E-275 Vol. 1 CILENA ANNING VALLEY AGRICULTURE DEVELOPME:NT PROJECT CN-PE 49665-CEIA Environmental Impact Assessment Report July 1998 For the World Bank Prepared by David E. Gue, Agro-industries Consultant Branstead, Higher Erith Road, Torquay, TQ1 2NQ ENGLAND Phone: ++44 1803 294 679 Fax :++44 1803 296 294 Longmang Mineral Fodder Corp. Environmental impactAssessment Report. : TABLE OF CONTENTS Foreword ..............................3 General Environmental Impacts .3 Waste Water .3 Air Emissions .4 Solid Waste ,..4 Chemicals. .4 Noise emissions ,. . ...4 Land Acquisition, Resettlement and Compensation .5 Non-Agricultural Land .....................5 Land Purchase and Compensation .5 List of Environmental Reports .6 Page 2 of 6 I I Longmang Mineral Fodder Corp. Environmental Impact Assessment Report. FOREWORD .1 An environmental impact assessment report was developed by the PPMO in Chengdu, and was translated into English during Pre-Appraisal of the project in October 1997. The report was reviewed by the Bank mission and some modifications incorporated by the PPMO. The revised document was presented to the Project Appraisal Mission in June 1998 incorporating all of the ~1 changes that were requested by the Bank mission. All processing plants on the project are covered in the report including Agro-Industries and 1 Sericulture components, and there are separate data sheets for each processing plant. GENERAL ENVIRONMENTAL IMPACTS. The project would not be expected to produce any detrimental environmental impacts in the project area. Each company has detailed the environmental aspects of their component, and indicated that their proposal is within the National environmental guidelines and regulations. There is no component of the project that poses an environmental risk. The processing plants have a limited potential for localised water, air and noise pollution within and around the plant buildings, but procurement specifications for processing equipment would :include full environmental protection measures to maintain pollution within national EPB standards. Waste Water. The project proposes to treat the effluents of all processing plants and administrative and marketing buildings in septic tanks where necessary, or to discharge effluents to municipal sewers where possible. The design objective would be in compliance with Chinese standard GB8978-88 for discharge of effluents, stipulating minimum discharge standards of: BOD5 200 mg/l and SS 200 mg/I. The combined effluent at all seven project processing plants is estimated to be < 3,000 m3/d with BOD concentration of 3 50-500 ppm. The capital cost of environment protection is included in the investment costs for equipment and civil works for each enterprise. The unit cost of treating the effluent is included in the general power consumption requirerments for each enterprise and has been included in the financial analysis of the project. Page 3 of 6 Longmang Mineral Fodder Corp. Environmental Impact Assessment Report. Air Emissions. Design of boilers and processing systems would provide for compliance with the relevant particulate emission standard. Cyclone dust collectors would be installed on all seed and rice handling systems to maintain particulate matter discharge <10 mg/m3. Solid Waste. The domestic heating system boilers and grain and seed dryers will generate ash and clinker, and it has been standard practice to use this in road construction and as an extender in brick manufacture. The disposal of theses negligible volumes of ash and clinker should not pose any problem. Water softening plant sludge, boiler blowdown sludge and septic tank sludge would be negligible in volume, and would be generated in widely dissipated locations. Disposal of sludge would be on local agricultural land. Chemicals. None of the processing plants use strong acid or alkali chemicals or materials with a high concentration of COD. The Xicheng seed processing plant will use seed coating chemicals in very small volumes, but this is a common chemical used throughout the seed industry in China, and is not likely to be discharged from the plant in any way, other than as a component of the finished products. Agricultural chemicals. The fertilisers and agricultural chemicals used in the production of seeds, rice, grain, fruit and vegetables would be standard fertilisers, pesticides, herbicides etc., as used in major agricultural economies for similar type of agricultural and horticultural production. All farm chemicals procured through the project would be Bank approved products. Optimal farm chemical use will be determined during the project with the aid of technical assistance, and would be Bank approved products where relevant. Noise emissions. All equipment procured for the project would be specified to be within the National Standards for noise emission. Page 4 of 6 Longmang Mineral Fodder Corp. Environmental Impact Assessment Report. LAND ACQUISITION, RESETTLEMENT AND COMPENSATION. The project would acquire a total land area of 2.0 ha for commercial activities, all of which for the Xicheng Wholesale Market and is located about 0.5 km from Xicheng city centre. It is currently agricultural land, and has 15 farming families (about 75 persons) using the land for income and sustenance. Details have been provided of the land to be acquired, compensation arrangements, and families affected by the project, and this data is summarised in Table-18 : Land Acquisition attached. Non-Agricultural Land. All enterprises have been requested to select land for commercial development that is not designated as agricultural land, and that does not currently have any occupants or dwellings. Xicheng Panxi Foods have selected such land for the rice mill and seed processing plant, where they already own the land. The four silk reeling mills will mainly expand their operations by upgrading existing buildings and installing modem processing machinery, and will not need to acquire additional land for these operations. Land Purchase and Compensation. Crop Compensation and Relocation Expenses: The crop compensation and relocation expenses paid to farmers would be in line with local regulations, and is dependent on the current crop being produced, and the crop value. The total crop compensation costs to be paid under the project would be Y1.2 million for 2 ha of land, an average of Y600,000 per ha, and relocation expenses 0.15 million. The Xicheng municipal government are committed to ensure that relocated farmers receive land that is at least as good quality as their existing land. This will be quite simple to achieve as the project will develop large tracts of land around Xicheng under the irrigation and land base developments of the project. Land Purchase: Land purchase prices vary depending on the location, but the project would pay a total land purchase price of Y4.65 million for 30 mu of land near down town Xicheng for the wholesale market. Building Compensation: None of the enterprises has any buildings on acquired land that will need to be compensated. Page 5 of 6 I Longmang Mineral Fodder Corp. Environmental Impact Assessment Report. ! -I LIST OF ENVIRONMENTAL REPORTS. Seed Processing Mill of Panxi Foods Co. Ltd.. Xichang Yuchang Silk Industry Co. Ltd. Xicheng Wholesale Market. Rice Processing mill of Panxi Foods Co. Ltd.. Ningnan Silk Reeling Mill. Huidong Silk Reeling Mill. Yanbian County Silk Reeling Mill. Page 6 of 6 ind CHINA: Seeds Sector Commercialisation Project. Seed Processing : Investment in facilities and equipment Table-18 : Land Acquisition Land Acquired for Proje Families involved in Compensation Ha _ _ Land acquisition Arran ements Y'000 ompany Comtercial Industrlal Farm Number affected Loss of Voluntary Crop Land Building Relocation New Land Land or waste land Land Famtiles Persons Dwellings Income Acceptance Compenstalon turchase Compensation Expenses Allocated Comment angshan Prefecture cheng Rice Mill 1.16 0 0 0 0 0 0 0 0 0 Existingcommercial land cheng Seed Processing Plant 1.16 0 0 0 0 0 0 0 0 0 Existing commercial land cheng Wholesale Market 2.00 15 75 0 15 15 1,200 4,650 0 150 2 ha Land to be acquired under projec cheng Silk Mill Expansion 0 No additional land acquired ingnan Silk Mill Expansion - 0 --- No additional land acquired uidong Silk Mill Expansion _ 0 No additional land acquired anzhihua Municipality anbian Silk Reeling Mill --- --- 0 --- --- --- --- --- --- No additional land acquired TOTALS 2.32 0.00 2.00 15 75 0 15 15 1,200 4,650 0 150 2 ha 08-Jul-98 F Environmental Impact Assessment on Seed Processing Mlill of Panxi Foods Co., Ltd. Summarv 1. Environmental background Seed Processing Mill of PatLi Foods Co., Ltd. Is locatod in -Xichang Miunicipality of Liangshan Yi Nationality Autonomy Region and covers a area of 1.16 ha. T he main products of the proposed project will be the seeds of hybnid rice, hybrid maize, hybrid wheat and some kinds of vegetable seeds. In the project area there are not any rivers passing through there. There is usually a fresh wind in Xichang city, the average wind speed throighout the year is 6-7 Mn ec. 2. Wastewater discharge and pollution load The wasteNw-ater discharged from the company is mainly come frotn household buildinas with a disclhaxge amount of 10 t/d. The pollution load of domestic wastewater will be be is follows: BOD: 2kgid COD: 4kg/d NH3-N3- 0. 4 kg/d SS: 2.2 kicgd The wastewater from household will be pre-treated by septic tanik botom it is discharged into muniicipal scwage pipeline system. .3. Waste gas discharge and pollution load The waste zas discharged from the company will be mainly come from fuel comnbustion for steam supply. The pollotion load of waste gas will be as follows: SO,:5.3 kg.'i TSP:30 kg`h The waste gas wil be treated bv dust remover instaled on the boiler. The couected dust will be dizpi-ed together with industrial solid waste mentioned belowv. 4. Solid waste production Thie industlial solid waste in the company will be mainly come from processing system and fiel conflmtflption, and domestic solid waste will be mainlv come from households o' thte company. T-he total amount of industnial soLid Nvaste production will be estimated as - tid. icluclina Solid waste of cli:ernash and production wastes. "The industial solid waste from the company. tozethler w'iti the collecte(l dust mentioned above. w^ill be brougfit to outside for r oad construcnon. The amount of domestic solid waste will be given as 300 kg/d. which consists of waste from household and has a content of vegetables and other organic. The domcstic solid waste will be tranmported to a municipal dump site for disposal. In addition Lle procees dust, which is estimated as 0.6 tdi will be mainlv come from the areas of seed processing, seed storase and ash disposaL so the dust extraction system should be inrtaUed for each of 3 areas. Noise The npiie in the company be mainly come from seed processing area. The noise linits in process area wifl be specified within National Standards. The noise from construction actnities will be ne;di;ible. Epb-20 Pagc CHINA - SEEDS SECTOR COMMERCIALISAT ION PROJECT ENVIRONMENTAL IMPACT ASSESSMENT, LAND ACQUISITION AND RESETTLEMENT PROJECT DESCRIPTION A. Project location: Province - PrefctlurelCount. Sichuan l.iungshan vichang Comipanm namc Seed Processing A-fill nf Panri JIodeis (Co.,l.id Reprcscntcd al Appraisal b! Mr. Wang Kang Dian Sub-project iiumlbcr B. Purpose of project: Seeds Processing and Afarkeetig Proposed production 5400Va Products C rice seed. jlheat seed, H. maize seed, Pepper seed, Tbmato seed and Beoa Persons cmploycd on projct 32 LAND ACQUISITION AND RESETTLEMENT C. Land acquired: Arca of laid acquired Hecures 116 1 No land acqiuired for poject Number affcctrd Families 0 Persons 0 Loss of dwcwlings Families 0 Loss of incomc Families 0 OMier losses Families 0 Volintar) acccptance Families 0 D. Compensation and relocation Land purclisc (Y(X0) 0 Crop compeinsation (Y00(l) 0 Building contpcnsatioti (Y'IXX)) 0 Relocation cxpcnses (Y'OO) 0 New land area allocatcd Hectares 0 Othcr compcinsation (Y000) O E. Monitnrinn- procedures Kev events achimeed (Yes/No) Land acquired Yes Compcnsation paid No New land occupicd No F. Land use_ Arca occupied b% buildinigs (rn2 _ gigo m2 Currcnt iand usc DrY land unutilised Currcnt landuse dcsignation Budlding land Landfonni Fiat Surroundinig landusc Dry land unutilised C. Climatic conditions: Mean annial tempcriure Degrees Celcius 17.1 Mean annual precipitation cm 104. 8 Frost frce period Days per year 1273 98A 402404.05 PM Epb 2U ~~ENVIRONMENTAvL IMPACT, MANAGEMENT AND MONITORIN&Gay Production, Processing and Marketing Actisities Prosince - PrefccgurelCounty Sichuan Liangshan Xichang CompanN name Seed Proccssing Mill of Panxi Foods Co..Ltd. 1. STAC(K EMISSIONS Stcan Capacity Fuel Consumed FuC Typc Boiler specifications O _ _5_ 4 tld Industnial coal 5,500 kCaJA 2. LIQUID EFFLUENTS Source Volume (M3/d) Characteristics Destination Process None None None Domestic sewage 10 m3/d EBOD COD City Sewage Sysytem Wash water NIone None None Treatment Domestic wastewater wilt be treated by soptic tank Treatment provided None None None 3. SOLID WASTES Volume (M3/d) Characteristics Destination Clinker and ash B5DKg/d Dry 3cm screen sirze Brick/load making Production wastes 3.2t/d pig_ feed Domestic wastes 300KgOd Organic matenals City Lanfll TOp Dust collccted 0. 6t/d Organic materials Compostingffeedmills Constiucuion wastes Negligable 4. WORKPLACE CONDITIONS Concentration Measures taken Process dust: Processing area < 10 mg/m3 Dust extraction system installed Storage arcas < 10 mgVm3 Dust extraction system installed Ash disposal < 10 mglm3 Dust extractfon system insta led Fire Hazards: Potential cause Measures taken Process area Dust/seed Extinguishers provided Storage areas Dust/seed Extinguishers provided Fuel handling Coal/dust Extinguishers provided Noise: Source Measures taken Process area Seed Machinery Noise limits specifid within National Standards Facto,y boundary None None 5. TRANSPORr Quantity tid Mode No of trucks Materials intake 22 Trucks (at 15 locations) 2 Coal intake 4 Truck (weekly) I Materials out 22 Truck (at 15 Jocations) 3 Garbage/asih out I Truck 1 6. CONSTRUC1 ION Source Measures taken Noise Negigable Negligable Dust Negligable Negigable 7. MONITORING PLAN Responsible person <1> Xichang Enviromental Protection Monitoring Station Staff involved 1 One at each processing plant When assigned External agency Xichang EPB Quality Control Sichuan Provincial Seed Q. C. Bureau 8. COSTS Investment costs Waste water treatmint svsitm 30, OOOCNY per sopatic tank construction Dust collection Recurrent costs Included in general plant operating costs 9. PUBLIC CONSULTATION The construction project is very small In nature, and public consultation would not be required. 10. REMARKS Refer to Summary 98/06124 04:0S PM Notes <I > Persontnci w otild be assigned at the time of F at the time of project implcmcntation Environmental Impact Assessment on Xichang Mlunicipal Yuchang Silk Industry Co. Ltd. Sumnmarv 1. Environmental background Xicciang NMunicipal Yuchang Silk Iidustry Co. Ltd(foriierty iiamed Michiang Silk Mill) is Iocated in XKichan miunicipality of Liangshian Yi Nationahty Autonomy Region and covers a area of 220'11 mI TIhe naint product of the proposed project will he white raw silk (3A-4A) with a proposed capacity of 18.S t,y. In the project area there are not any rivers passing through there. T'here is usiialh a fresh wind in X;icihang city, the average wind speed throughout the year is 6-7 im sec. 2. WN astewater discharge and pollution load The wvasrtewater discharged from the mill is niainly come fro.m silk-worm cocootl processing 4ysteni witLi a discharge amounit of 400 m'!d. and houselhold buil&dna with a discharge amounit of SO t/d. The pollJtion load of process wastewater will be as follows BOD: 19.8 kg/d NH3-N: 13.9 kg'd SS: 15.8 kg/d Tlhe pollution load of domestic wastewater will be ae follows: B(C)D: 16 kved COD: 32 kagd SS 17.6kg!d NH3-N: 3.2 kg'd Tfie w-iatewater from processuig system will be treated by mechanucal-chemical treatsnent method before it is discharged into irrigatioi canals. I'lie domestic wastewater will be pre-treated by septic tank beiVote it is discharged intp municipal sewage pipewlie systetn. J. W:tste gas discharge and pollution load The waste eas discharged from thie company will be mna.iiy come fonm fuel comIbustion For sleani supply. Ilie pollution load of waste gEas Nvil be as follows: SO2: 6.7 kg/h l TSP: 3.75 kg/h 1 lhe wastecas will be treated by, dust remover installed on the boiler. The collected dust will be disrosed together 'wth the solid wasie mentioned below. 4. Solidl dnte production The uidustial solid waste in the mill will be mainly come from fuel consumption and domestic soLid waste willl be mainly come from households of the company. The amnount of industrial solid waste pr oduction will be estimated as I t/d. The inidustrial soLid waste from the milL together with the collected dust mentioned above. will be brought to outside for road constmnction. The amount of domestic solid waste from the mill will be given as 150 kgld, which consists of waste from households and has a high content of vegetables and other organic matters. The domestic soLid waste xvill he transported to a municipal dump site for disposal. Nolise T1he aoise in the mill will be mainly come from reeling machine. The noise lirnits in process auea uill be -pecifiwd within National Standaids. The noise from construction actiVities will be negligible 4 Epb20) Pagc I CHINA - SEEDS SECTOR COMMERCIALISA1TION PROJECT ENVIRONMENTAL IMPACT ASSESSMENT, LAND ACQUISITION AND RESETTLEMENT PROJECT DESCRIPTION A. Project location: Province - Prefecture/Couniv Sichuan Liangshan .ichantg Companv name Nichang Silk Reeling NWl Rcpresentcd at Appraisail bs Mr.Li Guo Rong Sub-projcct niumnber B. Purpose of project: Auto Reeler 800ends:Reeltng Silk and Alarketing Proposed production Raw Silk:4&8t/a,inciuded 4A of 70%;3A of 30%. Products Raw Sil1k:48.81a,included 4A of 770;3,1 of 300,% Pcrsons employed on project 92 LAND ACQUISITION AND RESETTLEMENT C Land acquired: Arca of land acquired Hectares 0 No landl acquired for projed Numnbcr afTected Families 0 Persons 0 Loss of dwvellings Families 0 Loss of income Families 0 Other losses Families 0 Voluntary acccptancc Families 0 D. Compcnsation and relocation Lind purchase (Y'X)O) 0 Crop compensation (Y00) 0 BBuilding compeisation (Y00)0) 0 Relocation expcnses (Y)00) 0 Nen land area allocated Hectares 0 Other comnpcnsation (Y'tOO) 0 E. Monitoring procedures Key events achieved (Yes/No) Land acquired Yes Compensation paid No New land occupied Ato F. Land use Area occupied by buildings tn2) 444. 0 m2 Cuirent land usc Indusirial Landuse C(urrent landuse designation BuiJding land Landform Flat Surrounding landusc Dry land unutiltsed C. Climatic conditions: Mean annual tempcraturc Degrees Ceicius 17.4 Mean annual precipitation cm 104.8 Frost free penod Days per year 273 9810 24 02.09 PM Epb-20 Pagc 2 ENVIROffMENTAL IMPACT, MANAGEMENT AND MONITORING | ~~~~~~~~~~~~Production, Processing and Marketing Activities Province - Prefecture/Countk Sichuan Liangshan Xichang_ Company namc Xichang Silk Reeling Mill 1. STACK EMISSIONS Steam Capitcity Fuel Consumed Fuel Typc Boiler specirflcat ions ; 4 t4i Stid Industnal coal 5,500 kCab% 2. LIQUID EFFLUENTS Source Volume (M3/d) Characteristics Destination Process 400m31d Organic materials Dischaged into Irrigation Canal Domestic sewage 130m3/d BOO ,COD City Sewage Sysytem Wash water None None None Treatment Mechanical-Chemical treatment for _ Treatment provided None None None 3. SOLID WASTES Volume (M31d) Characteristics Destination Clinker and ash 1.Otfd Dry Screen road making Production wastes None Domestic wastes 15OKg/d DusI collected None Construction wastes Negligable 4. WORKPLACE CONDITIONS Concentration Mcasures taken _ Process dust: Proccssing area il ~~~~~~~~Storage arcas Ash disposal <2 rny Waste-screen extraction sysfem installed Fire Hazards: Potential cause Measures taken Process area Silk products Extinguishers provided Storage areas Silk woducts Extinguishers provided Fuel handling Coal/dust Extinguishers provided Noise: Source Mcasures taken Process area Negligable Factory boundary Negfigable 5. TRANSPORT Quantit3 tld Mode No of trucks Materials intake 1 5 Trucks (at 15 locations) 0.4 Coal intake 5.0 Truck (weekly) 1 Materials out 1.5 Truck (at 15 locatons) 0.4 Garbagelash out 1.2 Truck 0.2 6. CONSTRUCTION Source Measures taken Noise Negligable Dust Neg_ _ _ __ __ 7. MONITORING PLAN Responsible person < 1> Xichang Envirrncental Protection Monitoring Station Staif involved 1 One at each processing plant When assigned External agency Xichang EPS Quality Control Sichuan Provincial Silk O. C. Bureau 8. COSTS Investment Costs1 Wasic wvaler trcatmndi sstem 100 000 CNY Dust collection Recurrent costs 800 CNY/d 9. PUBLIC CONSULTATION The construcrion project is very small in nature, and public consultation would not be required. 1O). REMARKS Refer to Summary 980624 02:09 PM Notcs: <I> Pcrsonncl would be assigned at the time of projcca i at the time of project iinpicnicntation. l Environmental Impact Assessment on Xicheng Wholesale Market. Summary 1. Environmental background Xicheng Wholesale Market would be located in a new development zone of Xicheng city. This would replace the existing wholesale market that is congested, and has been identified by the Bank's marketing consultant to be a serious constraint to expanding fruit and vegetable production and marketing in Liangshan Prefecture. The market could handle over 900 tons per day of agricultural and horticultural produce and would become the major wholesale market in the Anning Valley, and would be owned by Xicheng Municipal Government. The market would be constructed on a 30 mu site located about 0.5 Km from the down-town area of Xicheng, and would include an integrated cool store and ventilated store for fiuit and vegetables. The overall market structure area would be approximately 7,000 m2 including 6,000 m2 covered market floor. The building would be completely open at both ends, but closed at both sides by a row of stores and offices running the length of the building. These would be arranged with cool stores and ventilated stores at ground level, with offices and communications center above. Four site entrances would each be 30m wide, and the front boundaiy would incorporate a block of shops and offices. The rear boundary would incorporate public toilets, and trash removal bins. The design is for the market to be doubled in covered area at some time in the future. The selected market site opens on to a main highway out of the city, and would not cause congestion on the highway. In fact the new market would relieve congestion at the existing market site. There is frequently a fresh wind in. Xicheng city, the average wind speed throughout the year is 6-7 km/h 2. Waste water discharge and pollution load The wastewater discharged from the market would be only wash water at the end of each day, and sewage from the public toilets and washing facilities, with an estimated discharge amount of 15 t/d from each of these two sources. The pollution load of domestic wastewater will be be in the following range: BOD 5-9kg/d COD 5-7kg/d NH3-N 0. 5-1.0 kg/d SS 200 - 450 kgld The waste water will be pre-treated by septic tank after which it is discharged into municipal sewage pipeline system. 3. Waste gas discharge and pollution load There will be no boilers or incinerators at the market, and no waste gas or industrial dust emissions are expected. 4. Solid waste production Relatively large volumes of solid waste can be expected at the market. Vegetable matter from trimming operations, fruit and vegetable discarded when over ripe, packing materials and the detritus of several hundred farmers and traders will produce a significant load of solid waste materials. The total solid waste production should be based on a proportion of the daily throughput of the market, and is dependent on the efficiency of the operation. Waste levels of 1.0% would be a very conservative estimate, and 10% a very high estimate. Assuming these extremes and a peak daily throughput at the market of 900t/d of produce, we should expect the solid wastes to peak at 9 - 90 t/d. If the average market throughput is closer to 600t/d then the solid waste would be in the order of 6 - 60 t/d. Most of the organic materials will be bought as compost by local farmers, and inorganic wastes will be disposed at the city landill tip. 5 - Noise The noise in the market will be mainly from transport and people. Neither of these can be mitigated by investing in environmental control equipment, but building designs can reduce the spread of such noise, and this will be investigated at the time of designing the market. Epb-20 Page 1 CHINA - SICHUAN ANNING VALLEY AGRICULTURAlI DEVELOPMENT PROJECT ENVIRONMENTAL IMPACT ASSESSMENT, LAND ACQIJISITION AND RESETTLEMENT PROJECT DESCRIPTIONI IA Project location: |Province - Prefecture/County Sichuan Province, Liangshan Prfecture, Xichang City j|Company name Xicheng Wholesale Market IRepresented at Appraisal by Mr. Lui Li *Sub-project number _ 11B. Purpose of project: Whoiesale Market for fruit and vegetables; jiProposed production 600tVd to 900 tld of produce iProducts Fruit and vegetables !Persons employed on project Full time employees 15 Temporary or seasonal workers 50 I, LAND ACQUISITION AND RESETTLEMENT iC. Land acquired: _ lArea of land acquired Hectares 2.00 il INumber affected Families 15 Persons 75 ILoss of dweliings Families lLoss oF income Families i15 lOther losses Families 0 Voluntary acceptance Families 15 0). Compensation and relocation Land purchase (Y000) 4650 Crop compensation CYD00) 11200 Building compensation (YOD0) _0 Relocation expenses (YOOO) 150 New land area allocated Hectares Z00 Other compensation (Y'000) __ |E. Monitoring procedures ._. |Key events achieved (Yes/No) Land acquired No Compensation paid |No New land occupied NO IF. Land use jrArea occupied by buildings (m2) Designed area 6000 'Current land use |Agriculture ICurrent landuse designation Agriculture |Landformn iFlat Surrounding landuse Commercial __ IG. Climatic conditions: !l |!Mean annual temperature Degrees Celcius 117 IlMean annual precipitation cm 101 iFrost free period Days per year !300 08-Jul-98 11:38AM Epb-20 Page 2 ENVIRONMENTAL IMPACT, MANAGEMENT AND MONITORING Production, Processing and Marketing Activities bProvince - Pretecture/County Sichuan Province, Liangshan Prfecture, Xichang City Company name Xicheng Wholesale Market i. STACK EMISSIONS Steam Capacity Fuel Consumed FuelType iBoiler specifications: 0 0 '2. LIQUID EFFLUENTS Source Volume (M3ld) Characteastics iDestination Process |None Wone INone Domestic sewage |15n/d ICOB, BOD=800-1000 iCity Sewage Sysytem Wash water 15m3/d COB,BOD.=150-300 INone Treatment None - discharge to city sewage system Treatment provided None iNone None b3. SOLID)WASTES IVolume (M31d) ]Characteristics Destination Clinker and ash b.0 lNone Production wastes 50tld lOrganic mateials lfeed Domestic wastes 1,000kg/d |Organic materials I City Landfill Tip Dust collected >0Kg1d Construction wastes !None ; _ _ _ WORKPLACE CONDITIONS IConcentration IMeasures taken Process dust: Processing area |None lNone Storage areas WNone None Ash disposal None iNone IFire Hazards: Potential cause IMeasures taken Process area None iNone Storage areas None None Fuel handling None INone INoise: Source Measures taken Process area Neghligable INone Factory boundary Neghligable INone r5. TRANSPORT Quantity tVd Mode INo of trucks Materials intake 00 Truck 57 Coal intake 0 Truck Materials out 500 ! Truck 7I Garbage/ash out o ITruck _7_ s. CONSTRUCTION ISource Measures taken _ Noise INegligable i _ Dust INegligable _ j _, 7. MONITORING PLAN Responsible person <1> Xichang EnvioMonitoring Station Staff involved 6 When assigned Will be assigned 199 External agency Will be Xichang EPB. Quality Control I8. COSTS illnvestment costs Waste water treatment system lNone Dust collection None Recurrent costs INone 19. PUBLIC CONSULTATION YNone r110. REMARKS Refer to Summary 08-Jul-98 11:38 AM Notes 1 > Personnel would be assigned at the time of project implementation. Envir onme ntal Impact Assessment on Rice Processing Mill of Panxi Foods Co., Ltd. Summary 1. Environmental background Rice Processing Mill of Panxi Foods Co., Ltd. is located in Xichang municipality of Liangahan Yi Nationality Autonomy Region andl covers a area of 17.6 Chinese Mu. The main products of the proposed project will be refined rice and by-products with a proposed capacity of 21007 t/y. In the project area there are not any rivers passing through there. There is usually a fresh wind in Xichang city, the average wvind speed throughout the vear is 6-7 tr/sec. 2. WVastemater discharge and pollution load The wastewater discharged from the factory is mainly come from houschold buildings with a discharge amount of 15 tld. The pollution load of domestic wastewater will be as follows: BOD: 3 kg/d COD: 6 kgd SS: 3.3kgd NH,-N: 0.6 kgId The domestic wastewater will be pie-treated by septic tank before it is discharged into mtunicipal sewage pipeline system. 3. Waste gas discharge and pollution load The waste -as discharged from the factory will be mainly come frorn fuel combustion for meam supply. The pollution load of waste gas will be as follows: S02. 10.67 kg/h TSP: 40 kg'h The waste gas will be treated by dust remover installed on the boiler. The collceted dust will be disposed together with the solid waste mentioned below. 4. Solid waste production The industrial solid waste in the factory is mainlly come from processing system and fuel consumnption, and domestic solid waste is mainly come from ihouseholds of tlhe plant. Thle total amount of inidustrial solid waste production is estimated as 35.6 tVd, includini solid waste of clilikeriashl and production wastes (huslk of rice). Tlie industrial solid waste fiomi fuel consumrrption. toetlier Nivli the collected dust mentioiied above. *ill be broueht to outside for road coisitiiction and the solid waste from rice processing is used as a pig feed. The aniount of doicstic solid waste from the factory is sven as 350 kg/d. which consists of waste from in uselcods and lhas a high content of vegetables and other organic matters. The domiiestic solid wvaste ir traivported to a municipal (dumlip site Itr disposal. In addliticni the process dust, whicl is estimated as 0.07 tVd. will be miainly come fiomsl thle areas of seed proceasmg and ash disposal. so the dust extraction system shioud be installed for each of 2 arcas. Noise IThe noise ui the company will be mainly come from rice processuig area. lhe sno!se linuts in process area wil! be specified withini National Standards. The noise fiom construction activities will be neglieihble. I, l. Epb-20 Pagc 1 CHINA - SEEDS SECTOR COMMERCIALISATION PROJECT ENVIRONMENTAL IMPACT ASSESSMENT, LAND ACQUISITION AND RESETTLEMENT PROJECT DESCRIPTION A. Project location: Pros incc - PrefecturcCounty Sichuan l.iangslhan .1ichang- Compain nan;c Rice Processing Afill ofl'anxi /ionls (Co.. Ld Rcprcsentcd at Appraisal by Mr. Wang Kang Dian Sub-project number B. Purpose or project: Fine Rice l'rocessing and Mark-eting Proposed production 21007t/a, Products Special Fragrant Rice 400va,S%'ycial Plearl Rice 4I i 11.a: Standard Pi Persons employed on project 43 LAND ACQUISITION AND RESETTLEMENT C. Land acquired _ Arca of land acquircd Hectares 1.2 No and acquired for proiect Numbcr affeccied Families 0 Persons 0 Loss of dwellings Families 0 Loss of incomc Families 0 Other losses Fanilies 0 Voluntarv acceptanjcc Families 0 D. CompeniJation and relocation Land purchase (Y'000) 0 Crop coiupcllsatioit (Y'O(X)) 0 Building compensation (YMOOO) 0 Relocation cxpenscs (Yt)) 0 NCei land arca allocatcd Hectares 0 Othcr compcnsation (Y'Ut)0) O E. Monitoring proceduresI Ke; cm euts achieved (Yes/No) Land acquired Yes Compensation paid No New land occupied No F. Land use Arcat occupied b\ buiidinigs (m _ 6030 m2 Current land use Dry land unutilised Current landuse designation Building land Landfonn fiat Surrounding latidusc Dry land unutilised G. Climatic conditions: Mean annual tempcrature Degrees Ceicius 17.1 Mcan antnual precipitation ctn 104.8 Frost free pcriod Davs per year .273 98106/24 02:09 PM Epb-20 Pagc 2 ENVIRONMENTAL IMPACT, MANAGEMENT AND MONITORING Production, Processing and Markcting Activities Province - Prefecture/Countv Sichuan Liangshan Xic iang Company name Rice Processing Mill of Panxi Foods Co.Lld. 1. STACK EMISSIONS Steam Capacity FntC Consumcd Fuel Type Boiler specifications 0.5 t4h 8t/d industrial coal 5,500 kCal4q 2. LIQUID EFFLUENTS Source Volume (M31d) Characteristics Dcstination Process None None None Domestic sewage t5t/d BOD COD City Sewage Sysytem Wash watcr None None None Treatment Domestic wastewater will be treated by soptic tank Treatmcnt provided None None None 3. SOLID WASTES Volume (M3/d) Characteristics Destination Clinker and ash 1. 6tid Coal ash Production wastes 4tUd Organic materials feed Domestic wastes 35OKgld Organic materials City Landill TVp Dust collected 7OKg/d Organic materials Comrosting/feedmills Constiruction wvastlc Negligable __... 4. WORKPLACE CONDITIONS Concentration Measures taken Process dust Proccssing arca < 10 mg'm3 Dust extraction system installed Storagc areas < 10 mgtrn3 Dust extraction system installed Ash disposal < 10 mg#n3 Dust extraction system instal.led Fire Hazards Potential cause Measures taken Proccss arca DusVrice Extinguishers provided Storage areas rice Extinguishers provided Fuel landling Coal/dust Extinguishers provided Noise Source Measures taken Process area Negligable Faloriy boundary Negligable 5. TRANSPORT Quantity tid Mode No of trucks Malcrials intake 13 Trucks (at 15 locations) 2 Coal intake 8 Truck (weekly) 1 Materials oul1 17 Truck (at 15* ocations) 3 Garbage/ash out 34 Truck 1 6. CONSTRtJCTION Source Measures taken Noise Negligable Negligable Dust Neg,gabie NeglVgable 7. MONITORING PLAN I Responsiblc person <1> Xichang Enviromental Protection Monitoring Station Stafl involved 1 One at each processing plant When assigned Extemal agencv Xichang EPB Qualily Control Sichuan Provincial Seed Q. C. Bureau 8. COSTS Investment costs Waste water trcatliicnt sn scm Dust collection Recurrent costs 9. PtUBLIC CONSULTATIO The construction project is very small in nature, and public consultation would not be required. 10. REMARKS Refer to Summary 98106124 02.09 PM Notes - <1> Personiel would be assigned at the tim at the time of projcct impliementation. Environmental Impact Assessment on Ningian Silk Mill. Summan- 1. Envirommental background Ningian silk mill is located in Nineuan county of Liangshan Yi Nationality Autonomy Region aiid covers a area of 29000 m2. The main product of the proposed project will be white rawv silk (3A-4A) with a proposed capacity of 142.8 t/y. In the project area the:re is a agricultural canal passing through thtere. Nmiznan county has an average windspeed of 5-6 n/isec thriougiout the year. 2. Wastewater discharge and pollution load Thie wastewater discharged from the mill is mainly come from silkworm cocoon processing syster -iti a discharge amount of 1000 m3/d, and household buildings Withi a discharge amount of 10o t'd. Frhe pollution load of process wastewater w,i}l be as follows: BOD: 46.8 kz/d NH3-N: 32.9 kg'd SS: 37.4 kgfd =I'he poliutton load of domestic wastewater wll be as follows: BOD: 20 kF'd COD: 40 ktid SS: 22 kid NH,-N: 4 kg'd The wastewater from processing system wYil be pre-tbeated by mechanical-chemical treatment nietfiod betbre it is discharged into the imgation canal. The domestic wastewater will be pre-treated bv septic tank before it is discharged into municipat sewage pipeline system. 3. Waste eas discharge and pollution load Tlhe \vwate gas discharged from the company wNill be mainly comiie fiom fuel conibustion for steam supply. The polution load of waste gas will be as follows: SO2: 20 kg'h TSP: 112 kegh The wasle gas wiUl be treated by dust remover installed on the boiler. The existing dust remover is warer-screen type, through which a lot of pollutions in waste gas can be reinoved. The wash water from the dust remover will be treated in a sediment tank- before discharge. and the sludge from the tank will be treated together with the solid waste mentioned below. 4. Solid waste production The industnal solid waste in the mill 6ill be mairdy come from fuel consumption. and the domestic sobd waste will be mainly come from households of the mill. The total anmount of industial sold Nvaste production will be estimated as 3 t'd. The induistrial solid waste from the rnill (clinker and ash). together with the shldge from sediment tank mentioned above, wvill be brought to outside for road constiuction. The amount of domestic solid waste will be given as 500 kg/cd, which consists of waste fiom heuseholds and has a content of vegetables and other organic matters. The domestic solid waste xill be transpoiled to a municipal dump site for disposal. Noise Thte noioe fiom construction actiites will be negligible. E2t-2t) Eagc_ CHINA - SEEDS SECTOR COMMERCIALISATION PROJECT ENVIRONMENTAL IMPACT ASSESSMENT, LAND ACQUISITION AND RESEITLEMENT PROJECT DESCRIPTiON A. Project location: Province - PrCfccturc/Couinilt Sichuan lbangshan Vngnan Compani name tivngnan County S/kA fill/ . Representcd at Appraisal bs Mr.Zhang Pei Mo Sub-projcct nmmbcr B. Purpose of project: Auto Reeler 2400ends;;Relvng SilA amd karketing Proposed production Raw Silk:142.8t/a,induded 4A of 70%;3A of 30%. Products Raw Silk. 142.&/a,included 4A of 70%;3A of 31%. Persons emploved on projecl 224 LAND ACQUISITION AND RESETTLEMENT C. Lsnd acquired: I Area of land acquired Hectares 0 No land acqured for project Number alfccted Fainilics 0 Persons 0 Loss of cd1eilings Fanilies 0 Loss of incomc Fazniliis 0 Olhcr losscs Families 0 Voluntarn acceptance Families 0 D. Compensation and relocation Land purchiasc (Y'OIO) 0 Crop collmpelsatioi (Y'o) 0 Building compensation (YOOU) 0 Rclocation expcnises (Yt.()) 0 Neii land area allocated Heclares 0 Othcr cotnpcnsation (Y0w0) 0 E. Monitoring procedures Kev events achieved (Yes/No) Land acquired no Compensation paid No New land occupied No F. Latnd u.se ___________________________________________ Area occupied by buildings (m2) 1059.2 m2 Current land usc Industrial Landuse Currenl landuse designation Building land Landfor_n Flat Surrounding landuse Dry land unutilised G. Climatic conditions: Mean annual temperature Degrees Ceicius 19 Mean annual preciptlation cm 90 Frost free pcriod Days pcr year 1 320 9&V6124 02:09 PM E-pb-20 Pagc 2 ENVIRONMENTALI IMPACT, MANAGEMENT AND MONITORING Production, Processing and Marketing Activities Province - Prefecture/Countv Sichuan Liangshan Ningnan Companv name Ningnan County Silk Mill ! . STACK EMISSIONS Steam Capacity Fuel Consumcd Fuel Type Boiler specirwations 4 tVhx2 15&1d Industrial coal 5, 500 kCal& I 2. LIQUID EFFLUENTS Source Volume (M3/d) Characteristics Destination Process 1OOOmn3/d Organic materials Dischaged into Imgat,on Canal Domestic sewage 0 BOD COO City Sewage Sysytem Wash water None tAone None Treatment Mechanical-Chemical treatment wasted _ Trcatment provided None None None 3. SOLID WASTES Volume (M3/d) Characteristics Destination Clinkcr and ash 3. Ot/d Production wastes None Dotnestic wastes 500Kgld Organic materials City landfill tip Dust collected None Construction wastcs Negligable ! 4. WORKPLACE CONDITIONS Concentration Measures taken Process du.t: Proccssing area 0 Storage areas 0 Ash disposal <20Q7V Dust extraction system insta lea Fire Hazards: Potential cause Measures taken Process arca Silk products Extinguishers provided Storage areas Silk products Extinguishers provided Fuel handling Coal/dust Extinguishers provided Noisc: Source Measures taken Process area Negligable _ Factory boundan Negligabie . 5. TRANSPORT Quantith t/d Mode No of trucks Materials intake 22.0 Trucks (at 15 locations) 3 Coal intake 15.0 Truck (weekly) 3 Malerials out 3.0 Truck (at 15 locations) I Garbagelash out 3.0 Truck 1.0 6. CONSTRUCTION Source Measures taken Noise Negligable Dust Negligable 7. MONITORING PLAN _ Responsible person <I> Ningnan Envtromental Protection Monitoring Station Staff involved 1 One at each processing plant When assigned External agency Ningnan EPB Quality Control Sichuan Provincial Silk Q.C. Bureau 8. COSTS Investment costs Waste water treatnient systcm 300 000 CNY Dust collection Recurrent costs 800 CNY/d 9. PUBLIC CONSULTATION The construction prolect Is very small in nature, and public consultation would not be required. 10. REMARKS Refer to Summary 98/0824 02:09 PM l Environmenital Impact Assessment o01 Huidong Silk Mlill Summarv 1. Environmental background Huidong silk rnMl is located in Huidong County of Liaugshan Yi Nationality Autonomy Region and covers a area of 29984.9 m2. The main product of the proposed project will be white raw slk (3A- 4A) with a proposed capacity of 48.8 t/y. In the project area there is a river named Canyu River passing through there. Canyu river is a tributarv of Jinsha River with an annual flow of 18 m31sec. T he water quality in the river is normally good, wiuclh means that the river water quality can meet class III National Water Qualit)y Standard. There is usually a fresh wind in Huidong county, the average wind speed throughout the year is 5-6 nm'sec. 2. Wastewater dischargo and pollution load Thie wastewater discharged from the mill is mainly come from silkworm cocoon processing Asytem with a discharge amount of 980 Mrn/dl, and household buildings with a discharge amouwit of 120 Vd. The pollution load of process wastewater will be as follows: BOD: 46.8 kg!d NHJ-N: 32.9 kgkd SS: 37.4 kuJ/ Tlhe pollution load of domestic wastewater will be as follows: BOD: 24 kgd COD 4S kg/d SS: 6.4 kg/d NH3-N: 4.S kg/d The wastewater from processing system uill be treated bv bio-chemnical treatment method before it is discharged into Canyu river. The concentrations of pollutant in treated wastewater can meet Sichuan Provincial Wastewater Discharge Standards. The doniestic wastewater will be pre-treated by septic tank before it is dischiaIged into municipal sewage pipeline system. 3. Waste gas discharge and pollution load Thie waste gas discharged from the compan wvill be mainly come from fuiel combustion for steam supply. The pollution load of waste gas will be as follows: SO2: 16 kg/h TSP: 90 kg/d The waste gas will be treated by dust remover mistalled on the boiler. The existing dust remover is uater-sreen type, through which a lot of pollutants can be removed. The wash water from the dust remover will be treated by a sediment tank before discharge. The treated water is rew%ed for dust rermoval and the sludge from the tank- will be treated together with solid waste mentioned below. 4. Solid waste production Thne industiial solid waste in the mill will be mainly come from fuel consumption. and domestic solid waste wAll be mainly come from households of the mill. Tlte total amount of industrial solid waste production will be estiniated as 2.4 t'd. includinu solid waste of clinker and ash. The industrial solid waste from the milla together widt the sludge mentioned above, will be brought to outside for road construction. The amount of domestic solid waste will be given as 700 kg/d, wvhich consists of waste from house holds and has a content of vegetables and other organic niatters. The donmestic solid waste will be transported to a municipal dump site for disposal. Noles 1The noise fisom construction activitics will be negligble. Pagc I CHINA - SEEDS SECTOR COMMERCIALISATION PROJECT ENVIRONMENTAL IMPACT ASSESSMENT, LAND ACQUtISrTION AND RESETTLEMENT PROJECT DESCRIPTION_ A. Project location: Province - PrcfccturelCounnt Sichuan Liongshan Iluidouag Company name Huidong Countv .Sik .MIIt Represented at Appraisal by Mr. Lao Xiang Sin Sub-project numnber B. Purpose of project: Auto Reeler 800cnds;Reeling Silk and Marketing Proposed production Raw Sik:48. Wa, Included 4A of 70%;3A of 30%. Products Raw Silk. 48.8L4a,included 4A of 70%:;3,l of 30tP6. Persons emploved on projccw 224 LAND ACQUISMON AND RESEITLEMENT C. Land acquired: Arra of land acquired Hectarms 0 No land acquired for projec Number affected Fanilies 0 Persons 0 Loss of dwellings Families 0 Loss of incomc Families 0 Other losses Families 0 Voluntarv acceptancc Families 0 D. Compensation and relocation Land purchasc (YU000) 0 Crop compcnsation (Y0o0) 0 Building compensation (Y000) 0 Relocation expcnses (Y 000) 0 Ncw land area allocaicd Hectares 0 O1thcr comllpcnsation CY'OOO) 0 E. Monitoring procedures Key events achieved (YesfNo) Land acquired Yes Compensation paid No Ncw land occupied No F. Land use Area occupied b) buildings (m2) 784 m2 Current land usc Industrial Landuse Current landusc designation Buliding land Landformn Flat Surrounding landusc Dry land unutilised G. Climatic conditions: Me-an annual temperaturc Degrees Celcius 16 Mean annual precipilation cm 104.8 Frost free period Days per year 1273 98106/24 02:09 PM Epb 2) Pagc 2 ENVIRONMENTAL IMPACT, MANAGEMENT AND MONITORING Production, Processing and Marketing Activities Province - PrefectureCounts Sichuan Liangshan Huidon Compana- name Huidong County Silk Mill I. STACK EMISSIONS Steam Capacity Fuel Consumed Fuel Type Soiler specifications: 4 tfx2 12t2d industrial coal 5, 000 kCaUk 2. LIQUID EFFLUENTS Source Volume (M3/d) Characteristics Destinattion Process 980m3fd Organic materials Dischaged into Imgation Canal Domestic sewage 120m31d Organic materials City Sewage Sysytem Wash water None lNone None Treatment Mechanical-Chemical treatment for Treatment provided None None None 3. SOLID WASTES Volume (M3/d) Characteristics Destination Clinker and ash 2.4tW Dry 3cm Screen road making Production wastes None Domestic wastes 70OKg/d Organic materials City Landfill Tip Dust collected None _ Constuction wastes Negligable 4. WORKPLACE CONDITIONS Concentration Measures taken Process dust Processing area Storage areas Ash disposal <20mntg Waste-screen extraction system installed Fir Hazards: Potential cause Measures taken Process area Silk products Extinguishers provided Storage areas Silk products Extinguishers provided Fuel handling Coalldust Extinguishers provided Noisx: Source Measures taken Process area Negligable Factory boundary ANegligable 5. TRANSPORT Quantity I/d Mode No of tnicks Materials intake 1?4 Trucks (at 15 locations) 1 Coal intake 12 0 Truck (weekly) 2 Matcrials'out 0 7 Truck (at 15 Jocations) I Garbagc/ash out 3.0 Truck 1.0 CONSTRUCTION Source Measures taken Noisc Negligable Dust Negligable _ 7. MONITORING PLAN_ Responsible person <1> Huidong Enviromental Protection Monitonng Station Staff involved 1 One at each processing plant Whcn assigned External agencv Huidong EPB Qualit~' Control Sichuan Provincial Silk Q. C. Bureau S. COSTS Investment costs Waste water treatmeni svstem 200,000 CNY Dust coUection Recurrent costs 400 CNY/d '). PUBLIC CONSULTATION The construction project is very small An nature, and public consultation would not be required. 11). REMARKS Refer to Summary 98/O5C24 02:09 PM Notes <I> Personncl %%ould be assigned at the time of project imr at the time of projcct implementation. Environimental limpact Assessmient on 4 II Yanbian Countv Ertan Silk Mtill Sunituarv 1. Env ironmental background Yifnbian County Ertan Silk. Mill is located in Yanbian county of PaZIhizua City and Covers ft area of '1000 nm, The main product ot the proposed project will be white raw silk (3A-4A) with a prnposed capacity of 97.5 t/y. In the project area there are not aniy rivers passing thiroughi there. Tlhere is usually a fresh wind in Yaanbiam cotyl-. the average wind speed throuiglhout the year iri 4-6 nilsCC. 2. Wastemater discharge and pollution load The wastewvater discharged from the mill is mainly come from silk-worm cocoon processing sy-stem with a discharge amount of 800 mnId. and household buildings with a discharge amotmt of IS U Vd. Tlhe polUutioni load of process wastewater will be as follows BOD: 46.8 kzyd NHFI3-N: 32.9 kgid SS: 374 k-gd The poliition load of donlestic wastewater will be as follows: BOD: 30 kg'd COD. 60 kg-ld Ss: 33 kg/d NH3-N 6kg'd the wastewater from processing systeni will be treated by mechanical-chernical tieatieuit iietliod beltre it iq thschaiged into irrigalion canals. The domestic wasiewater will be pi e-tieated by septic tank before it is discharged into municipal sewage pipeline system. 3. Waste gas dischlarge and pollution load Tlhe w aste gas discharged from the mill will be nmaily come fromi fuel combustion foi steami supply'. The pollution load of waste gas will be as follows: S(Q2: 10.7 kg'h TSP: 60 k,7h The wastepas will be treated by dust remnover installed on the boiler. The collected dust will be disposed together with the solid wu-ste mentioned below. 4. Solid waste production The industiial solid waste in the mill will be mainly come from fuel consunption, and domestic solid waste will be mairly come from households of the company. T'he amount of industrial solid waste production will be estimated as I tVd. The industrial solid waste from the mill, together with the collected dust mentioned above, will be brought to outside for mad construcuon. The amIoIuIt of domestic solid waste from the mill be gven as 150 kg!d, which consists of waste from households and has a high content of vegctables and other oraic matters. The domestic solid waste will be transported to a municipal dump site for disposal. Noise The noise in the mill will be mainly come from reeling machine. The noise limits in process area Wuill be specified within National Standards. The noise from construction actiMties will be nezible. Eph-2() Pagc I CHINA - SEEDS SECTOR COMMERCIALISATION PROJECT ENVIRONMENTAL IMPACT ASSESSMENT, LAND ACQIUISITION AND RESETLEMENT PROJECT DESCRIPTION A. Project kocation: Province - Prefecture/CountN Sichuan !'anzhilhua I anihia' Co.nmpnn namc Loanhinfenan) Silk nll Reprcscnted nt Appraisal bh Mr.Huang Cheng Fu Sub-project ntmhiLr B. Purpose of project: Auto Reeler 1600endks,Rerling Silk aande Marloring l1rop)sd prTduclion Raw Silk:97.5tla.included 4A of 70%;3A of 30%. PtxucIs Raw Silk 97.5va.included 4.4 of 70
Groupe de la Banque mondiale · Environmental Assessment
Anning Valley Agricultural Development Project - environmental impact and social assessment report (Vol. 1 of 2)
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale