Groupe de la Banque mondiale · Resettlement Plan

China - Hubei Hydroelectric Project - resettlement action plan (Vol. 3 of 5) : Revised Songshuling Hydropower - Zhushan County

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

RP-56 VOL. 3 Hubei Small Hydropower Development Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan First Draft Zhushan County Resettlement Development Bureau Zhushan Water and Electricity Development Cop.Ltd. East China Investigation and Design Institution June 2000 RAP for Songshuling Power Project Content Objects of the RAP and the Definition of Resettlement Terminology .......................................1 1. General ...................................................................3 1.1. Project Background ....................................................................3 1.2. Project General ....................................................................3 1.3. The scope of project impact and service .................................................................... 4 1.4. measures to reducing the project impact .................................................................... 4 1.5. Project design and review ....................................................................4 1.6. Progress Schedule ....................................................................4 1.6.1. Project Implementation Schedule . ...................................................................4 1.6.2. Implementation Plan for Resettlement ....................................................................5 1.7. Preparation for Resettlement and Monitoring ..................................................................5 1.7.1. Survey for material index ...................................................................5 1.7.2. Social Economy Survey ....................................................................5 1.8. Basis of RAP ...................................................................5 2. Socio-economic Conditions in Project Affected Area . ..........................................................7 2.1. National and Socio-economic Conditions in Zhushan County ................. .......................7 2.3. Basic product and living condition of the households affected by land requisition and relocating ................................................................... 10 3. Project Impact ................................................................... 14 3.1. Reservoir inundated scope ................................................................... 14 3.2. Project Impact Survey ................................................................... 15 3.3. Project affected inventory indexes ................................... ................................ 16 3.3.1. Land Requisition ................................................................... 17 3.3.2. Relocated houses and auxiliaries ................................................................... 18 3.3.3. Affected population by land requisition ................................................................. 20 3.3.4. Chopping down scattered trees ...................................................21.,. , .'.I 3.3.4. Project affected specific frastructures ................................................... 21 3.4. Socio-economy analysis on impaction of the inundated area .............................-........... " 4. Resettlement Policy Framework ................................................... 25 4.1. Policy Basis ................................................... 25 4.2. Rules of Law ................................................... 25 4.2.1. Main relative specifications of"Land Administration Law of the People's Republic of China" ............................................... 25 4.2.2. Specifications of Rules for Compensation of Land Acquisition and Resettlement for Middle and Large Water Resources and Hydropower Projects ....................... ........... 34 4.2.4. Pertinent Regulations of Enforcement Approach of Land Management Hubei Province ................................................. 35 4.3. Policy and Principle of Inhabitant Resettlement .................................. ............... 36 4.3.1. Policy ................................................. 36 4.3.2. Principles ............................................. 37 5. Plan for Resettlement and Restoration ............................................. 38 5.1. Target and Task ............................................. 38 5.1.1. Determination of the level year ............................................. 38 5.1.2. Task of Resettlement ............................................. 38 5.1.2. Resettlement Objects ............................................. 38 5.2. Environmental Capacity Evaluation ............................................. 39 5.3. Overall Plan for Resettlement ............................................. 43 5.3.1. Selecting of the scheme ............................................. 43 5.3.2. Resettlement Means ............................................. 43 5.4. Protecting Plan for Reservoir Area ............................................. 43 5.5. Resettlement Plan ............................................. 44 5.5.1. Production Resettlement Plan ............................................. 44 5.5.2. Plan for Skill Training ............................................. 45 5.5.3. Planning for Resettlement Site ............................................. 46 5.6. Plan for Relocation of Specific Facilities ............................................. 48 5.6.1. Road Rebuilding ............................................. 48 5.6.2. Tractor Road Rebuilding ............................................. 48 5.6.3. Bridges ............................................. 48 5.6.4. Power lines ............................................. 48 5.6.5. Post ray cable line ............................................. 48 5.6.6. Government's door ............................................. 48 5.6.7. Docks ............................................. 49 5.6.8. Mayuhe Power Station ............................................. 49 5.7. Plan for Clearing the Reservoir Bottom ............................................. 49 5.8. Reservoir Developing Plan ............................................. 50 5.9. Forecast of the resettlement production and living level ............................................. 50 6. Budget and Estimation of Land Requisition ............................................. 52 6.1. Base for Budget Prepared ............................................. 52 6.2. Compensation Principles ............................................. 52 6.3. Compensation Criteria ............................................. 52 6.3.1. Compensation for resettlement of the rural area ............................................. 52 6.3.2. Compensation for reconstruction of specific facilities ........................................... 56 6.3.3. Fees for project protection ............................................. 57 6.3.4. Fees for clearing the basin of the reservoir ............................................. 57 6.3.5. Other fees ............................................. 57 6.3.6. Fees for preparation ............................................. 58 6.3.7. Loan interest of the construction period ............................................. 58 6.3.8. Tax ............................................. 58 6.3.9. Overall Estimation of Resettlement ............................................. 58 6.4. Equilibrium analysis for fund using and resettlement fees ............................................ 62 7. Resettlement Implementation Plan ................................................. 63 7.1. Implementation procedures ................................................. 63 7.2. Progress schedule ................................................. 65 7.3. Fund Allocation ................................................. 66 7.3.1. Principles ................................................. 66 7.3.2. Mechanism Responsible for Resettlement Finaciance ........................................... 67 7.3.3. Fund Flow ................................................. 67 8. Institutional Organization ................................................. 69 8.1. Establishing of Organization ................................................. 69 8.2. Responsibilities ................................................. 69 8.2.1. Project leading group for resettlement ................................................. 69 8.2.2. Project Resettlement Office ................................................. 69 8.2.3. Zhushan County Resettlement Leading Group ................................................. 70 8.2.4. Zhushan County Resettlement Office ................................................. 70 8.2.5. Direction house for project of dam building ................................................. 71 8.2.6. Town(ship) Resettlement Group ................................................. 71 8.2.7. Village Committee and Villager Group ................................................. 71 8.2.8. External Independent Monitoring Institutions ................................................. 72 8.3. Staffing ................................................. 72 8.4. Organization Chart ................................................. 75 8.5. Working relation between organization ................................................. 75 8.6. Measures for Enchanting Capacity of Organization ................................................. 75 9. Public Participation and Appeal ................................................. 77 9.1. Public Participation ................................................. 77 9.1.1. Participation in Resettlement Preparation ................................................. 77 9.1.2. Participation in RAP Preparation ................................................. 77 9.1.3. Participation in Implementation of RAP ................................................. 81 9.2. Responding to Grievance and Appeal ................................................. 82 10. Monitoring and Evaluation ................................................. 83 10.1. Internal Monitoring and Report ................................................. 83 10.1.1. Target and Task ................................................. 83 10.1.2. Institution and Staff ................................................. 83 10.1.3. Indicators to be monitored ................................................. 83 10.1.4. Monitoring Procedures ................................................. 84 10.1.5. Reporting ................................................. 84 10.2. External Independent Monitoring Evaluation and Reporting ...................................... 86 10.2.1. Target and Tasks ................................................. 86 10.2.2. Institution and Staff ................................................. 86 10.2.3. Main Indicators to be Monitored and Evaluated ................................................. 88 10.2.4. Monitoring and Evaluation Measures ................................................................ 89 10.2.5. Working Progress ................................................................ 90 11. Preparation Plan for Report ................................................................ 92 11.1. Resettlement Propre ................................................................ 92 11.2. Resettlement Progress Report ................................................................ 92 11.2.1. Periodicity ................................................................. 92 11.2.2. Format of Report ................................................................ 92 11.3. Reporting ................................................................ 92 11.3.1. Periodicity ................................................................. 92 11.3.2. Contents ................................................................. 92 12. Entitlement Matrix ................................................................. 94 Attachment 1: PRC Zhushan county party committee (Notice) Zhushan Office Document, No. 15 .................................................................. 96 Attachment 2: Documents from Zhushan County Water and Power Developing Cop.Ltd..... 97 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan Objects of the RAP and the Definition of Resettlement Terminology This Resettlement Action Plan (RAP) is prepared according to the Laws and Regulations of PRC, and local area as well as the Guidelines of the World Bank (Operational Directive for Involuntary Resettlement OD.4.30). The purpose of this document is to set out an Action plan for the Resettlement and Rehabilitation of the Project Affected Persons(RAPs) to ensure that they will benefit from the project and the standard of living will improve or at least be restored after the Project Impact. Acquisition of land and other assets for the project will adversely affect the livelihood of persons, whose life, work or earn their living on the land that will be acquired for the project PAPs are defined as those persons whose income or livelihoods will be adversely affected by land acquisition for the project PAPs include the following categories: persons who have a title, right, interest , in structures(houses, enterprises, shelters, or public buildings), land(including residential, agricultural, and grazing land) or any other asset acquired or processed, in full or in part, permanently or temporarily. .Persons who use the structures, land or assets described above, or persons whose business, occupation, work, place of residence or habitat adversely affected, or Persons whose standard of living is adversely affected as a consequence of land acquisition. A definition of PAPs is given as below: Affected persons means persons who on account of the execution of the project had or would have there: 1). Standard of living adversely affected;2). Right, title, or interest in any house, land (including premises, agricultural and grazing land) or any other fixed or moveable asset acquired or processed, temporarily, or 3). Business, occupation, work or place of residence or habitat adversely affected, and "affected persons" means individually all those who qualify as "affected persons". PAPs may be individuals or legal persons such as a company, a public institution. Definition of PAPs is not limited to their legal registration or permission to live or conduct business in the affected location, or their title to property. Thus, it includes: a). All those affected by the project regardless of their legal rights or absence thereof to the assets being taken; and b). Persons without residential to live in a certain area. Therefore all such persons who are affected will need to considered and recorded as PAPs, regardless of their legal connection to assets land or location. If there are more than one person, family or household using or holding a title to the same land or property that is acquired, they will be compensated and rehabilitated according to the loss they suffer, their rights, and the impact on their living standards. The definition of the PAPs is linked directly to the adverse effect of the project, regardless of legal rights title or Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan interest. All PAPs entitled to the improvement or at least restoration of their standards of living, and compensation for the material losses they suffer. Compensation for assets will cover replacement cost. No deductions or discounts will be applied to the compensation amount for depreciation or other reasons. All PAPs deriving an economic benefit from the affected land and property are entitled to receive rehabilitation benefits in addition to the compensation for their assets lost. Those PAPs without title, authorization or legal permission to reside, conduct business, cultivate land or contract structures are eligible for rehabilitation of their livelihoods and compensation for their assets on an equal footing with those with formal legal title, authorization or permission to the assets. The term RESETTLEMENT includes: a). The relocation of living quarters; b). Finding acceptable new employment for those whose jobs is affected;3). Restoration (or compensation) of affected production resources such as land, workplace, trees, and infrastructures;4). Restoration of other adverse effect on PAP's living standards (quality of life) through land acquisition (such as the adverse effects of pollution);5). Restoration of or compensation for affected private and public enterprises; and 6). Restoration of adversely affected on cultural or common property. Rehabilitation means: the restoration of the PAPs' resource capacity to continue with productive activities or lifestyles at a level higher or at least equal to that before the project. The objective of this PAP is to provide a plan for the resettlement and rehabilitation of the PAPs so that their losses will be compensated and their standard of living will be improved or at least restored to the pre-project levels. To achieve these objects the plan provides for rehabilitation measures so that the income earning potential of individuals are restored to sustain their livelihoods. Affected productive resources of business (enterprises including shops) and public property Infrastructure and cultural property will also be improved or at least restored to their pre-project levels. 2. Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan 1. General 1.1. Project Background Songshuling Power Station sites in Zhushan County, in the west of Hubei Province, Borden with Shanxi Province on the west and facing Chongqing City on the north, with a total population of 450974 in the end of 1998, and a total land area of 3586.15km2. In recent years, along with the constant improving of living level, the need for power increases quickly. In the year of 1999, the total power using is 960 million kw.h, with a highest day load of 13000 kw. The Zhushan Power net has been connected with Hubei Provincial Power net, in the county, the power source is mainly provided by the small power station inside. The total installed capacity of the small power stations in Zhushan County is 35140kw, but the scale is very small(with a installed capacity of 100O0kw for the biggest power station), and the adjustment ability of the reservoirs is bad, so especially in the dry years, the contradiction between the needing and providing of power is more obvious, and the local production and living was affected, as well as the development of the economy was limited. The switch was usually pulled off, so the dependable power providing was urgently needed to satisfy their living. The installed capacity of Songshuling Power station is 50000kw, which will be the biggest power station in the county after its completion. 1.2. Project General Songshuling Power Station lies at the middle of the Guandu River, which is in Guandu Town in Zhushan County, the dam lies lkm upper the combining site of the Guansu River and its branch, Yangyugou, 40.7km to the combining site of the Guandu River and Duhe River at the lower point, 74km to the county district. The power station is mainly for power producing, as well as for piping, irrigating, aquatic production, shipping, etc.. The drainage area upper the dam of Songshuling power station is 2447km2, the mean runoff of years is 1826 million m3, the normal water retaining is 394m, the total storage capacity is 57.48m3 the backwater length is 19km, with an area of 2.74km, and the storage capacity is 48.2 million m3 under normal water retaining, the coefficient of storage capacity is 1.23%, a reservoir of season regulation. The installed capacity of the power station is 50 MW, the regulate annual eletricenergy production is 153.9 million kw.h, and the annual using time is 3078h, and 19km shipping line will be improved. After being put into operation, it will not only provide electricity for Zhushan County. but also will transmit electricity power to the provincial net. The project was mainly composed by the dam,piping tunnel, power station site, switchyard. The dam is built by concrete, of the type of gravity. The top of the dam is 399.5m, 65.5m for the biggest dam, and 128m for the length of the top. The project requisition involves Guandu, Liulin, Liangjia, three towns, and, Yangpo, Puxi, Taoyuan, Jiazhu, Tianchiya, Liuhe, Daping, Laozhu, 9 administrative villages, 52 households will be relocated, with a population of 216, and the relocating house area is 9889m2, 316.1mu cultivated land and 378.5mu forest land will be acquisition, 5.1km roads, a small hydropower station will be affected 3 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 1.3. The scope of project impact and service Land acquisition for Songshuling Power Station involves Guandu, Liulin, Liangjia, three towns, and Sangping, Yangpo, Puxi, Taoyuan, Jiazhu, Tianchiya, Liuhe, Daping, Laozhu, 9 administrative villages and 18 village groups. The Power Station is for season coordination, with a loading capacity of 50000kw for the machine. After completion, besides meet the needs of power in the local area, power menage will be transmitted to the provincial net. For decreasing the contradiction between the providing and needing of power in the local area, as well as improving the living level, industrial and agricultural production, and stimulating the economical development, the construction of the Power Station plays an important role. 1.4. measures to reducing the project impact Obviously, the project construction is relevant with the land acquisition, house demolishing, the resettlement, and will impact the living condition of the local inhabitant. In order to reduce the number of land requisition, and house demolishing, the design institute has adopted many measures, including the water level choice, permanent structure planning, temporary land acquisition of constructor choice, as could as possible to avoid residential area and cultivated land. To decrease the local impact by construction, following measures will be adopted: Enhance basic data acquisition procedures, analyses on local socio-economic status, and formulate practicable action plans with due consideration of actual situation, thus ensuring that the living standard of the resettlers will not be decreased. According to the actual condition of Kuwei dock, protecting measures will be adopted after survey and discussion, so as to reduce the impact to the interest of the inhabitant possibly. Strengthen internal and external independent monitoring activities, establish high efficient and smooth channel for information feedback, reduce informnation processing period, thus ensuring that problems can be resolved timely. During construction, priority will be given to use local materials such as bricks, sand and gravel, etc., as well as local transportation means and labor force, thus resettlers can obtain benefits from the project. 1.5. Project design and review The project item belongs to the World Bank Loading Item, according to the requirement of the World Bank, the project unit will provide practicable RAP plan for the World Bank to review. 1.6. Progress Schedule 1.6.1. Project Implementation Schedule For the project, the preparation work will be implemented in the second half of this year, and will be implemented at the beginning of next year, the whole work will be completed in 2005, and will be put into operation. The total construction time is four years. For the first installation, the power producing period is three and a half years. 4 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 1.6.2. Implementation Plan for Resettlement According to the implementation progress of the main projects, 52 households, with 116 persons will be resettled. The work is now planned to be done in two groups, for the first group of 35 households with 70 persons, the work will be finished by the end of 2001, and for the second group of 17 households with 46 persons, they will move into the houses ahead the end of 2002. 1.7. Preparation for Resettlement and Monitoring 1.7.1. Survey for material index The surveying work for the material index affected by permanent land acquisition and submerged by the reservior, was field explored and surveyed in the whole affected scope by a "surveying group for land requisition and relocating material index of Songshuling hydropower station project", which was composed by Zhushan County Government, Zhushan County Water and Electricity Developing Company, the County Resettlement Bureau, and was guided by the special oppionter of ECIDI. 1.7.2. Social Economy Survey 1.8. Basis of RAP Land Administrative Law of the PRC Specifications for Planning and Design of Reservior Inundation of hydropower Projects (DL/T.5046-1 996) Rules for compensation of Land Acquisition and Resettlement of Middle and Large Water Resource and Hydropower Projects Land Administrative Regulations of Hubei Province Woodland Administrative Law of Hubei Province Operational Directive OD.4.30, "Involuntary Resettlement" Relative Regulations for Land Acquisition and Relocating in Hubei Province Relative Regulations of Zhushan County Government The Feasibility Study Report for Songshuling Power Station in Zhushan County, Hubei Province The RAP Report for the Project The Contract and Documents entrusted by the Project owners Souci-economy Investigation 5 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan To analyze the affection on the local economy and prepare practicable RAP, the relative organizations were organized by Zhushan government and ECIDI to make socio-economic analysis for the impacted county and town(ship)s. At one side, to survey the affected households, family members, knowledge level, employment and land owning, family income resource of expenditure, and the resettlement means. The investigation group also talked with the local cadres, farmers, househoids, publicized the relative things about land requisition, housing relocation, resettlement and the construction to the local economy development. 6 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan 2. Socio-economic Conditions in Project Affected Area 2.1. National and Socio-economic Conditions in Zhushan County Zhushan County lies at the northwest of Hubei Province. By the end of 1998, it has 10 towns, 15 townships, 486 administrative villages, 3213 village groups, and 8 residential committee, with a population of 450974, 398894 for agriculture, accounting 88.45% of the total. The birthrate of the county is 8.4%%, 5.2%% for nature. The labor force in country is 186811 persons, with a population density of 126 person/km3. The total land area of the county is 526155mu, the mean cultivate land is 1.32mu per capita. The average product of grains is 397kg/mu, the mean income of the farmer is 1471 yuan every year. The GNP of the county is 1395.5552 million yuan, 596.14 million yuan for agriculture, accounting for 42.7% of the total, and 746.25 million yuan for industry, accounting for 53.5% of the total, 46.22million yuan for construction, accounting for 3.3% of the total, 6.01 million yuan for post work, accounting for 0.43%, and 935200 yuan for other assets, accounting for 0.01% of the total income. The county is at the northwest of Hubei Province, belongs semitropical and monsoon area, with warm weather and enough rainfall. The average annual rainfall is 836.3mm, and the average annual temperature is 15.5C, and the average annual wind speed is 0.8m/s. In the whole county, the mountains are continuos and the higher ones are sticking out, thus form lines of hills and valleys, and makes advantage water resource for the local place; the land resource in the county is also abundant, but hilly land takes a main part, and during 1960 to 1980, trees cutting was serious, so that series of soil erosion was made. After many years' protecting, some places are still not restored. But the plant covering is good and suitable for the growing of plants, rice, wheat and corn are popular in the local place, two times a year. Souci-economic condition for the place submerged and for resettling Sonfshuling Power Station locusts in Jiazhu Village, in Guandu ToWn, the reservoir feedback is 19km, with an area of 2.74km2. Continuos hills surrounded along the two sides of the reservoir, and the riverbed appears like V. The rock system along the river is complete, with high intensity and high ability against efflorescence as well as cliff shape. The slope aside the reservoir bank is basically stable, at the front of the bank, the rocks are sticking out. In the whole reservoir area, the hills are continuos, rising and falling and crossing each other, and the altitude of them are above 700m, along the two sides, the vegetation is developed, generally, the villages local more than 400m altitude; on the right bank, the fourth level road crosses the reservoir along the river, upper the dam site, Liangjia Township road connects with the other bank; in the early 40-50, shipping in the river is possible, but since years' silting up on the riverbed, shipping is basically not smooth at present. However, connecting with the other side of the river, there are three ferries, a chain bridge and a bridge on Liangjia road, so the transportation is convenient in a whole. According to the feasibility design report and knowledge from relative departments, no valuable minerals was submerged by the reservoir; and no developed dissolving tunnel or concealed river was found, the mountains are solid, so generally, no seepage will happen after the project completion. Moreover, no valuable cultural relics or historic site was found. In the 8 villages submerged by Songshuling Power Station, the cultivate land per capita is 7 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan 2.02mu, and 11.25mu for woodland per capita. The land resource is abundant overall, and the hilly land is wide, however, the dry land accounts for 89.8% of the total, the grain land per capita in 1999 is 359kg. The basic economic condition in 8 villages of Guandu, Liulin and Liangjia Town is detailed in Table 2-1, 2-2, 2-3, and 2-4. Tables on basic statistics of the town(ships) affected by reservoir submerge Table 2.1 Population Cultivated land (um) Cultivat TonVillage Group lan-Toa ln od- woodlan pure (ship) hold d Total Agricultu Total Paddy Dry land per land d (mu) income populatio re area land capita n Guandu 17 100 3204 13788 11805 17352 2864 14488 1.47 120000 10.2 1485 Liulin 11 55 2365 9226 8538 18000 632 17368 2.10 35200 4.12 1295 Liangjia 7 29 1334 6079 5904 9951 1110 8851 1.69 110000 18-6 1430 Total 35 184 6903 29093 26247 45303 4606 40707 1 .75 265200 10.1 1410 From Table 2-1, the agricultural land per capita is 1.75mu, and woodland per capita is 10.1mu, net income per capita is 1410 yuan. The agricultural land per capita is 31% higher than that of the whole county, and net income per capita is 4. 1% lower than that of the whole county, so the overall level is a little lower than the whole county. Basic statistics on 8 villages affected by reservoir submerge Table 2-2 Number Population Cultivate land Cultivate Wood- Cultivate Pure Village Number of Total land per land land per me of group house- .Agricultu Total Paddyv per . hold populatio re area land Dry land capita (mu) capita capita Sangping 5 141 625 625 918 101 817 1.47 5300 8.48 1321 Yangpo 5 93 374 374 1291 31 1260 3.45 5700 15.24 1363 Guandu Puxi 5 136 679 675 1090 66 1024 1.62 18000 26.7 1203 Taoyuan 7 157 655 655 1425 40 1385 2.18 16000 24.4 1352 5 101 396 396 921 9 812 2.32 1387 3.50 1338 Liulin Daping 4 135 537 537 1300 35 1265 2.42 1150 2.14 1465 Laozhu 4 79 331 331 819 19 800 2.47 1250 3.78 1111 .lianglia Tianchiva 5 247 1081 1081 1669 100 1569 1.54 3800 3.52 1500 Total 40 1089 4678 4674 9433 401 8932 2.02 52587 . 11.25 1356 From Table 2-2, the cultivate land of the 8 administrative villages is totaling 9433mu, and 2.02mu for per capita; woodland is totaling 52587mu, 11.25mu for per capita, and the net income per capita is 1356 yuan. The cultivate land per capita is 53% higher than that of the 8 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan whole county; the net income per capita is lower than that of the whole county Employment status statistics for labor forces affected by reservoir submerge Table 2-3 Labor force employed Labor force for Industrial Outgoing labors Administra agriculture transportat tive Total labor Among Hilly and ion and Otherjobs Remarks villages force them; Planting livestock business In the Outside women serviceprvnePoic Sangping 169 67 70 20 11 68 30 47 Since that the working Sangping 169 67 70 20 68 30 47 period of the outgoing Yangpo 70 27 36 21 3 10 10 24 labors maybe long or Yangpo 70 27 36 21 3 10 10 24 ~~~~short, all of them have been counted in the Puxi' 131 33 115 8 3 5 15 45 total labor force. Taoyuan 240 109 210 10 20 12 35 Liuhe 205 90 153 30 6 16 15 16 Daping 270 120 145 75 10 40 16 25 Laozhu 108 45 67 18 3 20 10 10 Tianchiya 362 111 309 20 13 20 53 123 Total 1555 602 1105 202 69 179 161 325 From Table 2-3: of all the labor force in the 8 administrative villages, 71% of them are for planting, 13% of them are for hilly livestock, only 16% are for non-agriculture. And of the total labors, 486 persons have been out for working(325 out the province, 161 in the very province) Economic proportion of the affected 8 villages in 1999 Table 2-4 Construction Business and Ohr Administrative Planting Forest Industrvi and serviceOthers villages Total income (EJ) (EO) (El) transportation (EO) Sangping 173.40 49 4.6 28 4 2.3 12.1 Yangpo 110.00 30.1 21.3 18 30.6 Puxi 168.90 40.4 15 21.4 3.2 20 Taovuan 190.04 47.7 14.1 23.4 1.6 2.6 10.6 Liuhe 110.60 65 15 4.5 9 6.5 Daping 163.00 55 6.3 6.2 20.9 11.6 Laozhu 76.00 43 13 6.6 37.4 Tianchiya 325.75 54 6 15 5 2 18 From Table 2-4: the economic proportion in the 8 administrative villages is as following: (1). 9 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Planting and growing accounts for 48%;(2). Foresting income accounts for 11.9%; (3). The other income accounts for 40.1 %. According to the material index survey, of the 8 administrative villages, land acquisition affect Sangping, Yangpo, Puxi, Taoyuan, Tianchiya, five villages, for the other villages, only involves resettlement and housing relocating. Of the 5 villages affected by land acquisition, by the end of 1999, the cultivate land per capita is 1.94muz woodland per capita is 15.47mu, net income of the villagers is 1365 yuan. Of the total economic income, planting accounts for 45.1%,foresting accounts for 10.8%, industry accounts for 28.9%, transportation accounts for 2.7%, business and service accounts for 2.1 %, and 10.4% for the other items. 2.3. Basic product and living condition of the households affected by land requisition and relocating Land requisition of Songshuling Power Station involves three towns or townships, including 8 administrative villages and 17 village groups. From the main affected households, 51 sample households have been selected for survey, with 227 persons(14 from non-agricultural resident), who were from all of the affected villages and groups. From the survey: Employment status: of the 51 households, laborforce 145 persons(including 64 women), 68 for agricultural product, accounting for 47% of the total, of who 33 persons have gone out for working, accounting for 22%, 21 persons for business and service, accounting for 14% of the total. Land contracting status: the total land contracted of the 51 households is 968.36mu, of which 325.96mu for cultivate land, 4.27mu land per capita, and 1.436mu cultivate land per capita, the mean grain per capita is 376kg. House area: according to survey from sample households, the house area per capita is 46.2m3, of which civil and wood structure accounts for 37.9%, brick and wood structure accounts for 28.5%, stone and wood structure accounts for 15.5%, brick fixed structure accounts for 10.1 %, grass and wood structure accounts for 3.1 %. The house land per capita is large, mainly due to the large house land per capita at the dock of Liulin Township, tail of the reservoir, with a house land per capita of 59m2. The economy there is relatively developed, the shops there stand in great numbers, and many people passing there. Moreover, it has convent traffic, just a transporting stop for entering and outgoing. The house land per capita in other town(ship)s is 36m2 about. Income: for the 51 sample households, the total income in 1999 is 1.148 million yuan, of which (I) agriculture,269000 yuan, accounts for 23.4%;55000 yuan for industry, accounts for 4.7%, (3). 92000 yuan for traffic, accounts for 8%; (4). 355000 yuan for business and service, accounts for 30.9%;(5). For outgoing work,257000 yuan, accounts for 22.4%;(6) 112000 yuan for other income, accounts for 8.9%. The net income is 2989 yuan. infrastructures and others: In every administrative village, there are primary school, hospital, shops and auxiliaries. At present, 90% of the villagers have got power, and 50% of them have used running water(which is drawn down from the mountain, but there are still two villages without roads. The production, management and present economy of the 51 sample households is Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan detailed in Table 2-6, and basic condition is shown in Table 2-7. 11 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Production and present economy of the households relocated by Songshuling Power Station land acquisition Table 2.6 No. Name Unit Total Liulin township Guandu Town Loansia Sub-total Liuhe Daping Laozhu Sub-total Sangping Puxi Taoyuan Yangpo Tianchiya I ample household Flousehold 51 22 20 1 1 28 16 9 1 2 1 2 otal population Person 227 100 87 7 6 120 72 36 4 8 7 3 abor force Person 145 66 55 6 5 75 46 23 2 4 4 emale Person 64 30 27 1 2 32 19 9 1 I 2 4 and contracted Mu 968.36 303.3 287.3 6 10 625.06 188.26 242.8 60 134 40 ultivate land Mu 325.96 81.8 65.8 6 10 229.66 90.06 119.6 6 14 14.5 5 umbers for non-agriculture Person 68 39 34 4 1 28 18 8 2 1 mong them: industry Person 10 9 9 1 1 raffic Person 4 3 1 2 I rading Person 21 13 12 I 8 4 3 i utgoing business Person 33 14 12 I 1 18 12 5 1 6 otal income Yuan 1148140 749200 571800 160400 17000 386740 221540 135100 11800 18300 12200 mong: agriculture Yuan 269090 86200 77800 6400 2000 176690 96790 62300 9800 7800 6200 ndustry Yuan 55000 49000 49000 6000 6000 raffic Yuan 92000 92000 12000 80000 rading Yuan 355100 292500 222500 60000 10000 62600 31600 31000 utgoing business Yuan 257000 181000 162000 14000 5000 76000 50000 22000 4000 6000 ther income Yuan 112400 47000 47000 65400 37100 19800 2000 6500 7 amily income per capita Yuan 2989 4431 3940 13828 600 1813 1875 1788 1650 1456 2545 12 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan The basic present living condition of the resettlers Table 2.7 Items Unit 8 villages Remarks I DCultivate land per capita Mu/person 1.436 20DHouse land per capita m3/person 46.2 (I)Proportion of fixed brick % 10.1 (2)Proportion of brick and wood _ ___ 28.5 (3Proportion of stone and wood % 15.5 (4)Proportion of soil and wood % 37.9 In every village, there are primary school. (5)Proportion of grass and wood % 3.1 hospital and shops with auxiliaries, and most of them are near to the villagers' houses. (6)Proportion of simple structure . 4.8 30Grain production per mu kg/mu 376 40Grain per capita for agricultural kg/person/year 545 persons 50Net income for agricultural persons Yuan/person 2989 60Present labor Person 145 70Traffic condition Two of the eight villages(Yangpo. Puxi) still have no roads 8 [Power providing 90% of the resettlers have used electricity power 9n Water drinking 50% of the resettlers used running water. 13 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resenlement Action Plan 3. Project Impact 3.1. Reservoir inundated scope The normal water level of Songshuling Hydropower Station is 394km(as Huanghai sign), from the dam to the end of the feedback water the length is 19km; and the area of the reservoir is 2.74km2. According to "Design Standard for Reservoir Inundation" and the "Prospecting Table for Water Feedback of Songshuling Power Station", which was provided by Hubei Province Water and Electricity Design and Institute on April 24, 2000, and combining with the actual condition of the reservoir area, the designed flood standard of reservoir submerge is as following: A.For the country residential district, enterprises or department, roads, bridges, power frastructures, telegram frastructures, the flood feedback line will be deternined according to once twenty years(p=5%); B. For cultivate land garden land, it will be ascertained according to once five years(p=20%); C. For woodland, it will be disposed as normal water level; D.To ascertain the tail of the reservoir, the crossing cut down scale, which has the same frequency and lower within 0.3m at the water level, will be defined as horizontal intending place. At the front of the dam, considering the impact of wave and wind, the survey level of p=5% section will be added Im, and 0.5m will be added to p=20% section, so as to ensure the safety. The feedback water survey result of Songshuling Hydropower Station area is detailed in Table 3-1. Water feedback level and survey level Table 3.1 unit: m Distance Relocatn l 5 Cultivate land requisition border No. Section Place between Total Relocating line(p=5/) (p=20%) number t distance Natural Feedback Surveying Natural Feedback Surveying level level level level level level I 0+000 Dam 361.7 394.0 358.8 394.00 2 368.93 394.16 3. 365.95 394.00 39450 980 3215 395.00 394.50 3 3+215 370.64 394.21 368.64 394.00 1510 4725 395.00 394.50 4 4+725 373.42 394.37 370.72 394.00 2235 6960 395.00 394.50 5 6+960 376.85 394.45 374.95 394.01 1 1 1785 8745 395.00 394.50 6 8+745 3379.85 394.63 378.10 394.01 2365 11110 395.79 .94.50 7 11+110 385.46 396.92 383.97 394.07 _2400 13510 396.93 -394.50 8 13+510 392.45 396.94 390.57 394.16 _ 1 2155 15665 - 397.72 _ _ . 395.53 9 15+665 Lower Longbei bend 395.6 398.5 394.39 396.90 _ 3335 19000 401.23 . 399.51 10 19+000 403.96 403.96 6 402.10 402.11 19+000 ___ _3 __914 402.11 1 4 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Land occupied by Project and for construction includes dam, station house, switchyard, power management house, fill land, workers' living district, and temporary road for construction, etc, According to "Project construction plane figure of Songshuling Power Station", after inventory survey, for permanent or temporary use, 150mu land was required, among which 80mu woodland was requisitioned. The land occupied above all belongs to Jiazhu Village, in Guandu Town. By the end of 1999, the village has 212 households, with a total population of 880 persons(all agricultural residence), 1142mu for cultivate land(196mu for paddy land, 946mu for dry land), cultivate land per capita is 1.3mu, generally no cultivate land was impacted by the project. And there are 2100mu woodland in the village, with 2.4mu per capita. After land requisition, the woodland per capita is 2.3mu, only 0.1mu less than that before land requisition. And during the construction period of four years, the village can take advantage of its special geography part, develop some service business, and make out advantage condition for the economy development, so the project construction has little impact to the village. In 1999, the net income of Jiazhu Village is 1349 yuan. 3.2. Project Impact Survey In the first ten days of April, 2000, the inventory index survey work was carried out by a "Inventory Index Survey Group Impacted by Songshuling Project", under the leading of Zhushan County Government which was composed by Zhushan Water and Electricity Development Cop.Ltd.. Zhushan Resettlement Bureau, ECIDI, and with the support of the survey members of the project group, in Zhushan Hydropower Bureau. The survey group surveyed the affected inventory data and the local national economy materials, developing scale. And the survey group entered the inundated area, project occupied land and temporary land for construction to make survey house by house. With the support of the cadres in relative town(ship) or village cadres, the survey work lasted half a month, and the survey result have been ensured by the relative town(ship)s, the main contents and means is as followings: Population Investigation: Based on the actual population in 1999. and make an administrative village or group as an unit, investigate the population in the affected area house to house according to agricultural and non-agricultural ones. Land investigation: according to the actual conducted height, measured the land by different villages, groups, and households and by different categories (cultivate land. garden land. woodland and house site). House investigation: taking an administrative village or a group as a unit, measured the house affected or inundated by households and structures(fixed brick, brick and wood, stone and wood, soil and wood, grass and wood, simple house), the land area was also calculated. Specific frastructures investigation: investigated and measured and remarked the roads, bridges, power lines, telegram lines, docks, etc, affected by the project. Collected the economy calculation yearly report and the local development schedule of the relative town(ship)s, villages, and groups in 1997,1998,1999. 15 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 3.3. Project affected inventory indexes The affection of land requisition for the project involved 3 town(ship)s, 9 administrative villages, 18 village groups, 52 households with 214 persons, 9889m2 for houses relocated; 316.1mu for cultivate land was requisitioned, 378.5mu for woodland was requisitioned, 22.74mu for house site was requisitioned; 397 scattered trees and 1891 other trees were cut down; submerge affected roads 5.lkm, tractor roads 0.85km, power lines 4.4km, ray cable line 6.26km, two bridges, a small hydropower station. The detailed inventory indexes is shown in Table 3-2. Inventory indexes of land requisition and housing relocation for Songshuling Power Staten Table 3.2 Among No. Items Unit Total Guandu Liulin Liangjia 1. Administrative villages 8 4 3 2. Village groups 17 9 6 2 3 Relocated households Household 52 26 22 4 4. Relocated population Person 214 107 100 7 Agriculturelnon-agri- Person/per 200/14 103/4 90/10 7/ son 5. Land Mu O Registered cultivate land Mu 316.08 301.58 14.5 Paddy land Mu 51.78 51.78 Level land Mu 173.9 171.4 2.5 Hilly land Mu 90.4 78.4 12 ,, Non-registered cultivate land Mu 29.7 25.7 4.5 Paddy land Mu - - Level land Mu 14.7 10.2 4.5 Hiliy land Mu 15 15 m Wood land Mu 298.5 295.5 3 Timberland Mu 24 24 Economy forest Mu 74.5 71.5 3 Shrubs Mu 200 200 P roject occupied land or land Mu 80 80 for construction nL House site M3 22.74 7.65 13.68 1.41 6. Housing construction area M3 9889 3319.7 5941 628.3 _! Brick fixture M3 999.14 228.54 770.6 n Brick and wood M3 2822.3 24.2 2798.1 0 Stone and wood M3 1534.7 185.3 1349.4 O Soil and wood M3 3743.07 2330.87 896 516.2 E Grass and wood M3 314.53 314.53 0 Simple house M3 475,62 236.62 126.9 112.1 16 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 7. Auxiliaries El Sunning ground(soilUconcrete) m3/ m3 1062.46 870.46/167 162/105 30/ El Shed for pig or cow 49 30 1 8 D Well 4 I 2 O Water power [: Pond 14 2 II El Toilet 50 28 21 L Cooking range 50 26 23 L Enclosing wall M3 76 10 66 1: Tomb 16 16 L Running water 13 6 6 1 LI Cable TV Set 17 4 13 O Telephone Set 10 10 L Cellar 12 II 8. Scattered trees L Fruit trees 397 361 14 22 El Complex trees 1891 1491 400 9. Water and power frastructures O Hydropower station SetlKW 1/1000 _ Transmission lines(low Pole/km 4.4 ____voltage) 10. Specific frastructures O Ray cable line Pole/km 6.25 I. Traffic km l County or town(ship) road km 5.1 Tractor road k 0.85 12. Bridge m l Lianglia Bridge m 95 LI Chain Bridge m 9() 14. Dock 3 15. Govemment's door 3.3.1. Land Requisition Land occupied by project permanently and for temporary construction, and cultivate or wood land requisitioned for reservoir involved 10 village groups of 6 administrative villages, only in Jiazhu Village, 80mu shrub land was affected; the project cultivate land requisitioned was totaling 315.lmu(51.8mu for paddy land, 264.3mu for dry land), and 378.5mu for woodland(timberland 24mu, economy land 74.5mu, shrub 280mu). The project occupied land is detailed as different categories and groups in Table 3-3. 17 Hubei Province Hvdropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Songshuling Power Station land requisition Table 3.3 Adminis- V Popula- Cultivate land (mu) woodland (mu) Town(ship) trative Vilage Househol tion villages groups ds (person) Sub-total Paddy Dry land Sub-total Timber Economy Shrub land land land 1 17 62 34.5 9 25.5 35 7 3 25 4 15 54 30.8 8 22.8 30 7 3 20 Sangping 5 2 7 2.7 2.7 X 5 5 Sub- 34 123 68 19.7 48.3 70 14 6 50 total__ _ _ Yangpo 1 15 46 51.5 20 31.5 70 70 Guandu 1 20 72 55 5 50 35.5 5 20.5 10 uarn Puxi . 2 18 55 66.1 6.1 60 76 3 43 30 Sub- 38 127 121.1 11.1 110 111.5 8 63.5 40 total _ _ I 11 35 40 1 39 24 2 2 20 Taovuan 6 8 21 20 20 20 1 20 Toun Sub- total 19 56 60 l 59 44 2 2 40 Total 8 106 352 300.6 51.8 249.8 295.5 24 71.5 200 Liangiia Tianchiya 3 1 4 14.5 14.5 3 3 tow nship I_ _ _ _ _ __ _ _ _ _ _ _I__ _ _ _ _ Jiazhu (project and construction) 3 80 Total 9 107 356 315.1 51.8 264.3 378.5 24 74.5 280 3.3.2. Relocated houses and auxiliaries 2 Songshuling Power Station will relocate house area of 9889m , among them brick fixture 999.12, brick and wood 2822m2, stone and wood structurel543m2, soil and wood structure 2 ~~~~~~~~~~~~~22 3743m2, grass and wood structure 314.5m simple houses 475.6m-. The details are shown in Table 3-4 in villages and groups. 18 Hubei Province Hydropowver Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Songshuling Power Station Project Land requisition and housing relocation Table 3.4 Town(ship)s Administrative Gto houscholds population houses among them (m 2) Adminvillages Groups households population (M 2) Brick and Stone and Soil and Grass and Simple Brick fixture wood wood wood wood houses l 4 24 1114.2 350.5 553.7 55 120 35 2 l 5 291.9 125F16 123.3 25 18 Liuhe 4 I 5 37.5 37.5 Liu.in township 5 14 53 2627.3 450 1540.6 126.4 618 47.8 Liulmn township Sub-total 20 87 4070.9 770.6 2255.1 181.4 763 100.8 Daping 2 1 7 210(.9 184.8 26.1 Laozhu 4 . 6 1659.2 358.2 1168 133 Total 22 1O0 5941 770.6 2798.1 1349.4 896 126.9 1 7 24 890.2 86.5 24.2 677.5 102 Sangping.4 5 19 772.6 677.1 95.6 Sangping 5 I 6 24.2 _ 24.2 Sub-total 13 49 1687 86.5 24.2 1378.8 197.6 1 2 10 131 _ 131 Yangpo 2 I 6 102 55.4 46.6 Sub-total 3 16 233 186.4 46.6 Guandu town 5 21 445.1 142 153.1 150 Puxi 2 4 17 854 32.2 543 267.5 11.3 Sub-total 9 38 1299.1 142 185.3 693 267.5 11.3 l l 4 72.7 72.7 Taoyuan 6 27.7 . 27.7 Sub-total 1 4 100.4 72.7 27.7 Total 26 107 3319.7 228.5 185.3 2330.2 314.1 236.6 l 3 400 315.9 84.1 Liangjia township Tianchiva 3 I 7 228.3 200.3 28 ._________ Sub-total 4 7 628.3 516.2 12.1 Total 52 214 9889 999.1 2822.3 1534.7 3743.1 314.5 475.6 19 Hubei Province Hydropowver Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan The auxiliaries of the project is as followings: shed for pigs and cows 49, four wells, 14 ponds, 50 toilets, 50 kitchen ranges, enclosing wall 76m , 50 tombs, running water of 13 households, cable TV of 17 households, 10 telephones, 12 cellars. The detail is shown in Table 3-5 in-groups. Auxiliaries of relocated constructures for the project Table 3.5 Shed unninuni Town dministra for pigs g ~~kitchen nclosi gunaie Cable Tele- Town dministr tGro for pigs gn wells ponds toilet ng wall tombs cellars tv phone (ship) tive village and ground ranges (m) house croup (m2) holds) (set) (set) 2 45 1 4 4 15 2 2 2 2 1 15 I I _ l Liuhe 4 1 25 l I 1 8 Liulin 5 12 158.5 1 3 14 15 33 2 3 8 6 _______ Total 16 243.5 1 6 19 21 66 2 5 12 9 Daping 2 1 4 I I I Laozhu 4 1 23.5 1 I I_ Total 18 267 1 I 21 23 66 4 6 13 10 9 13505 1 6 6 5 5 3 Sangping 4 5 124 1 5 4 10 15 4 5 5 98 1 . .____ Sub-total 15 375.5 _ 1 12 I I) 20 5 3 4 2 45 2 2 _ _ Yangpo 2 1 55 ; 1 1 l 1 18 I Sub-total 3 95 3 3 18 2 Guandu 1 6 105 I 4 4 2 _ Puxi 2 4 100 4 3 _ Sub-total 10 205 1 8 7 3 3 2 108 -1 4 I Taoyuan 6 - - 4 4 Sub-total 2 108 _ X 8 0370 _ _ Total 30 5 1 2 28 26 10 46 lI 6 4 Liangjia _ Town- Tianchiya 3 1 30 l l I I _ I 1 ship Sub-total I 30 I I I I lI I I = Total 49 1062.51 4 1 14 1 50 50 76 1 50 12 13 17 1 3.3.3. Affected population by land requisition The project land requisition affected 17 village groups of 3 town(ships). with 379 households, 1708 persons. Among them, 52 households with 214 persons was relocated, accounting for 12.5% of the total; 107 households were affected by land acquisition. with 356 persons. accounting for 20.8% of the total; 28 households were for land requisition and housing relocation, with 114 persons, accounting for 6.7%. The detail is shown in Table 3-6 in village group. 20 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Project affected inventor indexes Table 3.6 Total among them Town dministra group Only relocating house Only of land For house relocating (ship) tive village House- Popula- O requisition and land requisition hold tion household Population Household Population Household Population l 30 114 4 24 2 26 88 1 5 Liuhe 4 18 71 1 5 5 18 83 14 53 LIuin Sub-total 92 356 20 87 Daping 2 27 114 1 7 Laozhu 4 79 331 1 6 Total 198 801 22 100 1 30 133 7 24 17 62 7 24 Sanpn 4 20 91 5 19 15 54 5 19 Sangping 5 28 126 1 6 2 7 1 6 Sub-total 78 350 13 49 34 123 13 49 1 15 93 2 10 15 46 2 10 Yangpo 2 27 128 1 6 1 6 Guandu Sub-total 42 221 3 16 15 46 3 16 town 1 45 218 5 21 20 72 5 21 Puxi 2 17 107 4 17 18 55 4 17 Sub-total 62 325 9 38 38 127 9 38 32 136 1 4 11 35 1 4 Taoyuan 6 48 201 1 8 21 Sub-total 80 337 1 4 19 56 1 4 Total 262 1233 27 107 106 352 27 107 Liangiia 1 51 222 townsgia Tianchiya 3 66 253 1 7 1 7 1 7 Sub-total 117 475 4 7 1 7 17 Total 379 1708 52 214 107 356 28 114 3.3.4. Chopping down scattered trees For the project, 2288 scattered trees were chopped down, 397 for fruit trees, of which most are peach trees, plum trees, pear trees in front of or behind the villagers' houses; and 1891 trees of complex ones. The detail is shown in Table 3-7. Project affected scattered trees Table 3.7 Among them No. Items Unit Total Guandu Liulin Liangiia I C Fruit trees Plant 397 361 14 22 2 C Complex trees Plant 1891 1491 400 3 C Total Plant 2288 1852 14 422 3.3.4. Project affected specific frastructures The project affected telegram lines of 6.25 pole km, road of county and township 5.1km, tractor road of 0.85km, a small hydropower station, installation of 10OOkw, electric power line 21 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan of 4.4 pole km, two bridges(one is a bridge on the road of 95m, the other is chain bridge of 90m), three docks, . the detail is shown in Table 3-7. Inventory indexes of project affected specific frastructures Table 3.7 No. Items Unit Total 1[1 Communication frastructures Telegram line(ray line) Pole km 6.25 11G Traffic Km 1 U County or township road Km 5.1 2 0 Tractor road Km 0.85 III1 Bridges M I Liangiia Bridge M 95 20 Chain bridge M 90 IV[ Water and electricity frastructures I U Hydropower station Set/KW 1/1000 2D Transmission line Pole km 4.4 VD Docks 3 VID Government's door I 3.4. Socio-economy analysis on impaction of the inundated area Affection of inundation involved Sangping, Yangpo, Taoyuan, Puxi, four administrative villages in Guandu Town, Liuhe, Daping, Laozhu, three administrative villages in Liulin Township, and Tianchiya, an administrative village in Liangjia Township, totaling 17 village groups were affected. The 8 administrative villages has a population of 4678, 216 of them would be involved in relocation, accounting for 4.6%, and production resettlement population is 176 persons, accounting for 3.7%. The number variation of cultivates land and woodland after land requisition of the villages is shown in Table 3-5. The land requisition is shown in Table 5-1. Contrast of cultivate and woodland before and after inundation 22 Hubei Province Hvdropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Table 3-5 Administra Cultivate Rest cultivate land Administra .Woodlanld tviles Cultivate Woodland land requisitione Cultivate Rest villages land area area requisitione d land after Cultivate land woodland d___________ requisition per capita Sangping 918 5300 68 70 850 1.36 5230 Yangping 1291 5700 51.5 70 1239.5 3.31 5630 Puxi 1090 18000 121.1 111.5 968.9 1.44 17888.5 Taoyuan 1425 16000 60 44 1365 1.93 15956 Liuhe 921 1387 921 2.32 1387 Daping 1300 1150 1300 2.42 1150 Laozhu 819 1250 819 2.47 1250 Tianchiya 1669 3800 14.5 3 1654.5 1.53 3797 Total 9433 52587 315.1 298.5 9117.9 1.95 52288.5 From the Table above, of the 8 affected administrative villages, the cultivate land and woodland of Liuhe, Daping,Laozhu wasn't affected, meanwhile, the cultivate land per capita of the other five villages was 1.95mu after land requisition, and Sangping village got the lest per capita, 1.35mu.Puxi was most affected by project cultivate land requisition, which accounting for 11.1% of the total; Sangping village was most affected by the project woodland requisition, which accounting for 1.3% of the total. In another word, after project construction, part of the land was acquisition, but the basic grain ration can be ensured. Overall, project land requisition had little impact on the 8 administrative villages. The loss of project cultivate land requisition will be analyzed in Table 3-6 by proportion of the yearly total income. (take 1999 as an example). Loss proportion of the total income(1999) Table 3.6 oTotal cultivate Mean Requisitioned Loss of land Total income Proportion of total Town(ship) land(mu) production cultivate land requisition (I 0000 yuan) income Sangping 918 320 68 2.7 173.4 1.55 Yangpo 1291 230 51.5 1.5 1t0 1.36 Puxi 1090 332 121.1 5.0 168.9 2.96 Taoyuan 1425 350 60 2.6 190.04 1.37 Tianchiva 1669 468.1 14.5 0.8 325.75 0.5 Total 6393 349.2 315.1 19.8 968.09 2 Due to land requisition and housing relocation, the formal production system was damaged at different degree, thus affected the local place. First of all, grain will be reduced about 101 tons annually due to the loss of resource; but Songshuling reservoir area is in the mountains far away, where the economy develops slowly with the long period limitation of nature surroundings, at the same time, for agriculture production, because of the inferior soil quality and lack of fund, farmers invest little on agriculture production thus the formal living level was comparatively low, and the project construction provides a chance for rebuilding the 23 Hubei Province Hydropower Project Zhushan County Songshuling Hvdropower Station Resettlement Action Plan production system as well as the sociality system. The nature resource shall be fully developed and the latent power of land resource shall be tapped, thus to make a overall design on the present land resource, make cultivation suitable and specification suitable, advocate hilly land changing into ladder shape, dry land changing into paddy land, and improve the land with low production to increase the quality of land, and make conditions for the farmers to learn and train, implement scientific management, prepare RAP after careful investigation, resettle at the place with the wonderful traffic and social condition, and provide favorable measures on policies, technical, funds, m materials so as to produce conditions for the resettlers to restore the formal living level or get a better living ability. 24 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 4. Resettlement Policy Framework 4.1. Policy Basis Main legal and policy bases for requisition and resettlement of the project: A. Land Law of the People's Republic of China (passed by the plenary meeting of the 16th 6th oJueth session of the Standing Committee of the 6 NPC on June 25t, 1986, amended in accordance with Resolution about Amending Land Law of the People's Republic of China of the plenary meeting .of the 5th session of the Standing Committee of the 7th NPC on December 29tf, 1988, and revised at the plenary meeting of the 4th session of the Standing Committee of the 9th NPC on August 29, 1998). B. Enforcement Regulations of Land Law of the People's Republic of China (Decree No. 256 of the State Council of the People's Republic of China). C. Basic Regulations of Farmland Protection (Decree No. 257 of the State Council of the People's Republic of China). D. Provisional Regulations of the PRC on Tax for Possession and Use of Field Land (No. 27 the State Council's Notice on Promulgation issued by the State Council). EOlmplementation Regulations of Wood Administration Law of the People's Republic of China" FLEnforcement Approach of Land Management Hubei Province (passed by the plenary meeting of the 12th session of the standing committee of the gth People's Congress of Hubei Province on September 27, 1999). G2Regulations of Forest Land Management Hubei Province (passed by the plenary meeting of the 29th session of the standing committee of the 8th people's congress of Hubei Province on August 5. 1997). HiSpecifications on Planning and Design of Reservoir Submerging Hubei Province (the PRC's power industry standard DL/T5064-1996). I. Operational Directives OD.4.30, "Involuntary Resettlement" - World Bank 4.2. Rules of Law 4.2.1. Main relative specifications of"Land Administration Law of the People's Republic of China" Chapter O Ownership of Land and Right to the Use of Land Article 8 Land in the urban areas of cities shall be owned by the State. Land in rural and suburban areas shall be owned by peasant collectives, except for those portions which belong to the State as provided for by law; house sites and private plots of cropland and hilly land shall also be owned by peasant collectives. 25 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Article 10 Land owned by peasant collectives that belongs lawfully to peasant collectives of a village shall be operated and managed by collective economic organizations of the village or by villagers' committees; land already owned by different peasant collectives that belong to two or more different collective economic organizations in the village shall be operated and managed by the rural collective economic organizations in the village or by villagers' teams; land already owned by peasant collectives of a township (town) shall be operated and managed by rural collective economic organizations of the township (town). Article 11 Land owned by peasant collectives shall by registered and recorded by people's governnents at the county level, which shall, upon verification, issue certificates to confirm the ownership of such land. Land owned by peasant collectives to be lawfully used for non-agricultural construction shall be registered and recorded by people's govermnents at the county level, which shall, upon verification, issue certificates to confirm the right to the use of the land for such construction. State-owned land to be lawfully used by units or individuals shall be registered and recorded by people's governments at or above the county level, which shall, upon verification, issue certificates to confirm their right to the use of such land. The specific organs for registration and issue of certificates for State-owned land to be used by central State organs shall be determined by the State Council. Ownership or the right to the use of forest land or grassland and the right to the use of water surfaces or tidal flats for aquaculture shall be confirned respectively in accordance with the relevant provisions of the Forestry Law, the Grassland Law and the Fisheries Law of the people's Republic of China. Article 12 Any change to be lawfully made in land ownership, in the right to the use of land or in the purpose of use of land shall be registered. Article 13 The lawfully registered ownership of land and right to the use of land shall be protected by law and may not be infringed upon by any units or individuals. Article 14 Land owned by peasant collectives shall be operated under a contract by members of the economic organizations of the peasant collectives for crop cultivation, forestry, animal husbandry of fishery. The duration of such contract in 30 years. The party that gives out a contract and the party that undertakes it shall sign a contract in which to stipulate the rights and obligations of both parties. A peasant who undertakes to operate a piece of land under a contract shall have the obligation to protect the land and rationally use it in conformity with the purposes of use provided for in the contract. The right of a peasant to operate land under a contract shall be protected by law. Within the duration of the contract for operation of land, any appropriate readjustment of the land between individual contractors shall be made with the agreement of at least two-thirds of the members of the villagers assembly or of the representatives of villagers and submitted to the township (town) people's government and the agriculture administration department of the people's government of the county for approval. Chapter 0 Overall Plans for Land Utilization Article 19 Overall plans for land utilization shall be drawn up in accordance with the 26 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan following principles: (1) to strictly protect the capital farm land and keep land for agriculture under control lest in should be occupied and used for non-agricultural construction; (2) to increase the land utilization ratio; (3) to make overall planning for the use of land for different purpose and in different areas; (4) to protect and improve ecological environment and guarantee the sustainable use of land; and (5) to maintain balance between the amount of cultivated land used for other purpose and the amount of land developed and reclaimed. Article 22 The amount of land to be used for urban construction shall conform to the norm set by State regulations. Attention shall be paid to making full use of the existing land for construction and using little or no land for agriculture. The overall plans of cities and the plans of villages and towns shall be dovetailed with the overall plan for land utilization, and the amounted of land to be used for construction fixed in the former shall not exceed the amount fixed in the latter for the cities, villages and towns. In the areas covered by the plans of cities, villages and towns, the amount of land to be used for construction shall conform to the amount as is fixed in such plans. Article 24 People's governments at all levels shall exercise close supervision over the plans for land utilization and keep control over the total amount of land used for construction. Article 26 Any revision of an approved overall plan for land utilization shall be subject to approval by the organ that originally approval the plan; without such approval, no change may be made in the purposes of land use as prescribed in the overall plan for land utilization. Where a change needs to be made in an overall plan for land utilization to meet the demand of land for the construction of such large infrastructure projects as energy, communications or water conservancy projects that have been approval by the State Council, it shall be made in accordance with the document of approval issued by the State Council. Where a change needs to be made in an overall plan for land utilization to meet the demand of land for the construction of such infrastructure projects as energy, communications or water conservancy projects that have been approved by people's governments of provinces, autonomous regions or municipalities directly under the Central Government and the plan is under the approval authority of a people's government at the provincial level, the change shall be made in accordance with the document of approval issued by such government. Chapter O Protection of Cultivated Land Article 31 The State protects cultivated land and strictly controls conversion of cultivated land to non-cultivated land. The State applies the system of compensation for use of cultivated land for other purposes. The principle of "reclaiming the same amount of land as is used" shall be applied to any unit 27 Hubei Province Hydropower Project Zhushan County Songshuling Hvdropower Station Resettlement Action Plan that, with approval, uses cultivated land for construction of non-agriculture projects, that is, the unit shall be responsible for reclaiming the same amount and quality of the cultivated land it uses. If conditions for such reclamation do not exist or if the reclaimed land fails to meet the requirements, the unit shall pay expenses for reclamation in accordance with the regulations set by people's governments of provinces, autonomous regions and municipalities directly under the Central Government and the money shall exclusively be used for reclamation. People's governments of provinces, autonomous regions and municipalities directly under the Central Government shall formulate plans for land reclamation, see that the unit that uses cultivated land reclaims land according to plan or arrange reclamation according to plan, and conduct inspection before acceptance. Article 32 Local people's governments at or above the county level may require the units that wish to use cultivated land to remove the arable layer of cultivated land to the reclaimed land or to land of inferior quality, or to other cultivated land for improving soil. Article 33 People's governments of provinces, autonomous regions and municipalities directly under the Central Government shall strictly implement the overall plans and annual plans for land utilization and take measures to ensure that the total amount of cultivated land within their administrative areas remains unreduced, where the total amount of cultivated land is reduced, the State Council shall order the government concerned to reclaim land of the same quality and amount as is reduced within a time limit, and the land administration department together with the agriculture administration department under the State Council shall inspect the land reclaimed before acceptance, where individual governments of provinces or municipalities directly under the Central Government, for lack of land reserves, cannot reclaim enough land to make up for the cultivated land they used for additional construction projects, they shall apply to the State Council for approval of their reclaiming less or no land within their own administrative areas but of their reclaiming land in other areas. Article 36 In non-agricultural construction, attention shall be paid to economizing on the use of land. Where wasteland can be used, no cultivated land may be used; where land of interior quality can be used, no land of superior quality may be used. Article 41 The State encourages land revitalization. County and township (town) people's governments shall make arrangements for rural collective economic organizations to conduct, in accordance with overall plans for land utilization, all-round improvement of the fields, water conservancy, roads and forests and development of the villages in order to improve the quality of the cultivated land, increase the efficient area of cultivated land and better the conditions of agricultural production and the ecological environment. Local people's governments at all levels shall take measures to transform the medium- and low-yield fields and improve idle and waste land. Article 42 Land users that cause damage to land as a result of digging, subsiding or crumbling under heavy weight shall be responsible for re-cultivating the land in accordance with the relevant regulations of the State. Where conditions do not permit such re-cultivation or the land re-cultivated does not meet the requirements, the user shall pay charges for re- cultivation, which shall exclusively be used for the purpose, The land re-cultivated shall first be used for agriculture. 28 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan Chapter E: Land to be Used for Construction Article 43 All units and individuals that need land for construction purposes shall, in accordance with law, apply for the use of State-owned land, with the exception of the ones that have lawfully obtained approval of using the land owned by peasant collectives of their own collective economic organizations to build township or town enterprises or to build houses for villagers and the ones that have lawfully obtained approval of using the land owned by peasant collectives to build public utilities or public welfare undertakings of a township (town) or village. "The State-owned land" mentioned in the preceding paragraph includes land owned by the State and land originally owned by peasant collectives but requisitioned by the State. Article 44 Where land for agriculture in to be used for construction purpose, the fornalities of examination and approval shall be gone through for the conversion of use. Where land for agriculture is to be converted to land for the construction of road, pipeline or large infrastructure projects, for which approval has been obtained from people's governments of provinces, autonomous regions and municipalities directly under the Central Government, or for the construction of project, for which approval has been obtained from the State Council, the conversion shall be subject to approval by the State Council. Where land for agriculture is to be converted to land for construction of projects in different periods in order to carry out the overall plan for land utilization within the limits of the amount of land fixed in the plan for the construction of cities, villages or towns, the conversion of use of land shall, in accordance with the annual plan for land utilization, be subject to approval in batches by the organ that originally approved the overall plan for land utilization. Approval for the use of land for construction of specific projects within the limits of the amount of land for agriculture, conversion of the use of which has been approved, may be obtained from people's governments of cities or counties. Where land for agriculture is to be converted to land for construction projects other than what is provided for in the second and third paragraphs of this Article, the conversion shall be subject to approval by people's governments of provinces, autonomous regions and municipalities directly under the Central Government. Article 45 Approval shall be obtained from the State Council for requisition of the following land: (1) capital farm land; (2) cultivated land, not included in capital farm land, that exceeds 35 hectares; and (3) other land that exceeds 70 hectares. Requisition of land other than that provided for in the preceding paragraph shall be subject to approval of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government and be submitted to the State Council for the record. Land for agriculture shall be requisitioned after conversion of use of the land is examined and approved in accordance with the provinces of Article 44 of this Law. Where conversion of use 29 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan of such land is subject to approval by the State Council, requisition of the land shall be examined and approved at the same time, and there is no need to go through the formalities of examination and approval for the requisition separately. Where conversion of use of land is subject to approval by people's governments of provinces, autonomous regions and municipalities directly under the Central Government within the limits of their approval authority over the requisition of land, requisition of the land shall be exarnined and approved at the same time, and there is no need to go through the formalities of examination and approval for the requisition separately; if the land to be requisitioned is beyond the limits of their approval authority, it shall be examined and approved separately in accordance with the provisions of the first paragraph of this Article. Article 46 Where land is to be requisitioned by the State, the requisition shall, after approval is obtained through legal procedure, be announced by people's governments at or above the county level, which shall help execute the requisition. Units and individuals that own or have the right to the use of the land under requisition shall, within the time limit fixed in the announcement, register for compensation with the land administration department of the local people's government by presenting their certificates of land ownership or land-use right. Article 47 Land requisitioned shall be compensated for on the basis of its original purpose of use. Compensation for requisitioned cultivated land shall include compensation for land, resettlement subsidies and attachments and young crops on the requisitioned land. Compensation for requisition of cultivated land shall be six to ten times the average annual output value of the requisitioned land for three years preceding such requisition. Resettlement subsidies for requisition of cultivated land shall be calculated according to the agricultural population needing to be resettled. The agricultural population needing to be resettled shall be calculated by dividing the amount of requisitioned cultivated land by the average amount of the original cultivated land per person of the unit the land of which is requisitioned. The standard resettlement subsidies to be divided among members of the agricultural population needing resettlement shall be four to six times the average annual output value of the requisitioned cultivated land for three years preceding such requisition. However, the highest resettlement subsidies for each hectare of the requisitioned cultivated land shall not exceed fifteen time its average annual output value for the three years preceding such requisition. Standards of land compensation and resettlement subsidies for requisition of other types of land shall be prescribed by provinces, autonomous regions and municipalities directly under the Central Government with reference to the standards of compensation and resettlement subsidies for requisition of cultivated land. Standards for compensation for attachments and young crops on the requisitioned land shall be prescribed by provinces, autonomous regions and municipalities directly under the Central Government. For requisition of vegetable plots in city suburbs, the land users shall pay towards a development and construction fund for new vegetable plots in accordance with the relevant regulations of the State. If land compensation and resettlement subsidies paid in accordance with the provisions of the 30 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan second paragraph of the Article are still insufficient to help the peasants needing resettlement to maintain their original living standards, the resettlement subsidies may be increased upon approval by people's governments of provinces, autonomous regions and municipalities directly under the Central Government. However, the total land compensation and resettlement subsidies shall not exceed 30 times the average annual output value of the requisitioned land for the three years preceding such requisition. The State Council may, in light of the level of social and economic development and under special circumstances, raise the standards of land compensation and resettlement subsidies for requisition of cultivated land. Article 48 Once a plan for compensation and resettlement subsidies for requisition land is decided on, the local people's government concerned shall make is known to the general public and solicit comments and suggestions from the collective economic organizations, the land of which is requisitioned, and the peasants. Article 49 The rural collective economic organization, the land of which is requisitioned, shall accept supervision by making known to its members the income and expenses of the compensation received for land requisition. The compensation and other charges paid to the unit for its land requisitioned is forbidden to be embezzled or misappropriated. Article 50 Local people's governments at all levels shall support the rural collective economic organizations, the land of which is requisitioned, and the peasants in their efforts to engage in development or business operation or to start enterprises. Article 51 The standard of compensation for requisition of land to build large or medium- sized water conservancy or hydroelectric projects and the measures for resettling relocated people shall be prescribed separately by the State Council. Article 52 During the feasibility study of a construction project, land administration department may, in accordance with the overall plan for land utilization, the annual plan for land utilization and the standard amount of land for the use of construction, examine the matters related to lane for construction and offer its comments and suggestions. Article 53 Where a construction unit needs to use State-owned land for construction of its approved projects, it shall apply to the land administration department of the people's government at or above the county level that has the approval authority by presenting the relevant documents as required by laws and regulations, The said department shall examine the application before submitting it to the people's government at the corresponding level for approval. Article 54 A construction unit that to use State-owned land shall get it by such means of compensation as assignrment. However, land to be used for the following purposes may be allocated with the approval of a people's government at or above the county level: (1) FOR State organs or military purposes; (2) For urban infrastructure projects or public welfare undertakings; 31 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan (3) For major energy, communications, water conservancy and other infrastructure projects supported by the State; and (4) Other purposes as provided for by laws or administrative regulations. Article 55 A construction unit that obtains right to the use of State-owned land by such means of compensation as assignment shall, in keeping with the standards and measures prescribed by the State Council, pay among other charges compensation for use of land such as charges for the assignment of land-use right, before if can use the land. As of the date of implementation of this Law, 30 percent of the compensation paid for the use of additional land for construction shall go to the Central Government and 70 percent to the local people's govenunents concerned, both of which shall exclusively be use for developing cultivated land. Article 56 A construction unit that uses State-owned land shall use the land in agreement with the stipulations of the contract governing compensation for the use of land such as the assignment of the land-use right or the provisions in the documents of approval for allocation of the land-use right. Where it is definitely necessary to change the purposes of construction on this land, the matter shall be subject to agreement by the land administration department of the people's government that originally approved the use of lane. Where the land the purposes of use of which need to be changed is located in the area under urban planning, the matter shall be subject to agreement by the urban planning administration department concerned before it is submitted for approval. Article 57 Where land owned by the State or by peasant collectives need to be used temporarily for construction of projects or for geologic prospecting, the matter shall be subject to approval by the land administration departments of people's governments at or above the county level. However, if the land to be temporarily used in located in the area covered by urban planning, the matter shall be subject to agreement by the urban planning administration department concerned before it is submitted for approval. The land user shall, depending on who owns the land and who has the land-use right, enter into a contract for the temporary use of the land with the land administration department concerned, or the rural collective economic organization, or the villagers committee and pay compensation for it in accordance with the provisions of the contract. The temporary land user shall use the land for purposes stipulated in the contract for temporary use of the land and may not build permanent structures on it. Generally, the period for temporary use of land shall not exceed two years. Article 58 Under any of the following circumstances, the land administration department of the people's government concerned may, with the approval of the people's government that has originally approved the use of land or that possesses the approval authority, take back the right to the use of the State-owned land: (1) The land is needed for the benefits of the public; (2) The use of the land needs to be readjusted for renovating the old urban area according to urban planning; 32 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan (3) At the expiration of the period stipulated in the contract for use of the land by such means of compensation as land assignment, the land user has not applied for extending the period or, if he has applied for such extension, the application is not approved; (4) The use of the originally allocated State-owned land is terminated because, among other things, the unit that uses the land is dissolved or moved away; or (5) The highways, railways, airports or ore fields are abandoned with approval. The user granted with the land-use right shall be compensated appropriately when its right to the use of State-owned land is taken back according to the provisions of sub-paragraph (1) and (2) in the preceding paragraph. Article 61 Where land to be used for the construction of township (town) or village public utilities or public welfare undertakings, the matter shall be subject to examination and verification by the township (town) people's government, which shall submit an application to the land administration department of the local people's government at or above the county level for approval by the said people's government within the limits of approval authority as defined by the province, autonomous region and municipality directly under the Central Government. However, if land for agriculture is to be used for the purpose, the matter shall be subject to examination and approval in accordance with the provisions of Article 44 of this Law. Article 62 For villagers, one household shall have only one house site, the area of which may not exceed the standard set by provinces, autonomous regions and municipalities directly under the Central Government. Villagers shall build residences in keeping with the township (town) overall plan for land utilization and shall be encouraged to use their original house sites or idle lots in the village. Land to be used by villagers to build residences shall be subject to examination and verification by the township (town) people's government. However, if land for agriculture is to be used for the purpose, the matter shall be subject to examination and approval in accordance with the provision of Article 44 of this Law. Approval for other house sites shall not be granted to villagers who have sold or leased their houses. Article 63 No right to the use of land owned by peasant collectives may be assigned, transferred or leased for non-agricultural construction, with the exception of enterprises that have lawfully obtained land for construction in conformity with the overall plan for land utilization but have to transfer, according to law, their land-use right because of bankruptcy of merging or for other reasons. Article 64 No building or structure built before the overall plan for land utilization is drawn up and at variance with the purposes defined in such a plan may be rebuilt or expanded. Article 65 Under any of the following circumstance, a rural collective economic organization may, with the approval of the people's government that originally approved the use of land, take back the land-use right: 33 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan (1) The land is needed for constructing township (town) or village public utilities of public welfare undertakings; (2) The land is used at variance with the approved purposes; or (3) The use of land is terminated because, among other things, the unit concerned is dissolved or moved away. The user granted with the land-use right shall be compensated appropriately when the land owned by the peasant collective is taken back according to the provisions of subparagraph (1) of the preceding paragraph of this Article. 4.2.2. Specifications of Rules for Compensation of Land Acquisition and Resettlement for Middle and Large Water Resources and Hydropower Projects Section 1. General Article 4: The following principles shall be performed for compensation of land acquisition and resettlement of water resources and hydropower projects: (1) The relation between the state, collective and individual shall be correctly treated. The resettlement area and host area shall obey the national interest. (2) The resettlement and construction of reservoir area shall combine with local economy and natural resources to raise gradually or over the original living standard of resettlers. (3) The resettlement shall consider local condition, and resources of reservoir area shall be reasonably used under full planning. Resettlers shall settle down in original place or a higher place nearby. If no available condition, the ways for reclamation of flood plain, reallocating land and relocating outside, etc. shall be adopted. All these actions shall follow the relative rules of law and regulations. Section II. Compensation for land acquisition Article 5: For land acquisition of middle and large water resources and hydropower projects, the construction unit shall pay following land compensation fee and resettlement subsidy: (I) The compensation standard of land acquisition will be 3 to 4 times of the annual output value per mu for three years before land acquisition. The resettlement subsidy standard for each farmer will be 2 to 3 times of the annual output value per mu for three years before land acquisition. (2) The resettlement subsidy standard for the other type of land acquisition shall be specified by each province, autonomous region, and municipality referring item (I) herein. Article 6: If the land compensation and resettlement subsidies are paid on the base of Art. 5, the resettlement subsidies can be increased in case that the living standard of the resettler can not keep the original level. But total amount of the land compensation and resettlernent subsidies shall not exceed the following times of the average output value per mu for 3 years before the land acquisition. 34 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan (1) above lmu cultivated land per capita in reservoir area (including damsite) not exceed 8 times (2) 0.5-lmu cultivated land per capita in reservoir area (including damsite) not exceed 12 times (3) under 0.5mu cultivated land per capita in reservoir area (including damsite) not exceed 20 times Section III. Resettlement Article 12: The resettlers from water resources and hydropower project shall settle down within village and county area. If it is not available, they shall be settled down in the beneficial zone of the project. And if it is still not possible, they shall be moved to other area based on the reasonable conditions. The surplus labor caused by land acquisition of water resources and hydropower project shall be arranged by relative department organized by the local government to develop agriculture, sideline production and village-owned enterprises. Article 13: For those resettlers who move voluntarily to their relatives' family or friend's family, the governments of native place and host place shall sign agreement with resettlers. The corresponding subsidies for land acquisition and resettlement shall be paid by native government to host area government for unified arrangement of production and living. Article 15: According to the resettlement planing, resettlers shall be not allowed to be delay and reject the relocation. And, resettlers shall be not allowed to return at will when they settle down. 4.2.4. Pertinent Regulations of Enforcement Approach of Land Management Hubei Province Chapter 4 Arable Land Protection Article 16 Protection system of basic farmland should be enforced. The people's governments at all levels should, in accordance with the protection objective of basic farmland, plan protection zones of basic farmland. The protection and management of basic farmland should be enforced in the light of related laws and regulations. Article 17 Compensation system of requisitioned field land should be enforced. Non- agricultural construction which requisitions field land under approval should, in accordance with the principle of "How much is requisitioned, How much should be reclaimed", take responsibility to reclaim the farmland in the same size and quality as the requisitioned land. If reclaiming conditions are unavailable or the reclaimed land does not meet the requirements, field land reclamation fees should be paid in accordance with the following standards: (1) If basic farmland is requisitioned, the payment is from 1.5 times to 2 times of land compensation. (2) If field land other than basic farmland is requisitioned, the payment is from 1 time to 1.5 times of land compensation. 35 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Arable land reclamation fees should be included in gross investment of construction project. Specific management approaches of collection and use of field land reclamation fees will be formulated separately by the provincial government. Chapter 5 Construction Land Article 26 As for requisition, land compensation, resettlement allowance and compensation for ground attachment and young crops: (1) Land compensation is from 6 times to 10 times of the annual output value of the requisitioned field land over the previous three years. As for other land, land compensation is from 5 to 6 times of the annual output value of the nearby field-land over the previous three years. As for young crops, compensation should be offered according to their output value. If their output value can not be figured out, rational compensation should be offered. As for buildings and other ground attachment, rational compensation should be offered according to their market prices. As for rush planting and rush construction, which is conducted after the publication of requisition plan, compensation is prohibited. (2) As for resettled agricultural population, resettlement allowance is from 4 to 6 times of the annual output value of the requisitioned land over the previous three years. As for requisitioned field land per acre, resettlement allowance will not exceed 15 times of the annual output value of the land over the previous three years. As for other land bringing profits, resettlement allowance is from 4 times to 6 times of the nearby field land over the previous three years. As for land without profits, there is no resettlement allowance. (3) If land compensation and resettlement allowance issued in accordance with item (1) and (2) cannot keep up the former living standard of resettled peasants, resettlement allowance will be increased under approval of the provincial government. But the total sum of land compensation and resettlement allowance should not exceed 30 times of the annual output value of the requisitioned land over the previous three years. Article 33 As for residential land, peasant should file a land use application to village committee, examined by town (township) government and approved by county government. If farmland is requisitioned, Article 24 of this enforcement approach will be applied. As for the total homestead area of house construction and reconstruction including accessories, the area of farmland used per household should not exceed 140 square meters, the area of unused land (construction land) per household should not exceed 200 square meters. Within the above-mentioned limit, municipal and county governments can determine residential land standard in their administrative region according to local per capita farmland status. 4.3. Policy and Principle of Inhabitant Resettlement 4.3.1. Policy The resettlement policy for the resettlement work of YPSPP is: The resettlement work shall be conducted with due respect and consideration to the local tradition and habit in production and living, with full consideration of the willing of the resettlers. Based on that the original production and living mode will not be changed, the effort will be mainly made in resettlement procedures to develop planting production by using the local 36 Hubei Province Hydropower Project Zhushan County Songshuling Hvdropower Station Resettlement Action Plan land resource and exploitable natural resource in the original town (ship) and villages, and concurrently to develop the secondary and tertiary industries in local area. The inhabitant resettlement shall first be based on guaranteeing the basic substance and provide possibility for long-term development. The local land resource shall be fully utilized for development through resettlement, so as to reach the target of long-term prosperity. 4.3.2. Principles A. Resettlement planning should be based on the property indexes and compensation standards to improve, or at least to restore the original production and living conditions of the resettlers. B. The resettlement of the project shall be combined with the regional construction, resource development, economic development and environment protection. Considering the actual local conditions, practical and feasible measure shall be worked out for restoring and developing the production and living of the resettlers case by case, meanwhile, some necessary conditions shall be created for self-development of the resettlers. C. Planning should be based on the principle "Beneficial to the production and make the life convenient". D. Construction scale and standards of the resettlement project should be guided by the original scale and standards. Investment should be based on the quota planning. Investment for enlarging the scale, improving standards and future planning should be treated by the local government and relative departments. E. All factors should be taken into consideration. Benefits between the stateLIcollectives and individuals should be dealt with properly. F. By adopting the method of paying compensation and granting subsidies in pre-stage and production support in post-stage, and fully using the local natural resources, efforts shall be made to guarantee the resettlers production and living level to reach or exceed the original level before resettlement. 37 Hubei Province Hydropower Project Zhushan Countv Songshuling Hvdropower Station Resettlement Action Plan 5. Plan for Resettlement and Restoration Under the leadership of Zhushan County Government, directed by ECIDI, and based on Songshuling Hydropower Station Feasibility Design in Zhushan County, Hubei Province, the planning work of resettlement for Songshuling project(including those for the reservoir inundated area, areas for permanent construction and temporary use) was drawn up according to the present policies, laws and the request of the World Bank. 5.1. Target and Task 5.1.1. Determination of the level year According to the whole progress of the project planning, the project will be commenced in 2001 and put into operation in 2005, with a total construction period of 4 years. In order to cooperate with the construction, the resettlement work will be completed in two periods, 70% of the work will be completed by the end of 2001, the rest will be completed in 2002, so 2001 was determined as the resettlement level year. 5.1.2. Task of Resettlement Calculated according to the impacted population of the project from the survey result in 2000, and the nature increasing rate by 5.2%%, in 2001, 276 persons will be resettled in the reservoir area(including removal and production resettlement), among 14 persons of non- agriculture residence. The resettlement number of the villages is shown in Table 5-1. Contrast of the population before and after inundation in the reservoir area Table 5.1 Removal Production Removal and Name population resettlement production pop. Remark Naepopulation population Sangping 49 47 47 Yangpo 16 15 15 Puxi 38 74 39 Based on the Taoyuan 4 27 4population in 87 2000,calculate Daping 7 according to 5%% Daping _________ ~~~~~~~~~to 2001. Laozhu 6 Tianchiya 7 9 7 Total 216 174 112 5.1.2. Resettlement Objects Due to the inundation, the previous production and living system was damaged, so was the habit and net formed in a long period, but at the same time, a chance for house rebuilding, 38 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan improving their production and living level and developing the economy was provided. So the survey and study work must be done carefully, after analysis and contrast again and again, requiring the opinions of the people widely, the practicable resettlement plan will be formulated, thus wonderful outer condition and environment will be created and the resettlers can find their way out on production and living, and every labor force will be arranged reasonably, at last the production and living level will be improved. According to the present economic status on the resettlement area, and contrast with the Zhushan County "Ninth Five" and "Tenth Five" developing plan, the economic developing target of project resettlement was ascertained: Grain per capita is 660kg; Net income per capita of the resettlers is 1600 yuan; 2. Housing area per capita is 46m ; Public infrastructures, social welfare level, traffic, post and communication, medical treatment and hygiene, going to school of the children will be better than that before removal. 5.2. Environmental Capacity Evaluation The project inundation involved Sangping. Yangpo, Puxi, Taoyuan, Tianchiya, Liuhe, Laozhu, Daping, 8 administrative villages, but of them Liuhe, Laozhu, Daping are at the end of the reservoir area, the cultivate land and woodland was affected basically. According to the geography position and the business feature of the resetters, most of who are going for trading and service, after full investigation and choice of the designations, measures of building a new dam against flood for protection will be adopted, so that the previous living environment will not be affected basically, and to keep their production and living means unchanged. Now the production and living enviromnent of the resettlers in Sangping, Yangpo, Puxi, Taoyuan, Tianchiya will be mainly analyzed. It is detailed in Table 5-2. 39 Hubei Province Hydropower Project Zhushan County Songshuling Hvdropower Station Resettlement Action Plan Variation of cultivate land and woodland before and after land requisition in the reservoir area Table 5.2 Cultivate land per Woodland per V.flag Agricu Rest Rest capita capita Villag Itural Remov cultiva woodlan Pre-land After Pre-land After ers al pop. te land d requisiti land requisiti and re t Orequisiti requisiti on on on on Sangpi 629 50 850 5230 1.46 1.35 8.48 8.32 ng I___ _ Yangp 376 16 1239.5 5630 3.43 3.3 15.24 14.97 0 Puxi 679 39 968.9 17888.5 1.61 1.43 26.70 26.34 Taoyu 659 4 1365 15956 2.16 2.07 24.40 24.21 anI Tianch 1087 7 1654.5 3797 1.54 1.52 3.52 3.5 iya Total 3430 116 6077.9 48501.5 1.86 1.77 15.67 15.47 From Table 5-1, in the five administrative villages affected by inundation, according to the total population in 1999, calculating by 5.2%% to 2001, the cultivate land per capita is 1.86mu before land acquisition, and it is 1.77mu after inundation, and 1.35mu for Sangping village, which has the least, 0.03mu more than the county per capita, 1.32mu; before land acquisition, the woodland per capita is 15.67mu, and it is 15.47mu after inundation, 0.2mu was decreased. According to site survey, the living condition of the resettlers is bad, most of the houses were built during 70s, and they were far from the village committee seat. The residence pots were scattered, and most of their houses were by the river, so sometimes flood will come to the threshold. Only one to two and four to five for most lived together, and their collective living was poor, and with bad traffic condition. Through the project land requisition and resettlement, opportunity for improving living environment will be brought to the resettlers. The main population, cultivate land contrast is shown in Table 5-4. 40 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resenlement Action Plan Calculation of cultivate land in the affected villages and groups Table 5.3 Adminis Total Total cultivate land Cultivate hip) trative househ Pop. Sub- Paddy Dry land per hP) villages P old total land land capita 1 30 114 204 4 200 1.79 2 26 88 200 200 2.27 Lluhe 4 18 71 270 270 3.8 Liulin 5 18 83 67 67 0.81 Sub- 4 92 356 741 4 737 2.08 total Daping 2 27 114 205 20 185 1.8 Laozhu 4 79 331 918 18 900 2.77 Total 6 198 801 1864 42 1822 2.32 1 30 133 147 38 109 1.1 Sangpin 4 20 91 118 7 111 1.3 g 5 28 126 129 23 106 1.02 Sub- 3 78 350 394 68 326 1.13 total Yangpo 1 15 93 266 266 2.86 Yangpo__ 2 27 128 342 14 328 2.67 Sub- 2 42 221 608 14 594 2.75 Guandu total Puxi 1 45 218 290 60 230 1.33 Puxi 2 17 107 180 180 1.68 Sub- 2 62 325 470 60 410 1.15 total Taoyua 1 32 136 320 320 2.35 n 6 48 201 284 60 224 1.41 Sub- 2 80 337 604 60 544 1.79 totalI Total 9 262 1233 2076 202 1874 1.68 Tianchi 1 51 222 265 80 185 1.19 Liangjia ya 3 66 253 370 370 1.46 Sub- 2 117 475 635 80 555 1.34 totalII Total 17 577 2509 4575 324 4251 1.82 From the Table above, the project land requisition affection involved 17 village groups of 8 administrative villages in the three town(ship)s, with 577 household, 2509 persons, 4575mu cultivate land(324mu of paddy land, 4251mu dry land). The cultivate land per capita is 1.82mu, 0.8 1mu for the least and 3.8 mu for the most, only one group, with 83 persons, 3.3% of the total, got a land per capita lower than lmu,6 groups, with 847 persons, 33.8% of the total. Of the 8 administrative villages, impact is only for houses but not for cultivate land for three villages. Now according to the important position, after consultation and study, protection measure will be adopted for the affected houses, so the project has little impact on the 41 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan production and living of the three villages. The other administrative villages, have 11 village groups, with 379 households, 1708 persons, cultivate land 271 lmu, with 1.59mu per capita, 0.84mu for the least and 2.86mu for the most, not the same. The village group with a cultivate land per capita lower than lmu has 126 persons, accounting for 7.3% of the totaling; three of them have a cultivate land per capita more than 2mu, with 357 persons, accounting for 20.9% of the total. For the project construction, 52 households, with 116 persons will be relocated, and 315.1mu cultivate land will be requisitioned. All these are detailed in Table 5-4. Cultivate land of the 5 villages affected by project land requisition Table 5-4 Admi Total cultivate land Project affected Rest Cultiv Tow nistra gr popul cultivate land cultiv ate n(sh tive ou o Sub- Padd Padd Drlte land ip viaagop yub a Dry Sub- Dry ate iP) villag P total Y land total Y land land per e land land capita 1 133 147 38 109 34.5 9 25.5 112.5 0.84 Sang 4 91 118 7 111 30.8 8 22.8 87.2 0.96 ping 5 126 129 23 106 2.7 2.7 126.3 1.0 Sub- 3 350 394 68 326 68 19.7 48.3 326 0.93 total Yang 1 93 266 266 51.5 20 31.5 214.5 2.31 . 1 218 290 60 230 55 5 50 235 1.07 Gua Pux- 2 107 180 180 66.1 6.1 60 113.9 1.06 d Sub- 2 325 470 60 410 121.1 11.1 110 348.9 1.07 total__ _ _ __ _ _ __ _ _ Taoy 1 136 320 320 40 1 39 280 2.05 uan 6 201 284 60 224 20 _ 20 264 1.31 Sub- 2 337 604 60 544 60 1 59 544 1.61 total Total 8 1105 1734 188 1546 300.6 51.8 249.8 1433. 1.3 _ _ _4_ _ Lian Tianc 3 253 370 370 14.5 14.5 355.5 1.41 gjia hiya I I Total 9 1358 2104 188 1916 315.1 51.8 264.3 1788. 1.32 From the Table above, of the five administrative villages, the project affected 9 village groups, which now has 1358 persons, cultivate land totaling 2104mu, 188mu for paddy land(accounting for 8.9% of the total), 1916mu for dry land(accounting for 91.1% of the total). 315.1mu was requisitioned for the project, after land requisition the cultivate land per capita is 1.32mu, 0.84mu for the least and 2.31mu for the most. Two village groups had got cultivate land per capita lower than I mu, with 224 persons, accounting for 16.5% of the total, and two village groups had got a cultivate land per capita of higher than 2mu, with 229 persons, accounting for 16.9% of the total. From the analysis above, after land requisition, the land resource in local place is abundant, 0.84mu for the least, which can ensure the basic grain ration. Every village had enough places 42 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan for resettlement, although the numbers of resettlers are small to the total population. At the same time, the compensation was put into the production and construction. Then under the premise of ensuring that the grain can be self-provided to the villagers, through woodland management, aquatic, bamboo and wood processing, tourist traffic, etc., the development of No.2 and No.3 industry, the production and living level will be soon restored, moreover, condition will be created for the resettlers to reach or pass the previous living level. After land requisition, the local production and living was impacted at a certain degree, so the present land resource will be used plainly and will be treated. At the same time, the resettlers will be taught of specific knowledge for scientific farming. According to the planning of the affected villages, the rest cultivate land after requisition of Puxi, Sangping, Yangpo will be adjusted in the whole village, for Taoyuan and Tianchiya, and it will be done in the very group. Through the project resettlement, the condition of improving the production and living stable will be created for the resettlers. 5.3. Overall Plan for Resettlement 5.3.1. Selecting of the scheme According to the numbers of the resettlers, combining with the present status of abundant land resource and local economic developing potentiality, after comprehensive analysis and compression, all-round consideration, it is determined that the resettlers will be resettled within the own town(ship) at the back. Paying attention to the practice, and seeing from the angle of the future, the resettlement scheme was selected and leeway was left for the later development of the resettlers. 5.3.2. Resettlement Means For the resettlers of Sangping, Yangpo, Puxi, Taoyuan and Tianchiya, the five administrative villages affected by inundation, they were most agricultural resettled. Although the mean cultivate land is less than that before land requisition in the five villages, it is still more than that of the county level. At the same time, through hilly changing into ladder shape, dry land changing into paddy land, and adding irrigation frastructure. etc.. The auxiliaries, so as to improve the quality of the cultivate land and the production of grain. then under the premise of ensuring the grain self-providing, tourist, processing. trading. etc. The second and third industries will be carried out to increase their economy income and to ensure the object that they can remove and can also get rich; for the resettlers in Liuhe. Daping, Laozhu, measures of protection will be adopted to ensure they can go in for their previous jobs and their production, living will not be impacted. At the same time, they can grasp the chance of the putting into operation of the power station, make out new way of business and production, more business ways and more production means. Thus they can create better outer environment for stable increasing their economy income. 5.4. Protecting Plan for Reservoir Area The inundation in reservoir area involved 3 administrative villages of Liulin, with 6 village groups, 22 households, 100 persons, 10 of them for non-agricultural residence. In the three villages, only 4.5mu cultivate land without registration is affected by inundation. They lived at the old dock, with convenient traffic of water and land, and the trading, service business, industry transportation, repairing shops stood with a great number, the merchants coming and going stayed there like cloud, so it has long been a place the merchant scrambled badlv 43 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan According to our record household by household, the total income of the 22 household in 1999 was 607840 yuan, with 6078.40 per capita, among it 6008.40 yuan was from the catering and service trade. From the data above, the main economic income was from trade, service, catering. Therefore, to protect this piece of fertilized land, after compression once again, according to the villagers' opinions, project protection was adopted. According to the actual shape and surface of the land, it is designed by the County Water Resource and Power Design Group as below: A dam against flood of 432.8m will be built prospectively, with the top height of 404.5m, the wall is 13.529m in height, the bottom is 4.8m wide, the cutting down face is detailed in Appendix 3: The project quantity: 75# stone laying with liquid 15809.5m3, 150# concrete 1171 .1m3, clearing the base 12226.6m3. Project building price: 75# laying stone with water 15809.5m3...134.28 yuan/m2=2122900 yuan; 150# laying stone with liquid 1171.1 m3x279.28 yuan/m3=327000 yuan; clearing base 12226.6m3x6yuan/m3=73400 yuan; Water drawing facilities: pump house 120000 yuan, equipment 280000 yuan, totaling 400000 yuan. The investigation is totaling 2923400 yuan. 5.5. Resettlement Plan 5.5.1. Production Resettlement Plan After inundation, in Snapping, Yangpo, Puxi, Taoyuan, Tianchiya, the cultivate land and woodland is still plenty, with 1.77mu per capita for cultivate land and 15.47mu for woodland. According to our survey and visit to the cadres and farmers in the villages or groups, they still tend to and used to agricultural production. From the present employment status of labor force, 78.2% of the labor force are going in for agricultural production, the distribution of the labor force is detailed in the table below. 44 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Employment distribution for the labors of the villages in the reservoir area Table 5.4 Employed labors Labors going in for business Outgoing labors Village Total Plantin Shd trnadnsptirya Othe . Out the Vill laborsShed Industry Female and . City labors g forest tion and rs province service Snapping 169 67 70 20 11 68 30 47 Yangpo 70 27 36 21 3 10 10 24 Puxi 131 33 115 8 3 5 15 45 Taoyuan 240 109 210 10 20 12 35 Tianchiy 362 111 329 13 20 53 123 a Total 972 347 760 59 50 103 120 274 After careful investigation and study, the project resettlement is determined as below: Agriculture resettlement: cultivate land, woodland will be adjusted within the scope of the own village, for the present cultivate land, hilly land changing into ladder land, dry land changing into paddy land, improve the structure of the soil and the quality of the cultivate, it is prospectively to resettle 123 persons; Resettlement in trading, catering and service business: according to the position and the skill, continue to encourage them take in trading, catering service. It is prospectively to resettle 20 persons: Tourist business: take advantage of the specific view and fascinating scene of Lutou Valley in the area, open tourist, traffic affairs. It is prospectively to resettle 10 persons; Aquatic: after retaining water by the hydropower station, take use of the broaden water surface resource, support the net aquatic, go on the way of rich the reservoir and the people. It is prospectively to resettle 8 persons; Enterprise resettlement: take full use of the advantage of the abundant resource of bamboo and wood in the area, support to develop the village opened and household opened processing enterprise of middle and small type, go on the way of deep processing and intricate processing, broaden the selling channels constantly, so that the products can enter market and the income of the resettlers will increase. It is prospectively to resettle 15 persons. 5.5.2. Plan for Skill Training Training for Resettlement cadres 45 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan In March,2000, the officers, sent by Zhushan County Resettlement Office, were trained by the resettlement professioners of ICIDI in Hangzhou. During the training period, to integrate theory with practice, they visited the domestic item- the resettlement of Tongbo Water Pumping Power Station, Shanxi Water Pivotal Project, drawn up the success experience and learned a lesson, and benefited much, from that they made wonderful foundation for the project resettlement. And later in April in the same year, during the social economy survey, determination of inventory indexes, resettlement-planning period, ECIDI sent some persons there to give site direction for the workers. Training for Resettlers' Production Skill Although there were not a lot of resettlers for the project, however, the labors needed to be trained for higher ability and skill for specific business. a). To meet the need of the planting household, it is feasibly determined to have a training on potato planting in the first half of 2001, and a training of cregrette planting in the first of 2002; b). For the households going in for aquatic, organize them to visit and study in the other place; c). For the households going in for tourist, training of service will be given, and the materials for the local scene will be collected, at the same time the propagation work should be well done. C. Later Support for Resettlers According to Regulations for Land Compensation and Resettlement of Big and Middle Style Water and Power Project, it is suggested to set up subsidy fund in the reservoir area so as to keep and support the resettlers' production developing, and to restore and improve their production and living as quickly as possible. Drawing out from the generated enerage on the standard of 200yuan/person, together ten years of that will be drawn out. The fund will be for estimation, but for the cost of power enerage. 5.5.3. Planning for Resettlement Site Layout of Resettlement site (1). Principles Except the resettlement plan, it will based on the following principles: the original residences are willing and welcome to receive the resettlers; the resettlement site environment capacity is enough and the land resource is ascertained. With convenient traffic, perfect infrastructures and social service net; It is convenient for the resettlers' production, generally, the working site is no more than 2km away; Safety; The new sites are in light of the local conditions, more than 3 to 5 households for every resetting site. (2). The resettlement site distribution design 46 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan According to the principles above, the resettling sites are selected back the level belt, and near to the villages with collective population, thus to make it is convenient for them to join in the collective life, treat the neighborhood. The resettlers are totaling 116 persons, the resettlement site of the villages is as followings: 13 households with 49 persons in Snapping Village, will be resettled at the level belt near the primary school; one household with 4 persons of Taoyuan Village, will be resettled at the level belt near the village committee by the road; 9 households with 38 persons of Puxi Village, will be resettled near the previous primary school or rebuilt a resettlement village; 3 households with 16 persons of Yangpo Village, arranged in the same group, at the level belt back; In Tianchiya village, 4 households were involved, but only one household with 7 persons needed to be resettled(for the other three households, only houses were affected, which would be compensated but not be rebuilt), it is arranged in the same village, near the Liangiiahe cement plant. Construction Land Planning According to the investigation, According to the investigation, the mean house site area is 43.5m2, based on the standard to plan, the number for construction land of the villages is as following a). For Snapping village, 13 households with 49 persons, needs land of 2131.5m2; b). For Taoyuan village, one household with 4 persons, needs land of 174m2; c). For Puxi village, 9 households with 38 persons, needs land of 1653m2; d). For Yangpo village, 3 households with 16 persons, needs land of 692m2; e). For Tianchiya village, one household with 4 persons, needs land of 1 74m2. For the above, it is totaling 4828.5m2(7.3mu). Public Project Facilitates Planning Of the resettlers in the reservoir area, 90% have been electricity-fitted; 50% of them used running water(from the mountains). After removal, electricity has been fitted for every household and they can use running water. Roads and Communication At present, along the left side of the riverside of Guandu river, there is Zhuxiang road to the riverside, so the traffic is convenient. But in Puxi and Yangpo village, the road is not smooth, and the villagers can only carry with boarders to buy and sell things, so much inconvenience is for their production and living. After removal, it is needed to build up three docks, and to build a new village road of 1.5km(connect with Zhuxiang road, at the Puxi management part) to solve the shopping problem. Deployment of social service facilities The administrative villages affected by inundation have got the auxiliaries of primary school, medical treatment house, business net pots, no rebuilding is necessary. 47 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 5.6. Plan for Relocation of Specific Facilities The relative departments provide the plan. The specific for the project is mainly as following: Zhuxiang road, tractor road, power lines, ray chain line, bridges, Mayuhe Power Station, Government's door, docks, etc,. According to the actual project and local conditions, combining with the design requirement of the very period, the plan for the specifics is as follows: 5.6.1. Road Rebuilding Combining with the actual condition of the reservoir area, ensuring to restore the traffic, according to the requirement of the "Feasibility Study Report for Rebuilding Songshuling Power Station Project Affected Road", which was designed by Zhushan County Traffic Bureau in Sep. 1997, fourth level road three periods totaling 8.288km will be built in the area, 6.414km for two periods of Zhuxiang road, 1.874km for the period of Liangjia cement road; 3 bridges will be built, crossing 60m, totaling 136m, a new tunnel will be built with length of 280m; the rebuilt road is 8.5m wide for the base and 6m wide for the road. According to the project reconstruction design plan: the project will be designed at a time and completed in two periods, for the first period, two periods of Zhuxiang road will be completed; for the second period, after the compeltion of dam, use the darn to take instead of bridge to cross the Duhe river, and then rebuild Liangjia road. 5.6.2. Tractor Road Rebuilding The two periods of tractor road to Snapping village group one and Lutou valley float starting pot is totaling 0.85km. It will be carried out together with resettlement removal, and the road will be built to the new residence; in Puxi village, a tractor road of 1.5km will be built to the dock. 5.6.3. Bridges Above Liangjiahe river, a stone-arched bridge with pure crossing of 60m. 95m for length. 6m for wide will be built, and it has been brought into the reconstruction design and requirement which was provided by the county Traffic Bureau: in Puxi village, a chain bridge with 90m of length and 2m for wide will be built, since after reservoir retaining water, the surface will be broaden and it will be difficult to rebuild, so now it is determined to add ships and docks prospectively. 5.6.4. Power lines Restore low voltage line of 220v of 4.4 pole km. 5.6.5. Post ray cable line Restore post ray cable line of 6.25 pole km(from dam 74km broad to 79km broad) 5.6.6. Government's door Restore the government's door of Liangjia Township(4.5x8)m. 48 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 5.6.7. Docks Restore one for each of Liulin, Guandu, Taoyuan village group 6, Yangpo village group 1. 5.6.8. Mayuhe Power Station The power station is beside Liangjia township road; the altitude of the station house surface is 370m, built in 1990. The station will be inundated by Songshuling power station, with an installation capacity of 2x5OOkw, with workers of 28 and 41 5.8m for their living houses. The power station is now in the charge of Zhushan County Water and Electricity Developing Cop.Ltd., and it will lose its function after the completion of Songshuling Power Station. Because there is no suitable condition for power station building, it will be compensated, and the workers there will be transferred to Songshuling Power Station. 5.7. Plan for Clearing the Reservoir Bottom The surface of reservoir is 2.74m2, and the extinct water line is 384m, 116 persons live below the line signing for inundation once twenty years, and the area of the houses is 3984m2. To clear all the concealed peril before the operation of the power station, the bottom must be cleared before water retaining, inclosing clearing construction, hygienic, tomb and woodland. Clearing for constructor and structure All the houses and auxiliaries within the clearing scope must be relocated, the walls(except soil) should be leveled down, and the old and waste materials that easy to float wall are burnt stilly. All the auxiliaries including lines, telegram, broadcast within the scope that interring the safe operation of reservoir will be cleared, and the equipment, materials must be carried away After clearing, the rest height of the big building should be no more than 0.5m above the ground surface. The well, cellar within the area will be blocked, covered. Sanitation and antiepidemic plan The manure pit, sties, toilets, rubbish in the reservoir area will be cleared with sanitation and antiepidemic, carry them out or put them under the sun to be shone so that to sterilize. For every square meter, lkg lime will be used to sterilize, the sewage pit will be filled with soil. Tomb clearing plan The tombs that have been buried within 15 years will be moved out or be treated at the very place, lkg bleaching powder will be used for every pit. Whether the tombs buried before 15 years should be moved is based on the local custom. For the tombs bury land for those died of inflection disease, specific treatment will be taken. Clearing Planning for Woodland Before reservoir retaining water, gardens, woodland, timberland and scattered fruit trees should be fell down along the land level, and be transported out. The tree stakes will be no more than 0.3m, the firewood will also be transported out. The remaining branches, whither wood which easy to float on the water, should be burnt or bleached. 49 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan 5.8. Reservoir Developing Plan There is no industry pollution upper the reservoir area, and the residence is scattered, so the water and land resource was well kept, and the water quality is very good, fish and shrimps grows quickly; after completion of reservoir, the tail and bend can be used for aquatic, net fishing and other ways to find out the road to rich. In the reservoir area, especially at the front, the government take advantage of the special nature resource of the jagged rocks of grotesque shapes to develop Lutou Valley Floating tourist line, for this, publication was made through broadcast, TV and newspapers to attract more tourists. After the completion of reservoir, the surface of it will be more wide, the scene will be more grand, then with some auxiliaries and service facilities, more tourists will be attracted, but the local government shall strengthen the management, train the relative workers and provide favorable policies for the resettlers so that to create ways to rich. 5.9. Forecast of the resettlement production and living level After resettlement: The reservoir inundation involved Liuhe, Daping,Laozhu in Liulin township, generally, land resource was not affected. Measures of protecting was taken for their environment and infrastructures, their production and living condition did not change, and so did their employment, at the same time, they can share relative preferential policies, so their ways of production will be broaden and their living level will be improved little by little. The inundation involved cultivate land, woodland, houses of five villages, after inundation, they still got cultivate land per capita of 1.77mu, woodland 15.47mu, according to the grain production of 362kg per mu, they can get 640kg everyone. So the problem of eating can be ensured. Under the premise that there are grain remained, they can go in for trading, eating and drinking service, tourist, aquatic, set up self-opened or cooperate enterprise, so to make market brisk, strengthen people managed economic activities, and stimulate the continuos development of rural economy. After power station resettlement, according to the plan above, the production and living indexes of the resettlers is as the following Table 5-5. 50 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Budget of the main economic indexes of the reservoir area Table 5.5 Item unit Main economic measures remarks 1 Omean cultivate Mu 1.77 Numbers for mean land cultivate land and mean 2 0mean woodland Mu 15.47 woodland only include 3 0 mean occupied 3 43.5 relocating resettlers, not 30mean occupied m3 43.5 including the resettlers in 40mean living house m3 40 the protection area resettlement area. 5 0mean grain Kg 640 5 Umean grain Kg 640 Build village and group 60 income per capita Yuanlp 1600 roads of 1.5km erson 7 Elabors Person 85 resettlement 801traffic condition Connect the roads in the village with outer roads 9ielectricity and Fit electricity, have pure water supply water From the description above, the land owned by resettlers changed little before and after land resettlement, and the employment of the resettlers in the protecting area kept the same, so did their economic income; for the resettlers in Snapping, Yangpo, Puxi, Taoyuan, Tianchiya, they are mainly resettled by planting. For the present land resource, change the hilly land into ladder shape, change the dry land into paddy land, make suitable for forest forest, make suitable for special, carry out different kinds of business, and there are items for non- agricultural production; after relocation, the house living area didn't increase, but their living quality increased, especial on the structure, thus after two to three years' hard working, they can reach the production and living level before land requisition, and even exceed. 51 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 6. Budget and Estimation of Land Requisition 6.1. Base for Budget Prepared Land Administrative Law of PRC( implemented on 1,Jan.,1999) Planning and Design Specification for Reservoir Inundation Treatment of Hydropower Projects; Implementation Method of Land Administrative Law of Hubei Province Implementation Method of Cultivate Land Occupation Tax in Hubei Province[ezhengfa(l 987) No.73 Notice issued by Hubei Provincial Government]; Woodland Administrative Regulations of Hubei Province; Notice on Levying, Using and Administrative of Forest Tax of Hubei Province, jointly issued by Price Bureau, Finical Bureau and Forest Bureau[ejiazi(1994), No.61 Document] Notice of Decreasing the Buying Price and Arrangement for Buying Price of Late Rice, issued by Zhushan County Price Administrative Bureau[zhuguanzi,(l 999), No.18, No.35 document] 6.2. Compensation Principles Criteria of land compensation and resettlement subsidy is ascertained according to Land Administrative Law of PRC and Method of Land Implementation of Hubei Province; Compensation criteria for house and auxiliaries is ascertained according to the replacement cost; Compensation criteria for specific facilities is based on the affected degree and the need of actual restoration; Fees for protection will be ascertained according to design; The other fees are ascertained according to the present regulations. 6.3. Compensation Criteria The price taken for estimation is the price level of 1999. and the level year of reservoir inundation treatment temporarily determined is 2001, the production of grain is as the level as that of 1999, by an increasing rate of 1.5%, thus estimate to 2001. Corns, wheat and rice are mainly planted in the reservoir area. 6.3.1. Compensation for resettlement of the rural area Land compensation and resettlement subsidy Compensation for cultivate land requisition and resettlement subsidy Calculated by the mean grain production per mu of the five administrative villages, Snapping, Taoyuan, Puxi, Yangpo, Tianchiya, of 1997,1998,1999, which is 362kg, and by an increasing 52 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan rate of 1.5%, thus to 2001, suppose the grain production per mu is 367kg, the price is based on the actual cultivate land planting. In the local area, crops are mainly planted on dry lahd, and rice only take a proportion of 20%. The local grain production, according to the proportion of rice, corn, wheat, etc., calculate by Zhushan County Price Bureau(1999) No.35 and (1999) No.18, the grain price is 1.06yuan/kg, and the side-products, calculate as 75% of the grain production, the price is 0.20yuan/kg. Then the price of grain is 1.24yuan/kg. By calculation, the mean year production is 455.5yuan/mu of the five villages three years before land requisition. Compensation for land requisition is 8 times the mean production value three years before land requisition. Resettlement subsidy is caulked according to the number of persons needed to be resettled, calculated by using the land requisitioned to decide the mean cultivate land occupation number. The subsidy criteria for every one who needed to be resettled is 5 times of the mean production value of the cultivate land three years before. After calculation, the sum of the compensation and the resettlement subsidy in the five villages in the reservoir area is 4665yuan/mu, no resettlement subsidy for the land without registration (3446yuan/mu). The Renault is shown in Table 6-1. Calculation of cultivate land compensation for the villages inundated Table 6.1 Item Unit sangpi yangp Puxi Taoy Tianc Total Average ng o uan hiya Total pop.in Person 629 376 679 659 1087 3430 2001 Total cultivate Mu 918 1291 109 1425 1669 6393= in the three years Kg/mu 334 237 363 398 463 367.3 Output value yuan/mu 414.2 294 450. 493. 574.1 455.5 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~~~1 5 _ _ _ _ Cultivate land 121 Cultivated landMu 68 51.5 . 60 14.5 315.1 inundatedI Compensate Times/mu 8 8 8 8 8 times Subsidy times Times/mu 3.4 1.5 3.1 2.3 3.3 2.7 Mean cultivate Person/m 1.46 3.43 1.61 2.16 1.54 1.86 land u ___ Compensation Yuan/mu 3313 2351 360 3948 4593 3446.4 criteria 1 Subsidy criteria Yuan/mu 1419 428 2 1141 1870 1218.3 Total of above Yuan/mu 4732 2779 500 5089 6463 4664.6 53 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan B Compensation and subsidy for woodland requisition According to the relative regulations of Zhushan County on woodland requisition, the compensation and subsidy for woodland requisition is composed by compensation, wood compensation, resettlement subsidy. Compensation for woodland and wood are as below: 2000yuan/mu for timberland; 2500yuanlmu for economic forestland; 1500 yuan for shrub. For the project occupied land and the land for construction, since the construction period is 4 years, and the occupied land is basically shrub, it is determined to be compensated as the criteria of land requisitioned. C Compensation for scattered trees For the scattered fruit trees, 20 yuan every plant will be compensated, and 15yuan/plant for the fixed trees. D Compensation for host site The same with the compensation criteria for cultivate land, 3446yuan/mu will be compensated for host site, and no resettlement subsidy. E Compensation for house and auxiliaries i.Compensation for house According to the survey to Zhushan County Real Estate Bureau, combining with the actual house structure, after analysis on the materials, the house replacement cost in the reservoir area is determined as follows: brick fixture 290 yuan/mi2, brick and wood 250yuan/m2, stone and wood 176yuanlm 2, soil and wood 176yuan/m2, grass and wood 104yuan/m2, and 80yuan/m2 for simple structure. The main house compensation price is analyzed in Table 6- 2(according to the actual condition, generally the living area of the resettlers is 200m2 or so, now it is calculated based on 200m for every household. Moreover, most brick fixture and brick and wood are two floors, soil and wood is generally one floor. Thus how to analyze.) 54 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Brickfixture Table 6.2 UnitO 10000 yuan Item Number Price (yuan) Amount Remark Red brick 60000 yuan 0.23 1.38 Empty wood 120yuan 60 0.72 Cement 30 tons 300 0.9 Reinforce 2 tons 3000 0.6 Lime 9 times 250 0.225 Agricultural truck Black sand 35 times 25 0.0875 Agricultural truck Door and 55 m' 60 0.33 windows Electricity 0.2 Tile on the top 21250 0.2 0.425 Rubble 40 mb 50 0.2 Payment for 200 m' 25 0.5 working time Replacement 5.8 cost Brick and wood Table 6.2 Unit :10000 yuan Item Number price(yuan) Amount Remark Red brick 45000 0.23 1.265 Cement 9 tons 300 0.27 Wood 15 m 420 0.63 Tile 20000yuan 0.2 0.4 Reinforce 0.5 ton 3000 0.15 Lime 4 times 250 0.1 vehicle Black sand 30 times 25 0.075 Vehicle Doors and 40 m2 60 0.24 windows Hardware and 0.18 electricity Rubble 40 m3 50 0.2 Payment for 200 25 0.5 working time Replacement 5.000 cost Soil and wood structure Table 6.2 UnitL lOQ000G yuan 55 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Item Number Price Amount Remark Rubble 45 mz 50 0.225 Wood 30 mL 420 1.26 Cement 5 tons 300 0.15 Tile 20000 yuan 0.2 0.4 Lime 3 vechiles 250 0.078 Agricultural vechile Black sand 16 vechiles 40 0.064 Agricultural vechile Doors and 40 m2 55 0.22 windows Hardware and 0.18 electricity Candy house 208 25 0.523 Wage for 145 25 0.3625 carpentry Glass 30m2 18 0.054 Paint 40 mI 0 0.04 Nail 80kg 6 0.048 Replacement 3.52 price __52 2. Constructor auxiliaries Based on relative criteria and price. 15 yuan/mr2 for enclosing wall, 10 yuan/M2 for soil sunny ground, 15 yuan/mr for cement sunny ground, shed for cow or pig, 150 yuan for each, 100 yuan for a pond, 200 yuan for each kitchen range top, 250 yuan for each toilet, 350 yuan for each well, 200 yuan for a cellar. A Compensation for infrastructures Fees for infrastructures of reconstruction in the resettlement area(three smooth and one level), includes leveling the ground., public project, road in the area, capacity adding, subsidy for temporary living house, etc., for leveling the host site, 30 yuan/mr, for piping water, 300 yuan/ person, for electricity providing, 150 yuan/person will be compensated. B The transportation fees includes objects transportation fees (50 yuan/person), medical treatment fees(30 yuan/person), loss of removal(30 yuan/person), and subsidy for missing the work (240 yuan/person). It will be subsided by 350 yuan/person totally. 6.3.2. Compensation for reconstruction of specific facilities Electricity facilities(low voltage lines) There was a small hydropower station in the reservoir area, with installation of 1000kw, the compensation was 4.5 million-yuan, and the lines were compensated by I 0000-yuan/pole km. Telegram and cable line 80000-yuan/pole km for ray cable lines, 30 yuan/household for cable TV set. 56 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Restoration of traffic around the reservoir area The traffic around includes Zhuxiang road, Liangjia road, which will be compensated by 300000 yuan/km; the village or group tractor by 30000 yuan/lkm; Liangjiahe bridge by 50000 yuan/m; chain bridge by 1500 yuan/m; docks by 30000 yuan for each. Other facilities The governrnent's door by 20000 yuan for each. 6.3.3. Fees for project protection According to the design of the county project group of Water and Electricity Bureau for the protecting dam, 2923400 yuan will be invested. 6.3.4. Fees for clearing the basin of the reservoir For the clearing of the reservoir bottom, the buildings and structures, toilets, bars in the reservoir scope of 2.74km2 will be cleared in hygiene, the tombs will be removed and sterilized, and the woodland will be cleared. This project is totaling 142.1 thousand-yuan. 6.3.5. Other fees A. Fees for skill training It is based on 0.5% of the resettlement fees, which is used for improving the production skill, artistic appreciation of the resettlers and for the improvement of the resettlement cadres' management level. B. Fees for implementation of management It is calculated by 3% of the resettlement fees and 1% of the sum of reconstruction fees for specific facilities, project protection, reservoir bottom clearing, and it is mainly used for the house of resettlement organizations, purchasing of equipment, wage, office work, official business. C. Management fees for land requisitioned It is calculated by 3.6% of land compensation and resettlement subsidy, and it is used for the activities of land requisition and approval. D. Fees for monitoring It is calculated by 1% of the sum of the resettlement fees, specific facilities reconstruction fees, project protection fees, reservoir bottom clearing fees, and it is used for the removal of the resettlers, reconstruction of the specific facilities, the progress of production developing item, quality and using of funds. E. Fees for investigation and design It is calculated by 2% of the sum of the resettlement fees, reconstruction of the specific facilities, project protection fees, reservoir bottom clearing fees, it is generally used for the 57 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan design unit, during the possibility study and inviting bids. F. Fees for monitoring and estimation It is calculated by 1.0% of the fees mentioned above, and used for resettlers' removal, reconstruction of specific facilities, implementation progress of production item, checking, and for the activities of submitting the resettlement independent monitoring report to the World Bank through project owner. 6.3.6. Fees for preparation Fees for basic preparation is calculated by 10% of the fees of rural resettlement, reconstruction of specific facilities, project protection, clearing reservoir bottom. 6.3.7. Loan interest of the construction period The project construction needs four years, the year interest rate is 6.21%, the loan interest is totaling 1728 thousand yuan. 6.3.8. Tax According to the present relative policies and regulations: Implementation Method of Cultivate Land Occupation Tax in Hubei Province, Fund Requisition and Management Method for Cultivate Land Developing in Hubei Province, Notice for the Requisition, Using, Management Method for Forest Restoration Fees in Hubei Province, the fees is determined as follows: A. Tax for cultivate land occupation 3000 yuan per mu, the cultivate land area is 315.1 mu, totaling 945.3 thousand yuan; B.f. for reclaiming cultivate land 3000 yuan per mu, cultivate land area 315.1 mu totaling 945.3 thousand yuan; C. Fees for restarting forest: 2000 yuan per mu, woodland area 378.5mu. totaling 757 thousand yuan; the total of the three items above is 2647.6 thousand yuan. 6.3.9. Overall Estimation of Resettlement Resettlement investment for Songshuling Power Station is 18881.9 thousand yuan(calculate by 18880 thousand yuan, not including tactics). In which, static investigation is 17153.9 thousand yuan, the categories is detailed in Table 6-3, and the items is shown in Table 6-4. Resettlement investigation for Songshuling Project Table 6.3 No. Item Amount (10000 yuan) Proportion[1%0l I Resettlement compensation |322 E64 18.8 58 Hubei Province Hvdropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan for villagers 2 Fees for construction of 839!06 48.9 specific facilities 3 Fees for project protection 292EL34 17 Fees for clearing reservoir 14]21 0.8 bottom 5 Other fees 91 L20 5.4 6 Fees for preparation 155 194 9.1 In which, basic preparation 155 ]94 7 Total static investment 1715 C 39 8 Loan interest in 172]5 8 construction period 9 Project total investment 18881] 19 10 Relative tax 264C176 Planning investment for Songshuling Power Station reservoir inundation treatment Table 6.4 Total No . Item Unit price O yuan amount(ten Number p u thousand yuan) 1] Rural area 322.64 I (I) | Compensation for land 225.17 () Irequisition and subsidy 257 l.cultivate land 157.23 compensation _ (l)cultivate land Yuan/mr 4665.0 146.99 registered u . . (2)cultivate land Mu 29.7 3447.0 10.24 without registerence Mu 2.73470102 2.woodland: mu 298.5 53.43 (l)timber land mu 24 2000.0 4.80 (2)economic land mu 74.5 2500.0 18.63 (3)shrub (scattered trees) mu 200 1500.0 30.00 3.host site mu 7.3 3447.0 2.52 4.project occupied land or land for temporary Mu 80 1500.0 12.00 construction (2) Scattered trees 3.63 Scattered fruit trees Plant 397 20 0.79 Trees fixed Plant 1891 15 2.84 (3) Compensation for 69.97 house and auxiliaries l .house: m 66.66 (1)brick fixture m 228.5 290 6.63 (2)brick and wood m 24.2 250 0.61 (3)stone and wood m 185.3 176 3.26 (4)soil and wood m' 2847.1 176 50.11 59 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan (5)grass and wood _ 314.5 104 3.27 (6)simple structure MZ 348.7 80 2.79 2.auxiliaries: m 3.31 (I)fence m 10 15 0.02 (2)sunny ground ms 900.5/167 1.15 a. soil sunny ground m 900.5 10 0.90 b. cement sunny ground m' 167 15 0.25 (3)bar for pig and cow m 31 150 0.47 (4)pond 3 100 0.03 (5)kitchen range top 17 200 0.58 (6)toilet 29 250 0.73 (7)well 3 350 0.11 (8)cellar 12 200 0.24 (4) Infrastructures 19.80 l.ground leveling 7v 4861.3 30 14.58 2.piping water Person 116 300 3.48 3.water supply Person 116 150 1.74 (5) Transportation fees for 350 4.06 moving l.for objects Person 116 50 0.58 2.medical treatment Person 116 30 0.35 fees 3.1oss of moving Person 116 30 0.35 4.subsidy for missing wor Person 116 240 2.78 work Reconstruction fees for 2D ~specific facilities 839.06 Compensation for (l) water and power 450.00 facilities Small hydropower Set/KW 1/1000 4500 450.00 station (2) Compensation for 5.00 electric facilities Power lines of low Pole 5.0 10000 5.00 __________ voltage Km Fees for traffic (3) restoration around the 77.05 reservoir area Tractor road Km 2.35 30000 7.05 Bridges M 95.0 5000 47.50 Chain bridge M 90.0 1500 13.50 Docks 3 30000 9.00 (4) Fees for road line 255.00 changingII County and township Yuan/K 8.5 300000 255.00 road m 60 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Fees for reconstruction (5) of post and 50.01 communication Ray cable line Pole 6.3 80000 50.00 Km Cable TV set Househ 4.0 30 0.01 old Other Yuan/o (6) facilities(government's 1 20000 2.00 door) ne 3 0 Fees for project 292.34 protection 40 Fees for clearing the KM2 2.74 14.21 reservoir bottom Fees for clearing M2 9889 4 3.96 buildings Hygiene cleaning (toilet, bars for pigs and 60 16 0.1 cows) Moving of tombs 50 500 2.5 Clearing of tombs 50 15 0.08 Clearing of woodland mu 379 200 7.58 5. Other fees 91.20 l.fees for skill training 3.23 2.fees for management 21.14 implementation 3.fees for administration of 8.11 requisitioned land 4.fees for investigation 29.36 and design 5. fees for monitoring 14.68 6.fees for estimation of 14.68 resettlement monitoring 60 Fees for preparation 328.74 Basic preparation fees 155.94 Loan interest in the construction 172 08 periodLlyearly interest rate 6.21%0_ 7: bTotal investment of the 1888.19 project In which, static 1715.39 investment 8 b Other tax 264.76 Tax of cultivate land occupation mu 315.1 3000 94.53 Recultivation fees mu 315.1 3000 94.53 61 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resenlement Action Plan I I ~~Fees for restoration ofIIIII forest f mu 378.5 2000 75.7 6.4. Equilibrium analysis for fund using and resettlement fees The project resettlement planning investment is based on the present policies and regulations, according to the market price, the resettlement design that was complied after investigation, study and analysis, then get out the budget of the fees needed for the project implementation. And based on the affected inventory indexes, the resettlement designation, and under the premise of which, the budget is higher than or equal to the resettlement planning total investment, the design budget was made out, so that the resettlement plan will surely be implemented smoothly. The resettlement in the reservoir area is mainly agricultural resettlement backward, and the relocating households were all resettled in their own village, especially at the tail of the reservoir, measures of protection was taken to protect the present advantage of position. The resettlement fees was all used for the development of local collective production and the construction of village infrastructures, the rest is for the welfare for most of the villagers. After land requisition, land was adjusted within the scope of the whole village; for the project protection fees and the fees for restoration of specific project, the -fund must be used for its special purpose only. The planning resettlement investment is basically consistent with the designed budget after its adjustment. 62 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 7. Resettlement Implementation Plan 7.1. Implementation procedures Land requisition and compensation It will be completed by relative organizations in a coordinate way. The detailed procedure is as follows: a). The modem maps defining the scope and area of the land to be requisitioned will be provided by Hubei Province Water and Power Design and Investigation Institute. b). The project owners apply for permission to the land management departments; c). Apply for official approval; d). The resettlement offices negotiate on the land compensation with county land management departments, sign the compensation agreement and go through the formalities foreland use; e). County land management bureau signs together with the relative town(ship)s determines, on site, scope, and quantity of land requisition; f). County land management bureau signs "land Requisition Agreement" with relative town(ship)s; g). Allocate the compensation h). Go through legal formalities; i). Implementation of land requisition. In addition, the use of fees for land requisition(compensation and subsidy): most of the fees is used for the improvement of the land, and the rest is for the collective production and the improvement of the village infrastructures of the whole village; the fees for resettlement in the same village will be used to develop the collective production and improve the village infrastructures of the whole village, and land will be adjusted in the scope of the whole village. Generally, in addition to develop land resource and construct infrastructures, the rest fund will be in the village mainly for welfare, which can be shared by most of the villagers. If someone wants to get loan to open small enterprise(e.g.open a small shop), he must get the approval of the village representatives committee, then he can get loan from the rest of the land requisition fees, or the villager must get loan from the local bank. Production Restoration The village committee will implement the production rehabilitation. The procedure is as follows: a). Convene villager representative meetings, study and establish overall schedule of land adjustment and production restoration; 63 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan b). Publicize the schedule of land adjustment and production restoration; collect comments and suggestions from the villagers; c). Implement land adjustment; d). Cultivation and planting Housing removal and rebuilding The procedure is as follows: a). Hubei Provincial Water and Electricity Investigation and Design Institute provide the scope of housing removal; b). The county, town(ship) investigate into the quantity and quality of the houses; c). The county and town(ship) negotiate with villages on the compensation criteria of houses and ancillaries, and sign housing removal agreements; d). The county and town(ship) sign agreement on housing removal compensation with villages; e). Town(ship) resettlement group public the quantity, compensation criteria and the time schedule for removing and rebuilding houses, and inquire for comments from the PAPs; f). Town(ship)s resettlement group and village sign the agreement on the housing removal and rebuilding; g). Allocating of host site; h). PAPs receive the compensation fees; i). PAPs build their new houses and move into the new houses; j). PAPs demolish their old house. Reconstruction of specific items a). The project design unit provides the affection scope; b). Project resettlement office and the charge department of the specific items investigate into the quantity and level of the items; c). The project resettlement office entrusts the specific departments to prepare the reconstruction plan according to the resettlement plan; d). The project resettlement office and the specific item departments define the compensation criteria, and sign agreement on compensation of reconstruction of specific items e). The project resettlement office entrusts the specific departments to implement the reconstruction of the specific items; 64 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan f). The specific items being put into operation. 7.2. Progress schedule The project construction period is four years. To ensure its completion in time for water retaining and power producing, we will implement resettlers' removal together with the power station construction prospectively, so as to ensure the completion of water retaining, housing removal, and construction of protecting dam. It has been determined to implement the resettlement work in two periods for the reservoir area(except protecting resettlement), 60% for the first period, with 70 persons, completed by the end of 2001; the rest 46 persons were for the second period, completed by the end of 2002, the year next to the project starting year. The progress of inhabitant resettlement will be based on the following principle: Housing removal will be completed before water retaining; Housing removal date will be informed to the resettlers at least 7 months ahead of the date, in which 3 months for preparation (prepare the materials and workers), 4 months for new house building. Besides, the PAPs can stay in their old houses until completion of the new one. The duration of house rebuilding will be duly negotiated with the resettlers, and can be extended if necessary; Land requisition will be completed before construction commencement of the transmission project; Land adjustment will be completed during cropping intervals; Infrastructures will be completed before the completion of removal; The reconstruction of specific project will be completed before construction commencement, so to ensure the smooth traffic and post of the local place; The completion time will connect with the project water retaining time. According to the overall progress schedule, the project item progress schedule is detailed in Table 7-1. 65 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan Land requisition and removal progress schedule for Songshuling Power Station Table 7-1 Item Progress schedule IilLand requisition 1. Determination of object 2000.2 2.Preparation and implementation of site 2000.3-2000.4 material data 3.Consultation and determination for land 2000.4-2000.5 compensation 4.Compensation payment 2001.3-2003.12 5.Go through formalities of land requisition 2001.4-2004.6 11ElRestoration of production I.Land improvement 2001.5-2002.12 2. Consultation for land adjustment and 2001.10-2002.4 allocation plan 3.Land adjustment and allocation 2001.1-2001.12 4.Resettlement of labor force 2001.12 III D Housing relocation and rebuilding 1. Definition of relocating target 2000.4 2.Survey for relocating material data 2000.3-2000.4 3.Consultation and definition of 2000.4 2000.5 compensation criteria 4.Pay the compensation Before 2002.2 5.Host site election 2001.1-2002.2 6.Land requisition for host site 2001.1 -2002.2 IVEIRestoration and reconstruction of the Before 2003.3 specific facilities __ 7.3. Fund Allocation 7.3.1. Principles All the fees relative with land requisition will be counted in the budget of the project, the compensation for land requisition and other fees will be paid to the relative units or individuals through the county or township resettlement office by the proprietor. Compensation for housing relocation will be paid to the resettlers before they start to build their new houses; Compensation for land requisition and other facilities will be paid to the resettlers 3 months ahead of land requisition; In order to ensure a smooth implementation of the resettlement, the PRO will set up supervisory mechanism in the resettlement offices at all levels, so as to guarantee all the 66 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan money to be paid to the PAPs as specified. 7.3.2. Mechanism Responsible for Resettlement Finaciance The organizations responsible for compensation of land requisition are project office, county resettlement office, county Land Bureau, town(ship) government and village committee. The organization responsible for the compensation of housing relocation are project office, county resettlement office, town(ship) resettlement office, town(ship) government and village committee. In order to guarantee compensation fees to be timely transferred and be proper used, the resettlement compensation fees shall be transferred from higher level to lower level, correspondingly, each department shall implement the strictly stipulations in finance accounting and audit system. The ultilication and transferring status of compensation fees shall be periodically checked and reported, thus can submitted the adjustment plan and remedial measures for unexpected event. 7.3.3. Fund Flow according to the compensation policies and criteria set in the RAP, the PRO will sign an Agreement of Housing Relocation with the county resettlement office, and will sign an Agreement of Land Requisition with the county Land Administration Bureau. The county resettlement office will sign the agreements with the resettlers and the relative town(ship)s. According to the compensation content, quantity and time regulated in the relocating agreement, the compensation fund will paid to the county resettlement office through bank, then to the town(ship) resettlement working group, and later to the resettlers directly in periods. Based on the policies, the land compensation and subsidy will be paid to the county resettlement office, which will be used for river treatment, land cultivation and land resource developing. The land compensation fundflouw as the map: Fund flow chart Land compensation PRO -a county resettlement office Subsidy PRO -- county resettlement office House compensation and auxiliaries PRO - county resettlement office - town(ship) working group -- resettlers Relocation and transportation fees PRO-- county resettlement office town(ship) working group -. resettlers Subsidy for work missing PRO -- county resettlement office - town(ship) working 67 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan group -* resettlers Compensation for scattered trees PRO -- county resettlement office - town(ship) working group -+ household Fees for three convenience and one level PRO - county resettlement office-- town(ship) working group Compensation for infrastructures PRO- county resettlement office -. town(ship) working group Fees for management PRO - county resettlement office --county Land Administration Bureau - town(ship) working group Fees for planning PRO -* design organization Fees for monitoring PRO -. monitoring organization Fees for monitoring and estimation PRO -+ estimation organization Fees for management implementation PRO -* resettlement implementation organization 68 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 8. Institutional Organization 8.1. Establishing of Organization In order to implement the RAP in a smooth manner, a resettlement organizational network will be established by the PRO, zhushan county Resettlement Bureau and Zhushan county Government, which will be vested with the responsibility for planning, coordination and monitoring of resettlement activities. The following institutions are established for or involved in land requisition and resettlement of the project: Project leading group for resettlement Project resettlement office County resettlement leading group County resettlement office Direction office of dam building Town(ship) resettlement working group Village committee and villager group External independent monitoring organization 8.2. Responsibilities 8.2.1. Project leading group for resettlement The Project Leading Group is member by Hubei Provincial Planning Committee, Zhushan county Water and Electricity Development Cop.Ltd., and the purpose is to ensure the resettlement to be carried out smoothly. The Leading Group is mainly responsible for strength the leadership over the project, formulating project resettlement policy, coordinating the activities of land requisition and inhabitant resettlement between resettlement organizations at different levels. Project Resettlement Office is subordinate to the Leading Group, do with the everyday affairs. The (PRO) is in the Zhushan County Water and Electricity Developing Cop.Ltd.. 8.2.2. Project Resettlement Office The PRO is member by Hubei Provincial Planning Committee, Zhushan county Water and Electricity Developing Cop. Ltd.and the workers in the resettlement organizations at different levels. The main responsibilities are as follows: entrust the design units to define the project affected scope, and entrust the local prefecture resettlement offices to conduct socio-economic survey and statistics and to file up the datas; assume responsibility for training of workers of the resettlement organizations at different 69 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan levels Organize and coordinate preparation and implementation of the RAP Organize public consultation and popularize resettlement policies Assume responsibility for managing and monitoring payment of resettlement compensation and its use Instruct, coordinate and monitor the resettlement implementation progress performed by prefecture resettlement offices Take charge of internal monitoring activities, prepare internal monitoring report Assist in the external monitoring activities Prepare reports of the project progress 8.2.3. Zhushan County Resettlement Leading Group Zhushan County Leading Group for Resettlement, headed by the responsible leader of local county government, is member by representatives from the county Water and Electricity Developing Cop.Ltd., the county resettlement Bureau, the county Planning Committee, the County Land Administration Bureau, the County Agriculture Bureau, the County Construction Bureau, the County Environment Protecting Bureau, the County Traffic Bureau, the County Telegram Bureau, totally 18 departments. The main responsibility is to strengthen the leadership over actual implementation of resettlement in the county, coordinate among the resettlement organizations involved and take care of relationship between the state, collective and individual, so as to ensure a smooth land requisition and inhabitant resettlement within the county. 8.2.4. Zhushan County Resettlement Office Zhushan County Resettlement Office is member by the Water and Electricity Developing Cop.Ltd., the county Resettlement Bureau, and the specific cadres of town(ship)s for resettlement. The main responsibility is: Entrust the design units to define the project affected scope, assist to conduct survey, statistics on social economy and file up the data; Assist to prepare the RAP and monitor its implementation; Organize public constellation and popularize the resettlement policies; Go through relevant formalities for land requisition and resettlement; Assume responsibility for management of resettlement compensation, monitoring the allocation and using; Be responsible for training of personnel involved in resettlement in affected town(ship)s, instruct and supervise resettlement work in the town; 70 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan Solve problems in a coordinate way during implementation; Assist to complete the internal monitoring and external independent monitoring; Prepare the progress report and submit it to PRO; 8.2.5. Direction house for project of dam building The Direction House is member by Zhushan County Water and Electricity Cop.Ltd. And the skilled Cadres County Water Conservancy Bureau, the main responsibility is: Solve problems in a coordinate way during implementation; Assume the responsibility of dam building project for the resettlement; Organize public consultation and popularize the resettlement policies; Prepare the progress report and submit it to PRO. 8.2.6. Town(ship) Resettlement Group It is led by the relevant responsible leaders in the affected town(ship), and composed of the staff from local electric management station, land management office and police station as well as cadres of village administration. The main responsibility is: Participate in the project investigation and organize public consultation and popularize the resettlement policies; Execute, inspect, monitor and record the resettlement activities within the town(ship); Go through the fornalities for housing relocation; Sign housing removal agreement with the resettlers, supervise the land requisition, removal and construction of houses and auxiliaries; Be responsible for payment and management of compensation fund: Solve problems during RAP implementation in a coordinate way, Report to county land administration bureau and resettlement office the progress of land requisition, housing removal and inhabitant resettlement. 8.2.7. Village Committee and Villager Group The resettlement work group of village committee and villager group is composed of the main cadres of the village and villager group. The main responsibility is: Participate in investigation on social economy and project impact; Organize public consultation and popularize the resettlement policies; Help vulnerable households in resettlement; 71 Hubei Province Hydropower Project Zhushan Count' Songshuling Hvdropower Station Resettlement Action Plan Execute land adjustment, organize activities for production development; Be responsible for funds management and allocation; Report to the higher authorities comments and proposals from the resettlers; Report the resettlement progress implementation. 8.2.8. External Independent Monitoring Institutions The external independent monitoring institution for the project is ECIDI, and its main responsibility is: Observe every aspect of resettlement schedule and implementation, and furnish the resettlement monitoring evaluation report to the project owner and the World Bank. This responsibility will be described in detail in a separate section of the RAP herein dealing with external independent monitoring and evaluation. Assist the project owner to prepare the RAP; Provide technical advice to project owner and the relevant departments on survey and data processing. 8.3. Staffing In order to ensure a smooth implementation of land requisition and resettlement, the project and Zhushan county government arranged all necessary resources for the work. To cooperate with the work of the early days, notice on "Establishing Resettlement Leading Group for Songshuling Power Station Project" was announced on April, 7,2000 by Zhushan County government. The county standing committee and organization minister take in charge of the leader, the county resettlement bureau leader, Yuxianqing, and manager of the county water and electricity developing Cop.Ltd., Zhuze take in charge of the vice leader of the group. The leaders of the county Planning Committee. Finaciance Bureau, Construction Bureau, Traffic Bureau, Land Administration Bureau, Agriculture Bureau and Forestry Bureau were the members. At the same time, in the relative town(ship)s, the corresponding leading groups and organizations were set up to get the resettlement and removal work well done. All of this is detailed in 8-1. 72 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Resettlement organizations and members Table 8.1 Organization Members Position Number Group leadertl Hubei province planning Groupy committee Project resettlement leading leaderE~Zhuze Chief manager of Zhushan county group Members E Huang water and electricity developing 5 Taizhu Li Cop.Ltd. Taihengyg Deputy manager Chengyong Member director C Zhuze vice Chief manager of the company directorOHuang Deputy manager of the company Taizhu The other four are members of Project resettlement office Members ELi the company 6 Chengyong Tang Cheng Meng Shan Shao Wei County standing committee, organization minister County resettlement bureau leader Group Chief manager of county Water leaderGZhang and Electricity Development GeyingCoLt Vice directorEYu Cop.Ltd Xianqing Deputy director of county XZanqing planning committee Zhu Ze Deputy director of county finance Members E Zeng bureau Zhaoxing Deputy director of county Pig Bingbo construction bureau Zhushan county resettlement Chen Guangyao Deputy director of county land Zhhading gounty resettlem ing Chenhanggen administration bureau 18 leading group Ming Changgen Deputy director of county Yang Zhengdian environment protecting bureau Ma Longxue Deputy director of county traffic Tan Shifu bureau Fang Yingbing Deputy director of county Tu Huiguo agriculture bureau Yang Guangde Deputy director of county Yang Cheng broadcast bureau Bao Chengming Deputy director of county price Shuai Peng bureau Xu Gonglu Deputy director of county telegram bureau Deputy director of county statistics bureau 73 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Director of county house administration bureau Town leader of Guandu Vice leader of Liangjia township Vice leader of Liulin township Chief manager of the Water and Dicirector OZhu Electricity Cop.Ltd. Vice directorFYu Director of county resettlement Zhushan county PRO M embeiLi bureau 4 ChembesOng The Cop.Ltd of Water and Chengyong Electricity Zuo Zixiao Elcrit The county resettlement bureau Chief directorOZhu Ze Chief manager of Water and Direction house for dam Vice Electricity Cop.Ltd. protection director lHuang Vice manager of the company 3 protection Taizhu Project group of county water Members :Zhang bureau Zubing LeaderOlLiu Jihua Party committee sectrary of Deputy town director7Deng Leader of the town Guandu resettlement work Xinggui Vice sectary of town party 5 group Zhao Congyou committee Zhu Zhibing Sectary of the town inspecting Members O Zhu committee Zhisheng Town land administration house Leader EZhang Vice sectary of township party Mingqing committee Vice Deputy head of township leaderOShuai Head of township land Liangjia township Peng administration house 6 resettlement group Members ZFei Head of township finaciance Huaqiao house Gong Juxin Director of township party Wang Meng committee office Guo Xinming Director of Tianchiya village Leader Z Xu Gonglu Deputy head of township Vice leaderG Yu Head of township land Liulin township Chengbo administration house S resettlement work group MembersEXiong Head of township police station Jianzhong Leader of court of the township Liu Zongbing Wang Kangdong 8 administrative villages in Zhou Sectary, head and other cadres the reservoir area ZhenggangLZhan of the village _______ ____74 Yuqing 74 Hubei Province Hvdropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 8.4. Organization Chart Project Resettlement Leading Group The Project Resettlement Office Zhushan county resettlement leading group r,onitoring evaluation organization (ECIDI) * 4- Resettlemer! Office Town(ship) resettlement work group Village committee and villager group 8.5. Working relation between organization In the course of land requisition and resettlement, the resettlement organizations at different levels will sign agreements to define their undertakings and responsibilities. The process of signing agreement is as follows: A PRO will sign "Contract of land requisition for Songshuling Power Station" with the county PRO; B PRO will sign "Contract of Independent Resettlement Monitoring and Evaluation for Songshu Power Station Project" with ECISI; C The county resettlement office and the township resettlement group will sign "Housing Demolishing and Inhabitants Resettlement for the Project" township resettlement work group and the household to be resettled sign "Agreement of Housing Relocation and Removal" 8.6. Measures for Enchanting Capacity of Organization The resettlement units at all levels will be manned with administrative and professional personnel who are qualified with professional skill and management ability. Organize the key personnel of the units at all levels to participate in training, so that they have a better understanding of the national resettlement policies and relative requirement of the World Bank, and to enhance their professional skill and capability of solving problems; Guarantee fully on funds and facilities for management; Establish database and ensure the information flow from and to the units at all levels, major 75 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan problems will be solved and decided by the Leading Group; Strengthen reporting and internal monitoring system, and solve problems timely; Develop mechanism of external monitoring and evaluation, and set up predicting and alarm system. 76 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 9. Public Participation and Appeal During formulating resettlement policy, drawing up the RAP and resettlement implementation, the relevant authorities have paid and will pay special attention to the participation and consultation of the PAPs, and solicit pinions and proposals for several times on resettlement work and transmission line routes from the government, people's congress, People's Political Consultative Conference, social bodies, representatives of the mass of prefectures(cities), counties(cities), relevant town(ship). In preparation of the RAP, the PRO has once again solicited the opinions from local governments at all levels and the resettlers' representatives on the resettlement and compensation. With cooperation of local governments at all levels, this RAP is complied. In the implementation stage, the resettlement offices at all levels will further encourage the public participation in the resettlement and rehabilitation. 9.1. Public Participation 9.1.1. Participation in Resettlement Preparation The office has consulted extensively with local government at all levels and relevant authorities responsible for power, planning, land administration and telecommunication on the project locations, site cooperation and confirmation of local governments. The local governnents held meetings participated by the residents and cadres from towns, villages and villager groups, on land requisition and resettlement. At the meetings, the necessity of construction of the project and resettlement policies was made known to all involved. 9.1.2. Participation in RAP Preparation For land requisition and relocation of Songshuling Power Station project, the inventory indexes survey was carried out in the end of 1999. In April,2000, Zhushan County Government organized relevant departments, together with the workers sent by ECIDI, implemented the inventory indexes survey in a whole scope, and prepared the "Hubei Zhushan County Songshuling Power Station Resettlement Planning Report". While investigating into the resettlers, administrative villages. town(ship)and relative units, the sense and importance of the project construction were popularized. They also organized meetings at different levels, consulted on the means on the resettlement in the reservoir area, collected their suggestions and ideas. During the preparation of the RAP, the local governments at all levels and resettlers participated in the following activities: level of county and town: from 1999 to May,2000, carried out resettlement work 10 times, with 60 persons involved; level of village and group: from March to May in 2000, carried out resettlement work 10 times, with 198 persons involved. The objects were mainly of village cadres and resetters representatives;e.g.: On March, 18, Zhushan county government held a mobilization meeting on inventory indexes and social survey, participated by the representatives from Resettlement Bureau, Water and 77 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Electricity Developing Cop.Ltd., Planning Committee, Traffic Bureau, Forestry Bureau, Construction Committee, Post Office, governments of town(ship)s and village resettlers. On the meeting, the county Resettlement Office introduced the resettlement policies and arranged the survey the investigation work, and required the village resettler representatives to popularize the the resettlement work. On April 3, a meeting held by the Water and Electricity Development Cop.Ltd., and participated by the county resettlement bureau, the Cop.Ltd., ECIDI, and the consulting topic was "Songshuling Power Station Land Requisition and the RAP". On April 10, Guandu town government held a meeting participated by Resettlement Survey Group, Resettlement work Group, town(ship) cadres, village representatives of the resettlers' village, consulted the village representatives' opinions on feasibility design of resettlement, and request them to collect the villagers' suggestions and appeal it to the resettlement organizations for further modification. C During the process of survey of project land requisition and relocation, the survey group also conducted a wide-range socio-economic survey to solicit opinions from the the town(ship)s and villages. They conducted the opinions or suggestions on project construction and resettlement activities from 42 households to be relocated and relative villages or villager groups. The survey results are detailed in Table 9-1. 78 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Survey results on Resettlers 'Opinions Table9. 1 No. Question Answer Sample Result household I Do you know the project will be E Yes 36 85.7% constructedC tW A little 6 14.3% _ ]No 0% 2 Are you in favor of the project E] Yes 42 100% construction] ] No 0% 3 So,so 0% 3 Who will be benefited from the project State 42 100% construction? O Collective 42 100% E1 Individual 42 100% 4 Do you know the compensation policies ] Yes 17 40.5% of land requisition and resettlement for the ] No 25 59.5% project? 5 Are you willing to have your land ] Yes 42 100% requisitioned, house relocated and to be ] No resettled? 6 If you lose your land after land ] Agri- to 13 31% requisition, what is your first choice] Non-agri 7 16.7% { Work in 7 16.7% town(ship) 15 35.6% enterprise F] Continue to farmn ] Others 7 If your legal right is interfered, do you ] Yes 39 92.9% know you can lodge an appeal? ] No 3 7.1% 8 Which way of house removal /rebuilding] By 30 71.1% do you prefer? yourself 12 28.9% 17 1 By lorganization I_I D The survey group also make survey to local cadres and villagers. On the main factors of the restriction of local economy and relative questions of land requisition and relocation, they had a public sample survey, with a scope of town(ship) and village cadres, common villagers, and their names must be true, so as their the age, sexture, knowledge, present job, address. The total number is 26. The detailed content and statistics is in Table 9-2. Table 9.2 Choice (make a a1 in the grid) Answer perso Result 79 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan 1.Do you think what impact the local oelectricity 18 69.2% economy much? problem 24 92.3% otraffic condition 7 26.9% nwater resource onature resource oothers cdon't know 2. Do you know the project to be constructed? oYes 26 100% oNo 3.Do you think whether the project oYes 26 100% construction is good for the stimulation of the oNo development of the local economy cdon't know 4.Do you think the construction is necessary ? oYes 26 100% oNo ndon't know 5.During construction, land requisition will ofavorable 22 84.6% have impact on the local villagers and social, ounfavorable do you think it is good or bad? otogether 4 15.4% odon't know 6.Do you think you should support state oYes 26 100% construction? oNo odon't know II El Answer the questions C give simple answer F] What impact will be for social and your family by the project construction? Most of them thought that the construction will make the local economy develop, improvement the local production and living level. How do you think to supper the construction? Most of them said they would cooperate actively, subordinate the arrangement, do something favorable to the construction. What is your opinion on land requisition and relocation? Most of them think the compensation will be based on the state compensation policy, try to get stable improvement of resettlers' production and living. E In April,2000, again surveyed the project affected inventory indexes, the resettlement organizations at different levels, villages and villager groups participated the work. F In the future, through resettlement organizations at different levels, the county resettlement leading group will strengthen the popularization and encourage the participation of the villagers by the following measures: -----public the property before payment of compensation, the affected inventory indexes of the households will be publicized to be monitored by the resettlers. 80 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan -----Public the compensation policies Before compensation for the affected items, the compensation policies will be publicized first, so to be monitored by the resettlers. -Set up resettlers' information volume To ensure that the resettlers and the local government fully know the RAP and the plan of compensation, resettlement, the county resettlement will prepare a volume for resettlers' information. Before allocate land compensation to the county resettlement office, the volumes will be delivered to all the resettled households. The volume includes the following content: main content of RAP; resettlement compensation and resettlement policies; resettlers' right; channels for responding to grievance and appeal. -----Hold meetings It is mainly arranged ahead of the implementation of land requisition and relocation, made continuos and further lecture on relative policies, regulations, compensation criteria, so that the villagers can know and arrange early. 9.1.3. Participation in Implementation of RAP The resettlers will participate in the whole process of the PAP. A Participation in House Reconstruction (1). Housing compensation criteria The compensation criteria for housing will directly affect the interest of the Resettlers. Before the houses relocated, the relevant resettlement authority will consult and sign an agreement with the resettlers on the compensation criteria for the houses. The consulting results will be declared publicly before the agreement signed, so as to put the resettlement under public supervision. (2). Resettlement host sites and house relocation At the RAP preparation stage, the relevant authority carried out survey on the resettlement host sites and the way of house reconstruction. (see Table 9-1). According to the survey, most of them are willing to have their houses relocated in their own groups and by themselves. The local governments at all levels will give a helping hand at different stages for house relocation. (3) Disposal of Old Houses All the old houses to be relocated will be compensated at resettlement cost. Within a specified time period, resettlers can, on their will, demolish their old houses first and then rebuild the new houses or vice-versa. Resettlers themselves without deduction from compensation can use the salvageable material from the old houses. B Participation in Production Rehabilitation All the resettlers must participate in the land readjustment and allocation. 81 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan C Participation in Land Compensation Using and Management The land compensation will be paid to the village, and the government above the county level will arrange the using, and any unit or individual will not use it. D Participation in Project Construction The project construction will cause certain impact on the local community. In order to ensure the PAPs to get benefit from the project construction, the local people will be encouraged to take part in the construction, and favorable conditions will be created to use local materials and local labor force. 9.2. Responding to Grievance and Appeal The public participation is always encouraged in the process of compiling and implementing of the RAP. There will be some unforeseeable problems occurring in the process. In order to solve problems effectively and ensure the project construction and land requisition to be carried out successfully, a transparent and effective appeal channel has been set up respectively for rural resettlement. The procedures are described as follows: Stage 1. If any resettler is aggrieved by any respect of the resettlement, he can appeal to the village committee and the town(ship) resettlement office in oral or in written form. If an oral appeal is made, the village will record it on paper and process it. Village committee or town(ship) resettlement office will make decision on or resolve it in two weeks. Stage 2. If the aggrieved resettler is not satisfied with the decision of stage 1. He can appeal to the county resettlement office after receiving the decision; the county resettlement office will make decision in two weeks. Stage 3. If the resettler is still dissatisfied with the decision of the resettlement office, he can will appeal to the civil division of a people's court according to the civil procedural law after receiving the decision of the PRO. The resettlers can appeal on any respect of the resettlement, including compensation criteria. The organizations accept the appeals and grievance of the PAPs free of charge, and the PRO under project contingency will pay the expense incurred therefore. The resettlers will know their right of lodging appeal during participation in the public meetings and by other ways. At the same time, the appeal process will be publicized among the PAPs through media. The relative authorities will sort out the opinions and proposals of the PAPs and the resettlement offices at all levels will process the information in a timely and effective manner. 82 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan 10. Monitoring and Evaluation In order to guarantee that the RAP can be smoothly implemented and the resettlement target suitably realized the follow-up fact-finding and monitoring will be carried out in whole process. Monitoring on the resettlement will be divided into two parts, i.e, internal monitoring(by the resettlement office) and external independent monitoring. 10.1. Internal Monitoring and Report 10.1.1. Target and Task The target of internal monitoring is to maintain responsibility of the resettlement organs as specified in RAP during implementation, and ensure that the project can be constructed smoothly and the resettlers' legal rights will not be impaired. The auditing department of the government above the county level will independently exercise the auditing monitoring function over conceming units under its jurisdiction in accordance with the laws and regulations. The superior units assume the responsibilities for monitoring their subordinates so that the RAP principal and schedule can be followed. 10.1.2. Institution and Staff The routine work of internal monitoring will be organized by the PRO of the project owner, and be performed by the county resettlement office, the county Land Administrative Bureau, town resettlement work group and villages. To ensure an effective internal monitoring, one to two full-time professionals have been signed for each resettlement offices. All of them have participated or will participate in preparation and implementation of the RAP, they will also carry out internal monitoring and control of the resettlement progress. Institutions and persons involved in internal monitoring and data processing are shown in Table 10-1. Institution and Staff lnvolved in Internal Resettlement Monitoring Table 10.1 Resettlement institutions Chief Position Staff number Resettlement office in Zhu Ze Director 4 Zhushan county Town(ship) resettlement Zuo Zixiao Group leader 6 work group 8 administrative villages 2 Accountant of village 24 Accountant of village Total 34 10.1.3. Indicators to be monitored Allocation and ultization of the resettlement compensation; Allocation of the houses; Rebuilding of the private houses; 83 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Support to vulnerable group; Employment of infrastructure; Restoration of infrastructures; Scheduling of the work above mentioned; Implementation of the policies in RAP; Public participation and consultation during implementation; Staffing, training, work schedule and working effectiveness of resettlement offices in villages, townships, counties and cities. 10.1.4. Monitoring Procedures Develop an internal monitoring framework to supervise the resettlement activities. The project owner establish a database for the land requisition, housing relocation, and resettlement, and will monitor the whole process of preparation and implementation. The county resettlement office will establish relevant database, and renew them along with the resettlement progress for planning the resettlement work, and monitor the whole process of the resettlement. During the implementation stage, the county resettlement office will record the resettlement massages submitted by the township resettlement groups and based on the formats prepared by monitoring institutions. They will also timely transfer the on-going activity records to the county resettlement office so that a continuous monitoring can be realized. The county resettlement office will practice periodic inspections to affected villages and towns and report the implementation progress. In the above internal monitoring system, a set of formats of information lists have been drawn up so as to realize the continuous massage flows from the village to the PRO. The county resettlement office, the town resettlement work group are important chains in the internal monitoring system, and their work will be periodically checked and inspected. 10.1.5. Reporting Internal monitoring report A. Reporting circle After starting of the resettlement implementation, working reports will be submitted at least once three months from the town resettlement work group to the county resettlement office, and the similar reports be submitted from the county resettlement office to the county resettlement leading group or the project owner. And special events will be reported without any delay. The resettlement offices are required to prepare a work report summarizing the work of each implementation stage. B. Format of Report 84 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan The format of the working report of the PRO will be prepared to meet the requirements of the World Bank, and distributed to the institutions at all levels who will periodically fill and submit the completed report. The format of the report usually comprises of two parts: a). the context describing in detail the resettlement progress and payment and use of compensation, the progress, problems and difficulties met in the implementation, and the corresponding resolution and measures; b). Forms and lists mainly showing statistical data of previous three months, which reflect the progress by comparison of the actual and planned land requisition, house removal/reconstruction and use of compensation. The formats refer to the Attached Table 1 and 2. Attached Table 1 Progress Report of Land Requisition and Resettlement Department: Deadline for Reporting Contents: Date Month Year Fill-up Date: Date Month Year Items Unit Planned amount completed Accum.total Proportion Fund allocation Private house rebuilding PAPs move into new house Old houses demolition l l l Communication lines recovering Road reconstruction Cannel reconstruction Land requisition Land adjustment _ _ Labor employment l __ Reporter: Signature(person-in-charge): Official seal: Attached Table 2 Implementation Progress of Resettlement County(city) town(ship) Date up to: Date Month Year Fill-up Date: Date Month Year Affected Description Unit/Quantit Investment Compensation/Subsidy received units y required(yuan) (yuan) Reporter:__ Signature (person-in-charge):_ _ Official seal:_ Resettlement Progress Report Periodicity Prior to every July 31, the project resettlement office will submit a report to the World Bank indicating the resettlement progress. The report will be submitted once a year. 85 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Format of Report According to the requirements of the World Bank, the report usually comprises two parts: a). main context summarizing the resettlement progress and payment of compensation, the situations, problems and difficulties met in the implementation process, and the corresponding resolution method and measures, b). Forms and lists in the format provided by the World Bank, mainly containing statistical data of previous six months, which reflected the comparison between the actual and planned land requisition, resettlement progress and payment of compensation to the date. 10.2. External Independent Monitoring Evaluation and Reporting 10.2.1. Target and Tasks The external monitoring and evaluation by institution independent to the resettlement execution institutions is to monitor and evaluate whether the target of the land requisition, resettlement and relocation activities are realized, by which evaluation opinions and proposals will be put forward on the resettlement, housing relocation and restoration of the resettler's living standards, and to provide predicting alarm system to the project management, and reflecting channel to the resettlers. The external independent monitoring institution will be the consultant both for the Project Leading Group for Resettlement and the PRO, it will conduct follow-up investigation, monitoring and evaluation of the resettlement activities according to the RAP and provide advice for decision-making. 10.2.2. Institution and Staff The PRO has appointed ECIDI as independent institution responsible for overall monitoring and evaluation of the project resettlement. ECIDI will provide technical assistance to the PRO and conduct a survey of resettlement and living standards of the PAPs as well as all basic monitoring work. ECIDI will also assist the PRO to prepare annual and semi-annual report. ECIDI is a subordinate directly under the State Power Corporation of PRC. In 1993, ECIDI was appraised by the Chinese government as one of the 1 00 top design institutes with comprehensive capacity. In Dec. 1996, ECIDI has been qualified through verification according to GB/T19000 equivalent to ISO 9000. ECIDI has accumulated abundant experience through implementation of land requisition and resettlement for more than twenty large-and-medium-sized hydropower projects in China. Since 1990, ECIDI has undertaken resettlement monitoring and evaluation based on the Operational Directives OD4.30 of the World Bank. ECIDI has undertaken, among the others, the resettlement monitoring and evaluation work for the Shuikou Hydropower Project in Fujian Province, the Electric Power Development Project in Zhejiang Province, and assist the Electric Power Development Company to prepare RAP for the 500kv Transmission Project in Jiangsu Province in the past 10 years; that for the Shuikou Hydroelectric Power Project has been lasted five years and highly praised by the World Bank. ECIDI has a number of experts and entering and technical personnel who have participated the resettlement monitoring and evaluation work for the projects financed by the World Bank. Four of them have successively participated in the resettlement monitoring and evaluation seminars held by the World Bank and got the certificates after 86 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan completing the training courses; two of them have been invited to join in the World Bank. In ECIDI, a working group has been established particularly for the resettlement monitoring and evaluation work of Tongbo Pumping and Installation Power Station Project, the key members of are shown in Table 10-2, the member of the group member will be increased at the working peak as needed. Key Members of External Monitoring and Evaluation Working Group Table 10.2 Name Titles Experience Position Gong Senior Reservoir resettlement expert, vice head of Consultant Heping engineer resettlement house, chief engineer, a main participate for the independent resettlement monitoring and evaluation work of Shuikou Hydropower Project and the Electric Power Development Project in Zhejiang Province. He participated the high seminar, which held by the World Bank and got certificates after completed whole courses of the resettlement monitoring and evaluation works, later, he lectured the courses on the seminar held by the World Bank many times. And he has been sent by the World Bank to participate the inspection of the resettlement work of loan items. Now he is the expert of high quality for domestic World Bank Loan Item confirmed by the World Bank Bian Engineer Deputy engineer of Resettlement House, held or Group Bingqian participated many resettlement design works for large leader and medium size hydropower projects. He participated the similar, which held by the World Bank and got certificates. He held the RAP preparation and monitoring and evaluation work o the following World Bank Loan Item of: East China/Jiangsu Transmission Project, Beilun Second Transmission Project . Tianhuangping Remain Fund Transmission Project, Tongbo Pumping and Power Restoration Station. He lectured the courses on the seminar held by the World Bank. He has rich experience in the resettlement work for projects loaned by the World Bank Xu Engineer The main participates for the independent monitoring Member Chunhai work of the Electric Power Development Project in Zhejiang Province. He held the RAP preparation and resettlement work of Tongbo Pumping and Power Restoration Station, and held or took in much resettlement design work for large and medium size hydropower projects. He also participated the monitoring and evaluation work for Zhejiang Power Remained Fund. The World Bank loans all these items. 87 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Zhang Engineer He participated the monitoring and evaluation work Member Jiasheng of Shuikou Hydropower Project, held the independent resettlement monitoring and evaluation work of Zhejiang Electric Power Development Project. He also participated the resettlement design and monitoring and evaluation work of Beilun Second Remained Fund Auxiliaries, Tongbo Pumping and Power Straiten Auxiliaries, loaned by the World Bank. He has certain experience in monitoring and evaluation work for projects loaned by the World Bank. Chou Engineer He participated RAP preparation and monitoring and Member Qingsong evaluation of the projects of Beilun Second Remain Fund Transmission Project, Tianhuangping Remain Fund Transmission Project, Tongbo Pumping and Power Restoration Project and its Auxiliaries, which was loaned by the World Bank. He has certain experience in monitoring and evaluation work for projects loaned by the World Bank Zhou Assistanc Main participates of the monitoring and evaluation Member Jianxin e work for the project of East China/Jiangsu 500kv engineer Transmission Project. He also took in the RAP preparation, monitoring and evaluation work for Zhejiang Electric Power Development Project, Beilun Second Remained Fund Transmission Project, Tianhuangping Remained Fund Transmission Project, Tongbo Pumping and Power Restoration Station Project. He has certain experience in monitoring and evaluation work for projects loaned by the World ________ _______ Bank 10.2.3. Main Indicators to be Monitored and Evaluated Main Indicators for Monitoring 1.Progress:including preparation, implementation of land requisition, housing relocation and resettlement. 2.Quality: including civil construction quality and degree of resettlers' satisfaction; 3.investment: including fund allocation and using; Main Indicators for Evaluation Economic conditions: household economic development before and after resettlement, including assets, production materials, subsistence materials, income, etc.. Environmental conditions: living environment before and after resettlement, including traffic, culture and education, sanitation, commercial service facilities, etc.. 88 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Employment: change in employment, including employment rate, assistance to the different PAPs, especially the vulnerable PAPs, etc.. Development in community: local economy in resettlement host sites, environrment development, neighborhood relation, and public opinions after resettlement. 10.2.4. Monitoring and Evaluation Measures Monitoring and evaluation will be performed on the basis of the survey data provided by the survey design institution and resettlement implementation institution. With an overall understanding of the situation, the evaluation will be performed by sampling survey and quick evaluation. Typical samples (resettled households/units) which has the representatives will be selected to establish evaluation index system for different types of PAPs. Experienced experts will be invited to decide in a back-to-back way the weights of different indexes. Referring to the updated research output on living quality both in China and abroad, the indexes will be non-dimensionally treated, and the survey results are analyzed and the computation results are evaluated and compared. ECIDI will also carry out the following work: Survey of resettlers' living standards The base-line survey will be conducted for this project, the selected samples of the base-line living standards of the resettlers will be collected.(The preliminary samples will be randomly collected). The living standard will be investigated once or twice a year to monitor the variation in the resettlers' living standards. The necessary data can be obtained by periodically survey, random interview and site visit, based on which statistical analysis and evaluation are performed. The survey comprises of various indicators of judging the living standards. One indicator will be used for weighing the dynamic variation of living standards before and after land requisition and resettlement. The selected indicators will be checked to see whether they are reasonable in reflecting the actual production and living levels in the base-line survey and are subject to modification according to the actual conditions so as to guarantee the message obtained to reflect the quality and quantity of the real situation. B. Public Consultation ECIDI will participate in the public consultation conferences held by the village and township. By this method, the institution can evaluate the effectiveness the public participation and the cooperation altitude of the resettlers towards the RAP. Such activities will be conducted and after the resettlement implementation. C. Resettlers' Opinions ECIDI will often interview the resettlement offices at county and township level to know the opinions collected from the resettlers and interviews the resettlers who have aggrievance. The institution will timely transfer the opinions and requests to the PRO from individuals and enterprises affected by the project, and provide advice for improvement, so that the resettlement implementation can be more smooth and effective. 89 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan D. Other Responsibilities ECIDI has provided advice to the PRO in preparation of the RAP, and will monitor the following activities in the process of implementation. Selection of resettlement site; House construction; Production arrangement and rehabilitation; Support to invulnerable group; Infrastructures restoration and reconstruction Payment and amount of the compensation; Resettlers' transfer; Employment of labor force; Training; Scheduling of the items above mentioned; Use of compensation of the collective-owned land and resettlers' income, and Employment of the surplus labors and income increase of them. 10.2.5. Working Progress Preparation of monitoring and evaluation programs; Developing computer programs for monitoring and evaluation of the resettlement; Drafting the investigation outline, survey forms, and record cards for sample villages and sample households; Design of the sample survey; Base-line survey; Establishing the information system for monitoring and evaluation; Investigation for monitoring ____ community socio-economic survey resettlement implementation institution sample villages survey sample households survey 90 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Sorting of monitoring information and establishment of database Comparison analysis Preparing a monitoring and evaluation report each year. 91 Hubei Province Hydropower Project Zhushan Count" Songshuling Hydropower Station Resettlement Action Plan 11. Preparation Plan for Report 11.1. Resettlement Propre The RAP Report preparation work began in March 2000, and planned to be completed in the middle of July and then submitted to the World Bank to be evaluated. 11.2. Resettlement Progress Report 11.2.1. Periodicity Prior to every July3 1, the project owner will submit a report to the World Bank indicating the resettlement progress. The report will be submitted once a year. 11.2.2. Format of Report According to the requirements of the World Bank, the report usually comprises of two parts: a). Main context summarizing the resettlement progress and payment of compensation, the situations, problems and difficulties met in the implementation process, and the corresponding resolution method and measures, b). Forms and lists in the format provided by the World Bank, mainly containing statistical data of previous 6 months, which reflected the comparison between the actual and planned land requisition, resettlement progress and payment of compensation to the date. 11.3. Reporting ECIDI will report on the work that they undertake within one month after completion of the work. PRO will submit the resettlement progress report to the World Bank annually, with the reports received from ECIDI attached, 11.3.1. Periodicity In accordance with the World Bank requirements, after commencement of the resettlement, the monitoring and evaluation survey will be carried out once a year, starting in April every year. Prior to July.3 1, a resettlement monitoring and evaluation report will be submitted. The work for land requisition, housing relocation and resettlement of the project will be completed by Dec,2000. The work for independent monitoring and evaluation will be conducted for four times respectively in 2001,2002, 2003. 11.3.2. Contents Resettlement base-line survey Land requisition, housing relocation and resettlement schedule Production and rehabilitation Housing demolition, relocation and reconstruction 92 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Resettlers' living standards Availability and utilization of the resettlement funds Evaluation of operation and efficiency of the resettlement implementation institutions Support to vulnerable group Problems and proposals 93 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resettlement Action Plan 12. Entitlement Matrix The entire project affected units and resettlers will share the right and benefit in Table 12-1. Entitlement matrix for the affected objects Table 12-1 Affected Affected objects Entitlement items Major Relocated 1. All relocated housing will be compensated with replacement house and households value of the salvageable materials. Salvageable materials of the auxiliaries old houses belong to the PAPs, they can use them to build their new housing. Com ensation criteria for the major housing: brick fixture:290yuan/m, brick and wood 250yuanIm2, stone and wood 176yuan/m2, soil and wood 176yuan/m2, grass and wood 104yuan/m2, simple structure 80yuan/m2; compensation criteria for auxiliaries: fence lOyuan/m2, kitchen range 200yuan/m2, soil sunny ground 1Oyuan/m2, cement sunny ground 1Syuan/m2, pig and cow bar 150 yuan for each, well 350yuan for each, toilet 250yuan/each, cellar 200yuan for each, pond lOOyuan for each. 2.The resettlement organizations will provide host site with complete auxiliaries, and ensure that the host site area for each resettler will not be less than 35m2. The PAPs will build houses 3.According to the willing of most of the resettlers, as they wish. PAPs can use the salvageable materials of their old houses. The PAPs will stay in their old houses until the new houses are completed, and should not be forced to move out before the specified relocation deadline. 4. The PAPs will receive 3 months notice before starting housing construction, and will have at least 4 months for housing construction. Time frame will be discussed with the PAPs. Cropping intervals will be chosen for construction so far as possible. PAPs will receive compensation for housing removal by 350yuan/person. 5. Effective measures will be adopted to help vulnerable PAPs. For them, the town(ship) RO and village committee will help them to build new housing and to move in the new house after consulting with them. 6. Housing compensation will be paid to the PAPs before construction of their new houses. In case installment is adopted, the last installment will be paid before completion of the new houses. 7. The PAPs can lodge appeals or grievance free of charge on lany aspects relating to the resettlement including compensation. 94 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resenlement Action Plan Pernanen Back 1. Most of the compensation for land requisition and subsidy t land resettlement will be used for the land coutivating in the new resettlement requisitio area, with no less than one mu for a resettler correspondingly. n 2. Compensation criteria for garden, woodland and the land lost are described as 3 and 4 below. 3. The land compensation and resettlement subsidy will be paid to the villages. The criteria for land compensation and resettlement subsidy are 8 times and 5 times the average production value of the three years before land compensation. 4. Criteria for land compensation: 4665yuan/mu for cultivate land, and 3447yuanlmu for the land without registerance; woodland(2500yuan/mu for economic woodland, 1500yuan/mu for shrub, 2000yuan/mu for timberland). 5. Compensation for auxiliaries on the land: all the scattered trees will be compensated in cash, the criteria for fruit trees are 20yuan each, for fixture 1Syuan each. All the tombs to be removed will be compensated by 500yuan each. 6. The land compensation will be paid to the relocated units 3 months before acquisition. Temporar Contractor The project construction period is four years, and the land for y construction is generally along the riverside, most of, which is occupied beach, only parts with scattered trees. According to the land compensation criteria, 1500yuan/mu will compensate the land. Infrastruct Owner of user For the affected infrastructures that needed to be restored, the ures and fees will be paid to the owner of user by the PRO, and the specified reconstruction work will be completed before land requisition facilities and relocation, and the fees will be counted in the actual investment plan. 95 Hubei Province Hydropower Project Zhushan Countv Songshuling Hydropower Station Resetlement Action Plan Attachment 1: PRC Zhushan county party committee (Notice) Zhushan Office Document, No.15. The county party committee office, the county government office Notice for establishing Resettlement Work Leading Group for Songshuling Power Station The relative town(ship)s party committee, government and the units directly led by the county: To ensure a smooth implementation of the early resettlement of Songshuling Power Station, a "Resettlement Leading Group for Zhushan Songshuling Power Station" will be established according to the consolation of the county party committee and the county governrnent, now the members is announced as below: Group Leader: Zhang Geeing county Standing Organization Minister Vice Group Leader: Yu Xianqing head of county Resettlement Bureau Zhu Ze chief manager of county Water and Power Developing Cop.Ltd. Members: Zeng Zhaoxing county Planning Committee deputy director Hu Mingbao deputy director of county Financial Bureau Peng Bin deputy director of county Construction Bureau Chen Guangyao deputy director of county Land Administration Bureau Ming Changgen deputy director of county Environment Protecting Bureau Yang Zhengdian deuty director of county Traffic Bureau Ma Longxue deputy director of county Agriculture Bureau Tan Shifu deputy director of county Broadcast Bureau Fang Yingbin deputy director of county Price Bureau Tu Huiguo deputy director of county Telecommunication Bureau Yang Guangde deputy director of county statistics Bureau Yang Bin director of county Housing Administration Bureau Bao Chengming vice head of Guandu Town Shuai Peng vice head of Liangjia township Xu Gonglu vice head of Liulin township The relative town(ship)s will set up corresponding leading group and work organizations, take an active participation in resettlement and relocation work. Zhushan County Party Committee Office Zhu shan Government Office April 7,2000. 96 Hubei Province Hydropower Project Zhushan County Songshuling Hydropower Station Resettlement Action Plan Attachment 2: Documents from Zhushan County Water and Power Developing Cop.Ltd. ZHU SHUI KAI [2000] No.14 RAP preparation for Songshuling Power Station Report instructions from the relative coordinated units zhushan county government: The work for requiring loan from the World Bank has got much progress. According to the request of the experts of the World Bank, RAP for the project will be prepared for their inspection. At present, we have completed the resettlement survey, but for the preparation of RAP, relevant units will provide the relative materials. So we require the following units to provide relative materials: Zhushan county statistics yearbook in 1999(county Statistics Bureau) The county relative policies on land requisition; Zhushan county overall plan on land using(county Land Administration Bureau) The relative policies and regulations on housing compensation, categories: brick fixture, stone and brick, stone and wood, soil and wood, grass and wood structures, the workers and price of materials(county city Construction Bureau and Housing Administration Bureau) The latest policies and regulations for woodland compensation(county Forestry Bureau) Design, length and fees for road reconstruction(county Traffic Bureau) Design, length and fees for Cable ray reconstruction(county Telecommunication Bureau) Developing Plan for GNP: fifteenth Plan(county Planning Committee) The purchasing price of rice, wheat, and corn, etc.(county Price Bureau) Instruction here by, please approves. Zhushan county Water and Power Developing Cop.Ltd. April 18,2000. 97

Informations clés
Type de document Resettlement Plan