ENVIRONMENTAL IMPACT REPORT Beijing Environmental Assessment United Company March 2001 ENVIRONMENT IMPACT REPORT Table of Contents 1. Summary.............................................................................................................5 1.1 Project background and retrospect of environmental assessment task...............5 1.2 Evidence .............................................................................................................7 1.3 Assessment criterion and executed classification ...............................................8 1.4 Identification of environment impact factor and selection of assessment factor 14 1.5 Objective of environment protection..................................................................15 1.6 Scope of assessment........................................................................................15 1.7 Degree of environment assessment..................................................................16 1.8 Target and principle of the assessment.............................................................16 1.9 Procedure of assessment..................................................................................18 2 Summary of environment condition of the project area .....................................20 2.1 Summary of natural condition............................................................................20 2.2 Social environment summary............................................................................25 2.3 Classification of environment air quality in Dachang District .............................25 3 Investigation of pollution source in the region ...................................................25 3.1 Investigation and analysis of air pollution source ..............................................26 3.2 Assessment of water pollution source...............................................................27 3.3 Assessment of noise pollution...........................................................................31 3.4 Investigation and analysis of solid waste...........................................................31 4 Summary of the plant ........................................................................................33 5 Analysis on the project ......................................................................................33 5.1 Summary of the project .....................................................................................33 5.2 Project pollution factors analysis .......................................................................93 5.3 Analysis of the change of pollutant discharging amount in the plant area before and after completion of the proposed project..................................................138 6 Current quality status of ambient air and impact assessment .........................142 6.1 Monitoring of current quality status of ambient air and impact assessment ....142 6.2 Pollution Meteorological Features ...................................................................149 6.3 Impact Forecast on Ambient air Quality ..........................................................155 6.4 Impact Assessment on the Ambient air...........................................................170 7 Current Status and Impact Assessment of the Surface Water Environment Quality................................................................................................................... ........................................................................................................................173 7.1 Summary of the Water System in the Assessment Area.................................173 7.2 Current Status Investigation and Assessment of the Surface Water Environment Quality.............................................................................................................174 7.3 Environment Influence Forecast of Surface Water..........................................180 PAGE 2 OF 283 ENVIRONMENT IMPACT REPORT 7.4 Predict result and assessment of surface water environmental effects...........187 8 Existing situation and effect assessment of acoustic environment..................188 8.1 Investigation on existing acoustic environment ...............................................188 8.2 Existing situation assessment of acoustic environment...................................193 8.3 Assessment of the effect of acoustic environment ..........................................196 9 Environment effect analyze for solid waste .....................................................200 9.1 Classification of the solid waste in NISCO ......................................................200 9.2 The yield and utilization of each solid waste in NISCO ...................................200 9.3 The process of comprehensive usage of the main solid waste .......................205 9.4 The storage situation of the solid waste in NISCO ..........................................207 9.5 The effect analyses of the environment pollution by solid waste and the suggestions of the prevention method ............................................................207 10 Environment effect analyses during construction ............................................207 10.1 The analyses of the atmosphere effect during construction period and the control measures ............................................................................................208 10.2 The effect analyses of the construction acoustic environment and the control measures........................................................................................................209 10.3 The effect analyses of the aquatic environment and the control measures during construction period..........................................................................................211 10.4 The effect analyses of the construction refuse and the control measures.......212 11 Analyses and comments on cleaning production ............................................212 11.1 Eliminating the production process and equipment with high consumption and serious pollution..............................................................................................212 11.2 The assessment of the cleaning production for the proposed project .............215 11.3 Compare of main energy consumption and unit consumption of raw material for the proposed project .......................................................................................220 11.4 The analyses of material re-sourcelizing for the proposed project ..................225 11.5 Analyses of discharging index per tone of steel ..............................................225 12 Feasibility analyses of discharging up to standard of pollution source and environment protection measures...................................................................228 12.1 Existing project................................................................................................228 12.2 After completion of the proposed project.........................................................233 13 Gross Control Analysis for pollutants discharging ...........................................238 13.1 Gross control measures for pollutants discharging .........................................238 13.2 Changing of pollutants discharging amount and Gross Control Analysis........239 14 Environmental management and environmental monitoring ...........................242 14.1 Environmental management mechanism and management system...............242 14.2 Environmental monitoring system and rules ...................................................244 15 Analysis for environmental economy profit and loss........................................247 15.1 Analysis of economic returns ..........................................................................248 15.2 Analysis of social benefit.................................................................................250 PAGE 3 OF 283 ENVIRONMENT IMPACT REPORT 15.3 Analysis of environmental benefit ...................................................................250 16 Public participation ..........................................................................................252 16.1 The purpose, function and methodology of public participation ......................252 16.2 The investigation results from questionnaire...................................................252 17 Measures for environment quality improvement..............................................255 18 Conclusion of Environmental Impact Assessment (EIA) .................................259 9. Key points of appraising subjects execution....................................................270 9.1 Environmental conditions in project location and area pollution sources investigation....................................................................................................270 9.2 Project analysis...............................................................................................271 9.3 Current ambient air quality and impact assessment .......................................272 9.4 Current surface water quality and impact assessment....................................275 9.5 Current ambient noise quality and impact assessment...................................277 9.6 Environmental impact analysis of solid waste.................................................278 9.7 Environmental impact analysis in construction period.....................................278 9.8 Analysis and statement of cleaning production...............................................278 9.9 Standard discharging of pollution sources and feasibility analysis of environmental protection measures................................................................279 9.10 Gross control analysis for pollutants discharging............................................279 9.11 Environmental management and environmental monitoring...........................279 9.12 Analysis for environment economy profit and loss..........................................280 9.13 Public participation..........................................................................................280 10 Result submission ...........................................................................................281 11 Organization and division for appraisal ...........................................................281 PAGE 4 OF 283 ENVIRONMENT IMPACT REPORT 1. Summary 1.1 Project background and retrospect of environmental assessment task Nanjing Iron & Steel Group Co.Ltd ( called NISCO for short) is started in 1958. After construction and modification for more than 40 years, NISCO has expended gradually and become a large scale steel corporation, ranking among provincial key enterprises and 520 state key-supported industrial companies as well, which possesses a complete production facilities of sintering, pelletization, coking, ironmaking, steelmaking and steel rolling ,with all matched utilities facilities. The production capacity of 1.8 million tons of iron, 2.4 million tons of steel and 2.1 million tons of rolled products has been formed. The output in 1999 is 1.5 million tons of iron, 1.77 million tons of steel and 1.66 million tons of rolled product, with sale value of 3.757 billion RMB yuan and tax & profit of 0.347 billion RMB yuan. Even though the steel capacity of NISCO has already reached 2.4 million tons, the production equipment and technological process are under the framework of small scale integrated steel enterprise which is setup during planned economic stage. Due to lower equipment capacity, back-wardness of technological process, the product is mainly based on commercial grade of carbon steel and construction grade which has less value-added feature. In addition, market competiveness is not sharp due to lower labor productivity, higher energy consumption, higher production cost and poor economic efficiency. The problem of environmental pollution exists as well. In order to meet the need of national economic construction and NISCO `s development, NISCO urgently needs adjustment of technological process and product mix. NISCO has long time experience of production of plate. The ship plate has already acquired works approval from 8 shipping classification societies. The proposed modern Steckel mill adopts Steckel mill technology of producing plate from coiling process, which is different from traditional discrete plate production. It has the advantage of increase of yield, improvement of quality , less cost, more market competiveness and remarkable economica benefit compared with traditional plate mill. After abolition of the existing technology and devices, NISCO will make its contribution to improve the quality of environment in Dachang District via adjustment of product mix and improvement of pollution treatment measure. In order to start the project, Jiangsu Provincial Planning and Economical Committee has submitted to the National Planning Committee on Application of Prefeasibility Study of NISCO Wide Plate/ Coil Project with annualcapacity of 1 million tons. The National Planning Committee has approved the projection application on 20 Dec. 2000. Nanjing Municipal Environment Bureau and Jiangsu Provincial Environment Bureau has approved the projection application after assessment of Application Table on Environment impact of the proposed Project submitted by NISCO. As per the requirement in the regulation of Constructiive Project Environmental Protection Control, Environment Department of NISCO entrusted Beijing Environmental Assessment United Company to execute enviromental assessment of Wide Plate/ Coil Project of NISCO, and asked Nanjing Municipal Environmental Protection Scientific & Reserach Institute to render support. After site exploitation and data collection, and based on the principle of cleaning production, pollution discharging meeting standard, new project advancing exsiting facillities and polluant PAGE 5 OF 283 ENVIRONMENT IMPACT REPORT total amount control, and environmental assessment guidance, the assessment company compiled Environmental impact Outline of Wide Plate/ Coil Project. National Environment General Bureau sponsored review on the above mentioned Environmental Impact Outline on 21 Sep. 2000, and gave approval on 13 Oct 2000 of reply to Review of Environmental Impact Outline of Wide Plate/ Coil Project of NISCO , with Doc. Release No. 162 (2000) on Envorinmental Supervision. Based on the environmental impact outline and reply to review from authorities, the environmental assessment company completed the Environmental Impact Report of Wide Plate/ Coil Project of NISCO. During assessment progress, we received a lot of support from National Enviromental General Bureau, Environmental Assessment Center, Environmental Office of National Metallurgical Bureau, Jiangsu Environmental Protection Bureau, Nanjing Municipal Environmental Protection Bureau, NISCO's Enviornmental Protection Department and Planning Department. Hereby we express our thanks to all parties invloved. 1.2 Evidence 1.2.1 Environmental protection law, regulation and control document (1) Environmental Protection Law of P.R.China (Release Dec 1989)
Groupe de la Banque mondiale · Environmental Assessment
China - Nanjing Steel Converter Gas Recovery Project (Vol. 1 of 4) : Environmental impact assessment
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale