RP-20 VOL. 2 PEOPLE'S REPUBLIC OF CHINA World Bank-financed CHONGQING URBAN ENVIRONMENT PROJECT -j~~~~.' '_-'. , :. :. '-*2 i. !||||l||'>v.;''';;..'..' - RESETTLEMENT ACTION PLAN (the third draft) VOLUME I - Overall Report Chongqing Municipal Management Office of the World Bank's Capital Utilization 100709. R7 November 1999 Assisted by SHANGHAI ACADEMY OF SOCIAL SOGREAH SCIENCoESU ON S SCIENCES I Shanghai Academy of Social Sciences/SOGREAH Page i Chongqing Urban Environment Project Resettlement Action Plan Summary Report le SOGREAH _ _ _ _ _ _ _ _ _ OSiUI ''ANl'S CUEP - RESETTLEMENT ACTION PLAN - SYNTHESIS REPORT This report has been edited by SOGREAH Consultants, on behalf of Shanghai Academy of Social Sciences and Chongqing Project Management Office as part of the Design Review and Advisory (DRA) Services for the project preparation of the Phase 3A of the Chongqing Urban Environment Project, China (Job Number 1 00709) This report has been prepared by the project team under the supervision of Magnus HOLMER (Project Manager) following the procedures detailed in the Assurance Quality Manual and Codes of SOGREAH Consultants (SYSAQUAL/MAQ et CAQ) in compliance with 1S09001. The compilation of the RAP has followed the guidelines of the World Bank (OD 4.30 and Draft OP 4.12) The report is based on the RAP for Chongqing Wastewater prepared by SASS. However, in order to comply with the Draft OP 4.1 2 certain additions/explanations have been made to the original text. Furthermore, certain chapters have been re-organised to follow more closely the requirements of the World Bank (as requested in the Aide Memoire of September 1 999). Assurance Quality Name and Function Date Signature Report Prepared by Zhang Wei Jiang, RAP Specialist/ Eric BAYE, Socio- Economist ................... Report Checked by: Gary Moys, Team Leader ................... Report Approved by: Magnus Holmer, Project Manager ................. ....................doc November.1999 1 00709/R7/Final Summary Report US at 11-27 new hedr.doc November 1999 Shanghai Academy of Social Sciences/SOGREAH Page ii Chongqing Urban Environment Project Resettlement Action Plan Summary Report TABLE OF CONTENTS 1. INTRODUCTION_________________________----------1 1 .1 The chongqing urban environment project 2 1.2 Purpose and scope of the report 3 1.3 Resettlement action planning and the Project__________________________________5 1.4 OTHER PROJECTS IN THE STUDY AREA- 7 1.4.1 the rap and the three gorges project________________________________________________8 1 .5 Layout of report- 9 2. SUMMARY OF PROJECT COMPONENTS_-------------------------------- 11 2.1 general description of concerned sites_-------------------------------------- 11 2.2 CUEP in Chongqing_-------------------------------------------------------- 14 2.2.1 chongqing Waste water component ---------------------------------------------- 14 2.2.2The MUNCIPAL SOLID WASTE project in chongqing city -_________________________ 1 7 2.3 other components of cuep -------------------------------------------------- 21 2.3.1 CUEP in fuling -------------------------------------------------------------------
Groupe de la Banque mondiale · Resettlement Plan
China - Chongqing Urban Environment Project : resettlement action plan (Vol. 2 of 9)
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Resettlement Plan
Pays
Chine
Source
Banque mondiale