World Bank Loan Project - Hubei Hydropower Project E 416 VOL.1 EIA Report on Dong ping Hydropower Project (Draft) Chinese Research Academy of Environmental Sciences 2000. October Project Name: Dongping Hydropower Project in Xuanen County, Hubei Province Document Title: EIA Report of Xuanen Hydropower Project (First Draft) Prepared by: Project Manager, Professor Zhang Yutian Team members: Mao Wenyong professor Song Fu professor Su Yibing associate professor Sun Xueli engineer Jiang Hua engineer Nie Yihua engineer Liang Zhenming engineer Zhou Yun engineer Jiao Yang associate engineer Certification Number: Grade A No.1001, issued by China State Environmental Protection Management (SEPA) Audited by: Li Yanwu associate professor EIA Implementation Unit: Chinese Research Academy of Environmental Sciences Entrusted by: Development and Planning Committee of Hubei province EIA Report on Dongping Hydropower Project Table of Contents Table of Contents Chapter 1 Executive summary .....................................................1 1.1. Background .....................................................1 1.2. The EIA Classification and Purpose .....................................................2 1.3. Compiling basis .....................................................2 1.4. Assessment Scope and Criterion .....................................................3 1.5. Principles and criterion of the assessment ......................................................4 1.6. Main point of the environmental assessment and protect objective ........................................4 1.7. Management system and requirement ......................................................5 Chapter 2 Project summary .....................................................6 2.1. Project location .....................................................6 2.2. Project Developing Task ....................................................6 2.3. Project Scale and Arrarigement .....................................................6 2.4. Construction programming ....................................................7 Chapter 3 Environment summary in the project affected area .....................................................9 3.1. Natural environment summary .....................................................9 3.2. Reservoir region environment ..................................................... 12 3.3. Social environment .................................................... 17 3.4. Life Quality ..................................................... 18 3.5. Environmental quality status .................................................... 19 Chapter 4 Environment impact and defend measures ..................................................... 24 4.1. Environment impact during construction period .................................................... 24 4.2. Eco-environment impact analysis ..................................................... 28 4.3. Water environment impact analysis .................................................... 34 4.4. Environment geologic condition impact analysis ............................ ........................ 46 4.5. Environmental risk analysis ................................................. . .. 51 4.6. Project impact on the social environment .................................................... 53 4.7. Impact analysis for human health ...................................................... 62 Chapter 5 Alternatives .................................................... 65 5.1. Alternatives .................................................... 65 5.2. Compares of power station type .................................................... 65 5.3. Dam site compare .................................................... 66 5.4. Dam line and dam type ..................................................... 67 5.5. General collocation of the project ..................................................... 68 Chapter 6 Cost-benefit analysis of environment economic .......................... .......................... 69 6.1. Economic and social benefit analysis .................................................... 69 6.2. Environment investment assessment .................................................... 72 6.3. Cost-benefit analysis .................................................... 74 Chapter 7 Environment management and monitoring plan ......................... ........................... 76 7.1. Environment management capacity .................................................... 76 7.2. Environmental monitoring plan .................................................... 77 7.3. Personnel training .................................................... 78 7.4. Environment monitoring reportFl .................................................... 79 Chapter 8 Public consultation .................................................... 80 8.1. Investigation methods and contents .................................................... 80 8.2. Brief introduction of the investigation .................................................... 80 8.3. Investigation content ..................................................... 82 Chapter 9 Conclusion and suggestion .................................................... 84 9.1. Conclusion ..................................................... 84 9.2. Main positive impacts .................................................... 85 9.3. Major negative impacts and counterneasures during construction period ............. .............. 85 9.4. Negative impacts and countermeasures during the operation period .................................... 86 9.5. Conclusion and suggestion .................................................... 87 .i. EIA Report on Dongping Hydropower Project Chapter I Executive summary Chapter 1 Executive summary 1.1. Background 1.1.1. Brief introduction of the project "Dongping hydropower project in Hubei Xuanen County", planned to build on the main part of Zhongjian River, which is from Xuanen County to Zhongjian River County on Dongping spot in Hubei Province. Total investment is 0.805 billion RMB, storage capacity is 0.308 billion m3, surface area of the reservoir is 8.12 km2, backwater length is 31.35 km, capacity of the electric station is 102 MW. DONGPING hydropower project prepared ever since 1994, by now it had lasted for 6 years. Major prophase work includes: * 1993.10 Hubei Bureau of Water Resources signed the development plan, which was compiled by Hubei Design and Exploration Academy of Hydropower Institute. 1993,12 Hubei Planning Committee agreed to start the prophase work of the DONGPING hydropower station. * 1996,1 Hubei Planning Committee examined and approved the feasibility study report of Dongping hydropower station. * From 1997, started to prepare the prophase work. e 1997.9 Hubei Bureau of Water Resources examined the water and soil conservation scheme of the project. i 1998.12 Hubei Design and Exploration academy of Hydropower Institution completed the technique design work. * 2000.6 compiled the resettle plan report. 1.1.2. Environment assessment (EA) work progress The EIA (EIA) started from 1999, according to the domestic EIA progress, major works had been done as follows: * 1995.9 Hubei Research Institute of Environmental protection completed the outline of the EIA, which was signed by Hubei Bureau Environmental protection * 1996.5. Hubei Environmental Protection Bureau proved the Environmental Impact Report, 1996, 12 the report was completely finished. 1.1.3. Origin of the assignment Since the project planned to use the loan of World Bank (WB). the EIA should meet the requirements of the WB. According to the suggestions' raised by the WB in 2000. Feb. llu Bei Planning committee entrusted CRAES to take the consulting business of the project, which is emphasizing on providing a supplement for the Environmental Impact Report. Based on the Environmental impact report2 proposed by the Hubei Research Academy of Environmental Sciences, CRAES will do the following work from 2000,4: * To analyze, supply and recompile the content of the work according the suggestions and requirements proposed by the WB, and to contact the project company to prepare the relevant information. * To support the fieldwork including exploring the location of the dam site, gathering 'Consults the revising opinions for the report outline proposed by WB expert Scott Henna, 2000/06/22. 2 Consults the revising opinions for the report content proposed by WB expert Scott Henna, 2000/09/02. .] . EIA Report on Dongping Hydropower Project Chapter I Executive summary biological samples, collecting supplementary materials and carTyingout several kinds of consulting and surveying work. To recompile the Environmental Impact Report based on the supplementary work and on the discussion with the experts of WB about modifying the outline3 and the report content4. According to the domestic approve-procedure and the WB's requirements, the supplemental modification and the recompiling report should be in both Chinese and English. Also should be submitted to the delegates of WB and representatives of Chinese govemment to examine the Environmental Impact Report. 1.2. The EIA Classification and Purpose 1.2.1. The EIA Classification According to P.R.C. "Circulation on strengthening the management of EIA of the construction project financed by the international financial organization" andthe rules of the World Bank OP4.01 concerning classification of the EIA, averagewhile according to the characteristics of the proposed project, the project of Hubei Xuanen Dongping hydropower project was ascribed to the category A. 1.2.2. Compiling objective TIhe objectives of compiling this report are as follows: Based on analyzing the environmental conditions of the water area and reservoir region, impersonally assess the positive and negative impact on the natural environment and social environment; propose suggestions and measures to rationally utilize the positive impact and mitigate the negative impact; make conclusion on the long term and short-term impact of the project; propose environment inspection and management plans, and provide scientific foundation to further fulfill the project.(evaluating loans, compensating the implement of the activity and implementing the project) 1.3. Compiling basis 1. "Environmental Protection Regulations for Construction Project", P.R.C. State Department No.253. 2. "P.R.C. Environmental Protection Law" (1989) 3. "Enforcement Regulations of Environmental Protection and Management for The Construction Project in Hubei Province"(1998) NO.5 4. "P.R.C. Water Law"(1988) 5. "EIA Standard for Water Resource and Hydropower Project (trial issue)", SDJ302-88 6. "Technical Guide Principle of EIA: ", HJ/T2.1-2.3-93 7. " Letter About Agreement of Starting The Prophase Work of The DONGPING Hydropower project in Xuanen"(1993) ER JI Energy Letter No.319 8. " Reply Letter about The Opinion on The Outline of The EIA for Hubei Dongping Hydropower project"1995 Er En Letter No.107 9. " Outline of the EIA for the Hubei Dongping Hydropower project" 1995,9 Consults the appendix B of the memoire of Hubei hydropower project differentiating group "Opinions on Environmental Impact Report", 2000, 2. 'This report is compiled based on the report proposed by Hubei Academy of Environmental Sciences, utilized great amount of figure, picture and data of the original report. .2 . EIA Report on Dongping Hydropower Project Chapter 1 Executive summary 10. "Environmental Impact Report for The Hubei Dongping Hydropower project" Hubei Research Institution of Environmental protection, 1996,12 11. " Circulation about The Execution Criterion of The EIA for The Dongping Hydropower project" Xuan Jian Huan Fa [1996] NO. 38 12. "Hydropower Develop Plan Report for The Xuanen County Zhongjian River Water Area", Hubei Design institution of Hydropower Exploration, 1993,7 13. " Feasibility study Beforehand Report for The Dongping Hydropower project in Xuanen County" Hubei Design Institution of Hydropower Exploration, 1995.11 14. " Feasibility study Report for The Dongping Hydropower project in Xuanen County" Hubei Design Institution of Hydropower Exploration, 1996.6 15. "Migration Scheme for The Dongping Hydropower project in Xuanen County", Xuanen County Government, 2000,6 16. " General Situation of Reality Investigation for The Dongping Hydropower project in Xuanen County", Xuanen County Government in, 1995.7 17. " Letter About Entrusting the Consulting Work of The Environmental Assessment Prepare Work for The Small Hydropower Project in Hubei Province", Hubei Province Developing and Planning Committee of, 2000,3,8 1.4. Assessment Scope and Criterion 1.4.1. Assessment Scope Assessment scope includes submerged reservoir region, resettle area, construction area, and area in the down stream.
Groupe de la Banque mondiale · Environmental Assessment
China - Hubei Hydroelectric Project - environmental assessment (Vol. 1 of 7) : EIA report on Dongping hydropower project (revised)
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale