Documcuntof The World Bank FOR OFFICLAL USE ONLY Repot No. 8452 PROJECT COMPLETION REPORT TANZANIA SECOND TECHNICAL ASSISTANCE PROJECT (CREDIT 1060-TA) MARCH 19, 1990 Africa Regional Office Southern Africa Department Industry & Energy Division This dcument bas a resricted ditrbutio and may be used by reciiens only in te perfornamce of eir offieia duties. Its contets may not otherwise be dscbsed wihout Wold Bank audhorzation. CuaiiCY IOVALUTS Cmency Unit T Tanzanian Shilling (TSh) - 100 cents FY78: US$1 TSh 7.7 FY79180: US$l TSh 8.2 FY81: US$l . TSh 8.3 FY82: US$l - TSh 9.3 FY83: US$l = TSh 10.1 FY84: US$l TSh 15.3 FY85: US$l TSh 17.5 FY86: US$l - TSh 32.7 FY87: US$1 TSh 64.3 FY88s US$1 , TSh 98.7 FY89 (May): USS1 TShl37.4 Rate at appraisals TSh 8.3 ABBREVIATIONS AND ACRONYS TAC Tanzania Audit Corporation TAU a Technical Assistance Unit TIB Tanzania Investment Bank FTISAL YEAR Government: July 1 - June 30 TIB: July 1 - June 30 THE WORLD BANK FOR OFFIAL USI ONLY WashmnSton. DC 20433 USA Ohte d 01wc14v.Cafi March 19, 1990 MEMORANDUM TO THE EXECUTIVE DIRECTORS AND THE PRESIDENT SUBJECT: Project Completion Report on Tanzania - Second Technical Assistance Project (Credit 1060-TA) Attached, for information, is a copy of a report entitled *Project Completion Report on Tanzania - Second Technical Assistance Project (Credit 1060-TA)g prepared by the Africa Regional Office. No audit of this project has been made by the Operations Evaluation Department at this time. Attachment This document has a restficted distribution and may be used by recpients only in the performance of their official duties. Its contents may not otherwise be disclosed without Wortd Bsak authorization. FOR OMCIAL USE ONLY TANZANIA SECOND TECHNICAL ASSISTANCE PROJECT (CREDIT 1060-TA) PROJECT COMPLETION REPORT TABLE OF CONTENTS Page No. Preface ................... ........ .......................... Basic Data Sheet ........... .......... ............*. li Highlights .......................................................... iii I. BACKGROUND ... ... #* . ... *e*. ........*...... .. *.. 1 The Economy .......... ... ........... . . . .. 1 The Industrial Sector .. ......... ................. 1 The Financial Sector .................... .. ........... 2 Previous Bank Group Involvement ...................... 4 II. PROJECT OBJECTIVES AND DESCRIPTION .................... ..... 4 III. PROJECT IDENTIFICATION, PREPARATION AND APPRAISAL ........ 5 IV. PROJECT IMPLEMENTATION ..... .#.. ......... ...... ..... .. .. 6 Use of Subproject Funds ........ ...............*****....... 7 training ........................... 8 Tanzania Audit Corporation ........................... 9 Procurement .................... *..... O.*.....* .................. 9 Compliance with Covenants ...... ........... .......... . 9 Bank Supervision .................. *.#........... 00................ 9 V. CONCLUSIONS ..........*............. ... ....... . . 9 Annexes I. Previous Bank Group Involvement ..... ................ 12 II. Schedule of Disbursements . .... ..... . . ...... ...... .. . .... 13 TII. Status of Subprojects .................................... 15 IV. Subproject Summaries .. #* ........*............ 17 V. Summary of Utilization of Training Component ............. 26 VI. Status of Training Subprojects ........................... 27 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. TANZANIA SECOPD TECHNICAL ASSISTANCE PROJECT (CREDIT 1060-TA) PROJECT COMPLETION REPORT PREFACE This is the Project Completion Report (PCR) for the Second Technical Assistance Project in Tanzania, for which Credit 1060-TA in the amount of SDR8.4 million was approved on August 8, 1980. The credit was closed on June 30, 1988, three years behind schedule. Disbursements totalled SDR6.7 million, SDRI.7 million was cancelled. The last disbursement was in March 1989. The PCR was prepared by the Industry and Energy Division of the Southern Africa Department based, inter alia, on a draft report submitted by the Borrower, a field mission and documents in the project file. This PCR was read by the Operations Evaluation Department (OED). The draft PCR was sent to the Borrower on October 31, 1989, for comments by December 19, 1989, but none were received. ii PROJECT COMPLETION REPORT TANWANIAs SECOND TECHNICAL ASSISTANCE PROJECT (Cr. 1060-TA) Basic Data Sheet Disbursements (in SDR million): Oritinal Disbursed Cancelled Outstanding, as of 3131189 Cr. 1060-TA 8.4 6.7 1.7 6.7 IDA Fiscal Years 1981 1982 1983 1984 1985 1986 1987 1988 1989 Planned 0.3 1.1 3.5 6.4 8.4 -- -- -- -- Actual 0.0 0.5 1.1 2.6 3.6 4.6 5.1 5.7 6.7 X of planned 0 S0 31S 41S 432 552 602 681 782 Date of final disbursements March 1989 Ken Dates: Original ActuallRevised Appraisal 11;79 Board approval 07/15/80 08108180 Credit s

Informations clés
Type de document Project Completion Report
Date d'adoption
Pays Tanzanie
Source Banque mondiale