Groupe de la Banque mondiale · Environmental Assessment

China - Tuoketuo Thermal Power Station Project : environmental impact assessment

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

PRESELECTED ITEM FOR WORLD BANK LOAN ENVIRONMENTAL IMPACT ASSESSMENT of the Proposed Tuoketuo Power Plant (Plant A) Project NORTH CHINA ELECTRIC POWER DESIGN INSTITUTE THE INISTRY OF ELECTRIC POWER INDUSTRY January 1996 BEIJING Table of Contents Executive Summary Chapter 1 Preface I.I Project developer and purpose of environmental assessment 1.1.1 Name of project 1.1.2 Project developer 1.1.3 Source of the project 1.1.4 Importance of the project 1.1.5 Purpose of the environmental assessment and a brief description of the project 1.2 Environmental protection laws and regulations 1.2 . I Regulatory framework and government approvals 1.2.2 Documents of technical nature 1.2.3. Project environmental documentation 1.3 Scope and standards applied to this assessment 1.3. 1 Scope of assessment 1.3.1.1 Scope of assessment for air contamination impacts 1.3.1.2 Scope of assessment for impacts on surface water 1.3.1.3 Scope of assessment for water supply project 1.3.1.4 Scope of ecological assessment 1.3.2 Assessment standards 1.3.2.1 Environmental quality standards 1.3.2.2 Emission standards 1.3.2.3 Regulations 1.4 Emphasis of assessment 1.5 Methodology 1.6 Established topics 1.7 Principal personnel 1.8 Overall plan of assessment Chapter 2 General project information 2.1 General 2.1.1 Nature of the project 2.1.2 Geographic location of plant site 2.1.3 Site plan 2.1.4 Construction scale 2.1.5 Total amount of investment 2.1.6 Milestone construction schedule 2.1.7 Contents of major project items 2.1.8 Land area 2.1.9 Number of staff members 2.1 .10 General layout of plant site 2.2 Major equipment of the power plant and production process flow 2.2.1 Major equipment of the power plant 2.2.2. Production process flow 2.2.3 Fuel content and consumption 2.2.3.1 Coal source 2.2.3.2 Coal quality 2.2.3.3 Fuel consumption 2.2.4 Water sources and consumption of the power plant 2.2.4.1 Water source 2.2.4.2 Water consumption of the power plant 2.2.5 Water quantity balance chart 2.3 Main pollution sources and discharges 2.3.1 Main pollution sources 2.3.1.1 Flue gas 2.3.1.2 Ash and slag 2.3.1.3 Effluent 2.3.1.4 Noise 2.3.1.5 Fugitive dust 2.3.2 Project environmental impact factors 2.3.3 Wastestreams il 2.3.3.1 Stack gas 2.3.3.2 Effluent discharge characteristics 2.3.3.3 Ash and slag discharge characteristics 2.3.3.4 Noise 2.4 Ash disposal area 2.4.1 Gaobaoshi ash disposal area 2.5 Construction activity arrangements 2.5.1 General layout of construction 2.5.2 Construction Cycle 2.5.3 Land occupied during construction 2.5.4 Principal construction machinery and construction methods 2.5.4.1 Land leveling and earthwork 2.5.4.2 Concrete construction of main buildings (foundations) + 0 m elevation 2.5.4.3 Lifting of steel structure above

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Chine
Source Banque mondiale