Groupe de la Banque mondiale · Project Completion Report

Niger - Power Engineering and Technical Assistance Project

Niger Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Doct of The World Bank FOR 0MCAL USE ONLY RQUtNI 12399 PROJECT COmPLETION REPR REPUBIC OF IGM Pam EENGINEERING AND TECHNICAL ASSISTANCE PROJECT (CREDIT 1511 -NIR) OCTOBEI 13, 1993 MI CROGRAPH I CS Report No: 12399 Type: PCR industry and Enerty Division Country Department V Africa Region Tis document hs a rsicted dbuio and may be used by recipients only in the perfonnace of thdir offcl duis Its contes may not otberwbe be disclosed without World Bak autorization. CURRENCY EQUIVALENTS Currincy Unit CFAF US$1.00 CFAF 300 approximately FRP 1.00 CFAF 50 WEIGHTS AND MEASURES Metric System 1 MW - megawatt = 1,000 kdlowatts 1 kV - klo volt 1,000 volt 1 GWh- gigawatt hour = 1 million kilowatt hours ABBREVIATIONS ABK Autorite de Barrage de Kandadji CCCE Caisse Centrale de Cooperation Economique ESIE Ecole Superieure Interafricaine d'Electricite NEPA National Electricity Power Authority (of Nigeria) NIGELEC Societe Nigerienne d'Electricite SONICHAR Societe Nigerienne de Charbon FOR OFFICIAL USE ONLY THE WORLD BANK WashhqOn. D.C. 20493 U.SSA. .offto of Dtz.ctor-O;su.t&L Ope=stone Evabsaos October 13, 1993 NORADUH O ECUIIVIK DIECOS-ID TAEM PSIDtENT SUBJECT: Project Completion Report on Niger Power. naineeriAm sand Techbnical Assistggge Prolegt (Credit 51-1k Attached is the report entitled "Project Ccmpletion Report on Niger - Power Engineering and Technical Assistance Project (Credit 1511-Nfl)" prepared by the Africa Regional Office.. Neither the Borrower nor the B.nefic

Informations clés
Type de document Project Completion Report
Date d'adoption
Pays Niger
Source Banque mondiale