RP-0009 VOL. 2 The Promoting Project of GEF China Renewable Energy Commercialization Development Huitengxile Wind Farm Technical Innovation100MW The Residents Resettlement Action Plan Inner Mongolia Electric Power Survey Design Institute Inner Mongolia Wind Power Company Oct., 1998 Oct., 1998 Director Zhang Dazhong Chief Engineer Chui Chongzhi Project Manager Liu Guoxing Major Engineer Zhao Hongyan Check Dong Xiaohong Written by Zhao Hongyan:TDbng Xiaohong Yang Riming Translated by Wang Xiaochun A Nisi Wu En Zhang Linghui Tsing Gung Content 1 Project introduction .................................................1 1.1 Engineering introduction .1 1.2 Affected range .................................................I 1.3 The measures for reducing the effect . 1.3.1 The measures for reducing the effect due to the land occupation.. 1.3.2 The measures for reducing the influence on the local economy by the construction of the project .2 1.4 The investigation of the social views .. 2 The Impact of the project on the local social economy . . 3 3 The impact of the project ........................................4 4 The compensation policy for the requisition of land . . 4 4.1 Main policy ........................................4 4.2 Main regulation ........................................4 5 Compensation fee budget ........................................8 5.1 Compensation standard ........................................8 5.2 Total estimate for land acquisition compensation . .9 5.3 Disbursement plan ....................9 6 Production restoration .. 10 6.1 Analysis of project influence .....................1 0 6.2 Rehabilitation measures .. 10 6.3 Enforcement plan ...................... 10 6.3 .1 Enforcement procedures .. 10 6.3.2 Schedule .................................:.;-.: : I I 7 Organization ................................. I 1 7.1 Setting up organization ................................ 1 1 7.2 Dut ................................. 12 7.3 Block drawing ................................. 13 7.4 Measures of strengthening the organization ....................................... 14 8 The public participation in and discussion ...................................... 14 8.1 The period of project preparation and the public participation . ................................. 14 8.2 The public participation in during the period of immigrant resettlement action plan preparation ............................................. 14 8.3 The public participation during the period of resettlement action plan enforcement ............................................. 15 9 Appeal mechanism and channcl .............................................. 5 10 Supervisory report ..............................................1 5 10.1 Internal supervisory and report ............................................. 16 10.1.1 Object and task ............................................. 16 1 10.1.2 Supervisory content ................................... 16 10.1.3 Implementation procedure ..................................1 6 10.1.4 Report ................................. 16 10.2 EIxternal supervisory assessment and report ........... ............... ......................... 17 10.2.1 Object and task ........ 17 10.2.2 Responsibility of the organization ........ 18 10.2.3 Requirement of responsibility ........1 8 10.2.4 Main indexes of external supervisory assessmen.t. 1 8 10.2.5 Method of supervisory assessment .18 10.2.6 Working procedures .19 10.2.7 External independent supervisory report .19 2 1 Project Introduction 1.1 Engineering Introduction Huitengxile Wind Farm is located in the south of Desheng village, Chahaeryouyi Zhong Banner, Wulachabu League of Inner Mongolia Autonomous Region. It lies on the north ridge of Hadatou and Baiyinchanghan in Zuozishan County, and to the east of the road sign of 18 km of the way from Kezuoqi to Zuozishan. The central geographical coordinates of the wind farm is 112

Informations clés
Type de document Resettlement Plan
Date d'adoption
Pays Chine