R E S T R I C T E D Report No. TO-196-b This report was prepared for use within the Bank. In making it available to others, the Bank assumes no responsibility to them for the accuracy or completeness of the information contained herein. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT EXPANSION OF THE GUAYABO HYDROELECTRIC PROJECT EL SALVADOR February 12, 1959 Department of Technical Operations CURRENCY EQUIVALENTS us $I.00 . 2.50 Colones (;) (t1.00 . US $0.40 US $1 Million * I 2.5 Million j I M