Groupe de la Banque mondiale · Side Letter

Conformed Copy - L4117 - Flood Protection Project - Supplemental Letter

Argentine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Page 1 ARGENTINE REPUBLIC April 17, 1997 International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 U.S.A. Re: Loan No. 4117-AR (Flood Protection Project) Implementation Letter Dear Sirs: Please refer to the Loan Agreement (Flood Protection Project) of even date herewith between the Argentine Republic (the Borrower) and the International Bank for Reconstruction and Development (the Bank). Whenever used in this Letter, the terms defined in the Loan Agreement have the same meaning as set forth therein. With respect to Section 3.01 (a) of the Loan Agreement, please find in Annex A to this letter the timetable and in Annex B the monitoring indicators for the Project. With respect to Section 6.01 (b) of the Loan Agreement, please find in Annex C the basic provisions of a draft Flood Protection Law. With respect to paragraph 1 (a) of Schedule 6 to the Loan Agreement, please find in Annex D the lists of First Priority Subprojects and Second Priority Subprojects and their cost per Subproject and per Participating Province. Please confirm your agreement with the above and with the Annexes by signing this letter in the space provided. Very truly yours, ARGENTINE REPUBLIC By: Roque Benjamin Fernandez Authorized Representative AGREED: INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By: Shahid Javed Burki Authorized Representative

Informations clés
Type de document Side Letter
Date d'adoption
Pays Argentine
Source Banque mondiale