E687 Volume 16 Department of Potable Water Supply Ministry of Industry, Mining and Energy (MIME) Phnom Penh, Royal Kingdom of Cambodia Provincial and Peri-Urban Water Supply and Sanitation Project, Royal Kingdom of Cambodia Initial Environmental Impact Assessment Report Prasat (M19) District of Kampong Trabaek Prey Vieng Province DRAFT, December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME I PPWSA / WB) Prasat (M19), Prey Vieng TABLE OF CONTENTS PROJECT SUMMARY I INTRODUCTION ...................... 1-1 1 1 BACKGROUND OF THE PROJECT ..................................................... 1-1 1.2 ENVIRONMENTAL ASSESSMENT ...... .. ................... . ....... .. ........ . . 1-2 1.3 INSTITUTIONAL AND LEGAL FRAMEWORK .................................... ............ ... 1-2 2 PURPOSE OF THE PROJECT . 2-1 2.1 OBJECTIVES .. ............... ......... .. . .......... ... . 2-1 2 2 PUBLIC PARTICIPATION . ... .. ................................... ..............-..1.............. . 2-1 3 PROJECT DESCRIPTION .......................... 3-1 3 1 SERVICE AREA ........................................... ........................................... 3-1 3 2 SUMMARY OF INFRASTRUCTURE ..............3..................... ........... ......... 3-1 3 3 WATER QUALITY STANDARDS................. . . 3-3 3 4 PROJECT PLANNING AND IMPLEMENTATION . .....3. ................................................. 3-3 4 DESCRIPTION OF ENVIRONMENTAL RESOURCES .4-1 4 1 PHYSICAL RESOURCES ...................................... .4.-.......... .............. .......... 4-1 4:2 ECOLOGICAL RESOURCES .......... 4-4 4.3 SOCIO-ECONOMICAL RESOURCES ........... 4-4 5 PUBLIC PARTICIPATION ..... 5-1 5.1 GENERAL ....... ..................... ... .. .... . .................................................. 5-1 5.2 CONSULTATIONS WITH THE PROSPECTIVE USERS . ................................................ 5-2 5 3 WILLINGNESS-TO CONNECT (WTC) ................ ... ................. ..... .. .... ...5-2 6 ENVIRONMENTAL IMPACT ANALYSIS .6-1 6 1 METHODOLOGY ............1... ... .... .................................................... 6-1 6 2 PRE-CONSTRUCTION CONSIDERATIONS .................. ......... ..... ... . ...... 6-2 6 3 ENVIRONMENTAL IMPACTS DURING PROJECT CONSTRUCTION ...................... .. ...... 6-2 6 4 ENVIRONMENTAL IMPACT DURING PROJECT OPERATION . 6-3 6 5 SUMMARY OF SIGNIFICANT ENVIRONMENTAL IMPACT . 6-4 7 ECONOMICAL ANALYSIS AND ENVIRONMENTAL VALUE .7-1 7.1 GENERAL ...................... . ................ ....... .. ............. ...... 7-1 7.2 FINANCIAL DATA ... .... .......................... .. .............................................. .... 7-1 8 ENVIRONMENTAL MANAGEMENT PLAN .8-1 8 1 INTRODUCTION. 8-1 8.2 ENVIRONMENTAL MITIGATION PLAN .... ...... .................................................. 8-1 8.3 ENVIRONMENTAL MONITORING PLAN ... ........................................... 8-1 8.4 RESPONSIBILITIES . .................... .. ................... . . ............................. 8-1 9 INSTITUTIONAL CAPACITY ...... 9-1 10 CONCLUSIONS AND SUGGESTIONS ....................... 10-1 11 PRINCIPAL REFERENCES ........................ 11-1 AIP'Main text (DRAFT) i December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng LIST OF FIGURES Figure 1-1 - Location map of the project area ................................................ .. ........ 1-1 Figure 1-2 - Applied EA Process ................................................ . . 1-3 Figure 3-1 - Proposed service area and infrastructure (DRAFT) . 3-2 Figure 4-1 - Geological provinces .......................................... . 4-2 LIST OF TABLES Table 3-1 - Summary of proposed infrastructural works ................ .. ............ ............ 3-1 Table 4-1 - General climate conditions in Cambodia .4-3 Table 6-1 - Summary matrix of Environmental Issues/Impacts .6-1 Table 8-1 - Environmental Mitigation Plan ............-.................................. ................... 8-2 Table 8-2 - Environmental Monitoring Plan .................................... .............................. 8-3 LIST OF ANNEXES Annex I - List of EA preparers Annex II - VVTC Process documentation Annex IlIl - Proof of social acceptability Annex IV - Applied Water Quality Standards Annex V - Accountability statement of project owner AdIlPMain text (DRAFT) 11 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng LIST OF ABBREVIATIONS BOD Biochemical Oxygen Demand COD Chemical Oxygen Demand DBL Design/Build/Lease DD Detailed Design DPWS Department of Potable Water Supply DPWT Department of Public Works and Transport (Municipality) EA Environmental Assessment EEA Environmental Examination Application EIA Environmental Impact Assessment EMiP Environmental Mitigations Plan (part of an EMP) EMoP Environmental Monitoring Plan (part of an EMP) EMP Environmental Management Plan FS Feasibility Study FT Fraser Tomas (Engineering Consultants) GHD Gutteridge, Haskins & Davey (Engineering Consultants) IEIA Initial Environmental Impact Assessment JICA Japan International Cooperation Agency LCPSS Low Cost Pilot Sewerage System Lpcd Liters per capita per day Mg/l Milligrams per liter MIME Ministry of Industry, Mines, and Energy MoA Ministry of Agriculture MoE Ministry of Environment MPP Municipality of Phnom Penh MWRM Ministry of Water Resources and Meteorology MPWT Ministry of Public Works and Transport NGO Non Governmental Organization PCD Pollution Control Department (Ministry of Environment) PG Provincial Government PMU Project Management Unit PO Project Owner PPWSA Phnom Penh Water Supply Authority PPUWSSP Provincial and Peri-Urban Water Supply and Sanitation Project RGC Royal Government of Cambodia ToR Terms of Reference TSS Total Suspended Solids WB World Bank WHO World Health Organization WSS Water Supply and Sanitation WTC Willingness to Connect -lA P Main text (DRAFT) Iii December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng PROJECT SUMMARY General The purpose of the Environmental Assessment is to identify and evaluate the significance of any potential environmental impacts on the proposed construction and development program for a new water supply system for Prasat (District of Kampong Trabaek, Prey Vieng Province) and to recommend avoidance, preventive and mitigation measures to ensure that residual environmental impacts are acceptable and are within the applicable limitation standards prescribed by the Ministry of Environment and the World Bank. The Local Government of Prasat has initiated the current project, with support of the Provincial Government of Prey Vieng and the Department of Potable Water Supply (DPWS) of MIME. The actual 'Project Owner' is the Ministry of Industry, Mines and Energy. Project description Based upon the evaluation of the various options for a possible water supply scheme, MIME, with support of the Engineering Consultants GHD/FT, has prepared a viable project proposal. The project will provide piped water supply for a population estimated at 7,091 persons, with service initially to some 51 to 60 percent of the population within the service area at 40 I/cd, increasing to 60 I/cd and serving 90 percent of the population in the service area. Preliminary calculations indicate a required water demand (ADP) of 353 m3/ day. Groundwater will be abstracted via deep bores. The necessary treatment will be applied to comply with Cambodian drinking water quality standards. A treatment plant will be located on the land identified by the District and Commune at the southern extremity of the town. Treatment comprises aeration and disinfection. Water will be pumped from the clearwater tank through a booster pump into the network system serving the town. A single metered connection will be provided to each house, where it is assumed that household "water jar" storage will continue to be used. No resettlement will be required. Land Acquisition The scheme is based on three boreholes sited in open fields to the north of the market. The treatment plant will be located on the nearby vacant land which the Commune has indicated will be available for the scheme. The land for the proposed wells and pumping stations should be made available by the commune (or purchased) with official documentation as soon as the locations of well and treatment plant are confirmed by the private operator. The land required is estimated ....m2. The acquisition of land will be facilitated by MIME as part of their responsibility to the project. If possible, the PMU representative will facilitate the issuance of "Deed of Donation" or statements on the willingness to sell prior to the construction to avoid any conflict with the lot owner. .Al 'Main text (DRAFT) Iv December 2002 Provincial and Peri-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME I PPWSA / WB) Prasat (M19), Prey Vieng Consultations After series of meetings/consultations with concerned Provincial Government Officials of the Prey Vieng Province and the local officials and residents of Prasat, the Project was approved and endorsed. Overall, the project is perceived to be of great help to the community since it will significantly improve the quality of the drinking water supply and public health conditions by reducing common cases of water borne diseases (diarrhea, gastroenteritis and parasitism). The project will further stimulate socio-economic growth through increase in the number of commercial and economic activities thus adding revenue to the community. The Willingness to Connect (WTC) indicated that 69.6% of the 586 households within the service area of Prasat approved a tariff of 1985 Riel/m3. Environmental Management Plan To mitigate possible general adverse environmental impacts (e.g. drainage, sanitation, damage to soils and water and economic losses), discussions are held with all major stakeholders. The findings and conclusions on the actions to be taken have been summarized in an Environmental Management Plan (EMP), including: * An Environmental Mitigation Plan (EMiP), outlining the measures to be taken to mitigate adverse environmental impacts; * An Environmental Monitoring Plan (EMoP), defining the environmental parameters to be observed and reported; * Overview if the implementation arrangements, defining the responsibilities and timing. Monitoring arrangements MIME will have the overall responsibility for the proper implementation of the Environmental Management Plan (EMP). Upon the signing of the DBL contract, the Project. Management Unit (PMU) will proceed with the necessary steps for the environmentally sound construction and operation of the water supply system, as defined in the EMP. During the construction phase, PMU will be responsible for securing that proper measures are taken by the different contractors. The PMU will inform DPWS/MIME if violations occur, and appropriate actions will be taken. Moreover, DPWS/MIME staff will carry out control inspection during their regular visits to the Provinces. During operation of the water supply system, the Contractor and the PMU will have the main responsibility for the proper implementation of the monitoring plan. The monitoring data will be well documented and be available with the Contractor and PMU for consultation and inspection. Brief quarterly monitoring reports will be submitted to DPWS/MIME and the Ministry of Environment, including: Presentation of the collected data; Discussion of the compliance and non-compliance to the EMP; and Conclusion and Recommendation. Regular annual monitoring reports will be submitted to the World Bank during the operation phase. The environmental data will be available with the DPWS/MIME and the Contractor for consultation and inspection. AIPF'Main text (DRAFT) v December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng Environmental Mitigation Plan (EMiP) for Prasat, Prey Vieng Phase Mitigation measures Responsibility Schedule Pre- * Lack of control of water source Acquire land MIME, World Bank Prior to DBL construction directly around the facilities (or secure a Contracts possible purchase), * Reduction in flow Locate the well in an area where other water users are not affected * Disturbance of land use and economic activities Usage of public areas, Provision for proper compensation Construction * Disturbance of land use due to Operator, with Continuous drilling/construction Minimize impacts, supervision of during Restore damages MIME consultant construction * Loss of natural vegetation Replanting of phase affected areas * Disturbance of stream channels, aquatic plant and animal habitats Erosion and sedimentation control * Soil and water contamination (e g spilling of oil products and other construction materials) Control (collection, disposal) of waste water * Hindrance (noise, air pollution, traffic, etc) due to drilling/construction activities Minimize hindrance, Usage of main roads when possible * Soil erosion and compaction Proper runoff and erosion control measures, Heavy traffic restrictions * Safety hazards Proper safety and warning measures, Provision of temporary crossings/bridges, Public information campaign Operation * Public health hazards due to increase of Operator, with To be wastewater Support the construction of supervision of determined proper on-site sanitary facilities (if lacking), MIME dunng feasibility Improve storm drainage system for sullage, study * Contamination of the groundwater Acquire and fence a protection zone directly around the well, Regulate potential polluting activities in recharge zone, Monitor water level and groundwater abstraction * Lowered groundwater table Space wells at larger distances, Avoid over-abstraction and consequent lowering of groundwater table, Calculate safe yield (abstraction); Assure/proof that other water users are not affected * Increase of noise Usage of electrical submersible pumps, Construction of pumping house Abandoning * Water availibility keep traditional water phase sources available AIlP'Main text (DRAFT) vI December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng Environmental Monitoring Plan (EMoP) for Prasat, Prey Vieng Phase Monitoring activities Responsibility Implementation Pre- * Land acquisition Check if the MIME, World Bank Prior to DBL Contract construction required land has been acquired properly, or that a proper "Deed of Sale/Donation" has been prepared * Resettlement and Compensation If applicable, check if proper arrangments are made and documented Construction * Hindrance to local population Operator, with Continuous, through Noise, air pollution (odor, TSP, fume supervision of MIME regular construction emissions), land damage, traffic consultant supervision * EMP compliance of the contractors Erosion control, vegetation protection, soil and water contamination * Safety precautions of contractors Conform professional standards * Sanitary control. Proper construction of on-site facilities, Proper construction of sullage drainage system Operation * Quality of distributed water conform Operator, with Regular, according to official standard procedures supervision of MIME professional standards (microbiology, standard parameters, Arsenic, heavy metals), * Groundwater resources water level (2 X per month (after pumping recovery period), operation of pumps (abstraction). Abandoning * None phase AlFIVMain text (DRAFT) vii December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng 1 INTRODUCTION 1.1 Background of the Project The 'Provincial and Peri-Urban Water Supply and Sanitation' project (PPUWSSP) is being prepared and implemented by the Department of Potable Water Supply (DPWS) of the Ministry of Industry, Mining and Energy (MIME), and the Phnom Penh Water Supply Authority (PPWSA), Kingdom of Cambodia. The PPUWSSP is financed through a loan from the World Bank. The MIME component aims at financing water supply and sanitation projects targeting provincial towns and district towns that express demand for improved services and low- income communities in urban centers. It finances investments that (i) respond to what consumers want and are willing to pay, (ii) facilitate and develop private sector participation in financing, operating and maintaining constructed facilities, while designing specific instruments that ensure inclusion of low income communities residing in the service areas. Upon the request of the local governments, the town of Prasat, Province of Prey Vieng (Figure 1-1), has been included in the first batch of the project. Prasat has expressed its interest in the project as it does not have a proper water supply system yet. During the dry season, serious water shortages occurs. Figure 1-1 - Location map of the project area development of a pipedvwater supply system for Prasat, Province of Prey Vien (M7) The purpose of the present Initial Environmental Impact Assessment (IEIA) is to identify possible environmental and social impacts arising from the proposed construction and development of a piped water supply system for Prasat, Province of Prey Vieng (Ml19). As described below, many sections of the current report have been obtained from the Feasibility Study reports, prepared by the Engineering Consultant GHD/FT. AJI Main text (DRAFT) 1.1 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng 1.2 Environmental Assessment The EA has been prepared in accordance with the guidelines of the Ministry of Environment (MoE, see also section 1.3), combined with World Bank guidelines on Environmental Assessment. Both within the Cambodian and the World Bank regulatory framework an environmental clearance is required before the project implementation can start. Environmentally sound practices have been incorporated in the project planning and design, and possible negative impacts have been identified to be mitigated to acceptable levels The EA was carried out by a technical team, comprising of engineers and environment specialists (See Annex I - List of EA preparers). Multiple consultations with the staff of MIME, Provincial Government, Commune chiefs, and the local beneficiaries were conducted in order to solicit their comments, reactions and finally seek their proper approval and endorsement of the proposed project (see Annex II - WTC Process documentation and Annex IlIl - Proof of social acceptability). Desk research was carried out through obtaining available data about the physical, socio-economic, environmental characterization, political profiles from the Engineering Consultants GHD/FT. Data were also gathered and reviewed from the national line agencies/offices such as Ministry of Rural Development (MRD), Ministry of Agriculture (MoA), and Ministry of Environment (MoE). These available reports/literatures and other materials relevant to the conduct of the Environmental Assessment report were compiled and reviewed. Aside from data gathering activities, actual interview and constant coordination with the members of the Provincial Management Unit (PMU) at the Provincial and Municipal/City levels were carried out to gather first hand information/data. 1.3 Institutional and legal framework Overall management of the environment lies with the Ministry of Environment (MoE), which was created in 1993. The MoE has wide responsibilities, which are spelled out in the Law on Environmental Protection and Natural Resources Management. At the provincial and city levels, there are corresponding Provincial/City Environment Departments. These local departments have the responsibility of enforcing the environmental legislation coming under the competence of the MoE. However, the daily operational functions of these departments would normally come under the direct control of the provincial/city authorities. The objectives of the framework Law are to protect environmental quality through the prevention, reduction and control of pollution, to establish an Environmental Impact Assessment (EIA) system, to ensure sustainable use of natural resources, to encourage public participation and to suppress acts which are harmful to the environment. The framework Law calls for an EA to be conducted for every private or public project, to be reviewed by the Ministry of Environment before submission to the Government for a .AIE Main text (DRAFT) 1-2 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng final decision. All proposed and existing activities are to be covered under this requirement. Sub-decrees are anticipated to provide for the finer details of the system. The Sub-degree on Environmental Impact Assessment Process, which was issued in December 1999, details specific procedures to be followed and the nature and size of projects which are required to submit ElAs. The Cambodian EIA requirements for water supply projects start with 10,000 users. Based on the above mentioned documents, the MoE have drafted flowcharts showing the EIA procedure to be applied. For the present project, with MIME being the Project owner, the applied process is shown in Figure 1-2. Figure 1-2 - Applied EA Process EIA Process for Proposed Project Approved by Project's Owner as Ministry and Institution 30 days 30 days PO Sub,mits PO Revises IEIA P0D S 'ubmits ti EAA & iEiA report or Prepare Revised IEIA or Et RprtP &emPnt Report to MoE EIArpr IA Report to MoE r EtA Report requirEdIor EiA Report EiA Repor 7~~~~ needs l~~~~~~ned V. EIA Revevisevi on l e_ponRepocnsn ABBREViATIONS PO Pioien O-,er MoE =i ewsi _, Ei,s,rn_ C set EUP IEIAvvn m 7g R on un efiPIuro lOlA inissi Cnvionmeni.I Impact AssesI ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ evlson EIA~ ~ ~ E-EIA Report...- CIACn,romeiaiimaciAs Css onsen EA EAnv,r-ntu E--nbaon Appi-bon The first step in the EA process is the preparation of an Initial Environmental Impact Assessment (IEIA), to be submitted by the Project Owner to the MoE, supplemented with an Environmental Examination Application (EEA). Based on the review of the IEIA, the Project will either be approved, additional changes to the IEIA will have to be made, or a full scale EIA report will have to be prepared. Furthermore, the MoE has prepared draft guidelines for the set-up and contents of the EIA reports). Although still in draft form, they have been applied as the basis for the IEIA reports. ..IlVIMain text (DRAFT) 1-3 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Inital Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng 2 PURPOSE OF THE PROJECT 2.1 Objectives The objective of the project is to supply safe drinking water through a piped water supply system to the town of Prasat, Prey Vieng Province. The project is anchored on the principals that: * Water can be managed as an economic good; * The project must be "demand-driven" oriented meaning, that the prospective end users must be willing and capable to pay for services; * The system will be operated and managed by a private operator. The project design is consistent with the water supply and sanitation policy framework of Cambodia, and finance investments that (i) respond to what consumers want and are willing to pay, (ii) facilitate and develop private sector participation in financing, operating and maintaining constructed facilities, while designing specific instruments that ensure inclusion of low income communities residing in the service areas. 2.2 Public participation Public participation and consultations of the PPUWSSP focused on two main objectives: 1. To assist national and local governments in arriving at a decision to finance the development of their water supply system based on their financial capacity and to select the most feasible management and operation system of the water utility; 2. To encourage user's participation in the selection of a technically feasible water supply system, that is based on their demand/wants and their capacity and willingness-to pay for that desired service. Bearing these principles in mind GHD/FT designed strategies that would promote these principles during the conduct of the Rapid Feasibility Study. Among these strategies are the series of presentation and consultation activities with the different stakeholders at the local level. The areas for consultation and negotiations were focused on the following: * Technical options for the water supply system, the project investment cost, and the required equity contribution; * Cost recovery options and water tariff structure; * Operation and management scheme for the system; and * Project implementation arrangement (Design/Build/Lease) of the water utility. There were two levels of consultations during the feasibility study. The first level was with the local governments (see section 5.1). The second level of consultation focused on for the prospective users in the service areas (see section 5.2). For a Project Town to proceed to full preliminary design, at least 51% of the heads of households living within the Service Area(s) must indicate their support for the new scheme (see section 5.3). AlPMain text (DRAFT) 2-1 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng 3 PROJECT DESCRIPTION 3.1 Service area The proposed service area or the project is shown in Figure 3-1. The service area consists of the town center, market and linear development extending for 1.6 kilometers along NR1. Also residential and other development along roads Intersecting with NR1 within the town. The project will provide piped water supply for a population estimated at 7,091 persons, with service initially to some 51 to 60 percent of the population within the service area at 40 I/cd, increasing to 60 I/cd and serving 90 percent of the population in the service area. Preliminary calculations indicate a required water demand (ADP) of 353 m3/ day. 3.2 Summary of Infrastructure The proposed infrastructure to be constructed for the project is summarized in Table 3-1. The listing is based on the feasibility study, as prepared by GHD/FT. Figure 3-1 shows the layout of the proposed infrastructure. Table 3-1 - Summary of proposed infrastructural works * Groundwater abstraction via deep bores; * The establishment of a treatment plant on the land identified by the District and Commune at the southern extremity of the town. * Treatment comprising aeration and disinfection. * Pumping from the Clearwater tank through a booster pump into the network system serving the town. * Distribution network along the main roads. . A single metered connection provided to each house, where it is assumed that household "water jar" storage will continue to be used. ..l -Main text (DRAFT) 3-1 December 2002 Provincial and Peri-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng Figure 3-1 - Proposed service area and infrastructure (DRAFT) 12 a i~~~I Source GHDIFT, 2002 4IP'Main text (DRAFT) 3-2 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng 3.3 Water quality standards There are currently not yet official water quality standards of Cambodia. In general, the World Health Organization (WHO) guidelines are being applied. Official standards are however under preparation by an Inter-ministerial Committee, with support from WHO. The proposed water quality standards are included in Annex IV, and will be applied for the proposed water supply system. The recommendations are especially important for the Arsenic level. As it seems that the WHO guideline of lOpg/l is unrealistic to apply currently, a (temporary) value of 50pg/l will be proposed for Cambodia. 3.4 Project planning and implementation Prasat is part of a first batch of the PPUWSSP, to be implemented under World Bank financing, through the joint effort of MIME, the PPWSA, and Ministry of Finance (MoF). MIME has the implementation responsibility for the provincial town program. A Project Management Office (PMO) has been established by the MIME in Phnom Penh for directing, supervising and coordinating all day-to-day implementation activities The Provincial Government of Prey Vieng has established a Project Management Unit (PMU) for actual implementation of the water system. The adopted strategy for implementing the water supply systems in the towns is to bid a Design/Build/Lease (DBL) scheme to private operators. Under the DBL scheme, MIME will enter into a contract with a private operator who will be responsible for the design, construction and operation of a cluster of systems. The lease contract is expected to cover a period of fifteen (15) years and will establish the conditions and provisions under which the operator must operate and maintain the water system. After the 15 years contract period, the private operator should turn over the water system in operating conditions to MIME or may enter into a new agreement with MIME to renew the lease contract for a similar period of time. The project construction is expected to commence, after approval of the proposed water charges by the respective beneficiaries, beginning of 2003, with the bidding for the DBL contract and to be implemented over a period of 18 months. The confirmation of the water sources recommended in the feasibility study, particularly the drilling and construction of exploratory/production well, is considered a critical activity. In fact only when capacity and quality of the water sources are confirmed and detailed design can be prepared including any necessary revision in the scheme outlines in the feasibility study. ..I,lP'Main text (DRAFT) 3.3 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng 4 DESCRIPTION OF ENVIRONMENTAL RESOURCES 4.1 Physical resources Topography Prasat is a thriving market town within the Kampong Trabaek District of Prey Veng Province. The town contains the Commune Office. The Chang Ty Chinese school, the Prasat Primary School and the Kampong Trabaek High School are located in the town as well as a health center and the Kampong Trabaek Hospital. The town development is linear with development extending along NR1 and the two significant intersecting side roads. There is an active market at the center of the town and mixed household/industrial enterprises that are also largely confined to the central town area. Residential development extends along NR1 through the town for a distance of 1.6 kilometers. There are three Wats within the town. In geographic terms Prasat is situated on NR1 east of Neak Loeang and 94.5 km by road from Phnom Penh. Prasat, like many of the project towns lies in the middle of extensive cultivated rice fields. It has a developed area of some 55 hectares, largely in the form of ribbon development along the main highway and secondary roads traversing the town. The topography is flat with little variation in level. Geology Cambodia can be divided by 'geological provinces', as shown in Figure 4-1 (ESCAP, 1993). Prasat is located in the Southern portion of the Tongle Sap-Mekong plains. This area, including the great Lake Basin of Tongle Sap and the central valley of Cambodia, were formed by the slight subsidence of the broad central area along northwest- southeast axes in the Quaternary, leading to broad areas of a Mid- to Late-Quaternary cover with a thin to moderate thickness. AIPEMain text (DRAFT) 4-1 December 2002 Provincial and Pen-Urban Water Supply and Sanitation Project Initial Environmental Impact Assessment Royal Kingdom of Cambodia (MIME / PPWSA / WB) Prasat (M19), Prey Vieng Figure 4-1 - Geological provinces R ,PLATEA4U i I- RATAr4A KIRI . 14G1H..ANDS \ YSe ,/\ /E SIEM REAP - STUNG TFENG ---... f A'<oi# '\ \VOLCANO - SEDIMENTARY FOLDu BELT 4*~E~ISRUE PLATEAU 'PAILIN META -- - ' PLATEAU & FOLD BELt tA - WE " SOUTH - EASC DAAT VOLCANI~Si - URSAEAT . _T \KAMPOfl \ S OLCA ._.s . CARDAMOM FOLD 'xQ1 HIGH-LAND I X CjE
Groupe de la Banque mondiale · Environmental Assessment
Cambodia - Provincial and Peri-Urban Water Supply and Sanitation Project (Vol. 16 of 23) : Initial environmental impact assessment report - Prasat (M19)
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Cambodge
Source
Banque mondiale