RP88 Vol. 3 Shanghai Municipal Environment APL Proiect Phase I Resettlement Action Plan for Shanghai Sewage Project Phase III Option II Shanghai Water Environment Construction Co. Ltd. January 20, 2002 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Table of Content 1. Description of the Project ..............................................................1 1.1 Project Background ......................................................................l1 1.2 Impact Scope .......................................................................3 1.3 Socio-Economic Impacts .......................................................................6 1.4 Measures Taken to Minimize Negative Impacts .................................................................7 1.5 Ownership & Organization of the Project ....................................................................... 8 1.6 Schedule of the Project and the Resettlement .....................................................................8 1.7 Principles & Objectives for Compiling the RAP ................................................................8 2. Project Impact ............................................................. 10 2.1 Scope of the Acquired Land ...................................................................... 10 2.2 Impact of Land Acquisition ...................................................................... 11 2.2.1 Affected Land ...................................................................... 11 2.2.2 Affected Residential Buildings ...................................................................... 21 2.2.3 Affected Enterprises ...................................................................... 23 2.2.4 Impact on Employment ...................................................................... 32 2.2.5 Affected Infrastructures ...................................................................... 34 2.2.6 Impact on Vulnerable Group ...................................................................... 34 3. Objectives ............................................................. 35 4. Socio-Economic Impact ............................................................. 37 4.1 Brief Description of the Project Area ...................................................................... 37 4.2 Socio-Econorniic Situations of the Project Affected Area ................................................. 42 4.3 Living Level of the Areas Affected by the Project ............................................................ 43 4.4 Socio-Economic Impact of the Land Acquisition on the PAPs ......................................... 45 5. Legal Framework ............................................................. 47 5.1 Policies & Regulations ...................................................................... 47 5.2 World Bank Policy & Implementation ...................................................................... 52 6. Institutional Organizations ............................................................. 54 6.1 Major Institutions ...................................................................... 54 6.2 Institutional Capacity ...................................................................... 55 7. Compensation Rates ............................................................. 56 7.1 Compensation for Land ...................................................................... 56 7.2 Compensation To Residents ...................................................................... 57 7.3 Compensation for Affected Enterprise ...................................................................... 62 7.4 Compensation Rates for Affected Agricultural Facilities, Infrastructures and Other Assets ................................................................................................................................................ .63 7.5 Compensation for Affected Vulnerable Groups ................................................................ 64 8. Rehabilitation Measures ............................................................. 65 8.1 Income Rehabilitation Plan ...................................................................... 65 8.2 Treatment & Monitoring of the Environmental Disadvantageous Factors ....................... 66 9. Choice and Preparation for the Host Residence ................................... ................. 67 9.1 Choice of Resettlement ...................................................................... 67 9.2 Choice of the Host Communities ...................................................................... 68 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 9.3 Assistance during Relocation ..................................................... 71 10. Residential Buildings, Infrastructures, & Social Service of the Host Community 72 11. Environment Protection & Management .......................... ....................... 75 12. Community Participation & Integration with the Local Residents .......... ............. 77 12.1 Consultations and Participation ........................................................ 77 12.1.1 Public Consultation & Participation in Drafting the RAP ................................... 77 12.1.2 Public Consultation and Participation In Implementing and Monitoring the Project ......................................................... 77 12.1.3 Public Consultation & Participation after Resettlement ...................................... 78 12.2 Measures of Integration with Residents of the Host Community ................................... 79 13. Appealing Procedures ................................................. 80 14. Organizations & Responsibilities ................................................. 82 14.1 Institutional Responsibilities ......................................................... 82 14.2 Measures to Strengthen Institutional Capacity ......................................................... 84 15. Implementation Schedule ................................................. 86 15.1 Schedule of Implementing the Land Acquisition and Resettlement ............................... 86 15.2 Timely Resettlement of the Affected Residents ......................................................... 88 16. Cost & Budget ................................................. 90 16.1 Base Cost of Land Acquisition & Resettlement ......................................................... 91 16.2 Annual Budget ......................................................... 98 16.3 Finance & Flow of Funds ......................................................... 98 17 Monitoring & Appraisal ................................................. 100 17.1 Internal Monitoring ................................... : 100 17.2 External Monitoring ................................... 101 Appendix 1: Map of Location of the Project .............................. 106 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Name List of the Participants of the RAP for Shanghai Sewage Treatment Project Phase III People in charge: Huang,Jianpin Xu, YuejiangDai,Yirong Report Drafters: Dai,Yirong Zhang,Zhiqiang Participants: Huang,Jianpin Xu,Yuejiang Dai,Yirong Zhang,Zhiqiang Zhuang,Yili Xingongfu RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 1. Description of the Project 1.1 Project Background With the deepening of the reform and opening-up, Shanghai is developing very fast on its way to becoming an international economic, financial and trade center in the Far East. To make its economy more sustainable and more competitive, Shanghai is reinforcing its construction. In infrastructure constructions particularly, Shanghai is investing huge amount of money to make the city progress fast every day. In addition to continuously constructing its road system and electricity infrastructures, Shanghai is making great effort in improving its ecological environment. A benign ecological environment is the prerequisite of the healthy development of economy as well as the basic condition for guaranteeing the healthy livelihood of the resident. Shanghai has always adopted high standards and strict requirements in constructing ecological environment in its efforts to improve people's livelihood and living standard and to fundamentally sustain the vitality of Shanghai. In this regard, Shanghai municipal government has gradually increased its investment on the environment projects since mid 1980s. In particular, the government invested hugely on rehabilitating the polluted waters in Shanghai. In recent years, Shanghai has constructed many large-scaled sewage treatment projects, e.g, the Sewage Project Phase I, which was completed in 1993. The project mainly resolved the solutions for the integrated sewages and living sewages in such districts and areas as Putuo, Changning, Jin'an, Zhabei, (part of) Huangpu, (part of) Hongkou, Yangpu and Waigaoqiao of Pudong area. The project serves an area of over 100 squ. km. and a population of over 2 million. Shortly after that, Shanghai completed such major infrastructures as the collective pipes, pre-treatment factory, and drainage mouth in Pudong Area under the Sewage Project Phase II. These facilities mainly provide solutions to the sewages in Xuhui and Luwan of Puxi, and part of the area in Pudong south of Zhaojiagou and north of Chuanyang Creek. These facilities serve an area of 2 million squ.km. and a population of 2.8 million. The above two projects intercept the sewage from many pollution sources along both sides of Suzhou Creek and Huangpu River, and thus improve, to certain degree, the water quality in the upper reaches of the creek and the river. In addition, in 1998, Shanghai municipal government started Suzhou Creek Rehabilitation Project Phase I. A lot of sub-projects under the rehabilitation project are under intense construction in order to change the water pollution status in Suzhou Creek. However, seen from the development of the constructions in Shanghai in recent years, because urbanized area continues to expand, the volume of urban sewage increases, too. The burden for treating sewages is increasingly heavy. Therefore, the RAP for Shanghai Sewage Project Phase III (Zhuyuan)) environmental treatment is still behind the step of the municipal construction. The water pollution status in Shanghai has not been fundamentally changed. There is still a large volume of sewage directly drained, without any treatment or pipe interception, into Huangpu River, Suzhou Creek and their tributaries. Water pollution is still one of the most outstanding problems blocking the development of Shanghai in the future. To step up to a higher level, to make the sewage treatment work in Shanghai more coherent, and to further improve the ecological environment in Shanghai, Shanghai municipal government put forward "Shanghai Sewage Project Phase III" according to the municipal plan. Shanghai Sewage Project Phase III (hereinafter "Phase III") is another major municipal construction after Sewage Project Phase I and Phase II. Phase III (hereinafter "Phase I" and "Phase II") is a composite of the overall plan of the municipal government on treating sewage as well as a key strategic measure to protect the water environment in Shanghai. If Phase I and Phase II mainly dispose the pollution of water in the upper reaches of Huangpu River and Suzhou Creek, Phase III will dispose the pollution in the middle and lower reaches of Huangpu River and Suzhou Creek. Along both sides of the six tributaries (i.e. Pengyuepu, Zhenrugang, Mudugang, Shenjigang, Xinjingang, and Huacaogang) of the middle and lower reaches of Suzhou Creek, enormous sewage directly is drained into the river course without any treatment. The sewage flows into Suzhou Creek from the tributaries and makes these tributaries the biggest sources of pollution for Suzhou Creek. Now, over 2 million m3/d of sewage was collected through the sewage facilities of Phase I and Phase II for pre-treatment before the sewage is drained into Changjiang River, or the sewage may be drained into the waters in Shanghai after it is treated through the sewage treatment factory. However, still over 2 million m3/d of untreated sewage and wastewater were drained into Huangpu River, Suzhou Creek and their tributaries. Phase III mainly disposes the sewage left unsolved by The Tributaries of Suzhou Creek Sewage Interception Project (North Section), the Sewage Interception Project at Hongkougang and Yangpugang of Phase II, and Phase I north of Zhaojiagou in Pudong New Area. In addition, according to the sewage drainage plan, to limit the drainage of sewage at Shidongkou, the sewage south of Yunzaobang, east of the west main line, west of Yixian Road and north of Wenshui Road, which was designed to be drained through the west line, is also included into the service scope of this project. The implementation of Phase III will considerably improve the quality of the water in Huangpu River, and Suzhou Creek, as well as its tributaries Hongkougang and Yangpugang. The implementation of the project will also improve the rehabilitation degrees of the water south of Yunzaobang in Puxi and north of Zhaojiagou in Pudong. According to Phase III, a sewage treatment factory --- Zhuyuan Sewage Treatment Factory (temporary name) will be constructed in Zhuyuan Village of Gaodong Town 2 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) in Pudong New Area. In addition, five intermediary pump stations will be set up. They are Minzhu Pump Station, Zhangmiao Pump Station, Wenshuilu Intermediate Pump Station, Jiamusi Intermediate Pump Station, and Zhouhai Road Intermediary Pump Station. Also, some sewage collective pipes will be established (See the following table for details). Phase III was designed with respect to the overall development plan of Shanghai and mainly targeted on the backward status of the sewage colleting system in Baoshan, Hongkou, and Yangpu of Shanghai, including providing solution for the sewage north of Zhaojiagou of Pudong New Area. Through the project construction, the unruly situations of sewage collection in these areas will be greatly improved so as to enhance the production development in these areas and to improve the living environment and livelihood of the residents in these areas. Meanwhile, the project construction complies with the overall requirements specified in "the Professional Plan on the Sewage Drainage System in Shanghai (2020)". In that respect, Shanghai Water Environment Construction Co. Ltd. entrusted in April 2001 Shanghai Municipal Construction Design Institute and Shanghai Municipal Project Design Research Institute to mutually compile the Feasibility Study Report on Shanghai Sewage Treatment Project Phase III. Because the feasibility study report specified several options for the project, according to the optimization principle, this RAP is compiled according to the design of Option II. The report was appraised in January 2001 by Shanghai Investment Consulting Company. The Municipal Planning Conmmission replied in January 2002 and approved the construction of Phase III. 1.2 Impact Scope Phase III will include the construction of a sewage treatment factory, i.e. Shanghai Zhuyuan No. Two Sewage Treatment Factory (temporary name). The factory is situated in Zhuyuan Village of Gaodong Town in Pudong New Area, south of Shanghai Zhuyuan No. One Sewage Treatment Factory (to be constructed). Meanwhile, 5 intermediary pump stations will be built up. Zhangmiao Pump Station is located in the land belonging to Xin'er Village of Songnan Town east of South Jiangyang Road and north of Tongnan Road in Baoshan District. Minzhu Pump Station is located in the land belonging to Jiangyang Village of Gaojing Town in Baoshan District, south of 128 Jinian Road and west of West Sitang. Wenshui Intermediate Pump Station is situated north of Wenshui Road and west of Yuexiu Road in Yangjialou residential area belonging to Yuexiu Neighborhood Committee of Daning Street in Zhabei District. Jiamusi Intermediate Pump Station is located in the land belonging to No. 11 Mobile Team of Yangpu Mobile Transport Company and near some residential housing west of Jungong Road and south of Jiamusi Road. Zhouhai Road Intermediary Pump Station lies in Gaoxi Village of Gaohang Town in Pudong New Area. The collective pipe of Phase III runs along South Jiangyang Road from Yunzaobang cross Wenshui Road to Guanglinsi Road and finally to the pipe of 3 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Phase I. The other collective pipe goes along Songhuajiang Road from Shuangyang Road to Jungong Road, along Jungong Road from Dinghaigang Road to Nenjiang Road, along Nenjiang Road eastward cross Huangpu River, along the planned Zhouhai Road to the planned Zhangyang Road, along the planned Zhangyang Road northward to Hangjin Road, along Hangjin Road eastward to Zhuyuan No. Two Sewage Treatment Factory. In addition, some auxiliary sewage pipes will be installed to connect the collective pipes. In addition, rain and sewage collection systems are going to be constructed in Baoshan and Yangpu Districts of Puxi. In Baoshan District, 4 sewage pump stations and 14 rain pump stations will be newly set up in Baoshan District. Meanwhile, some old pump stations in Yangpu District will be reconstructed to make the sewage drained into the pipes of Phase III. The scope of Puxi collection system includes the collection system in Baoshan District (south of Yunzaobang area), the dry-season sewage interception project in Yangpugang area, and the service area of the five drainage systems east of Yangpugang, i.e. Changbai, Kongjiang, Dadinghai, Zhoujiazui, and Fuxindao. Baoshan District The collection system in Baoshan District mainly serves the area south of Yunzaobang in Baoshan District (including some area in Zhabei District uncovered by Phase I and the Tributaries of Suzhou Creek Sewage Interception Project). The system serves a total population of 551,100 people and an area of 55.56 km2. The service scope is: north to Yunzaobang, east to Tongji Road and Yixian Road, southeast to Songhu branch line of Baoshan District, south to 300 m. south of Changzhong Road, Beichangbang, Echanpu, Hu-Jia highway, and west to the outer ring. The scope does not include the neighborhood of Dachang Airport (south to Changzhong Road, west to Hutai Road, Ximipu, north to Yunzaobang, and east to the protective river of the airport) and the service scope of Sitang Sewage Factory (south to West Changjiang Road, west to Gonghexin Road, north to Yunzaobang, and east to Xisitang). The service scope of the project includes the neighborhoods of Qilian, Nanda Road (including some land of Zhabei District), Zhennan-(north) Dachang, Miaohang, Gongkang, Minzhu, Zhangmiao, Songnan, Wusong Industrial Park (south of Yunzaobang) and the Linfen Garden of Zhabei District. Within the service scope in Baoshan District there is Shidongkou Sewage Drainage System (the west section sewage collective pipe has already been set up, and Shidongkou Sewage Factory is under construction and will be finished in 2003). Some sewage collected by the collection system may first access into the west main 4 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) line and then be treated by Shidongkou Sewage Treatment Factory. The rest sewage may access into the drainage system of Phase I. The total volume of sewage collected by the system amounts to 246,800 m3/d. Sewage pipes of 124.32 km long will be constructed. The flow-separation mechanism applies to most of the scope of the sewage collection system. In order to avoid repeated earth digging and waste of investment attributable to separate constructions of the sewage collection system and the rain system, both systems will be constructed at the same time in Baoshan District. Altogether 27 rain systems, 136.45-km-long rain pipe, and 14 rain pump stations will be involved in this area. Hon2kou and Yanimu Districts The collection system in Hongkou and Yangpu Districts mainly collects the sewage unsolved by Hongkougang and Yangpugang interception projects. The service scope of the system covers the area east of Yangpugang. The project serves an area of 11.37 km2 and a population of 307,000 people. The project is designed to dispose more than 200,000 m3/d volume of sewage, which includes the sewage from Changbai, Kongjiang, Dadinghai, Zhoujiazui and Fuxin Island drainage systems. Under the project will be established a collective pipe along Zhengben Road-Guoding Road-Huangxin Road and a pipe on Dunhua Road (Old Dunhua Pump Station-Songhuajiang Road). Pudong New Area In Pudong Area a sewage collection system, ten sewage internediate pump stations (two of which have already been constructed) will be constructed. The impact scope of the collection system project in Pudong mainly includes the planned added urban area outside the outer ring and some area inside the outer ring. Below is the identified service scope. 1. Outside the outer ring: ship construction base, port area, Caolu area (Caolu, Gulu, Gonglu, the industrial park), Tangzhen Area (Tangzhen, Wangggang, industrial park), Heqin Area (Heqin, Cailu), Huaxia Commercial Area, Jichang Town, and Huanglou. 2. Inside the outer ring: Gaoqiao Industrial Park (Linqiao), Gaodong area (Gaodong, Yangyuan, industrial park), Donggou, Sunqiao (Sunqiao, industrial park), west of Jiyang Road, and Sanlin. The project serves a total area of 52.61 km2 and disposes a total sewage volume of 5 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) about 240,000m3/d. This volume, plus the already disposed sewage volume of 1.3 million m3/d, amounts to 1.54 million m3/d, which accounts for 92% of the total planned treated sewage volume in Pudong New Area. The service scope of Pudong Collection System Project covers 8 towns: Jichang, Tangzhen, Caolu, Heqin, Gaohang, Gaodong, Sanlin, Sunqiao. The rest of the scope covers the existing towns or land. Except the industrial park, most of the covered area is residential area. The land west of Jiyang Road is a recreational area subjected on large green land. Construction of Shanghai Sewage Phase III will directly affect 6 districts (Baoshan, Yangpu, Zhabei, Hongkou, Putuo and Pudong New Area), 2 residential districts (Daning, Changbai), 14 towns (Songnan, Gaojin, Dachang, Taopu, Gucun, Gaoqiao, Gaohang, Gaodong, Caolu, Tangzhen, Sunqiao, Chuansha, Jichang, Sanlin), more than 10 villages (Xin'er Village, Xin'san Village, Shanegli Village, Gaoxi Village, Zhandou Village, Gaonan Village, Zhuyuan Village, Zhangjiazhai Village, Xinhua Village, Huandong Village, Hongyi Village, Jikou Village, Duimian Village, Jielong Village, etc.) and some residents, enterprises, green land and infrastructures, etc.. Please see Appendix 1 for the location of the above projects. 1.3 Socio-Economic Impacts The project affected items mainly include the municipal forestation facilities along the pipes of Phase III, some affected underground pipes, and many buildings that will be dismantled because of the project. Some affected enterprises were newly established and have just started business. When they were informed that they would be relocated because the land was designed to build pump stations, the enterprise managements were rather surprised and embarrassed. Because relocation is a complicated assignment and the business has just started, the relocation will have a significant impact on these enterprises. How to make the enterprise operation unaffected by relocation is the most important task for them. They particularly need to be consulted with in advance and to be adequately compensated and relocated. Due to the extensive scope of impact of the project, many enterprises will be affected. Other affected enterprises have more or less the above relocation problems. However, everything has two faces. According to our experiences in relocation for municipal works in Shanghai, not all project construction would have negative impact on the relocated enterprise. For instance, Zhangmiao Pump Station, which will be constructed for the project, is situated in Xin'er Village of Songnan Town in Baoshan District. The land needed by the pump station happens to be occupied by a village owned enterprise. Now the enterprise is at the edge of stopping production and changing business direction. Besides several guards, there are few people in the 6 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) factory. The enterprise management is worrying about the solution for the current status. As this site is selected for the project construction, the enterprise becomes hopeful for a new birth from the current embarrassing situations. Because the enterprise will get compensation for relocation, it will get the essential fund for adjusting its operation and thus regain the business vitality and retain the employment. Due to the large scale of the project, it will affect many enterprises. Many enterprises are having similar situations as described above. These enterprises will all have chance to regain their births through relocation. That will help in promoting development of the production in the area as well as in maintaining social stability. In addition, the project implementation will play an active role in collecting rain and sewage in northwest, north, and northeast of Shanghai. The project will make the water quality in these areas considerably improved and will thus improve the living environment and livelihood of the local residents. Meanwhile, the project implementation will greatly improve the quality of the water in the lower reaches of Huangpu River and Suzhou Creek. All these will bring significant benefits to the urban environmental sanitation and people's health in Shanghai. 1.4 Measures Taken to Minimize Negative Impacts To implement the WB principles on minimizing the scope of project affected persons (PAPs), the project host, after several surveys, researches and repeated discussions, decides to take the following measures to minimize the scope of PAPs and to lighten or to eliminate negative impacts. (1) Several schemes were designed. After comparing and evaluating advantages and disadvantages, the design is optimized. It is decided to use jack pipe in the downtown area of dense population in order to avoid large-scaled earth digging and thus to reduce immigration. (2) Before immigration, staffs were organized to visit the spot to see which buildings could be saved or partly relocated. (3) For those buildings to be temporarily occupied by the project, the owner was noticed to empty the buildings before dismantle, or temporary buildings were set up in the owner's scope of land. After the project is completed, the old building owner will rebuild the buildings at the same site. (4) For losses incurred by the resettlement, adequate compensation that is calculated according to the replacement price will be paid to the residents so as to minimize the negative impact of the resettlement. (5) The resettlement area is chosen to be close to the original residential area. By doing so, the residents will keep connection with the old residential area on the one hand and avoid increasing the distance from the resettlement area to the working place of the affected residents. (6) For the affected enterprises, notice will be sent to them in advance for them to 7 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) arrange relocation place. Their loss will be duly compensated. It is endeavored to shorten the operation interruption period and to arrange employees' work through consultation with the enterprise owners. (7) During the process of resettlement, relevant parties were requested to give help to the affected residents and enterprises, and to provide convenience for them, in order to enhance the smooth conduct of the resettlement and to lighten their burden and loss. 1.5 Ownership & Organization of the Project Shanghai Water Environment Construction Co. Ltd. (SWECC) is responsible for the concrete project implementation. The preliminary-stage engineering department of the company is responsible for the resettlement and relevant coordination. Assisted by various levels of administration, the local government will be responsible for the resettlement implementation. During the process of project implementation, a lot of community work on the affected population will need the support of local government. Therefore, the local district government, as well as its subordinate offices, neighborhoods, and village committees are also the associates for the project implementation. 1.6 Schedule of the Project and the Resettlement The whole construction period of the project will be 3 years, starting from March 2003 and ending in March 2006. Accordingly, the period for the resettlement implementation is planed to be from September 2002 to March 2003. See 15.1 for details of the implementation procedures. 1.7 Principles & Objectives for Compiling the RAP This RAP was planned by SWECC. The RAP is prepared in accordance with the various laws and regulations of the country and the locality as well as the World Bank Operative Principles on Involuntary Resettlement (OP4.12). The objective is to seek the best option to ensure that the project affected residents, enterprises, infrastructures, and public facilities will be properly resettled or rebuilt, and to ensure that the livelihood of the PAPs and the business level of the affected enterprises will be maintained or improved. In order to realize the above principles and objectives, we endeavor to follow the 8 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) following principles while compiling the RAP. 1) To repeatedly revise and perfect the RAP to minimize the scope of the impact, to substitute compulsive resettlement measures with other measures in order to minimize resettlement. 2) Where involuntary resettlement is unavoidable, resettlement activities should be conceived and executed as sustainable development program, providing sufficient investment resources. It should be guaranteed that all PAPs receive compensation for their total loss and are properly resettled and rehabilitated so that they can share the benefits of the project. Meanwhile, compensation should be paid for their temporary hardships, and affected properties according to replacement price. Resettled people should be assisted in their efforts to improve their livelihoods and be financed in their activities in improving their living environments, or at least to restore them, in real terms, to pre-resettlement levels or to levels prevailing prior to beginning of project implementation, whichever is higher. 3) To perfect the necessary equipment of the new housing, and make the resettlement community equipped with complete facilities, convenient transport, comfortable livelihood and fine environment. 4) To enable the resettled people to get used to the host community in a short period so as to stabilize their life. 5) To provide the vulnerable groups with preferential policies in housing, employment, etc.. 6) To keep the scope and function of the buildings of the affected enterprises, to restore to the original business environment as far as possible, and to compensate for their losses from operation interruption and temporary change of business environment. 7) To properly compensate the collective-owned land for all its loss and to pay the compensation to the community for no other use but developing the collective economy; 8) The implementation of the resettlement will be monitored and evaluated by the external monitor. The representatives of the PAPs will take part in the decision-making of the resettlement; special institutions will receive complaints from the PAPs. 9) During the process of the project implementing, if the RAP has significant change due to change of the design, etc., the RAP will be revised and submitted to the World Bank for approval; significant changes in the number of affected objects, in the compensation policy or in compensation rates will be submitted to the World Bank first and then -implemented after approval. Minor changes during implementation of the RAP will be reflected in the internal and the external monitoring report. 9 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 2. Project Impact 2. 1 Scope of the Acquired Land Construction of Phase III will include not only installing pipes of long distance but building large-scaled sewage treatment factory and several intermediary pump stations. Accordingly, some land will be acquired or borrowed. The situations of land acquisition and borrowing are categorized into the following aspects. 1. To acquire Land (1) Sewage treatment factory: Shanghai Zhuyuan No. Two Sewage Treatment Factory (temporary name); (2) Intermediary pump stations: Wenshuilu Intermediary Pump Station, Zhangmiao Pump Station, Minzhu Pump Station, Jiamusi Intermediary Pump Station, Zhouhai Road Intermediary Pump Station and the rain and sewage pump stations incorporated in the collection system of Puxi and that of Pudong; (3) Pipes installed along: South Jiangyang Road (from West Changjiang Road to Changzhong Road), Guangyue Road (from Changzhong Road by Kuizhao Road cross Yujingpu to Wenshui Road), Wenshui Road (from Gaoping Road to Liangcheng Road), Liangcheng Road (from Wenshui Road to Guanglingsi Road), Xiangying Road (from Wujiaochang to Jungong Road), Songhuajiang Road (from Shuangyang Road to Jungong Road), Jungong Road (from Nenjiang Road by Liping Road to Dinghaigang Road), Zhengben Road (from Guocui Road to North Zhongshan'er Road), Guocui Road (from Zhengben Road to Huangxin Road), Huangxin Road (from Guocui Road to Wujiaochang), *Nenjiang Road (from Jungong Road to the riverside of Huangpu River in Puxi), the planned Zhouhai Road (from the riverside of Huangpu River to the planned Zhangyang Road), *the planned Zhangyang Road (from the planned Zhouhai Road to Hangjin Road), Hangjin Road (from the planned Zhangyang Road to Huandiong First Avenue of Zhuyuan Village in Gaodong Town), and the pipes included in the collection systems of Puxi and Pudong. 2. To borrow Land: the land that will be used during the project construction. The total area of land to be acquired for the project is: 781761.9 squ.m., equaling with 1172.637mu (of which 232288.5 squ.m., equaling with 348.431 mu is collective arable land, and 549469.4 squ.m. equaling with 824.2 mu is non-arable land); 10 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Total borrowed land is: 3581617.9 squ.m., equaling with 5372.4 mu. (lmu = 666.67 squ.m.) 2.2 Impact of Land Acquisition The resettlement scope of the project will be decided according to the needs of the project construction. Following is the impact of land acquisition for the project. 2.2.1 Affected Land The land to be acquired or borrowed for the project is listed as follows. RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Sheet 2. la Summary Sheet of the Land to Be Acquired or Borrowed for the Project (Acquired or Borrowed Land for the Construction of Intermediary Pump Station and Collective Pipes) Project Name Address Area of used land(M) Acquired land Borrowed land* Shanghai Zhuyuan No. Zhuyuan Village of Gaodong Town in 450293.6 0 Two Sewage Treatment Pudong New Area (675.437 mu, Factory of which 275.031 mu is arable land) Zhouhai Road North of the planned Zhouhai Road 14000 (21 Intermediary Pump and south of Hangnan Road (in Gaoxi mu, of which Station Village of Gaohang Town) 12 mu is arable land) Nenjiang Road Puxi Section of Nenjiang Road (the 2000(2 mu) 1000 (1.5 mu) Cross-River Inverted existing Nenjiang Road Cross-River Well Wheel Dock) Wenshuilu Intermediary North of Wenshui road and west of 6000 0 Pump Station Yuexiu Road (9mu) Jiamusi Intermediary No. 2 Jiamusi Road (near Jungong 4000 3333 Pump Station Road) (6 mu) (5 mu) Zhangmiao East of South Jiangyang Road and 4000 1333 Intermediary Pump north of Tongnan Road (in the (6 mu) (2 mu) Station neighborhood of Songnanxin'er Community Minzhu Pump Station(a South of 128 Jinian Road and west of 12000 0 rain pump station and a Xisitang (18 mu) sewage pump station) 12 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Laying pipes by slotting I *South Jianevanm Road (from West To acquire To borrow land or jack piping Changjiang Road to Changzhong land for jack for installing Road); pp el,arppsb ltii *Installing pipes by 2.Guangyue Road (from Changzhong pipe wells, air pipes by slotting slotting will be used Road by Kuizhao Road cross Yujin holes, and the and jack pipe in constructing these Road to Wenshui Road); test wells: well, etc.: sections. 3. Wenshui Road (from Gaoping 86667.1 1666675 Road to Liangcheng Road); 230 mu 2500 mu 4. Liangcheng Road (from Wenshui Road to Guanglinsi Road); 5. Xiangyin Road (from Wujiaochang to Jungong Road); 6. Songhuajiang Road (from Shuangyang Road to Jungong Road); 7. Jungong Road (from Nenjiang Road by Liping Road to Dinghaigang Road); 8. Zhengben Road (from Guocui Road to North Zhongshan'er Road); 9. Guocui Road (from Zhengben Road to Huangxin Road); 10. Huangxin Road (from Guocui Road to Wujiaochang); 11. Nenjiang Road (from Jungong Road to the riverside of Huangpu River in Puxi); 12. *the planned Zhouhai Road (from the riverside of Huangpu River in Pudong to the planned Zhangyang Road); 13. *the planned Zhangyang Road (from the planned Zhouhai Road to Hangjin Road); 14. Hangjin Road (from the planned Zhangyang Road to Huangdong First Avenue at Zhuyuan Village of Gaodong Town) Total 644961.22 1672341.69 ( totaling (2508.5 mu) 967.437mu, of which 287.031 mu is arable land and 680.4 mu is non-arable land ) I To acquire land the rain pump station of the collection system in Baoshan District of Puxi: 56267 squ.m., totaling 84.4 mu, of which the area of arable land is 23.85 mu, that of non-arable land is 60.56 mu (that of the enterprise land is 44 mu) To borrow land: For the pipes in Baoshan District: 4000m.*20m.=80000squ.m., equaling 120mu; For the pipes in Yangpu District: 9540m.*20m.=190800squ.m., equaling 286mu. Big space for temporary use of the project: 2000squ.m.*6 = 2006 squ.m., 13 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) equaling 3 mu. Remarks: 20 m. width is used to estimate the area of the borrowed land. The method of jack piping, complemented with the method of installation by slotting, will be employed in constructing the collection system in Yangpu District of Puxi. Therefore, land will mainly be borrowed for the construction. 14 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Sheet 2. lb Summary Sheet of the Land to Be Acquired or Borrowed for the Project (Acquired Land for the Construction of the Collection System in Puxi) (1) Area of the land occupied for constructing rain pump stations: To acquire land: 56267 squ.m., totaling 84.4 mu. No. Name of the area Name of the Occupied Place pump area ( m2 ) station 1 Qilian Area Xinkaihe 4800 South of Yunzaobang Brook and west of Xinkaihe 2 Jinqiujiazho 4800 South of Yunzaobang Brook u and west of Nanchen Road 3 Shanghai 3300 South of Taopu Brook and University south of Fengxiang Road 4 Qianxi 4680 East of Taopu Brook and north of Fengxiang Road 5 Nanda Road Area Nanda 3000 East of Guihuasan Road and north of Henanbang Brook 6 Miaohang Area Miaohang 3300 East of Kangning Road and south of Yunzaobang Brook 7 Dachang Area Dachang 3080 East of the intersection of Zoumatang Brook and Ximipu Brook 8 Miaopeng 3620 West of Dongjiaojing Brook 9 Zhennan-Dachan Zhennan 3300 West of Nanchen Road and Area (north) north of Luogangxiang 10 Zhenda 4880 South of Zoumatang Brook and east of Hutai Road 11 Gongkang Area Gongkang 4760 Southeast of Dongjiaojing and Yunzaobang Brook 12 Linfen Garden Linfen 2870 East of Xisitang Brook and Area Garden south of Fenxi Road 13 Songnan Area Songnan 5080 South of Changjiang Road and west of Nansitang 14 Wusong Industrial Jiangyangn 4800 West of South Jiangyang Road Park an and south of Yunzaobang Brook Total 14 56267 15 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) (2) Summary Sheet of the Land to Be Acquired from the Affected Production Team Category Name of Owner Area of the Land (mu) Remarks the pump Village Arable Non-arable Enterprise station Land Land Land Rain pump Dachang Zhabei 1510.8 Already station in District acquired by a Pudong real estate Collection company System Zhangmiao Xin No.2 3580 Enterprise land Village of Songnan Town Xinkaihe Feng Village 4800 There are 2 of Dachang households in Town the land. Jinqiu- Baiyang 4800 Brick Storing Jiazhou Village of Land Gucun Town Shanghai Lianxi Village 3300 An aggregate University of Dachang shop of Town fitting-up materials has just been opened Qianxi Belonging to 4680 Commercial Qianxi Real housings are Estate being set up. Company Nanda Nanda Village 3000 of Dachang Town Miaohang Changbei 3300 Part of the land Village of has been Miaohang acquired by Town Suzhou Creek Construction Company and needs to be moved. 16 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Dachang Belonging to 3080 Belonging to the the 91321 army Army Miaopeng Xinfu Village 3620 Enterprise land of Pengpu Town Zhennan Jinguang 3300 Mushroom (north) Village of sheds and some Taopu Town enterprise land in Putuo District Zhenda Changnan 4880 Residential Villageof housing and Dachang some enterprise Town in buildings Baoshan District Gongkang Shanghai 4760 State-owned Fruit & Food land Co., Ltd. Linfen Shengli 2870 The land has Garden Village of already been Gaojin Town acquired by in Baoshan Pengpu District Neighborhood Phase 10 to build Linfen Community Songnan Belonging to 5080 State-owned Songnan Real land, on which Estate there are 2 Development residential Company buildings Jiangyangn Belonging to 4800 State-owned an Huayi Group land Company Total 15900 11050 29320 (23.85mu) 16.5mu (44mu) 17 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Table 2.1c Summary Sheet of the Land to Be Acquired from the Affected Production Team Area of the land (m2) Name of the project Place Acquired land Borrowed land* P1 Pump Station East of Huangdong First Avenue 4133.4 1340 (temporarily called (Zhangjiazha Village of Gaodong 6.2 mu 2mu Zhouhailu Pump Town in Pudong) Station) P2 Pump Station South of Jinhai Road and west of the 4133.4 1340 (temporarily called planned Huadong Avenue (The 6.2mu 2mu Jinhalu Pump Station) Seventh Team of Xinhua Village of Caolu Town in Pudong) P2 Pump Station West of the planned Huadong Road 4133.4 1340 (temporarily called and north of Longdong Avenue 5.2mu 2 mu Hongyicun Pump (Hongyi Village of Tang Town in Station) Pudong) P4 Pump Station South of the planned Binzhou Road 5466.7 1340 (temporarily called and west of the planned Huadong Binzhoulu Pump Road (Jikou Village of Tang Town in Station) Pudong west of the planned Gutang Road) P3 Pump Station West of Huandong Second Avenue 3333.4 1340 (temporarily called and south of Mid. Huaxia Road Huandong Pump (Wangjia Team of Huandong Village Station) (Sizao Village) of Sunqiao Town in 2.35 mu is arable Pudong) land) P3' Pump Station South of East Huaxia Road and 3333.4 1340 (temporarily called 1200m. west of Huadong Road Duimiancun Pump (west of Puyi Garden) Station) P6 Pump Station South of the planned Wanglou Road 4000 1340 (temporarily called and west of the planned Huadong 6 mu arable land 2 mu Jielong Pump Station) Road (Jielong Village) P7 Pump Station North of Huannan First Avenue and 4000 1340 (temporally called east of Jiyang Road 6mu 2mu Jiyang Pump Station) P8 Pump Station North of Gangcheng Road and west 4000 1340 (temporarily called of Jiangdong Road (6mu) 2 mu Gaoqiao Pump Station) P9 Pump Station North of South Huanqin Road and 5333 1340 (temporarily called west of East Huanqin Road Heqin Pump Station) 18 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) PlO Pump Station North of Chenyang Road and west 34667 1340 (temporarily called of Yuandong Avenue 5.2 i) 2 ) Jichang ( Pump Station) 19 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Installing pipes by 1. Wuzhou Avenue (Donggou To acquire land for 43046 m.*20 slotting . the jack pipe wells, 860920 air holes, and test (1291.4 mu) 2. Wuzhou Avenue (Pudong wells, etc.. Canal-Huandong First Avenue ; 33333.5 ( estimated 3. Huadong Road (Yangjiagou- (about 50 mu) Jufeng Road, Jufeng Road- Shangfeng Road); 4. Shangfeng Road (Huadong Road-Chuansha Road); 5. Binzhou Road (Tanglu Road- Huadong Road); 6. Mid. Huaxia Road (Shenjiang Road-Huadong Road); 7. Chuanzhou Highway (Jinrin Road-Jongxin Road); 8. Huanglou Road (Yongxin Road -Huadong Road); 9. Changqin Road (West Huaxia Road-Linzhao Road); 10. Sanlin Road (Changqin Road -Jiyang Road); 11. Jiyang Road (Changqin Road-Jiyang Road) 12. Jiangdong Road (Caogao Branch Road-Gangcheng Road); 13. South Huanqin Road (West Huanqin Road-Qinhua Road); 14. South Huanqin Road (Qinhua Road-Yuandong Avenue); 15. Qinhua Road (Qianshao Road-Binshou Road) 16. Chenyang Road (Linkong Road I :_L_ n.l_ T :_L_ RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Total 80533.7 1636590.4 (120.8 mu, including (2454.9mu) 37.55 mu arable land and 83.25 mu non-arable land) *The area of borrowed land that will incur expense during the process of project construction is also counted in this RAP. 2.2.2 Affected Residential Buildings According to the optimized design scheme and the on-spot survey, the residential buildings of 1048 households will be affected within the scope of the acquired land of the project. The affected buildings are separately located in Daning Residential District of Zhabei District, Changbai Residential District of Yangpu District, Dachang Town and Songnan Town (Wusong) of Baoshan District, and Zhuyuan Village of Gaodong Town, Zhandou Village and Gaonan Village of Gaohang Town, Sunqiao Town, Caolu Town and Tang Town of Pudong New Area. Most of the affected residential houses are one or two storied buildings of brick-wood structure. A few of the affected houses are of brick-concrete structure. Most of these buildings have poor living conditions and auxiliary facilities. They are part of the simple or dangerous buildings to be reconstructed in Shanghai in the future. Because of the disorderly drainage system, draining is often blocked in the community. Passes inside the community are shallow. Some places are low-lying land so that the rainwater will rise to knees inside the house in raining days. These facts, plus the loose management, make the community environment very poor. The residents also hope to be relocated as early as possible in order to improve the existing living conditions. The property rights of most of the affected housings are owned by the inhabitants. 21 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Table 2.2 Summary Sheet of the Residents Affected by the Project Item Location of the affected residents Residents Number Remarks (household) of people (building area) Shanghai No. 6 and No. 7 Teams of Zhuyuan 297 (rural) 891 53460 Two Sewage Village in Gaodong Town Treatment Factory Zhouhai Road Zhunanjiazhai of Zhandou Village in 52 (rural) 158 9360 and Gaohang Town Zhangyang Road Slotting Pipe Zhuyezhai, Xiyangjiamen, and 92 (rural) 276 16560 Installation Nanzhangjiaxiang (Dongyangjiamen) Projects in Gaonan Village in Gaohang Town Wenshuilu Yangjialou of Yuexiu Neighborhood 120 360 8400 Intermediary of Daning Residential District in Pump Station Zhabei District Jiamusi Changbai Residential District in 145 435 10150 Intermediary Yangpu District Pump Station Songnan Songnan Town in Baoshan District 36 108 2520 Rainwater Pump Station Zhennan-Dac Zhennan Village of Dachang Town in 110 rural 350 19800 hang Pump Baoshan District Station P2'Pump Xinhua Production Team of Caolu 120 7200 Station of Town in Pudong Pudong P2Pump Hongyi Village of Tang Town in 24 rural 72 4320 Station of Pudong Pudong P4 Pump Jikou Village of Pudong 128 rural 384 23040 Station of Pudong P3 Pump Huandong Village of Suqiao Town in 4 rural 12 720 Station of Pudong Pudong . Total 1048 3166 155530 (including 747 including ( including 130460 rural 2263 rural area and households rural 25070 urban area) and 301 urban residents households) and 903 urban residents ) 22 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 2.2.3 Affected Enterprises Altogether, 73 enterprises will be affected by the project implementation. Many of these enterprises will be wholly resettled. Please see the following sheets for details of the enterprises affected by the project construction. Table 2.3 Summary Sheet of the Affected Enterprises Composites of Number of Number Affected area (m2) the project relocated of Buildings Empty Green Circling Others enterprises people (building land land wall area) Sewage 30 1588 121121.83 48516.7 4895 6692.4 38511 treatment factories, trees pump stations, and collective pipes Rainwater Puinwations 23 341 40840 40840 500 305 Pump Stations Collection 20 1229 20463.7 20463.7 940 1266 1827 trees System in Pudong I_I_ I Total 73 3158 143442.83 109820.4 6335 8263.4 38938tees 23 RAP for Shanghai Sewage Project Phase 1II (Zhuyuan)) Table 2.3a: Summary of the Enterprises Affected by Sewage Treatment Factory, Intermediary Pump Stations, and the Relevant Collective pipes Name of the Name of the Own- Number Affected Area(m2) Address pump station enterprise ership of the afecpted Building Empty Green Circling Others -pes (building land land wall -s area) Shanghai Shanghai Pudong Collect 36 2500 570 300 400 430 No. 8 Zhuyuarl Zhuyuan Industrial ive Tianyuanz Zhuyuan Center trees hai, No. Two Gaodong Sewage Army base Army 0 6200 120 250 Same as Treatment above trees Factory Gaodong Zhuyuan Collect 78 1100 390 60 389 140 Same as Mechanic Repairs ive above Factory trees Shanghai Shenpu Collect 385 63500 8750 460 768 270 Hangjin Crane Mechanic ive Road of Factory (Gaodong trees Gaodong Town) Shanghai Yiheng Collect 28 2005 2600 730 2400 360 No. 8 Chemical Industry ive Tianyuanz Co. Ltd. trees hai Shanghai Collect 60 350 420 0 30 85 Same as ZhangxongCopper ive above Products Co. Ltd. trees Shanghai Diancan Collect 15 700 900 0 0 120 No. 8 Special ive Tianyuanz Electromagnetic Line trees hai Factory Pudong Zhuyuan Collect 130 2800 5600 0 500 0 No. 139 Pressure Container ive Haixu Factory Road Shanghai Gaohua State 150 2400 0 0 0 Gaoqiao Chuangyian Plastics Area of Co. Ltd. North Pudong .___________________ R oad Pudong Gaohang Collect 35 350 8000 0 Gaohang Gaoxi Village ive Town of Huangjiatou Team Pudong Pudong Gaohang Collect 10 6300 350 0 0 466 Same as Gaoxi Xinguang ive above Industrial Company trees Shanghai Junshun Collect 15 500 800 90 70 toilet Gaohango Materials Trade ive f Pudong Company Gaonan 15 New Area Branch squ.m. Gaohang Zhandou Collect 14 750 608 5 0 350 Same as Village Industrial Co. ive above Ltd. 00 trees Gaohang Gaonan Collect 670 400 1 18 240 Same as Village Industrial Co. ive above Ltd. 30 5 trees Inverted Shanghai Nenjiang State 40 150 3200 550 0 200 At the Well and Road Wheel Dock side of trees Huangpu Installing River on Pipe by Nenjiang Slotting on Road Nenjiang sh Pa gi State 120- 2350 2600 0 Stand_ No.200 Forest Park Jungong Road ing Road plants 25000 plants 24 RAP for Shanghai Sewage Project Phase Ill (Zhuyuan)) Shanghai Jinseng State 1 3450 300 500 0 Big Same as Gardening above Forestation Co. Ltd. shed: 1200M 2 Shanghai State 25 1352 432 280 0 8000 Same as SenshengGardening above Science & trees Technology Development Co. Ltd. Shanghai Senyuan State 35 3128 400 600 0 Stand Same as Garden Construction above Co. Ltd. -ing plants :2000 plants *Shanghai Yangpu State 35 2560 1230 50 200 540 Nenjiang River Channel Road Management Station trees Shanghai Nenjiang State 40 150 3200 5 0 300 At the Road Wheel Dock side of 50 trees Huangpu River on Nenjiang Road Wenshui *Business Office State- 7 2600 60 0 0 1000 Road Of Miao Town in owned Yuexiu Intermediary Chongming Road Pump District . Station Shanghai Wanzhao Collec 40 1800 30 50 200 15 Industry & Trade tive-o Wenshui Co. Ltd. wned Road Jiuhuan-Huaxin-Y State- 0 0 0 50 300 11 uexiu No. 17Lh Gas owned Wenshui Station Road Jiamusi *Hudong Mobile State- 86 2435 4200 150 438 85 2 Intermediary Transport owned Jiamusi Pump Company toil-et Road Station s (including 2 *Yanpu Prefecture State- 81 621.83 1410 30 372.4 60 1179 inverted Municipal Works owned Jungong wells) Maintenance & whar- Road Construction Co. ves Ltd. *Yangpu Changbai Collec 24 890 40 0 0 0 Songhuaj Residential District tive-o iang Third Industry wned Road Operation Company Shanghai State- 31 1500 500 235 165 0 117OJun Jiehanseng owned gong Decoration Road Engineering Co. I Ltd. Zhangmiao *Real Estate Collec 30- 160 30 10 25 10 Pump Maintenance tive-o Tongnan Station Company of wned Road Songnan, Baoshan *Xin'er Privat 20- 1500 30 250 2 Electronics e-own Tongnan Accessories ed Road Factory of Songnan, Baoshan Minzhu Shanghai Collec 40 1500 4666. 0 0 40 856 Pump Jiangyang Village tive-o South 25 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Station Industrial wned 7 toil-et Jiangyan Company g Road S Total 1588 121121. 48516 4895 6692.4 38511 83 .7 trees 26 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Table 2.3b: Summary of the Enterprises Affected by the Construction of Collection System in Puxi Name of Name of the Own- Number Affected Area(m2) Address the pump enterprise ership of the station affected Building Empty Green Circling Others employees (building land land wall area) Linfen The State 25 2500 2870 0 0 Lane 370 Garden Headquarters owned South Pump of the Tenth Jiangyang Station Huangpu Road (south Development of Fenyang & Road and east Construction of Yangquan of Zhabei Road) District Urban Investment Construction Co. Ltd. (the land formally owned by Shengli Village of Gaojin Town) Songnan Songnan Real State 10 200 5080 0 0 Temporary West of Pump Estate owned building Heqiaogang Station Development on West Company Changjiang Road Jiangyang Electric Stone State 15 3800 4000 0 0 Remains of 2590 South -nan Pump Factory of owned Electric Jiangyang Station Zhongyuan Stone Road Chemical Piling Land Engineering Co. Ltd. (the land is owned by Huayi Group Company) I Gongkang Jiyun Road State 18 560 4000 200 0 Wharf 58 Jiyun Road Pump Business owned Station Dept. of Shanghai Fruit & Food Co. Ltd. Miaohang Changbei Collec 0 0 3300 0 0 Lime pool East of Pump Village of -tive Dongjiaojing Station Miaohang owned Brook and Town north of the water gate in Dongjiajing Brook Dachang 91321Army Army 0 450 0 3000 0 Greenland South of Old Town base and resting Luochang Pump pavilion Road and east Station of Zoumatang Miao Peng Yuejing State 12 192 1000 0 . 25 Shed 45 Liuyang Pump Medical owned 220m2 Road Station Instruments Warehouse (leased) _ _ _ _ 20 Shuntong Collec 24 90 120 0 20 Shed 360 Factory -tive m2 (leased) owned _ 27 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Baoshan Collec 33 560 0 0 0 Daily -tive Chemical owned Factory Xinfu Village Collec 11 60 0 0 0 Road and of Pengpu -tive sewer Town owned (north) Shanghai Collec 20 850 1150 0 50 30 m. of Jinguang Zhennan Jiefeng Doors -tive sewer Tenth Team Pump & Windows owned Station Factory (leased) _ Shanghai Collec 15 120 600 0 30 60 m. of Yingpeng -tive sewer Chemical owned Factory (leased). Jinguang Collec 30 40 400 0 30 360m2 of Tenth Team -tive shed; 60 m. Floor Factory owned of sewer (leased) Shanghai Collec 20 600 200 0 30 40 m. of Shending -tive sewer Plastics owned Factory (leased) Shanghai Collec 40 750 500 0 40 50 m. of Jiecheng -tive sewer Stationary owned Factory (leased) Pingru Collec 6 320 60 0 60 750m2 of Planting Farm -tive shed; (leased) owned 250m. of under- ground jet _____________ pipe Jinguang Collec 2 140 30 0 20 160m.of Tenth Team -tive big obvious Agnicultural owned ditch Machine Room Zhennan- Weierdong Private 35 4680 350 0 0 East of Hutai Dachang Furniture Co. owned Road and Pump Ltd. south of Station Zoumatang South Houjiangqiao Collec 12 289 2900 0 0 North of Nanda Team of =tive Henabang Pump Nanda Village owned Station of Dachang I Town Shanghai * Lianda Private 8 0 0 0 0 3000 North of University . owned squ.m. of Huanzhen Pump Materials simple shed Road and at Station Nanchen Aggregate Road Shop _ _ _ _ _ _ _ _ _ Qianxi Qianxi Real State 0 0 4680 0 0 Where North of Community Estate owned . Qianxi Huanzhen Pump Company Real Estate Road and east Station Company of Taopujing is West of Fengcunqiaoti Collec- 0 0 4800 0 0 West of Xinkaihe ng Production tive Xinkaihe and Pump Team of owned south of Station Dachang Yunzaobang Town 28 RAP for Shanghai Sewage Project Phase 111 (Zhuyuan)) Jinqiujia- Yangjazhai Collec- 5 260 4800 0 0 4800m2 of South of zhou Pump Producton tive brick land Yunzaobang Station Team of owned and west of Baiyang Nanchen Village of Road Gucun Town Total 341 16461 40840 500 305 . 29 RAP for Shanghai Sewage Project Phase Ill (Zhuyuan)) Table 2.3c Enterprises Affected by the Collection System in Pudong Name of Name of the Own- Number of Affected Area(m2) Address the pump enterprise ership the station affected Buildi Empty Green Circling Others employees ngs land land wall Pi Gaodong Collec 15 30 80 120 80 Huandong Industrial Co. tive trees First Avenue Ltd. owned (Gaodong Town Industrial Park) P2' Shanghai State 250 300 500 20 150 120 trees 80 Jinhai Minlin owned Road in Non-Ferrous Pudong Metal Co. Ltd. P2 Pudong Collec 30 2100 420 80 200 210 trees West of the Tangzhen tive planned Automobile owned Huadong Repairs Co. Road and Ltd. north of Longdong Avenue Pudong Collec 50 1400 180 120 40 50 trees Same as Tangzhen tive above Town owned Hongyi Industrial Company _ ___ Tangzhen Collec 55 1000 700 100 0 340 trees South of the Jikou tive planned Village owned Binzhou Industrial Road and Co. Ltd. west of the planned Gutang .__________ Road P4 Tangzhen Collec 50 550 120 30 78 75 trees On the Metal tive planned Machinery owned Binzhou Road Co. Ltd. Tangzhen Collec 120 500 1000 120 110 90 trees Same as Cement tive above Products owned Factory I_I_I Tangzhen Collec 55 350 100 80 56 70 trees Same as Workmanship tive above Factory owned Tangzhen Collec 25 200 450 50 . 130 58 trees Same as Agricultural tive above Products owned Processing Factory Tangzhen Collec 250 950 150 20 95 25 trees Same as Engineerin tive above g owned Decoration Co. Ltd. Tangzhen Collec 150 800 80 15 45 89 trees Same as Building tive above Repairs owned I Company 30 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Tangzhen Collec 50 ! 630 350 60 112 120 trees Same as Sideline Food tive above Co. Ltd. owned Tangzhen Collec 100 1100 600 100 250 320 trees Same as Concrete tive above Agitation owned Factory P3 Sunqiao Collec 15 0 60 25 0 20 trees West of Huandong tive and a pool Huandong Industrial owned of200mx 10 Second Co.Ltd. m Avenue and south of Mid. Huaxia Road P3' Duimian Collec I 0 3133.4 0 0 130 trees 1176 East Village of tive Huaxia Road Chuansha owned P6 Arable land of Collec 4 0 3133.4 0 0 30 trees Jielongcun Jielong tive Avenue Village of owned Chuansha P7 Construction State 0 0 3466.7 0 0 50 squ.m. Jiyang Road, Site of owned of green Huannan Lupu land Second Bridge at Avenue Sanlin (already acquired for municipal work) P8 Shanghai Port State 10 0 3133.4 0 0 120 squ.m. North of Logistics owned of green Gangcheng Warehousing land Road and Co. Ltd. west of Jiangdong Road P9 Heqin Collec 0 0 1733.4 0 0 0 North of Sewage Pump tive South Station owned Huanqin (already Road and constructed) west of Yuandong Avenue PlO Jichang Collec 0 0 1733.4 0 0 0 North of Sewage Pump tive Chenyang Station owned Road and (already west of constructed) Yuandong Avenue Total 1229 5860 20463. 940 1266 1827 trees 7 31 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 2.2.4 Impact on Employment The project construction needs to acquire some village owned collective land in addition to the state-owned and enterprise-owned lands. Among the affected enterprises, those that will be wholly relocated will rehabilitate its production and operation by leasing other production or business sites. The employees of these enterprises will receive subsidy for the temporary interruption of employment. After the enterprise is relocated, the employees can go to work again in the old enterprise. So the relocation of these enterprises will not have much impact on their employees. Those enterprises that will be partly relocated will feel the temporary impact of the project. Through adequate compensation and relocation, however, the old production layout of the enterprise will be adjusted, e.g. by compacting production space, adjusting the old production site. So the production and operation of these enterprises will not be impacted by the project. Compared with the employees of the enterprises that will be wholly relocated, the employees of the enterprises to be partly relocated will feel less impact from the project and will not be influenced in their engagement with the enterprise. In addition, the project construction needs to acquire some village owned collective land, mainly for the construction of the collection system projects in Puxi and Pudong. For this purpose, 348.431 mu of arable land will be acquired. According to the land acquisition conditions and the land labor rates of the villages, 681 labors need be provided with jobs after the project. See the following table for details. 32 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) Table 2.4 Number of Labors Affected by Construction of the Pump Stations Category Name of the Affected village Affected area PAPs pump station Squ.m. mu Sewage Shanghai Zhuyuan Village of 183354. 275.031 523 Factory Zhuyuan Gaodong Town 9 No. Two Sewage Treatment Factory Zhouhai Gaoxi Village of 8000 12 24 Road Gaohang Town Intermediary Pump Station Pudong P3 Huandong Village of 1567 2.35 5 Collection Sunqiao Town System P3' Duimian Village of 3333.3 5 10 Chuansha Town P4 Jikou Village of Tang 5466.7 8.2 20 Town P6 Jielong Village of 4000 6 12 Chuansha Town P9 Hongqi Village of 5333 8 19 Heqin Town PIO JichangTown 5333 8 19 Rain Xinkaihe Fengcun Village of 4800 7.20 15 Pump Dachang Town Station in Jinzhoujiazh Baiyang Village of 4800 7.20 15 Puxi ou Gucun Town Nanda Nanda Village of 3000 4.50 10 Dachang Town Zhennan Jinguang Villageof 3300 4.95 9 (north Taopu Town Total 232288. 348.431 681 5 Due to the land acquisition, the above 681 people (of whom 49 people live in Puxi and 632 in Pudong) will lose their land which they rely on for living. With this regard, the project host will pay labor resettlement fee to them. 33 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 2.2.5 Affected Infrastructures Project affected infrastructures mainly include road, trees, green land, pavement trees and various underground pipes and lines. The project host will compensate the infrastructure owners before the project construction and pay attention to protecting those public infrastructures that are difficult to be relocated during the project construction. After the project construction, the roads, trees, green land and pavement trees will be rehabilitated. 2.2.6 Impact on Vulnerable Group From the baseline survey, it is known that within the scope of the project construction, 15 households are impoverished households whose per capita monthly income is under 280 yuan, and 3 households are either minority, or the senior living alone, or disabled households. 34 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 3. Objectives The purposes of this RAP is to enable the PAPs to benefit from the project, to improve or at least restore their livelihood, income capacity and production scope, and to pay attention to the need of the vulnerable groups in particular. Following are the objectives of the RAP. 1. To properly arrange the livelihood and the residence of the PAPs and to guarantee that the income level of the PAPs be improved or at least restored to the prevailing level. 2. To repeatedly revise and perfect the RAP in order to lighten the impact and to minimize the scope of immigration. 3. To guarantee that all PAPs receive compensation for their total loss and are properly relocated and rehabilitated so that they can share the benefits of the project. Meanwhile, compensation should be paid for their temporary hardships and affected properties according to replacement price so that their income level, living standard and the profit-making ability of the affected enterprises will be improved or at least be restored to the pre-resettlement levels. 4. To perfect the necessary equipment of the new housing, and make the resettlement community equipped with complete facilities, convenient transport, comfortable livelihood and fine environment. 5. To enable the resettled people to get used to the host community in a short period so as to stabilize their life. 6. To provide the vulnerable groups with preferential policies in housing, employment, etc.. 7. To keep the scope and function of the buildings of the affected enterprises, to restore to the original business environment as far as possible, and to compensate for their losses from operation interruption and temporary change of business environment. 8. To properly compensate the collective-owned land for all its loss and to pay the compensation to the community for no other use but developing the collective economy; 9. The implementation of the resettlement will be monitored and evaluated by the external monitor. The representatives of the PAPs will take part in the decision-making of the resettlement; special institutions will receive complaints from the PAPs. 10. During the process of the project implementing, if the RAP has significant change due to change of the design, etc., the RAP will be revised and submitted to the World Bank for approval; significant changes in the number of affected objects, in the compensation policy or in compensation rates will be submitted to the World Bank first and then implemented after approval. Minor changes during 35 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) implementation of the RAP will be reflected in the internal and the external monitoring report. 11. After Phase III is completed, a new modern city of Shanghai will appear before the people. Both the appearance and the sanitary conditions of the project covered area will be greatly improved, which will play an active role in enhancing the health of the relocated people and those in the neighborhood. The completion of the project will promote the social development of the city and help Shanghai take part in the global competition with the appearance of a modern international cosmopolitan. The project will make contributions to the undertaking of environmental protection for China and the world. 36 RAP for Shanghai Sewage Project Phase III (Zhuyuan)) 4. Socio-Economic Impact The project host made a baseline socio-economic survey on the project affected area. Through on-spot investigation, random sampling and written questionnaire, data and materials are collected. Some time after the project is completed, the project host will make another socio-economic survey. The results of the two surveys will be compared and analyzed to show the positive or the negative impacts, as well as the degree of the impacts, of the project implementation on the affected population. The purpose of the comparison is to verify the effectiveness of the project implementation. 4.1 Brief Description of the Project Area The project runs cross 6 districts (Baoshan, Yangpu, Zhabei, Hongkou, Putuo and Putuo New Area), 2 residential districts (Daning and Changbai), 14 towns (Songnan, Gaojin, Dachang, Taopu, Gucun, Gaoqiao, Gaodong, Caolu, Tangzhen, Sunqiao, Chuansha, Jichang, and Sanlin), and more than 10 villages (Xin 2 Village, Xin 3 Village, Shengli Village, Zhangjiazhai Village, Xinhua Village, Huandong Village, Hongyi Village, Jikou Village, Duimian Village, Jielong Village, Gaonan Village, Zhandou Village, and Zhuyuan Village, etc.) Yangpu District is located northeast of downtown Shanghai and at the lower reaches of Huangpu River, with the east and the south facing the river. The total area of the district is 60.61 squ.km. As the biggest district in downtown Shanghai, it has a registered residential population of 1.24 million. One of the downtown districts of Shanghai, Putuo District is located in the northwest of the city, with 55 squ.km. area and 0.85 million population. It has always been called "the west grand lobby" of Shanghai. Lying east of the north downtown Shanghai, Hongkou District has an area of 23.48 squ.km. and a registered population of 0.86 million. Situated in the north of Shanghai, Baoshan District is one of the key new urban areas that are included in the long strategic plan of Shanghai to be developed in priority. 56 km long from east to west and 23 km long from south to north, the district has a total area of 415 squ.km. and a population of 0.95 million. As an important composite of Shanghai, Pudong New Area is located east of downtown Huangpu River and has an area of 533.44 squ.km and a registered residential population of 1.534 million. On April 18, 1990, Chinese government declared to develop and open up Pudong in Shanghai and decided to take the development and opening-up of Pudong as the- dragonhead to further open the coastal cities along Changjiang River. According to the declaration, Shanghai will be built in the shortest period into an international economic, financial and trade center so as to push the new economic flight of the 37 RAP for Shanghai Sewage Project Phase I1 (Zhuyuan)) whole Changjiang base. The development and opening-up of Pudong has provided historic opportunity for Shanghai. During the past ten years of development and opening-up, the economy of Pudong has been developing at a very high speed, and the urban appearance has changed significantly. Now, Pudong New Area has become the base for the newly emerging high-tech industries and modem industry in Shanghai, the new economic growth point of Shanghai, and the focus and symbol of China's reform and opening-up in the 90s. The macroscopic background of Shanghai's economy and its influence on the urban residents 1. Shanghai's GDP has been increasing at the two-digit rate. 0 Rate of Development of Shanghai's Economy 2001 10. 20
Groupe de la Banque mondiale · Resettlement Plan
China - Shanghai Urban Environment Project : resettlement action plan (Vol. 3 of 6) : Resettlement plan for Shanghai Sewage Phase 3, option 2
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Resettlement Plan
Pays
Chine
Source
Banque mondiale