Всемирная организация здравоохранения (ВОЗ / WHO) · Technical Documents

Programme budget, 1992-1993 :budget performance (interim report)

Всемирная организация здравоохранения
Полный текст

• WORLD HEALTtt ORGANIZA"ION

._) 'WI

.

ORGANISATION MONOIALE DE LA SANTE

•

REGIONAL OFFICE FOR THE WESTERN PACIFIC BUREAU R~GIONAL DU PACIFIQUE OCCIDENTAL

REGIONAL COMMITIEE Forty-fourth session Manila 13-17 September 1993 Provisional agenda item 9

WPRlRC44/4

5 July 1993

ORIGINAL: ENGLISH

PROGRAMME BUDGET, 1992-1993: BUDGET PERFORMANCE (INTERIM REPORT)

This document presents an interim report on the implementation of the regular budget for the biennium 1992-1993 as at 31 May 1993. The Report also summarizes the difficulties faced prior to and during the situation. Implementation in monetary terms as at 31 May 1993 amounted to US$ 44.4 million or 78 % of the current operating budget. It is expected that the budget will be fully implemented by the end of the biennium. Expenditures and explanations for significant variations within the individual programmes are shown in the Annexes. The Regional Committee is asked to consider this document prior to the final report on budget performance 1992-1993 that will be presented to the Regional Committee at its forty-fifth session next year. Discussions on the final implementation can take place at that time. im~lementation

stages, and the actions taken to resolve the

,

.,

·c

WPRlRC44/4 page 2

This interim report has been prepared on the budget performance for the regular budget for the biennium 1992-1993 as at 31 May 1993. The biennium has been very difficult, and since the budget was presented to the Regional Committee in September 1990, there have been a number of important changes, summarized in Annex 1, which are described in detail below.

Prior to implementation The regular programme budget proposed to the Regional Committee at its forty-first session in September 1990 (column 1 in Annex 2) amounted to US$ 63 901400. The rate of exchange used (Philippine pesos 22.50 to US$ 1) was changed prior to the eighty-seventh session of the Executive Board in January 1991 to pesos 26.00, US$ 63 209 000. reducing the budget total by US$ 692 400 to Following adoption of the WHO budget by the World Health Assembly in

May 1991, the rate of exchange applied was again revised, to pesos 27.70, further reducing the budget allocation by US$ 282 000 to US$ 62 927000. The two currency adjustments are shown in Annex 1 and included in column 3 of Annex 2. In December 1991, the Director General decided to withhold 10% of all regional allocations in anticipation of the inability of some Member States to make their assessed contributions. For the Western Pacific Regional Office, this reduction was US$ 6 292 700, being 10% of the original budget after currency adjustment deductions as described above. The actual regular budget allocated to the Western Pacific Regional Office thus became US$ 56 634 300, a reduction of US$ 7267 100 from the original proposed budget of US$ 63 901 400 (see Annex 1). Further currency adjustments were made to reflect later changes in the exchange rate between the US dollar and the Philippine peso and to include additional funds totalling US$ 123 000 from headquarters for the implementation of certain project activities. These adjustments, together with the currency adjustments already described above, resulted in a net reduction of US$ 468 300, as shown in column 3 of Annex 2, bringing the approved programme budget to US$ 57 140400 (as shown in Annex 1 and column 4 of Annex 2).

.-

During implementation In view ofthe fact that the cost increases actually allowed and budgeted for in the 1992-1993 programme budget were lower than required, a recosting of the reduced 1992-1993 budget, using 1992 estimated costs, was carried out. This showed that a budgetary deficit of US$ 12 000 000 could be expected as a result of this situation alone. Taking into account a number of activities that had to be carried over from the 1990-1991 biennium in the amount of approximately US$ 1 million,

WPRlRC44/4 page 3

and including the 10% withheld by the Director-General, the Region was therefore faced with an overall budgetary deficit of US$ 19 300 000. The following measures were taken to deal with this serious situation: (a) at the level of regional and intercountry programmes, a reduction of US$ 6.4 million

was made; (b) the Regional Director wrote to all Member States in February 1992 informing them

of the situation and seeking their cooperation in working with WHO representatives and country liaison officers to reduce country allocations. The reduction requested was about 20% of the overall country allocation. To simplify the process, the Regional Office indicated target activities for reduction (known as Priority C items), most of which the Governments kindly accommodated. In that way, further reductions of US$ 7.4 miIIion were made. These reductions, however. added up to only US$ 13.8 miIIion, which meant that a further reduction of approximately US$ 5.5 million was still required. without seriously jeopardizing implementation of programmes. It would have been extremely

difficult to cut back any further, particularly at country level at such an early stage of the biennium, The Regional Director therefore decided to carry the deficit and to make a final decision as implementation progressed. At the early stages of the biennium, the budget strategy was to reduce the expected shortfall of US$ 5.5M as far as possible by cost reduction measures. It was hoped also that before the end of the biennium. some portion of the 10% withheld for unpaid contributions might be released, which would avoid any further programme reductions. All the above was reported at the last session of the Regional Committee in September 1992. Throughout the biennium, stringent cost-saving measures have been instituted.

These included reducing the duration of consultancies, using Regional Advisers in lieu of consultants, placing fellows at alternative cheaper venues and/or reducing the duration of their study without sacrificing technical content, financing meetings jointly by using regular budget as well as extrabudgetary funds, limiting local costs to a maximum of US$ 5000 for each activity and freezing a number of posts or delaying filling them, particularly at the Regional Office and intercountry level. As a result of all the above, a current operating budget has been derived which enables the Region still substantially to meet its country and regional priorities. Annex 2, column 5 reflects all the adjustments described above. Column 6 reflects the current operating budget. Implementation

WPRlRC44/4 page 4

of the progrannnes has therefore been compared with this operating budget, as it is considered to be a more appropriate measurement than to make the traditional comparison with the original approved budget. Towards mid-1993, it became clear that any release of the 10% withheld by the Director-General would be most unlikely. While further operating economies had been made amounting to around US$ 1.2 million, it was reluctantly accepted that further progrannne reductions were necessary. After a series of consultations with Governments, further reductions of approximately US$ 3 million were agreed upon at the country level, the balance of US$1.3 million being absorbed at the Regional Office and intercountry levels. These reductions have also been incorporated in the operating budget.

-

Status of implementation Expenditures and obligations to the end of May 1993 are shown in Annex 2, column 7 with the relevant implementation rate given in column 8. Annex 3. Annex 2 shows that expenditures and obligations incurred as at 31 May 1993 amounted to US$ 44 446 200 (column 7), resulting in an implementation rate of 78 % in dollar terms (column 8). The budget is expected to be fully implemented by the end of the biennium. Explanations for variations are shown in

WPRlRC44/4 page 5

ANNEX 1

CHANGES IN THE 1992-1993 REGULAR BUDGET

I.

Regular programme budget estimates as presented to the Regional Conunittee at its forty-first session 1. Philippine peso exchange rate changes

US$ 63 901 400

(a) 22.50 (b) 26.00

26.00 27.70

US$ (692 4(0)

(282000)

(974400)

II.

WHA-approved progranune budget 2. Ten per cent of budget withheld by headquarters Sub-total 3. 4. Currency exchange adjustments from pesos 27.70 to 25.40 Funds allocated from headquarters in order to implement certain project activities

62927000 (6292 7(0) 56634300 383 100

123000

III.

Adjusted progranune budget

US$ 57 140 400

WPR/RC44/4 page

6

-

)

)

INTERIM FINANCIAL IMPLEMENTATION BY MAJOR PROGRAMME AND PROGRAMME FOR THE BIENNIUM 1992-1993 (as at 31 May 1993) (I) MAJOR PROGRAMME/ PROGRAMME" Regular programme budget •• WPRlRC4116 (2) 10% of budget withheld by HQ ••• (3) Currency and other adjustments (4) Adjusted programme budget (1)+(2)+1-(3)

(5) Programme changes during implementation periocl ••••

(6) Current operating budget (4)+/-(5)

(7)

(8) Percentage of operating budget implemented (7)/(6)

Interim actual expenditures! obligations

I. GOVERNING BODY

1.3 Regional Committee Sub-total 2. WHO'S GENERAL PROGRAMME DEVELOPMENT AND MANAGEMENT 2. I Executive management 2.2 Regional Director's Development Programme 2.3 General programme development 2.4 External coordination for health and social development 2.5 Health-for-a11 strategy coordination 2.6 Informatics management Sub-total

343000 343000

(34 300) (34 300)

0% 0

308700 308700

88700 88700

397400 397400

229 100 229 100

58 58

524300 I 100 000 1973200

(50820) (110000) (188850)

(9400) 118000 (52400)

464 080 I 108000 1731950

323500 (12500) 150300

787580 1095500 1882250

669400 294 100 I 665 100

85 27 88

414600 745700 629000 5386800

(39570) (73500) (58 190) (520930)

(11 800) (6600) (28400) 9400

363230 665600 542410 4875270

17600 134 800 35200 648900

380830 800 400 577610 5524170

386500 842800 526700 4384 600

101

lOS 91 79

• Classification based on the Eighth General Programme of Work (1990-1995) •• The total of this column represents the estimates that were presented to the Regional Committee under WPRlRC41/6. The actual amount approved was $ 62 927 000, after two currency adjustments were taken into account. These currency adjustments are included under column 3. ••• The 10% was based on the amount of $ 62 927 000 as explained above . •••• Programme changes made during the implementation periocl comprising full recosting of the programme budget, the priority reduction exercises as well as other reprogrammings initiated by countries.

~

!~

~

~

~f

(I) MAJOR PROGRAMMEI PROGRAMME· Regular programme budget •• WPRlRC4116

(2) 10% of budget witbheld by HQ •••

(3) Currency and other adjustments

(4) Adjusted programme budget (1)+(2)+1-(3)

(5)

(6) Current operating budget (4)+1-(5)

(I) Interim actual expendituresl obligations

(8) Percentage of operating budget implemented (7)/(6)

Programme elumges during implementation period ••••

i N

i~ n

" ~ OC~

~

3. HEALTH SYSTEM DEVELOPMENT 3.1 Health situation and trend assessment

I 827300

(180880)

(54 800)

1591 620

(343700)

1247920

948500

76

3.2 Managerial process for national health development 3.3 Health systems research and development 3.4 Health legislation Sub-total 4. ORGANIZATION OF HEALTH SYSTEMS BASED ON PRIMARY HEALTH CARE Sub-total 5. DEVELOPMENT OF HUMAN RESOURCES FOR HEALTH Sub-total 6. PUBLIC INFORMATION AND EDUCATION FOR HEALTH Sub-total 7. RESEARCH PROMOTION AND DEVELOPMENT. INCLUDING RESEARCH ON HEALTHPROMOTING BEHAVIOUR Sub-total

5781 100 495300 160 600 8264 300

(577 350) (49530) (16060) (823820)

152900 (219 100) 0 (121000)

5356650 226670 144 540 7319480

3966100 (71 800) (35400) 3 515 200

9322750 154 870 109 140 10 834 680

7832 100 66500 70700 8917800

84

43 65 82

7602200 7602200

(757 180) (757 180)

517200 517 200

7362220 7362220

(1 598 100) (I 598 100)

5764 120 5764 120

4322200 4322200

75 75

10389000 10389000

(I 033730) (I 033 730)

32600 32600

9387870 9387870

(765600) (765600)

8622270 8622270

6484 500 6484 500

75 75

I 319200 I 319200

(13\ \60) (131 160)

(2000) (2000)

1 186040 I 186040

(558400) (558400)

627640 627640

314500 314500

50 50

I 337 100 1 337 100 -

(132890) (132890)

(507 100) (507 100)

697 110 697110

26900 26900

724 010 724010

596500 596500

82 82

)

)

)

)

(I) MAJOR PROGRAMME! PROGRAMME· Regular programme budget •• WPRlRC4116

(2) 10% of budget withheld by HQ •••

(3) Currency and other adjustments

(4) Adjusted programme

(5) Programme

(6) Current

(7) Interim actual expendituresl obligations

(8) Percentage of operating budget implemented (7)/(6)

budget (1)+(2)+1-(3)

changes during implementation period ••••

operating budget (4)+/-(5)

8. GENERAL HEALTH PROTECTION AND PROMOTION 8. I 8.2 8.3 8.4 Nutrition Oral health Accident prevention Tobacco or health Sub-tota! 9. PROTECTION AND PROMOTION OF THE HEALTH OF SPECIFIC POPULATION GROUPS 9.1 Maternal and child health. inel uding family planning 9.2 Adolescent health 9.4 Workers' health 9.5 Health of the elderly Sub-tota! 10. PROTECTION AND PROMOTION OF MENTAL HEALTH 10. 1 Psychosocial and behavioural factors in the promotion of health and human development 10.2 Prevention and control of alcohol and drug abuse 10.3 Prevention and treatment of menta! and neurological disorders Sub-tota! 772 800 I 051 600 75500 123500 2023400 (76530) (104 410) (7550) (12350) (200 840) (22000) 39400 0 0 17400 674270 986590 67950 111 ISO 22900 (411 600) (33700) (31 300) (453700) 697 170 574990 34 250 79850 1386260 603800 372 000 14000 26700 1016500 87 65 41 33 73

I 839960

924700 7500 419000 265000 1 616200

(91 720) (750) (41 900) (26500) (160 870)

25800 0 32400 (1 000) 57200

858780 6750 409 500 237500 1 512530

(341 100) (6750) (239500) (58500) (645850)

517680 0 170000 179000 866680

298 100 0 137700 90200 526000

58 0 81 50 61

232000 208700

(22450) (20870)

(4700) 0

204 850 187830

104 600 (126400)

309 450 61430

290900 22900

94 37

361 800 802500

(36 180) (79500)

18000 13300

343620 736300

(113800) (135600)

229820 600 700

67600 381400

29 63

i ~

!r; ~t -oiO:

~

N

(I) MAJOR PROGRAMME! PROGRAMME· Regular programme budget •• WPRlRC4116

(2) 10% of budget withheld by HQ •••

(3) Currency and other adjustments

(4) Adjusted programme budget (1)+(2)+/-(3)

(5) Programme cbanges during implementation period ••••

(6)

(7)

(8) Percentage of operating budget implemented (7)/(6)

Current operating budget (4)+/-(5)

Interim actual expendituresl obligations

f !~ ID~ (') N

;:=

t

II. PROMOTION OF ENVIRONMENT AL HEALTH ILl Community water supply and sanitation 11.2 Environmental health in rural and urban development and housing 11.4 Control of environmental health hazards 1l.5 Food safety Sub-total 12. DIAGNOSTIC, THERAPEUTIC AND REHABILITATIVE TECHNOLOGY 12.1 Clinieal, laboratory and radiological technology for health systems based on primary health care 12.2 Essential drugs and vaccines 12.3 Drug and vaccine quality, safety and efficacy 12.4 Traditional medicine 12.5 Rehabilitation Sub-total 13. DISEASE PREVENTION AND CONTROL 13.1 13.2 13.3 13.4 Immunization Disease vector control Malaria Parasitic diseases 683200 581600 2763500 849400 (67590) (57410) (275600) (84 190) (4600) (36500) 9400 (3700) 611010 487690 2497300 761 510 140 400 (164 900) (248400) (211 800) 751410 322790 2248900 549710 583900 290900 1892600 468400 78 90 84 85 I 845800 (183080) (32 900) I 629820 317300 1947 120 1737500 89

2714600 445400 241400 5247200

(271460) (44 540) (24 140) (523220)

(27600) (19300) 0 (79800)

2415540 381560 217260 4644 180

(136300) (187500) (113700) (120200)

2279240 194060 103560 4523980

1929500 120400 70200 3857600

85 62 68 85

2028300 1429700 279300 616800 170800 4524900

(202070) (142240) (27930) (60 950) (17080) (450270)

(481 000) 39800 286600 (20200) 0 (174800)

I 345230 I 327260 537970 535650 153720 3899830

(16400) (612600) (226700) 62400 (31 200) (824500)

1328830 714660 311 270 598050 122520 3075330

1099500 511 600 182800 464100 57400 2315400

83 72 59 78 47 75

)

)

)

) (3) Currency and other adjustments (4) Adjusted programme budget (I) + (2) + 1-(3)

(I) MAJOR PROGRAMMEI PROGRAMME· Regular programme budget •• WPRlRC41/6

(2) 10'-' of budget withheld by HQ •••

(5) Programme

(6) Current operating budget (4)+1-(5)

(7) Interim octual expenditures! obligations

(8) Percentage of operating budget implemented (7)/(6) 99 80 69 62 89 101 0

changes during implementation period ••••

13.6 13.7 13.8 13.9 13.10 13.12 13.13 13.14

13. IS 13.16 13. 17 13.18

Diarrhoeal diseases Acute respiratory infections Tuberculosis Leprosy Zoonoses Research and development in the field of vaccines AIDS Other communicable disease prevention and control activities Blindness and deafness Cancer Cardiovascular diseases Other noncommunicable disease prevention and control activities

427500 414700 562200 298 100 190000 0 113400

(42020) (40740) (56220) (29060) (19000) 0 (II 340)

(4600) (10400) (56400) 57000 0 0 0

380880 363560 449580 326040 171000 0 102060

5400 (166700) (133300) 4600 (46300) 12400 (102060)

386280 196860 316280 330640 124 700 12400 0

382800 157100 218400 204 900 110800 12500 0 744 900 86200 42400 72 600 420300 5688700

I 158800 134 600 146400 474400

(113630) (13460) (14640) (47440)

(IS 000) 0 173500 (275900)

1030170 121 140 305260 151060

(91 500) IS 800 (75200) 2300

938670 136940 230060 153 360

79 63 18 47

574200 Sub-total 9372 000

(55900) (928240)

245900 78700

764 200 8522460

(134 400) (I 193660)

629800 7328800

67 78

14. HEALTH INFORMATION SUPPORT Sub-total IS. SUPPORT SERVICES 15.1 Personnel 15.2 General administration and services 15.3 Budget and fmance 15.4 Equipment and supplies for Member States Sub-total TOTAL

1077 800 1077800

(103070) (103070)

(30200) (30200)

944 530 944 530

305200 305200

1249730 I 249730

808800 808800

65 65

399 100 3 3\3 000 583000 300 700 4595800 63901400

(36970) (298820) (49880) (27 OlD) (412680) (6292 700)

(17900) (192600) (50300) (18400) (279200) (468300)

344 230 2821580 482820 255290 3903920 57140400

289300 I 121 210 310000 (9800) I 710 710 0

633530

543500 3054 100 758700 246300 4602600 ------

86 77 96 100 82 78

3942790 792820 245490 5614630 57140 400

44 446 200

~ i ~£ I-' _ ~ I-'~

WPRlRC44/4 page 12

-

-

)

)

REMARKS ON THE INTERIM REGULAR BUDGET FINANCIAL IMPLEMENTATION BY MAJOR PROGRAMME AND PROGRAMME FOR THE BIENNIUM 1992-1993 (as at 31 May 1993) (I) MAJOR PROGRAMME! PROGRAMME Current operating budget (2) Interim actual expenditures! obligations (3)

Percentage of operating budget implemented (2)/(1)

Remarks

I.

GOVERNING BODY 1.3 Regional Committee Sub-total 397400 397400 229 100 229100 58 58 Remaining provisions are earmarked for the costs of the forty-fourth session of the Regional Committee in 1993

2. WHO'S GENERAL PROGRAMME DEVELOPMENT AND MANAGEMENT 2.1 2.2 2.3 2.4

2.5 2.6

Executive management Regional Director's Development Programme General programme development External coordination for health and social development Health-for-all strategy coordination Informatics management Sub-total

787580 1095500 I 882250

669400 294 100 1665100

85 27 88

Ten approved activities are in the process of implementation amounting to S 235 000. The remaining provision is expected to be fully utilized before the end of the biennium.

I I , I

380830 800400 577 610 5524170

386500 842800 526700 4384 600

101 I

105 91 79

3.

HEALTH SYSTEM DEVELOPMENT 3.1 Health situation and trend assessment

1247920

948500

76

~ !~ .... ~t ~ ~,j:o,

(I) MAJOR PROGRAMME! PROGRAMME Current operating budget

(2) Interim actual expenditurea/ obligations

(3) Percentage of operating budget implemented (2)/(1) 84 43 65 82

Remarks

8 i:.~ ~ ~ ~ ~li3

!

3.2 Managerial process for national health development 3.3 Health systems research and development 3.4 Health legislation Sub-total 4. ORGANIZATION OF HEALTH SYSTEMS BASED ON PRIMARY HEALTH CARE Sub-total 5. DEVELOPMENT OF HUMAN RESOURCES FOR HEALTH Sub-total 6. PUBLIC INFORMATION AND EDUCATION FOR HEALTH Sub-total 7. RESEARCH PROMOTION AND DEVELOPMENT,INCLUDING RESEARCH ON HEALTHPROMOTING BEHAVIOUR Sub-total 8. GENERAL HEALTH PROTECTION AND PROMOTION 8.1 Nutrition 8.2 Oral health

9322750 154 870 109 140 10 834 680

7832 100 66500 70700 8917800

The current operating budget includes $ I 165900 for the WHO Representative's office in Cambodia which was not budgeted for previously. Several activities are scheduled for implementation in the 3rd quarter of 1993. Some activities were implemented utilizing extrabugetary funds. Several activities are scheduled for implementation in the 3rd and 4th quarters of 1993.

5764 120 5764 120 8622270 8622270 627640 627640

4322200 4322200 6484 500 6484 500 314500 314500

75 75 75 75 50 50 Several activities, including four other health promotion projects, are scheduled for implementation for the remaining part of 1993. Many activities, including a substantial number of fellowships, are in the proce5l> of being implemented.

724010 724010

596500 596500

82 82

697 170 574990

603800 372 000

87 65

Several activities, including visits to the Philippines and South Pacific countries, are scheduled for implementation in the 3rd and 4th quarters of 1993.

)

)

)

)

(I) MAJOR PROGRAMME! PROGRAMME Current operating budget

(2)

(3) Percentage of operating budget implemented (2)/( I) 41 33 73

Interim actual expenditures! obligations

Remarb

8.3 Accident prevention 8.4 Tobacco or health Sub-total 9. PROTECTION AND PROMOTION OF THE HEALTH OF SPECIFIC POPULATION GROUPS 9.1 Maternal and child health, including family planning 9.2 Adolescent health 9.4 Workers' health 9.5 Health of the elderly

34250 79850 I 386260

14000 26700 I 016500

Three workshops are scheduled for China, the Republic of Korea and the South Pacific. Several activities are scheduled for implementation in the 3rd quarter of 1993.

517680 0 170000 179000

298 100 0 137700 90200

58 0 81 50

The remaining portion of the budget is in the process of implementation. The consultant provision was cancelled. Several activities are scheduled for implementation in the 3rd and 4th quarters of 1993. Extrabudgetary resources were also used to implement other activities in this programme.

Sub-total 10. PROTECTION AND PROMOTION OF MENTAL HEALTH 10.1 Psychosocial and behavioural factors in the promotion of health and human development 10.2 Prevention and control of alcohol and drug abuse 10.3 Prevention and treatment of mental and neurological disorders Sub-total

866680

526000

61

309 450 61430

290900 22900

94 37

The remaining activities are scheduled for implementation for the 3rd and 4th quarters of 1993. Extrabudgetary funds were also used to implement part of this programme. Several activities are scheduled for implementation in the 3rd and 4th quarters of 1993. Some activities were also implemented utilizing extrabudgetary funds. _.

229820 600 700

67600 381 400

29 63

g ~ c..I

!i-1D:t .... VI'"

(I) MAJOR PROGRAMME! PROGRAMME Current operating budget

(2) Interim actual expeoditurcsl obligations

(3) Percentage of operating budget implemented (2)/(1)

( ~~ t..>

~\lI:I

Remarks

i

n

II.

PROMOTION OF ENVIRONMENT AL HEALTH 11.1 Community water supply and sanitation

I 947 120

1737500

89

11.2 Environmental health in rural and urban development and housing 11.4 Control of environmental health hazards 11.5 Food safety

2279240 194060 103560

1929500 120400 70200

85 62 68

Several activities in China, the Republic of Korea and Malaysia are planned for implementation in the 3rd and 4th quarters. Some activities are planned for implementation in the 3rd and 4th quarters of 1993. Extrabudgetary funds were also used to fund some of the activities in China and the Philippines

Sub-total 12. DIAGNOSTIC, THERAPEUTIC AND REHABILITATIVE TECHNOLOGY 12.1 Clinieal, laboratory and radiological technology for health systems based on primary health care 12.2 Essential drugs and vaccines 12.3 Drug and vaccine quality, safety and efficacy 12.4 Traditional medicine 12.5 Rehabilitation Sub-total

4523980

3857600

85

I 328830 714660 311 270

1099500 511 600 182800

83 72 59

Some activities are planned for implementation later this year. Extrabudgctary sources were used to fund some of the activities. Some activities in Brunei Darussalam, the Republic of Korea and Vietnam are still scheduled for implementation. Some activities were implemented using extrabudgctary resources. Some activities are planned for implementation in the 3rd and 4th quarters of 1993. Extrabudgetary funds were also used to cover the other activities in this programme.

598050 122520 3075330

464 100 57400 2315400

78 47 75

)

)

)

)

(I)

(2) Interim actual expenditures! obligations

(3)

MAJOR PROGRAMME/ PROGRAMME

Current operating budget

Percentage of operating budget implemented (2)/(1)

Remarks

13.

DISEASE PREVENTION AND CONTROL 13.1 13.2 13.3 13.4 13.6 13.7 13.8 13.9

Immunization Disease vector control Malaria Parasitic diseases Diarrhoeal diseases Acute respiratory infections

Tuberculosis Leprosy

751410 322790 2248900 549710 386280 196860 316280 330640

583900 290900 1892600 468400 382800 157 100 218400 204 900

78 90

84 85 99 80 69 62

Several activities in five countries are still scheduled for implementation. Several activities in the Lao People's Democratic Republic and Papua New Guinea are still scheduled for implementation. Some activities were implemented using extrabudgetary resources.

I

13.10 Zoonoses 13.12 Research and development in the field of vaccines 13.13 AIDS 13.14 Other communicable disease prevention and control activities

124100 12400 0

110800 12500 0

89 101 0

The AIDS activities in the regular budget were integrated into the Global Programme on AIDS funded from extrabudgetary resources.

13.15 Blindness and deafness 13.16 Cancer 13.17 Cardiovascular diseases

938670 136940 230060 153360

744 900 86200 42400 72 600

19 63 18 47

While some activities are still for implementation other activities were supported using extrabudgetary funds. This programme is also supplemented by funds from extrabudgetary sources. Several activities are still scheduled for implementation in the 3rd quarter of 1993. Activities for the 3rd and 4th quarters of 1993 are still earmarked for implementation! while other activities in this programme were also implemented using other sources of funds.

13.18 Other noncommunicable disease prevention and control activities Sub·total

629800 7328800

420300 5688700

67 78

-

i 1.0>

!~ :t ......... ID

~

..... "'"

(I)

(2)

(3)

i Remarks 65 65 Several activities, including supplies and equipment for China, are scheduled for implementation in the 3rd and 4th quarters of 1993.

""

!~ cc:=

MAJOR PROGRAMMEI PROGRAMME

Current operating budget

Interim actual expendituresl obligations

Pereentage of operating budget implemented (2)/( I)

i

14.

HEALTH INFORMATION SUPPORT Sub-total

1249730 1249730

808800 808800

IS. SUPPORT SERVICES 15.1 Personnel 15.2 General administration and services 15.3 Budget and fmancc 15.4 Equipment and supplies for Member States Sub-total TOTAL 633530 3942790 792820 245490 5614630 57 140400 543500 3054 100 758700 246300 4602600 44446200 86 77 96 100 82 78

)

)

...-

Основные сведения
Тип документа Technical Documents
Дата принятия
Источник Всемирная организация здравоохранения