Page 1 PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1049 Project Name Sichuan Urban Development Project Region EAST ASIA AND PACIFIC Sector Roads and highways (60%); General water, sanitation and flood protection sector (40%) Project ID P083322 Borrower(s) PRC Implementing Agency Sichuan Provincial Construction Commission No. 40, South Renmin Road Sichuan Province China Tel: (86-28) 557-1036 Fax: (86-28) 557-1037 Environment Category [X] A [ ] B [ ] C [ ] FI [ ] TBD (to be determined) Safeguard Classification [ ] S 1 [ ] S 2 [ ] S 3 [ ] S F [X ] TBD (to be determined) Date PID Prepared September 7, 2004 Estimated Date of Appraisal Authorization May 1, 2005 Estimated Date of Board Approval November 15, 2005 1. Key development issues and rationale for Bank involvement China
Группа Всемирного банка · Project Information Document
China - Sichuan Urban Infrastructure Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Project Information Document
Страна
Китай
Источник
Всемирный банк