F- /AS? Elotq IPROJ.E(rT 45E9 E;NVIRONMENTAL A\SSESSM EN-l REPOR I' EAF POLLJUTION 1'REVENTION & MOVE' PROJECT (SUMMARY) CIIONGQIN(G SPE(:IAL STEEL (:OMPANY CHONCQINC, PEOPLE'S REPtUBIAC OF CHINA 'I. CHONGQING IRON & STEIrEL DESIGNING INSTITU1TE OF MNMI-M1EMBER OF BEI.JING ENVIRO1MENTAL ASSESSMENT (COMPANV SEPTEMBER. 1995 PROJ EcT45E9 ENVIRONMENTAL ASSESSMENT REPORT EAF POLLUTION PREVENTION & MOVE PROJECT (SUMNIARY) CHONGQING SPECIAL STEEL COMPANY CHONGQING, PEOPLE'S REPUBLIC OF CHINA SEPTEMBERI 1995 TABLE OF CONTENTS 1.0 Introduction 1.1 Project Background 1.2 Framework for an Environmental Impact Assessment (EIA) 1.2.1 Responsible Govemment Agencies 1.2.2 Reference of Regulons 1.2.3 References of Environmental Standards 1.2.4 Scope of EAS for Individual Projects 1.3 Environmental Benefits to the Local Community 1.4 Schedule 1.4.1 Preparation of the Environmental Assessment (EA) for the Project 1.4.2 Location, Site and Schedult 1.5 Magnitude of EIA Effort 2.0 Project Description 2.1 Major Production Faciities 2.2 Production Technology and Metallic Balance 2.3 Industrial Pollution Control Components 2.3.1 Air Pollution Control 2.3.2 Industrial and Sanitary Waste Water Treatment 2.3.3 Noise and Noise Abatement 2.3.4 Solid Waste 6326k 3.0 Baseline Conditions 3.1 3urvey of the Natural Environment 3.1.1 Geographical Position 3.1.2 Topography and Geomorphology of Jmkou New Area 3.1.3 Soil 3.1.4 Climatology 3.1.5 Hvdrology 3.2 Survey ofthe Ecological Environment 3.2.1 Terrestrial Ecosystem 3.2.2 Aquifer Ecosystem 3.3 Survey of Social Environment 3.3.1 Shuangbei 3.3.2 Shapingba Subzone 3.3.4 Status of Environmental Characteristics 3.4 Quality of Living 3.4.1 Income and Expenses 3.4.2 Education and Culture 3.4.3 Medical and Health Facilities 3.4.4 Residences 4.0 Anticipated Impacts 4.1 General Description of Inpacts 4.1.1 Wastewater Treatment 4.1.2 Solid Waste Management 4.1.3 Industrial Pollution Control (]PC) Project 4.2 Impact on Water Quality 6326R 4.3 Air Quality Impact of the Proposed Project 4.3.1 Emission Standards for the Metallurgical Industiy 4.3.2 Ambient Air Quality Standards 4.3.3 Existing Air Quality 4.3.4 Air Pollution Controls 4.3.5 Emissions of Nor, SO2, and Particulate Matter (PM) firom the Facilities that are Scheduled to be Shutdown and The New Facilities 4.3.6 Meteorological Data for the Chongqing Area 4.3.7 Air Quality Inpact of the Proposed Project 4.4 Disposal of Industrial Wastes 4.4.1 Impact of Solid Waste Disposal at the Existing Plant 4.4.2 Impact of Solid Waste Disposal After the Proposed Project is Completed 4.5 Noise and Noise Abatement 4.6 Environmental Impact During the Construction Period 4.7 Impact of the Proposed Project on Living Quality 4.8 Inpact on the Social Enviromnent 4.8.1 Analysis of the Effect of the Existing Faciies on the Social Environment 4.8.2 Impact on the Social Environment of the Proposed Project 4.8.3 Analysis of the Effect on the Social Envronment During Production 4.9 Impact on the Ecological Environment 4.9.1 Air Polutant Emissions from the Existing Plant 4.9.2 Waste Water Discharges from the Existing Plant 4.9.3 Solid Waste Disposal from the Existing Plant 4.9.4 Air Pollutant E;nissions from the Proposed Facilities 6326f 4.9.5 Efficient Discharges from the Proposed Facilities 4.9.6 Solid Waste Disposal from the Proposed Facilities 5.0 Environmental Management and Monitoring Plan 5.1 Plan of Environmental Protection Management 5.2 Environmental Monitoring Plan 6.0 Public Participation 6.1 Purpose of Public Participation 6.2 Method and Range of Public Participation 6.3 Results of Public Participation 6.3.1 Statistical Result of Public Opiniion Investigation 6.3.2 Result of the Public Meefings 6.3.3 Summary of Fmidings 7.0 Conclusions and Recommendations 7.1 Air Quality 7.2 Surface Water Quality 7.3 Noise and Noise Abatement 7.4 Solid Wastes 7.5 Living Quality 6326R PROJECT 45E9 SECTION I CONTENTS ENVIRO N ENTINAL ASSESSME NT REPORT EAF POLLUTION PREVENTION & MOVW PROJECT (SUMMIARI) CJIONGQINNG SPECIAL STEEL COMPANY CHONGQING, PEGPLE'S REPIJBLIC OF CHINA - CONTNTS - 1.0 INTRODUCTION .....................................................1I 1.1 ProjectBackground . ..................................................... 1 1.2 Framework.for an Environmental Impact Assessment ....................... 2 1.3 Environmental Benefits to the Local Community ............................... 8 1.4 Schedule ....................................................9 1.5 Magnitude of EIAEffort ................................................... 11 6316R PROJECT 45E V SECTION 1 Page I ENV MRONMENT'AL ASSESSMELNI'REPORT EAF POLLUTION PREVENTION & MOVE PROJECT (SUMMARSY CRONGQ1NG SPECIAL STEEL COMPANY CHONCQING, PEOPLE'S REPUBLIC OF CHINA 1.0 INTRODUCTION Chongqing Special Steel Company (CSSC) was established in 1934 in the Shapingba district in Chongqing City, Sichaun Province. The plant is locaed on the Jialing River in a very densely populated area. CSSC is state owned and employs about 18,300 people. The plant produced an average of 219,500 tonnes of steel products over the last five years. The steel grades were 44 peret carbon, 7 percent stanless and 49 percent high quality special alloy steels. The existing steel making facilities consist of ten small - electric arc furaces (EAF). The furmaces are of 1950's technology. Because of their age and condition and the lack of space, the fimuaces cannot be retrofitted to bring them into compliance with enviromental standards for air, water and solid wate disosal. CSSC is unable to consistently meet the product quality of specialty steels used in the transportation and machinery manufactuing industries because of obsolete facilities. These facilities are scheduled to be tom down in 1996- 1998. 1.1 Project Background CSSC has been designated a "key" company in the production of specialty steels in China and is expected to play a major role in the projected expansion of the economy. In order to effectively solve the pollution issues, it is proposed to build a new steelmaling plant capable of meeting environmental standards and to produce 450,000 tonnes per year of high quality semi-finished steel blooms. Major production equipment in the new plant will be a 100 tonne electric arc furnace, a continuous bloom caster, a ladle metallurgy furnace and a vacuum degasser. The plant will be constructed on a green field site five kilometers from the existing 6316R PROJECT 4-5E9 SECTION I Page 2 plant. Cast blooms will be shipped by rail to be processed on the existing finishing mills. Environmental control facilites will include: * A baghouse for control of DC arc fuimace, ladle metallurgical furnace and furnace systems, and fimace raw mateial supply system. * A multi-function and anti-corrosion cyclone separator for control of boiler's fume.
Groupe de la Banque mondiale · Environmental Assessment
China - Chongqing Industrial Reform and Pollution Control Project : environmental assessment report : summary
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale