Document of The World Bank FOR OFmFCIAL USE ONLY Report No.5986 SRI LANKA TANK IRRIGATION MODERNIZATION PROJECT (Credit 666-CE) December 23, 1985 South Asia Regional Office This document hs a restricted distribuio and may be used by reipients only in the perfomnnance of their oicial adues. Its cotets may not oderise be disclsed without Wodd DBnk antherlntion. WEIGHTS ANI MEASURES 1 lb - .4536 kg 1 kg - 2.205 lbs I lb/ac - .00112 tlha 1 tlha - 892 lbs/ac 1 bu - 45 lbs (of paddy) I in - 25.4 mm 1 sq mi - 2.59 sq km 1 sq km - .386 sq mi 1 ac - .405 ha (4,047 sq m) 1 ha - 2.47 ac ABBREVIATIONS AND GLOSSARY ARTI - Agrarian Research and Training Institute Chena - Slash and burn CP - FAO/IBRD Cooperative Program DCA - Development Credit Agreement ECL - Engineering Consultants Ltd. GDP - Gross Domestic Product ID - Irrigation Department IRR - Internal Rate of Return iRRI - International Rice Research Institute LB - Left Bank Maha - Northeast monsoon season, October to January MIRP - Major Irrigation Rehabilitation Project (Cr. 1537-CE) ODA - Overseas Development Administration (U.K.) O&M - Operation and Maintenance P - Present PCR - Project Completion Report PY - Project Year SAR - Staff Appraisal Report TIMP - Tank Irrigation Modernization Project (Cr. 666-CE) i&V - Training and Visit (system of extension) W - With project W - Without project Yala - Southwest monsoon season, April to June Fo0 OMCIAL USE ONLY SRI LANKA TANK IRRIGATION HDDERNIZATION PROJECT Credit 666-CE TABLE OF CONTENTS Paze No. PREFACE ........................ ...................... BASIC DATA SHEET ......... ........................... ii EVALUATION SUMMARY .................. ................. iv I. INTRODUCTION ................................. 1 II. IDENTIFICATION, PREPARATION AND APPRAISAL ............ 2 III. APPRAISAL ESTIHAIES ............................... . 5 IV. IMPLEMENTATION ...................................... . 7 A. Start-Up .................................. 7 B. Subsequent Developments ..... ............ . 8 1. Civil Works Construction ..................... 8 2. Agricultural Extension Service .... ........... 11 3. Technical Assistance ......................... 12 4. Cost and Financing ........................... 13 5. The IDA Credit ............................... 14 6. Cost Recovery ................................ 15 7. Procurement .................................. 17 8. Reports ...................................... 17 V. AGRICULTURAL IMPACT ....... ........................... 18 A. Appraisal Estimates ............. .. ............... 18 B. Current Situation .............. .. ................ 22 1. General ...................................... 22 2. Water Management ............................. 23 3. Cultivation Practices ........................ 24 4. Cropping Patterns and Yields .... ............. 25 VI. ECONOMIC ANALYSIS .................. .................. 28 A. Appraisal Estimates . 28 B. PCR Estimates ........................ 28 VII. CHANGES IN THE FOLLOW-UP PROJECT ..................... 30 VIII. CONCLUSIONS .......................................... 31 Ths domen has a restcted diswittonand m aybe used by rcpets onlr in the performanc of thew ofrci duum Its owtents moV AS otbemt be dscosed wihut World Bank auoitioUn E ANNEXES I Annex 1 Description of the Project Annex Table 1 - Original Cost Estimates Table 2 - Revised Cost Estimates Table 3 - PCR Cost Estimates Table 4 - Original and Estimated Actual Project Costs Table 5 - Estimated Actual Cost by Tank Scheme Annex 3 Original Financing Plan Annex 4 Table 1 - Withdraval of the Proceeds of the Credit Table 2 - Estimated and Actual Disbursements Table 3 - Utilization of U.K. Grant Annex 5 Side Letter on Cost Recovery Annex 6 Table 1 - Appraisal Estimates of Cropping Patterns, Yields and Production Table 2 - Appraisal Estimates of Irrigation Demand and Supply Table 3 - Estimates of Tank Co_mand Areas Table 4 - Agricultural Data Table 5 - Annual Rainfall Annex 7 Table 1 - Economic Benefits and Costs Table 2 - Economic Rates of Return at Different Yield Levels Annex 8 Performance Ratings in Supervision Reports Annex 9 Proposed Paragraphs for President's Reports APPENDIX 1 Comments by Cofinancier Staff APPENDIX 2 Comments by the Borrower MAP IBRD 11749 Tank Locations SRI LAUK& TANK IRRIGATION HDIDERNIZATION PROJECT - Credit 666-CE PREFAE This is a project completion report (PCR) for the Tank Irrigation Nodernization Project in Sri Lanka for vhich a credit of.US$5.0 million (No. 666-CE Vwas extended to the Republic of Sri Lanka in January 1977. The project was cofinanced by a grant from the United Kingdom. The credit closing date was extended once, by two years, to June 30, 1983. Instead of a further one-year extension requested by the Borrover, the books vere kept open to allow disbursements against eligible expenditures until December 31, 1983. The final disbursement was made in March 1984 and the undisbursed credit balance of US$775,862.07 (15.5Z of the credit amount) was cancelled on April 23, 1984. The PCR is based on a review of IDA records and a draft completion report prepared by the Borrower (Irrigation Department, June 1984). Following a reviev of the PCR by OED staff, it was decided not to audit the project and the PCR was sent to the Borrower and the cofinancier for comment in September 1985. Comments received have been appended to the report. Hovever, as sustainability of benefits is a challenge faced by the project, it vould be useful if the project could be selected for an impact evaluation a fev years from now. SRI LOUK TANI IRRIGTION NODERNIZ&TIOS PROJECT Credit 666-CE Basic Data Sheet KWE PROJECT DATA Appraisal Actual or Colum 2 as m 1stimate Current Estimate Column I (1) (2) (3) Total Project Cost (US$ willion) 23.0 / 16.66 2 72 Credit Azount (US million) 5.0 4.22 84 Cofinancing usS$ million) United Kingdom (ODA) 6.0 4.54 3/ 76 Date of Physical Components Completed 12/31/80 12/31/a3 Proportion then Completed (Z) 100 99 Economic Rate of Return (2) 23 15 65 Institutional Performance God Fair Agroeconomic Performance OGod 4/ Number of Direct Beneficiaries 79,000 >l 79,000 5/ 100 CUMUAfTIVE DISBIURSENENTS FY77 FY78 FY79 FY80 FY81 FY82 FY83 FY84 Appraisal Estimate (USS million) 0.5 2.0 3.2 4.2 5.0 - - - Actual (USS aillion) - 0.06 0.45 0.63 2.08 3.11 3.84 4.22 Actual as I of Appraisal - 3 14 15 42 62 77 84 Date of Final Disbursement: Marcb 28, 1984 PROJECT DATES Original Plan Revisions Actual Identification Report 05/17/74 Negotiations 05176 Board Approval 11/30/76 Credit Signing 01/12/77 Credit Effectiveness 03/14/77 04/18/77 6/ 04/12/77 Credit Closing 06/30/81 06/30/83 06/30/83 ij Excluding US$7.0 million duties and taxes. _f Net of duties and taxes. 3J Including US$0.69 million technical assistance provided under regular cooperation program. i/ As yet undetermined. / About 10,500 families; average family size 7.5 persons. 6/ Second revision. SRI LIIJDA TAiK IRUIaTIO XODN URIZATIOU PROJECT Credit 666-CE BUaic Data Sheet (Page 2) MISSION DATA Sent Month/ No. of Mandays Specializations Performance Types of Mission by Year Persons in Field Renresented 1/ Rating 21 Trend 31 Problems y Identification FAO/CP 02-03/74 3 75 IS, A, E Preparation FAO/CP 06-07/74 3 + 2 112 IZ, A, E, 20 Preparation f FAO/CP 11-12/74 3 + 1 74 IE, A, 2E Preparation
Groupe de la Banque mondiale · Project Completion Report
Sri Lanka - Tank Irrigation Modernization Project
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Retour à la vue par articleTexte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Project Completion Report
Pays
Sri Lanka
Source
Banque mondiale