe- e-tlmwork---f --th-e projec t atce al .. Tianhe District Total Area of Area of Area of land land land Area of land requisition borrowing Total area requisition borrowing Total area 502.58 1,642.98 2,145.56 14,411.75 41,801.52 56,213.27 24,960.72 71,313.02 96,273.74 45,744.12 138,177.36 183,921.47 38,082.08 .117,471.74 155,553.81 205,334.38 648,751.57 854,085.95 36,293.95 108,802.11 145,096.06 136,086.00 395,815.75 531,901.75 48,257.96 152,498.50 200,756.46 128,304.20 402,095.66 530,399.86 55,738.76 185,662.00 241,400.76 165,095.48 542,315.91 707,411.39 203,836.04 637,390.35 841,226.39 694,975.92 2,168,957.77 2,863,933.69 Page 2 of 2 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode for': MJ%eRepe2.iRe2 , 1 , .1 Total Number of Number of Floor area Floor area of Total household PAPs demolished land demolished Project use Type of demolished Quantity borrowed floor area Wholly demolished 887 962 3012 93230.5289 3 932 0.5289 Partially demolished 933 993 2615 56022.6021 n 560 2.6021 Partially Partially demolished/part demolished ially borrowed 683 1058 4110 85299.2966 29923.146 115 22.443 Pertially demolished/who Ily borrowed 387 445 1742 44031.3801 33326.0792 77 57.4593 Pertially Land borrowed 508 509 1098 C 6998.82813 69 8.82813 borrowing Wholly borrowed 27 27 50 C 358.102142 358.102142 Housing Subtotal 3425 3994 12627 278583.808 70606.1554 34 189.963 Wholly demolished 113 205 1030 9056.52101 7- 90 6.52101 Partially demolished 109 149 624 4856.72258 n 48 6.72258 Partially Partially demolished/part demolished ially borrowed 168 476 2887 20142.9745 7043.79625 27 86.7708 Pertially demolished/who lly borrowed 70 121 713 4021.59743 2904.15447 69q5.75191 Pertially Land borrowed 57 57 103 C 857.380908 857.380908 borrowing Wholly borrowed 2 3 12 El 114.26195 1 14.26195 shop Subtotal 519 1011 5369 38077.8156 10919.5936 48 397.4092 Wholly demolished 47 71 440 3724.38226 37]4.38226 Partially s demolished 50 75 462 2837.23557 E 28 7.23557 Partially e Partially demolished/part W demolished ially borrowed 42 167 1395 8401.6628 2932.97232 11334.6351 a Pertially g demolished/who e lly borrowed 8 12 96 480.051932 240.782519 720.834451 Pertially Land borrowed 23 23 42 C 204.302209 204.302209 P borrowing Wholly i _borrowed 1 1 2 n 10.5588001 10.5588001 p office Subtotal 171 349 2437 15443.3326 3388.61585 18831.9484 e Wholly demolished 96 125 409 6756.83865 El 6756.83865 Partially demolished 90 116 478 8331.37284 Li 8331.37284 e Partially Partially ePartially demolished/part t demolished ially borrowed 323 806 4556 53687.8878 20287.739 73975.6269 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode foratQahc,egie2Ai W Pertialf4 e LW O demolished/who r Illy borrowed 35 71 260 2425.16363 1712.75923 4137.92287 k Pertially Land borrowed 49 53 80 O 1029.36712 102S36712 S borrowing Wholly borrowed 2 2 2 [1 22.8831 Z|81 tory build Subtotal 595 1173 5785 71201.263 23052.7485 94254.0115 Wholly demolished 85 92 228 3231.12671 O 323 .12671 Partially demolished 26 45 216 1403.85414 O 140E .85414 Partially Partially demolished/part demolished ially borrowed 34 92 534 3518,14472 1326.7913 4844z.93601 Pertially demolished/who lly borrowed 11 18 77 647.461321 584.302877 123 1.7642 Pertially Land borrowed 15 15 25 O 190.920211 190.920211 borrowing Wholly borrowed 4 4 6 O 53.1419709 53.1419709 Other uses Subtotal 175 266 1086 8800.58689 2155.15636 109;5.7432 Wholly demolished 1228 1455 5119 115999.398 O 115099.398 Partially demolished 1208 1378 4395 73451.7872 l 734$ 1.7872 Partially Partially demolished/part demolished ially borrowed 1250 2599 13482 171049.967 61514.4449 232 64.411 Pertially demolished/who Ily borrowed 511 667 2888 51605.6544 38768.0783 903 3.7327 Pertially Land borrowed 652 657 1348 O 9280.79858 928 .79858 borrowing Wholly borrowed 36 37 72 O 558.947963 558 p47963 Subtotal Subtotal 4885 6793 27304 412106.806 110122.27 522229.075 Wholly demolished 502 630 1961 59729.29 C 5'729.29 Partially demolished 471 499 1430 27580.1554 C 27580.1554 Partially Partially demolished/part demolished ially borrowed 407 626 2203 44858.7353 18790.9677 63649.7029 Pertially demolished/who lly borrowed 236 303 1109 28483.7705 21230.0238 497.3.7942 Pertially Land borrowed 259 259 645 O 4291.849 4 .849 borrowing Wholly borrowed 10 11 1 9 C 301.7365 301.7365 Housing Subtotal 1885 2328 7367 160651.951 44614.5769 205: 66.528 Wholly demolished 52 59 247 2899.31795 O 289'.31795 Partially demolished 77 82 179 2062.90611 _ D

Основные сведения
Тип документа Resettlement Plan
Дата принятия
Страна Китай
Источник Всемирный банк