Groupe de la Banque mondiale · Environmental Assessment

China - Guigang Multi-Purpose Navigation Project : environmental action plan and environmental monitoring plan (Vol. 5 of 12)

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

C'c4 - --22 8<4ACTION PLAN of Environmental Protection"for the Xiangjiang Navigational Construction Project of Hunan Province under a Loan of World Bank REVISED EDITION Hunan Xiangjiang Navigatioinal Construction & Development Corporation 18 May 1995 Translated by Hunan Translation Centre 1995a5a I flE CONTENTS tntroduction I 1. The Objects for the Environmental Protection of the Xiangjiang Navigational Construction Engineering 3 2. The Excution of the Plan for the Enrironmental Protection 4 3. The managemental project for the Environmental Protection 6 4. The Investment for the Environmental Protection 19 6. The Enforcement Bodies of the Environmental Protection and Their Responsibilies 22 S. The Plan for the Environmental Monitoring 26 7. The Responsibilities of the EnvironmenXtl Managenent and the Enforcement plan 32 Appedix I Summary of Environmental Evaluation Appedix 2 Summary of management of Environmtal Protection Appedix 3 Table for The Plan of Environmenal Monitorting Appedix 4 The Parficle Gradaton of Silt on Shoals Appedix 5 Table of Content of the poisonous elements In silt on the shoal Appedix 6 The menitoring equipment list for the envirommerital monitoring sWaons of Hengyang and Zhuzhou Attached Drawing 1 The Sectional Drawing of Water Quality Montoring of the Xiangjiang (HengYang-Zhuzhou) Attached E;rawing 2 Locations of Environmental Monitonng Points of Hengyang port Attached Draing 3 Locations of Enviromental Monitoring Points of Zhuzhou Port Instrction From Nov.21 to Dec. 3, 1994, the delegation of Worid Bank for evaluation of the environmental impacts on the Xiangjiang Prmject and the official evaluation group for the Xiangliang Project visited Hunan Province oe after anotr and held s-x-day talks on the environmental Protection matters of the Xiangfiang nrvigational constuction engineering 4uth the Xiangiiang Navigational Cnstrtion Corotion and Hunan Uniesity. the environmental evaluation department. The talks clarified some misunderstandings related to the documents submited by the Office of the Xlingjiang Navigational Construction Project. The experts of the delegation and the group gave their construtve suggesto on the environmental protecin in the various phases of the Xangj-iang navigational construction, The editor. in accordance with the summaries of minutes of the two talks and with the Memorandum of project Evaluation has verffied the original editon of "The Action Plan for Environmental Protection ot the Xiangaiang Navigtional Construction Project and made up the new edi.*Io here of The Actio Plan for Environmentl Protection (Revised Edfflon) The Xiangjiang (Hengyang-ZhDhou, Navgationai Construction Project is the 2nd-phase engineering of the Xiangjiang 1,000-tonage navigationa constction. 'ts main engineerings include the navigational hub of Dayuandu, 120km Dayuandu - Zhuzhou WaterNays dredging, 1 ,O00-ton age wharfs at the two ports of Zhuzhou and Hlengyang. The enviromental evaluations on the engineering are fade step by step on he action phase and operation phase of the three subpro;jects. The Action Plan of Evironmental Protection of the Xianojiang 2nd-phase Navigatonal Constructon Engineering hereof is based or, the Evaluattion Repott cn the Impact of the Xlangjiang (Hergyang-Zhuzhou) Navigational Engineenng on the Enmironment to make up an action plan for the excutionalma nagement and monitoring of the ernirenmental orotection. The environmentai protection of the Xiangjlano 2nd- phase NaAtional Coztruct,on Eng.i.eel has t a '.- t_ the nver's envrronmrent and the comprehensive tunction ot water conservancy and naviation into consideration and wi1l adhere to the policy "overall planning, phase by phase enforcing, comprehense utilzing ,changing the harmful to be tie useful, preventing and treating by the public, protecting the environment; insisting prevention first,combining prevention and treatment, reinforcing administration and management, promoting the treatment by the administration and management, canying out 4the responsibility system " who pollutes the environment who shal take the responsibility of treatment " so as to control and eliminate step by step the enironmental pollution Caused by the engineering in the whole course of construction and operation of the project and protect the environmental quality of the e4gineerinr-re.ated area 2 1. The Objects for the Environmental Protection of the Xiangjiang Naviational Construction Engineering. 1.1- Water Quality: Control the poltution of the waste water of sand and stone processing, the ;oss of bulk-cargo, wiater course dredging and emission of waste oil of ships. etc. To make it up to the water qualfty standard provided in the Functonal Dision of the Water Quality stipulated by the environmental protection aminisron for the reach of the river. 1.2 Air Control the dust pollution of the engineeing of earthwork transportatior and open stotrage of building waterials, especially caused bv loading and unloading of cOa! and minerals at ports, 3nd make .he ai. quality reach the standard. 4 13 Noises: Conttrol the noises of engineering Machinery, loading and un.,nding and transportation vehicle under the national or professional standards. 1.4 Enmironment of Reservoir Area. Due to the reonstructicn of the Dayuardu Hub, the water level of the reservoir reach will be rised so tha, to immerse partial outlets of drainage culverts and gates and ail the low-lying farmland and to endanger the stability of partrial sections of the dyke-of the reservoir Active preventions and proper settlemert shall be the oniy principle on the problem so as to reduce the impacts on the ecotope arourd the reservoir as low as possible. 1.5 Fishery Resources: Develop the cuftivating fishery actuivety in the reservoir area and protect thte fishery resources of the reach of the river. r 2. Excution of Plan for the Environimental protection The specific plans shall be mane up fo- the measures of environmental protection and of pollution prevtention deterrninend by the Xiangjiang Navigational Constrution project The relevant requirements concerming the supervision and monitoring activties during the excution of the specific plans and the operation periods shall be stipulated. The management measures of the environ mental u-otection plan and the determination of fte obects for supersion and monitonring during tfe design, engineering and operation periods shall be of and based on the stpulations on Design of Environmental Protection for the Constrution Projects drawn up by the state planning Commission and the Environmental Protection Commision under the State Council in light of the Law of Envircimmenta! Prmtection of the People's Repubi' of China and the Administration of Environmental Protection for the Construcction Pro-ects and be ot and based on the Administrative Prcedure of Erironmerntal Protectin for Communications Construction Projects and the Strpulations on Environmental Protection Administration promuigated by the Communications Ministry of the People's Republic of China. Tne Hunan Provincial Environmental Protection Bureau as the competent authority under the Hunan Provnial People's Government are responsible for the supervision of the environmental protection adminis- tration in Hunan Province; The environmental protection bureaus at municipal (prefectural ) leve(s as the competent authorities under the local governments are responsible ;'or the supervision of environmental protection administration in the relevant cties and prefectures under their jurisdiction; the envrcnmental protection bureaus at t1hIc county leve,- om responsible for the environmental quality and take measures to improve the environant,a) q;al 'J:-i e,. elvant a.ea under their; ;urisdictwcn; th mo-nitor tations set up by the provincial environmental protection bureau and the orarnzations and instiutes under prefectural or municipal govemments carni out the enmironmental monnitoring wvork. The monrtonng stations at the reach of Hengyang City, Zhuzhou Cty and 4 counties under their juuisdiction, Hengnan Cout Hengshan County Hengdorg County and Zhuzhou County. monitor at the same time the water quality of the reach of the Xiangjiang and the air and noises of the sensiti,e enirc-nmental points conemed along the river that means the environmental qualitv in construction and operation periods will be under their monitor and be fUlly controlled by them. The Xiargjiang Navigational Constuction Development Corporation and Contractors wil take the excution responsibility e. the environmental protection plarn for the Hengyang-Zhuzhcu navigational construction ergJneenng of the Xiangliang. At the meantime. ,me corporation shall take the responsibilty of supervision ond ranae-muern o the environment ot the proiect. The management. administration and moritonnq institutes of environment protection at the project area are as follaws: : ::- f : :D - -: : . f u~~~~~~ Hunan Provincila| Hunan Prcvinda! Enviror.ment3: ironmentar Protection R ureau iMantoring Centrai t ~~~~~Sta'aon Zuz.nou Zhuzhou Hengang Hentieng Muunicipal Municipal -muicipal Municial ErMtrnmental Environmer.tal Ermironmeatal Environmental Protecton Monitring Protectin Monitoring Bureau Stailon Bureau Staton Znuzhou ; -uzhou Henadonr Hlenonan Ccunty County CoCr.A County ErMrorirnental Environmental Envionmentai Environmental Protection PrrMtecnton Protection Protection I Bureau J B ureau IrBureau _ 2urea L 3. Management Project of Environmental Protection. The Dayuandu Hub is a mluti-purpose project of the water resources. The retum water of the reservoir wili channel a 90-kin navigatabie course upper reaches and increase the navigable capacity of lower reaches so that to upgrade the course of Hengyang-Zhuz&ou from the present V navigable classification to 1!1 navigabie classification, and make the sail of 1000-tonage fleets available, the hydro-power station with 120 MW irstalling capacity wili generate about 53C million kwh annualty to relax thie tension of electricity supply, Vhe economic and ervironmental beneFits being obous. As for the bac Impacts of t7e prect on tne environment, we would try Our best to avoid and reduce them in the period of the constuction the project The construction engineeinng and its relevart environsm-Iental protect enginteeet oni tc designed. constructed and operated at the same time phase by ohase and the Stres shatl be laid on both engineering supeNis;on and envirnmental supervo n both The report has put forward the strategies of preventon and treatment for the potertal imnpact on the ernronment by the en..ers in accrdance 'W"i t.e Evaluation Report of the Envirorimental Impacts on the Xiangping (hengyang-zhou) Novigational Corstuction Engineering. 3.1 The Engineering of Oayuandu Hub 3.1.1 Gonsideration on the flood conotr and the losses of submergence in the design phase: For reduceing submergence and bnnging no impacts on flood control of the -eservoir area, the selection of normal water stc:'age ieve and . . -.e . f the hub have been studied and demonstrated carefu[Nl The font of over,flwo, has been widened. he ! idh'. of .he 2i-Ottc sin.'s , overflow gate has been reduced as low as possible that almost be the same as the attitude of the origiral river bed so as to form a lower, opened gate dan- .when discharging the flood. to ensure the flood discharge in natural flow shape. To compare the water level of 20-year encounted flcod after the completion of the reservoir p..ject with the !evel of naturaf flood in same frequence. the dammini up just is 0.07-0-17mr The normal check level is decIded to be SOm (Huanghai Alitute). Tne water level of reservoir forrned by the upward reach of the dam fill be limited within the embankment that wouid just submerge 356 Chinese mu of farm larxdl of enjyoyng the repayment under the sts-e relevant stipulations. athouCh it .S a poor land for farm. 7 3.1.2 The impacts on the embankmnent of the reservoir by the rise of watr level The flood prevention dyke of Hengyg City ;n the .:ter danmed ama ws designed for 50-vear encounted flood and is in constructon. The enbankment of the resernoir area is designed for 20-year et-munted food. After te comnplon of te reservoir. the water level of the reach of Hengyang City wouid be rised 0.07rn and 0.17m at the front ofthe Dayuandu Dam by the 20-year encounted flood compared with that of the natural state. So, the impact of the water storage of the reservioir s very srnall on the flood control ability of the embankment of the tw banks of tme reach ard may be neglected if the thin dykes in a few sections have been reinforced and heightened property .Naw, the flood-control dykes in the area under the jurisdiction of Hengyung Municipal People's Govemrnment is being reinforced and the average 1 meter will be heightened . Ater the compeletion of the engireering, the flood preventon abi.lty of the dykes will be improved greatly. 3.1.3. Protection of the banks slopes Due to the rise of the water level wiening, the water surface after the. weater has been stored in the reservoir. the immersion time of th' bench terace of the reservoir banks would oe prolonged and the water erosion and water cut be more serious. So, it is necessary to adopt the stone masonry bank and the sloDed bank cavered by grass for the cuff bank and loose-soil bank to reinforce the dyke's safty. 3.1.4. Transform of drainage culverts and gates There are 66 drainage cu!verts and gates in the reseroir area. The present outlet base plates of them are lower so that they woul;J be submerged when the water level of the reservoir nsed tha will affect the their Cratnaae function of detained water and sewage- So, they shall be tronsformed and be equipped wzth needed facilities before the water s.orage of the reservoir. 8 3.1.5. The prevention of watertogging for land below tMe normal water level itn the e:mbankme.t There is 15,000-plus Chinese mu of !and below Me normal water level in the ernbanknent calcuLated according to the rneasurerental dwang, of which there is 600o-plus Chinese mu helong to Hengshan Cointy accountng for 2% of the total larmland of the county; 900 C,;inese mu to Hetngdong County, accounftrg for 1.3% of the total farm!aid of the county. These farm. land namnty scatter around Longying Port and .Huangni Pow of Hengshan County. After the Water leve of the reservior is ised, the level of underyround water of those areas would be atso nsed. Because the lands mentioned above are at ower place, the drainage of the watedioggi.g v. becone d1ifTicult so as to affact the outout of t1he crops. The different waterlogging shiall be treated by different way: Fcr the large area of f-c-g band, C.he snt practice of the area it shall adhere to the onncna! "to DumD the hpaher-wvater with !a higlh intack pos;tion- to purmp VTe law-water with7 a loW intack pcidn a. ( d# to cp-- inside water and outside water of the embankmenl' and butid a ti3cd control channel through w,hich wAter gathered frI rain-area flw into Jhe reservoir. The wate.r w,l be pumped into the reservoir from some cultivated land in loaver area which can't be discharged by itself and crops prograrm mTy tbe cbanged ad. sorne present cultivating lanc may be changed into fishery farm. About all, Measures mentioned above to be adopted ae foCr Keeping the local peopes iMng standard no lower than before 3.1.6 Protection of fishery resource After the hub has been co-npleted Ithe darn. vvuld be blocked t-e channel of fish m:igation so thsat the parent population can not rntcratea tC. trhe upard reaches for spawniltng that *R affect the rfztsheri resourccs. Por - ncxr-n; the cccn m o . of the main course of the Xenojiang protectinga the tfsherv resources. the hub tri it Of the suocestul practice of other area will build the !.shpass. which Wi!! take the charactonstics of fish into consideraion -.or the spawning migration of fish to the upper reaches and ensure fthe fish to migrate from the Yangtze through the Dongting lake to the Xiarx4iangs upward reaches and then bac The reservoir may be fully uilized by the fishery department to develop the fishery farming. 3.1.7 Noises control and tfhe " three wastesc disposal. Water pollution:The waste water of the engineering area mainly comes from the sands and stones proccessing system- It has been estimated the suspended solids density in the waste water, although diluted by the river water, wvill still surpass the standard. So. the waste water shall be settled in a settling tank before emission by the contractors. Noises Proveniffon: The noises in the engineering area are mainly caused by the ergineering machiriery and the proccessing of sands and stones. The noises happened irregularty, suddenly. u rsuccessively an-d very strongly. Because the engineering area is located at the open and wildness places more than 300 meters away from any villages, the impact wilU be very sm.all. But,for easing the trouble of noises on the staff members and worKers at the engineering ste, the contractors shall select the machinery with good performance, adjust the operation time property e.m. to arrange the wvrk with loud noises in the day time and make the noises source as far as away from the living quarters of the engineering area- The waste residue treatment: There will be waste earth and residue in large quatity at the engineering areas that shall be treated property and make the waste to be the useful. The contractors shall, in accordance with the require.ments of design of the engineenng, use the waste earth and waster residue to fill the low-lina lands close to the engineering areas or use that as the road meteriaL 't is est. atad that about 3-00- * Th.nese mu of lw-wying land will be transformed lito cultite frmland by the 10 returning the surface soil to farmlandc! measure (The earth throwng area refer to 4.1.4.c. the Summery Report) Air pollafion: the air pollution ove7 the engineering area is rnainiy caused by the tail gas discharge of the engineering machinery with the diese as their power and the dust of powder nratral of building, earthwork and tilling engineeing But the engineering sites are at o en places wth a dmtance to any w71ages and a natura damp condition. the air pollution will form no social effects. However because. the earthwork and stone mining should strip the surface of the soil and destroy the vegetative cover so as to cause the erosion of soil and fose of water and hurm the natural landscape. the contractor(s) shall plant trees and lay turf on the slopes after the engineeni.gs have been completed to prevent the loss of water and erosion of soil and to beatffy the envrronment. Tne pawder material shall not ?be pilled in the open air. 3.1

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Chine
Source Banque mondiale