Page 1 CONFORMED COPY CREDIT NUMBER 2408 EG (Second Petroleum Technical Assistance Project) between REPUBLIC OF EQUATORIAL GUINEA and INTERNATIONAL DEVELOPMENT ASSOCIATION Dated July 22, 1992 CREDIT NUMBER 2408 EG DEVELOPMENT CREDIT AGREEMENT AGREEMENT, dated July 22, 1992, between REPUBLIC OF EQUATORIAL GUINEA (the Borrower) and INTERNATIONAL DEVELOPMENT ASSOCIATION (the Association). WHEREAS the Borrower, having satisfied itself as to the feasibility and priority of the Project described in Schedule 2 to this Agreement, has requested the Association to assist in the financing of the Project; WHEREAS the Association has agreed on the basis, inter alia, of the foregoing, to extend the Credit to the Borrower upon the terms and conditions set forth in this Agreement; NOW THEREFORE the parties hereto hereby agree as follows: ARTICLE I General Conditions; Definitions Section 1.01. The "General Conditions Applicable to Page 2 Development Credit Agreements" of the Association, dated January 1, 1985, with the last sentence of Section 3.02 deleted (the General Conditions) constitute an integral part of this Agreement. Section 1.02. Unless the context otherwise requires, the several terms defined in the General Conditions have the respective meanings therein set forth and the following additional terms have the following meanings: (a) "DH" means the Directorate of Hydrocarbons of the Borrower; (b) "Fiscal Year" means the Borrower's fiscal year which runs from January 1 to December 31; (c) "MMH" means the Ministry of Mines and Hydrocarbons of the Borrower; (d) "Project Preparation Advance" means the project preparation advance granted by the Association to the Borrower pursuant to an exchange of letters dated March 27, 1992 and April 12, 1992 between the Borrower and the Association; (e) "CFAF" means the currency of the Borrower; and (f) "Special Account" means the account referred to in Section 2.02 (b) of this Agreement. ARTICLE II The Credit Section 2.01. The Association agrees to lend to the Borrower, on the terms and conditions set forth or referred to in the Development Credit Agreement, an amount in various currencies equivalent to one million eight hundred thousand Special Drawing Rights (SDR 1,800,000). Section 2.02. (a) The amount of the Credit may be withdrawn from the Credit Account in accordance with the provisions of Schedule 1 to this Agreement for expenditures made (or, if the Association shall so agree, to be made) in respect of the reasonable cost of goods and services required for the Project described in Schedule 2 to this Agreement and to be financed out of the proceeds of the Credit. (b) The Borrower shall, for the purposes of Part C of the Project, open and maintain in U.S. dollars a special deposit account in a commercial bank on terms and conditions satisfactory to the Association, including appropriate protection against set-off, seizure or attachment. Deposits into, and payments out of, the Special Account shall be made in accordance with the provisions of Schedule 4 to this Agreement. (c) Promptly after the Effective Date, the Association shall, on behalf of the Borrower, withdraw from the Credit Account and pay to itself the amount required to repay the principal amount of the Project Preparation Advance withdrawn and outstanding as of such date and to pay all unpaid charges thereon. The unwithdrawn balance of the authorized amount of the Project Preparation Advance shall thereupon be cancelled. Section 2.03. The Closing Date shall be June 30, 1997 or such later date as the Association shall establish. The Association shall promptly notify the Borrower of such later date. Section 2.04. (a) The Borrower shall pay to the Association a commitment charge on the principal amount of the Credit not withdrawn from time to time at a rate to be set by the Association as of June 30 of each year, but not to exceed the rate of one-half of one percent (1/2 of 1%) per annum. Page 3 (b) The commitment charge shall accrue: (i) from the date sixty days after the date of this Agreement (the accrual date) to the respective dates on which amounts shall be withdrawn by the Borrower from the Credit Account or cancelled; and (ii) at the rate set as of the June 30 immediately preceding the accrual date or at such other rates as may be set from time to time thereafter pursuant to paragraph (a) above. The rate set as of June 30 in each year shall be applied from the next payment date in that year specified in Section 2.06 of this Agreement. (c) The commitment charge shall be paid: (i) at such places as the Association shall reasonably request; (ii) without restrictions of any kind imposed by, or in the territory of, the Borrower; and (iii) in the currency specified in this Agreement for the purposes of Section 4.02 of the General Conditions or in such other eligible currency or currencies as may from time to time be designated or selected pursuant to the provisions of that Section. Section 2.05. The Borrower shall pay to the Association a service charge at the rate of three-fourths of one percent (3/4 of 1%) per annum on the principal amount of the Credit withdrawn and outstanding from time to time. Section 2.06. Commitment charges and service charges shall be payable semi-annually on June 15 and December 15 in each year. Section 2.07. (a) Subject to paragraphs (b) and (c) below, the Borrower shall repay the principal amount of the Credit in semi- annual installments payable on each June 15 and December 15 commencing December 15, 2002 and ending June 15, 2032. Each installment to and including the installment payable on June 15, 2012, shall be one percent (1%) of such principal amount, and each installment thereafter shall be two percent (2%) of such principal amount. (b) Whenever: (i) the Borrower's gross national product per capita, as determined by the Association, shall have exceeded $790 in constant 1985 dollars for five consecutive years; and (ii) the Bank shall consider the Borrower creditworthy for Bank lending, the Association may, subsequent to the review and approval thereof by the Executive Directors of the Association and after due consideration by them of the development of the Borrower's economy, modify the terms of repayment of installments under paragraph (a) above by requiring the Borrower to repay twice the amount of each such installment not yet due until the principal amount of the Credit shall have been repaid. If so requested by the Borrower, the Association may revise such modification to include, in lieu of some or all of the increase in the amounts of such installments, the payment of interest at an annual rate agreed with the Association on the principal amount of the Credit withdrawn and outstanding from time to time, provided that, in the judgment of the Association, such revision shall not change the grant element obtained under the above-mentioned repayment modification. (c) If, at any time after a modification of terms pursuant to paragraph (b) above, the Association determines that the Borrower's economic condition has deteriorated significantly, the Association may, if so requested by the Borrower, further modify the terms of repayment to conform to the schedule of installments as provided in paragraph (a) above. Section 2.08. The currency of the French Republic is hereby specified for the purposes of Section 4.02 of the General Conditions. ARTICLE III Execution of the Project Section 3.01. The Borrower declares its commitment to the objectives of the Project as set forth in Schedule 2 to this Agreement and, to this end, shall carry out the Project through MMH Page 4 with due diligence and efficiency and in conformity with appropriate administrative, financial and engineering practices, and shall provide, promptly as needed, the funds, facilities, services and other resources required for the Project. Section 3.02. Except as the Association shall otherwise agree, procurement of the goods, works and consultants' services required for the Project and to be financed out of the proceeds of the Credit shall be governed by the provisions of Schedule 3 to this Agreement. Section 3.03. Without limitation upon the provisions of Section 3.01 of this Agreement, the Borrower shall: (a) for the purposes of making available its contribution to the Project, open and maintain in a commercial bank a separate account in the name of the Project, make an initial deposit of the equivalent of $15,000 into such account and replenish it at least on a quarterly basis; and (b) starting with its Fiscal Year 1993, enter all revenues derived from the exploitation of the Alba field or other hydrocarbon accumulations into its annual budget. Section 3.04. The Borrower shall: (a) carry out a feasibility study of the gas utilization program, and an independent study to establish the optimal program for development of Alba gas and condensate field; and (b) not later than November 30, 1992, agree with the Association on an action plan based on the recommendations of such studies. Section 3.05. The Borrower shall: (a) carry out an environmental impact study of production of the Alba field; (b) review the recommendations of such study with the Association; and (c) not later than January 15, 1993, agree on an action plan and a timetable for its implementation with the Association. Section 3.06. The Borrower shall: (a) submit to the Association for review and approval: (i) terms of reference of any study to be financed out of the proceeds of the Credit; and (ii) a training program for DH staff, including names of proposed staff, objectives, methods, location, duration and cost for such training; and (b) take all necessary measures to ensure that all trained staff remain assigned to the respective jobs for which they were trained for a period of at least three years. Section 3.07. The Borrower shall: (a) by June 30, 1994, carry out an in-depth review of the implementation of the Project and submit a report thereon to the Association in such scope and detail as the Association shall reasonably request; and (b) by September 30, 1994, review with the Association such report, and thereafter take all necessary measures to remedy any problems identified during said review. Section 3.08. The Borrower shall appoint national counterpart staff prior to the hiring of the technical assistance personnel referred to under Part B of the Project. ARTICLE IV Financial Covenants Section 4.01. (a) The Borrower shall maintain or cause to be maintained records and accounts adequate to reflect in accordance with sound accounting practices the operations, resources and expenditures in respect of the Project of the departments or agencies of the Borrower responsible for carrying out the Project or any part thereof. (b) The Borrower shall: (i) have the records and accounts referred to in paragraph (a) of this Section, including those for the Special Account and the account referred to under Section 3.03 of this Agreement, for each fiscal year audited, in accordance with Page 5 appropriate auditing principles consistently applied, by independent auditors acceptable to the Association; (ii) furnish to the Association, as soon as available, but in any case not later than six months after the end of each such year, a certified copy of the report of such audit by said auditors, of such scope and in such detail as the Association shall have reasonably requested; and (iii) furnish to the Association such other information concerning said records, accounts and the audit thereof as the Association shall from time to time reasonably request. (c) For all expenditures with respect to which withdrawals from the Credit Account were made on the basis of statements of expenditure, the Borrower shall: (i) maintain or cause to be maintained, in accordance with paragraph (a) of this Section, records and accounts reflecting such expenditures; (ii) retain, until at least one year after the Association has received the audit for the fiscal year in which the last withdrawal from the Credit Account was made, all records (contracts, orders, invoices, bills, receipts and other documents) evidencing such expenditures; (iii) enable the Association's representatives to examine such records; and (iv) ensure that such records and accounts are included in the annual audit referred to in paragraph (b) of this Section and that the report of such audit contains a separate opinion by said auditors as to whether the statements of expenditure submitted during such fiscal year, together with the procedures and internal controls involved in their preparation, can be relied upon to support the related withdrawals. ARTICLE V Effective Date; Termination Section 5.01. The following events are specified as additional conditions to the effectiveness of the Development Credit Agreement within the meaning of Section 12.01 (b) of the General Conditions: (a) that the Borrower has selected the consultants necessary to carry out the studies referred to under Parts A.1 and 2 and Part B.1 of the Project; and (b) that the account referred to under Section 3.03 of this Agreement has been opened and that the initial deposit referred to under the same Section has been made. Section 5.02. The date ninety (90) days after the date of this Agreement is hereby specified for the purposes of Section 12.04 of the General Conditions. ARTICLE VI Representatives of the Borrower; Addresses Section 6.01. The Minister of the Borrower responsible for Mines and Hydrocarbons is designated as representative of the Borrower for the purposes of Section 11.03 of the General Conditions. Page 6 Section 6.02. The following addresses are specified for the purposes of Section 11.01 of the General Conditions: For the Borrower: Ministerio de Minas e Hidrocarburos Malabo Guinea Ecuatorial Telex: 939 5405 For the Association: International Development Association 1818 H Street, N.W. Washington, D.C. 20433 United States of America Cable address: Telex: INDEVAS 248423 (RCA) Washington, D.C. 82987 (FTCC) 64145 (WUI) or 197688 (TRT) IN WITNESS WHEREOF, the parties hereto, acting through their duly authorized representatives, have caused this Agreement to be signed in their respective names in the District of Columbia, United States of America, as of the day and year first above written. REPUBLIC OF EQUATORIAL GUINEA By /s/ Damaso Obiang Ndong Authorized Representative INTERNATIONAL DEVELOPMENT ASSOCIATION By /s/ Edward V. K. Jaycox Regional Vice President Africa SCHEDULE 1 Withdrawal of the Proceeds of the Credit 1. The table below sets forth the Categories of items to be financed out of the proceeds of the Credit, the allocation of the amounts of the Credit to each Category and the percentage of expenditures for items so to be financed in each Category: Amount of the Credit Allocated % of (Expressed in Expenditures Category SDR Equivalent) to be Financed (1) Consultants' 1,000,000 100% of foreign services expenditures and 26% of local expenditures Page 7 (2) Training 400,000 100% of foreign expenditures (3) Rehabilitation 70,000 100% of foreign of buildings expenditures (4) Vehicles 30,000 100% of foreign expenditures (5) Refunding of 110,000 Amounts due pur- Project suant to Section Preparation 2.02 (c) of this Advance Agreement (6) Unallocated 190,000 __________ TOTAL 1,800,000 ========== 2. For the purposes of this Schedule: (a) the term "foreign expenditures" means expenditures in the currency of any country other than that of the Borrower for goods or services supplied from the territory of any country other than that of the Borrower; and (b) the term "local expenditures" means expenditures in the currency of the Borrower or for goods or services supplied from the territory of the Borrower; provided, however, that if the currency of the Borrower is also that of another country from the territory of which the goods and services are supplied, expenditures in such currency for such goods or services shall be deemed to be "foreign expenditures". 3. Notwithstanding the provisions of paragraph 1 above, no withdrawals shall be made in respect of payments made for expenditures prior to the date of this Agreement. SCHEDULE 2 Description of the Project The objectives of the Project are to: (a) ensure that the Borrower receives the maximum and sustainable revenue from the production of Alba field; (b) identify the most cost effective methods to utilize the associated gas from Alba field; (c) minimize the risks for the marine and land environment during the production of the field; (d) improve the efficiency of energy sector institutions; and (e) strengthen the capacity of the MMH in monitoring the activities of oil companies, and in evaluating the supply and pricing system for petroleum products. The Project consists of the following parts, subject to such modifications thereof as the Borrower and the Association may agree upon from time to time to achieve such objectives: Part A: Studies covering the following: (1) Designing the most efficient way to develop Alba field; (2) identifying the most cost effective methods to utilize the products separated from the Alba flare; (3) environmental assessment for the production of Alba field and identifying appropriate methods to address identified issues; (4) revising the petroleum exploration and production contractual framework; and Page 8 (5) improving the organization of the institutions involved in the Energy Sector. Part B: Technical assistance for the following: (1) Monitoring the production of Alba field; (2) monitoring the exploration activities carried out in the country; (3) reviewing audit reports on Contractor's expenditures; (4) evaluating the Contractor's development assets; (5) negotiating new contracts, or renewal of existing Contracts, with the oil industry; (6) applying the recommendations of the Alba gas utilization study; (7) applying the recommendations of the environmental impact study of production of Alba field; (8) applying the recommendations of the study of improvement of the Energy Sector institutional framework; (9) establishing a data filing and statistical system within the MMH; and (10) control of the supply, conservation, transport and distribution activities of petroleum products. Part C: Training of the MMH personnel, including scholarships, tuition fees, travel and per diem of MMH engineers. Part D: Rehabilitation of the MMH building, and acquisition of two field vehicles. * * * The Project is expected to be completed by December 31, 1996. SCHEDULE 3 Procurement and Consultants' Services Section I. Procurement of Goods and Works Part A: International Competitive Bidding Except as provided in Part D hereof, goods and works shall be procured under contracts awarded in accordance with procedures consistent with those set forth in Sections I and II of the "Guidelines for Procurement under IBRD Loans and IDA Credits" published by the Bank in May 1985 (the Guidelines). Part B: Preference for Domestic Manufacturers In the procurement of goods in accordance with the procedures described in Part A hereof, goods manufactured in Equatorial Guinea may be granted a margin of preference in accordance with, and subject to, the provisions of paragraphs 2.55 and 2.56 of the Guidelines and paragraphs 1 through 4 of Appendix 2 thereto. Part C: Preference for Domestic Contractors Page 9 In the procurement of works in accordance with the procedures described in Part A hereof, the Borrower may grant a margin of preference to domestic contractors in accordance with, and subject to, the provisions of paragraphs 2.55 and 2.56 of the Guidelines and paragraph 5 of Appendix 2 thereto. Part D: Other Procurement Procedures 1. Civil works estimated to cost the equivalent of $50,000 or less per contract, up to an aggregate amount equivalent to $100,000, may be procured under contracts awarded on the basis of competitive bidding, advertised locally, in accordance with procedures satisfactory to the Association. 2. Vehicles estimated to cost the equivalent of $20,000 or less per contract, up to an aggregate amount equivalent to $40,000, may be procured under contracts awarded on the basis of comparison of price quotations obtained from at least three suppliers eligible under the Guidelines, in accordance with procedures satisfactory to the Association. Part E: Review by the Association of Procurement Decisions 1. Review of invitations to bid and of proposed awards and final contracts: (a) With respect to each contract estimated to cost the equivalent of $20,000 or more, the procedures set forth in paragraphs 2 and 4 of Appendix 1 to the Guidelines shall apply. Where payments for such contract are to be made out of the Special Account, such procedures shall be modified to ensure that the two conformed copies of the contract required to be furnished to the Association pursuant to said paragraph 2 (d) shall be furnished to the Association prior to the making of the first payment out of the Special Account in respect of such contract. (b) With respect to each contract not governed by the preceding paragraph, the procedures set forth in paragraphs 3 and 4 of Appendix 1 to the Guidelines shall apply. Where payments for such contract are to be made out of the Special Account, such procedures shall be modified to ensure that the two conformed copies of the contract together with the other information required to be furnished to the Association pursuant to said paragraph 3 shall be furnished to the Association as part of the evidence to be furnished pursuant to paragraph 4 of Schedule 4 to this Agreement. (c) The provisions of the preceding subparagraph (b) shall not apply to contracts on account of which withdrawals from the Credit Account are to be made on the basis of statements of expenditure. 2. The figure of 15% is hereby specified for purposes of paragraph 4 of Appendix 1 to the Guidelines. Section II. Employment of Consultants In order to assist the Borrower in carrying out the Project, the Borrower shall employ consultants whose qualifications, experience and terms and conditions of employment shall be satisfactory to the Association. Such consultants shall be selected in accordance with principles and procedures satisfactory to the Association on the basis of the "Guidelines for the Use of Consultants by World Bank Borrowers and by the World Bank as Executing Agency" published by the Bank in August 1981. SCHEDULE 4 Special Account 1. For the purposes of this Schedule: Page 10 (a) the term "eligible Category" means Category (2) set forth in the table in paragraph 1 of Schedule 1 to this Agreement; (b) the term "eligible expenditures" means expenditures in respect of the reasonable cost of goods and services required for Part C of the Project and to be financed out of the proceeds of the Credit allocated from time to time to the eligible Category in accordance with the provisions of Schedule 1 to this Agreement; and (c) the term "Authorized Allocation" means an amount of $50,000 to be withdrawn from the Credit Account and deposited into the Special Account pursuant to paragraph 3 (a) of this Schedule. 2. Payments out of the Special Account shall be made exclusively for eligible expenditures in accordance with the provisions of this Schedule. 3. After the Association has received evidence satisfactory to it that the Special Account has been duly opened, withdrawals of the Authorized Allocation and subsequent withdrawals to replenish the Special Account shall be made as follows: (a) For withdrawals of the Authorized Allocation, the Borrower shall furnish to the Association a request or requests for a deposit or deposits which do not exceed the aggregate amount of the Authorized Allocation. On the basis of such request or requests, the Association shall, on behalf of the Borrower, withdraw from the Credit Account and deposit into the Special Account such amount or amounts as the Borrower shall have requested. (b) (i) For replenishment of the Special Account, the Borrower shall furnish to the Association requests for deposits into the Special Account at such intervals as the Association shall specify. (ii) Prior to or at the time of each such request, the Borrower shall furnish to the Association the documents and other evidence required pursuant to paragraph 4 of this Schedule for the payment or payments in respect of which replenishment is requested. On the basis of each such request, the Association shall, on behalf of the Borrower, withdraw from the Credit Account and deposit into the Special Account such amount as the Borrower shall have requested and as shall have been shown by said documents and other evidence to have been paid out of the Special Account for eligible expenditures. All such deposits shall be withdrawn by the Association from the Credit Account under the respective eligible Category, and in the respective equivalent amounts, as shall have been justified by said documents and other evidence. 4. For each payment made by the Borrower out of the Special Account, the Borrower shall, at such time as the Association shall reasonably request, furnish to the Association such documents and other evidence showing that such payment was made exclusively for eligible expenditures. 5. Notwithstanding the provisions of paragraph 3 of this Schedule, the Association shall not be required to make further deposits into the Special Account: (a) if, at any time, the Association shall have determined that all further withdrawals should be made by the Borrower directly from the Credit Account in accordance with the provisions of Article V of the General Conditions and paragraph (a) of Section 2.02 of this Agreement; or (b) once the total unwithdrawn amount of the Credit allo- Page 11 cated to the eligible Category for Part C of the Project, less the amount of any outstanding special commitment entered into by the Association pursuant to Section 5.02 of the General Conditions with respect to Part C of the Project, shall equal the equivalent of $100,000 twice the amount of the Authorized Allocation. Thereafter, withdrawal from the Credit Account of the remaining unwithdrawn amount of the Credit allocated to the eligible Category for Part C of the Project shall follow such procedures as the Association shall specify by notice to the Borrower. Such further withdrawals shall be made only after and to the extent that the Association shall have been satisfied that all such amounts remaining on deposit in the Special Account as of the date of such notice will be utilized in making payments for eligible expenditures. 6. (a) If the Association shall have determined at any time that any payment out of the Special Account: (i) was made for an expenditure or in an amount not eligible pursuant to paragraph 2 of this Schedule; or (ii) was not justified by the evidence furnished to the Association, the Borrower shall, promptly upon notice from the Association: (A) provide such additional evidence as the Association may request; or (B) deposit into the Special Account (or, if the Association shall so request, refund to the Association) an amount equal to the amount of such payment or the portion thereof not so eligible or justified. Unless the Association shall otherwise agree, no further deposit by the Association into the Special Account shall be made until the Borrower has provided such evidence or made such deposit or refund, as the case may be. (b) If the Association shall have determined at any time that any amount outstanding in the Special Account will not be required to cover further payments for eligible expenditures, the Borrower shall, promptly upon notice from the Association, refund to the Association such outstanding amount. (c) The Borrower may, upon notice to the Association, refund to the Association all or any portion of the funds on deposit in the Special Account. (d) Refunds to the Association made pursuant to paragraph 6 (a), (b) and (c) of this Schedule shall be credited to the Credit Account for subsequent withdrawal or for cancellation in accordance with the relevant provisions of this Agreement, including the General Conditions.
Groupe de la Banque mondiale · Credit Agreement
Conformed Copy - C2408 - Second Petroleum Technical Assistance Project - Development Credit Agreement
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Credit Agreement
Pays
Guinée équatoriale
Source
Banque mondiale