Environmental O Assessment/Analysis % Reports Report E0040 China - Liaoning Environmental Pro ect EA Category B Environmental Assessment 8 of 12 September 1993 This report has been prepared by the Borrower or its Consultant 311.0luumq|A13 .bie t. /c 2lsl JUN o 9 1994 RZ-Ckzf., ENVIRONMX TAL. ASSMSSMNrT RE:CrT FIOR TANSSSSIOC: PIPEL:NE WORKS OF DISTRICT CIJTRRAI HEATING SYSTEw4 MN AARE:A, BE:N Beijing Environment Assessment Corporation Oct. 1992 Beijing The Beijina Environrmental Assessmrent,Corporation are responsible for preparation of this EA sul-report of Benx. proposed project (compiling an.d checking) . The key personnel in charge of this work are to be as following: Written By: llu Taiqin & Zhang Yongming Checked By: Li Zaigong Technical chief: Zhang Yongming Project Manager: Mu Taiqing General Manager: Wu Zhicheng The anticipates attended to this work and their qualification are listed as below: flame Professional position Specialty Li Zaigong director engineer Environmental senior engineer Assessment Zhang Yonm.ing senior engineer --Environmental Engineering Li Youliang senior engineer Environmental management vauJufEtutU puU isoII@JJ Laded ploAmJ COUITTrlT 1. Introduction --------------------------------- 1 2. Relative Policies, Standards and Management System1 ---l 3. Description of Proposed Project---------------------------2 3.1 General of the Proposed Project
Groupe de la Banque mondiale · Environmental Assessment
China - Liaoning Environmental Project : environmental assessment (Vol. 8 of 12) : Report on EI : transmission pipeline works of district central heating system in Dongfen area, Benxi
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale