Groupe de la Banque mondiale · Resettlement Plan

Cambodia - Rural Electrification and Transmission, and, Renewable Energy Development Projects : resettlement plan (Vol. 4 of 4) : Resettlement action plan - Appendices

Cambodge Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

RP92 Volume 4 Royal Government of Cambodia Asian Development Bank World Bank Inter-Ministerial Resettlement Committee Ministry of Economy and Finance Ministry of Industry Mines and Energy POWER DISTIRBUTION AND GREATER MEKONG SUB-REGION TRANSMISSION PROJECT RESETTLEMENT ACTION PLAN APPENDIXES November 2003 FILWE COPY This volume contais the following appendixes Appendix Title A ADB's Policv on Involuntary Resettlement World Bank Operational Policy OP 4.12 - Involuntarv Resettlement B GIS Database C Affected Persons Census D Questionnaires E Data Collected from Replacement Cost Survey F Draft Public Information Booklet G Estimate of Compensation Costs, Based on Replacement Cost Study H Terms of Reference for Independent Monitoring Organization (INIO) I Terms of Reference for RP Environmental Coordinator (RPEC) J Terms of Reference for Trees Cost Assessment and Income Impacts and Remediation Study K Terms of Reference for Substation Land Fill Studv APPENDIX A ADB'S POLICY ON INVOLUNTARY RESETTLEMENT WORLD BANK OPERATIONAL POLICY OP4.12 INVOLUNTARY RESETTLEMENT APPENDIX B GIS DATABASE This appendix includes several of the aerial photographs with the transmission line right of way superimposed, showing propertn numbers (in blue) corresponding to the spreadsheet index and also houses that are affected (in red). The photographs selected include: * The eastern end of the 110kV lines at the existing ring main (Figure 1) * West Phnom Penh Sub-Station (Figure 13) * A section parallel to the railway line north of Takeo (Figure 44) * Takeo Sub-Station (Figure 72) These are representative of the infornation (123 figures in all), which is available on the GIS database. APPENDIX C AFFECTED PERSONS CENSUS This appendix includes several sample pages from the Affected Persons' spreadsheet from the 2000 survey. The printed sheets show onlv a selection of the data available, which has been sorted so that the properties appear consecutivelv along the route (i) North to south from WX,est Phnom Penh, 220 kV; (ii) West to east from W est Phnom Penh along the Northern 115 kV spur: and (iii) West to east from West Phnom Penh along the Southem 115 kV7 spur. The complete data, which includes land ownerslhip issues, details of propertv and structure values and more information on individual trees on properties, is available in the GIS database. The spreadsheets have been colour coded to help during the evaluation: * Red shading = WXPP and Takeo Sub-Stations * Grey shading = Presence of a house on the property * Red font = Some apparent discrepancy to be checked * Yellow shading = IP APPENDIX D QUESTIONNAIRES This appendix includes the questionnaires for the following surveys: A. Affected Person (AP) Census (100% of APs) (2000) B. Socio-Economic Survey (25%o of APs) (2000) C. Replacement Cost Survev for Structures (2003), D. Replacement Cost Survey for Affected Persons losing Land to Sub-Station (2003) and E. Replacement Cost Survev for Land Mfarket Prices (2003) APPENDIX E DATA COLLECTED FROM REPLACEMENT COST SURVEY This appendix includes: (a) Summarv of information on prices for land sold along transmission line route in last 12 months. (b) Summary of information on prices for land sold in Sub-Station sites in last 12 months (c) Summarv of prices requested by land owners on Sub-Station sites (d) Summary of information on structures affected by the transmission line construction. (e) Summanr of prices requested byi occupants for trees. (f) Photographs of all structures affected by the transmission line construction, in most cases comparing present condition with that in 2000 Survey. (g) Several sample reports from the 2003 survey, showing the information that has been collected. All this information is available on CD. Structure Affected in ROW ID: 359 Block Number 20095 Land Owner Phoung Phan GPS 0475913E, 1260541N Structure type Pet B2 Location Kampong Speu, Kong Pisei, Preah Nipean, Prey Toteung Cost to build $1,600.00 2001 Photo 2003 Photo ID: 360 Block Number 20096 Land Owner Em Somnang GPS 0475922E, 1260401N Structure type Kantang Al Location Kampong Speu, Kong Pisei, Preah Nipean, Prey Totueng Cost to build $7,000.00 2001 Photo 2003 Photo I.- TS. f6- ~ ~ k ID: 154 Block Number 10091 Land Owner Men Samith GPS 0476677E, 1267382N Structure type Location Kandal, Angsnouri, Boeng Thum, Boeng Thum Ti Bei Cost to build 2001 Photo 2003 Photo No Picture Thursday, November 13, 2003 Page 1 of 49 ID: 153 Block Number 10090 Land Owner Horm Hout GPS 0476687E, 1267417N Structure type Kantang Al Location Kandal, Angsnourl, Boeng Thum, Boeng Thum Ti Bei Cost to build $2,000.00 2001 Photo 2003 Photo .a,,,~~~~~~~ ' - ID: 155 Block Number 10092 Land Owner Long Eng GPS 0476704E, 1267385N Structure type Pet Bi Location Kandal, Angsnourl, Boeng Thum, Boeng Thum Ti Bei Cost to build $1,000.00 2001 Photo 2003 Photo ID: 276 Block Number 40160 Land Owner H.E Hing Bunheang GPS 0475623E, 1262885N Structure type Chicken Shed Location Kandal, Kandal Stueng, Daeum Rues, Krang Chake Cost to build $50,000.00 2001 Photo 2003 Photo .tS ~ ~ ~~ ~ ~~~~~~~~~~~~~~~~~~~ , , . Thursday, November 13, 2003 Page 2 of 49 ID: 7467 Block Number 20118 Land Owner Larm Chanvong GPS 0476027E, 1254680N Structure type Kantang A2 Location Kandal, Kandal Stueng, Tbaeng, Chrolong Cost to build $750.00 2001 Photo 2003 Photo 7 -Z"~~~~~~~~~~~~~~- : % a0v | ~; V, f-'.'j ID: 467 Block Number 20118 Land Owner Lom Sao Hean GPS 0476027E, 1254680N Structure type Kantang A2 Location Kandal, Kandal Stueng, Tbaeng, Chrolong Cost to build $250.00 2001 Photo 2003 Photo ~~- . +-a Si ! - wV+6 ID: 463 Block Number 20114 Land Owner Em Son GPS 0476046E, 1254878N Structure type Kantang Al Location Kandal, Kandal Stueng, Tbaeng, Chrolong Cost to build $1,500.00 2001 Photo 2003 Photo Thursday, November 13, 2003 P. a o Thursday, November 1 3, 2003 Page 3 of 49 ID: 393 Block Number 30196 Land Owner Ouk Say GPS 0476178E, 1258588N Structure type Kantang A2 Location Kandai, Kandal Stueng, Trapaeng Veaeng, Prey Totueng Cost to build $800.00 2001 Photo 2003 Photo ID: 3132 Block Number 40610 Land Owner Phon Peang GPS 0482133E, 1271211N Structure type Kantang Al Location Phnom Penh, Dang Kor, Chaom Chau, Domnak Troyeung Cost to build $5,000.00 2001 Photo 2003 Photo No Picture A 4 4 ID: 3134 Block Number 40612 Land Owner Sim Sorn GPS 0482344E, 1271212N Structure type American Style Location Phnom Penh, Dang Kor, Chaom Chau, Domnak Troyeung Cost to build $2,500.00 2001 Photo 2003 Photo No Picture Thursday, November 13, 2003 Page 4 of 49 ID: 3135 Block Number 40613 Land Owner San So GPS 0482371E, 1271213N Structure type Kantang A2 Location Phnom Penh, Dang Kor, Chaom Chau, Domnak Troyeung Cost to build $1,750.00 2001 Photo 2003 Photo No Picture ID: 3064 Block Number 10635 Land Owner Khim Chan GPS 0484591E, 1272256N Structure type Kantang Al Location Phnom Penh, Dang Kor, Chaom Chau, Trapeang Rom Chake Cost to build $8,500.00 2001 Photo 2003 Photo N" 7 No Picture ID: 3159 Block Number 40637 Land Owner Sous Yeing GPS 0484203E, 1271225N Structure type Kantang Al Location Phnom Penh, Dang Kor, Prey Sor, Prey Tytuy Cost to build $1,400.00 2001 Photo 2003 Photo No Picture Thursday, November 13, 2003 Page 5 of 49 ID: 797 Block Number 10355 Land Owner Chimm Chum GPS 0475311E, 1242138N Structure type Pet B2 Location Takeo, Bati, Trapaeng Krasang, Rolaeng Cost to build $1,800.00 2001 Photo 2003 Photo w _ *;- z 1_ ; tS71C,s,, x,=. s s , t ' . \~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ..... # > - -v ID: 798 Block Number 10356 Land Owner Sao Ith GPS 0475275E, 1242133N Structure type Pet B2 Location Takeo, Bati, Trapaeng Krasang, Rolaeng Cost to build $1,800.00 2001 Photo 2003 Photo *. .

Informations clés
Type de document Resettlement Plan
Date d'adoption
Pays Cambodge
Source Banque mondiale