Groupe de la Banque mondiale · Staff Appraisal Report

Dahomey - Highway Maintenance and Engineering Project

Bénin Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

RETURN TO REPORTS DESK R ESTR I CTED WITHIjNJ | lL' CniY Report No. PTR-31a 1ON3E /E?EK I 'WI This report was prepared for use within the Bank and its affiliated organizations. They do not accept responsibility for its accuracy or completeness. The report may not be published nor may it be quoted as representing their views. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION APPRAISAL OF A HIGHWAY MAINTENANCE AND ENGINEERING PROJECT DAHOMEY June 11, 1970 Transportation Projects Department CURRENCY EQUIVALENTS (as of August 1969) Currency Unit = CFA Franc (CFAF) US$1 = CFAF 277.71 CFAF 1 = US#. 0.36 CFAF 1 million = 11$ 3,600 FISCAL YEAR January 1 to December 31 WEIGHTS AND MEASURES: Metric Conversion Metric: EQUIVALENT BRITISH/US SYSTEM 1 kilometer (km) = 0.62 miles (mi) 1 meter (m) = 3.28 feet (ft) 1 hectare (ha) 2 = 2.47 acres (ac) 1 square kilometer (km2) = 0.386 square niles (sq mi) 1 liter (1) = 0.22 gallons (Imp gal) 1 metric ton (ton) 2,204 pounds (lbs) ABBREVIATIONS ADT - Average daily traffic (number of motor vehicles, tota:! in both directions)

Informations clés
Type de document Staff Appraisal Report
Date d'adoption
Pays Bénin
Source Banque mondiale