. . · FOR IMMEDIATE RE~EASE ,. . -World Bank 1818 H Street, N.W ., Washington, D.C. 20433, U.S.A.• Telephone: (202) 477-1234 February 12, 1981 IDA NEWS RELEASE NO. 81/46 IDA SUPPORTS FORESTRY PROJECT IN SENEGAL A project designed to improve supplies of fuelwood, building poles, and tree fodder· for rural and urban populations in Senegal will be supported by a credit of SOR 7.1 million ($9.3 mill ion) from the International Development Assoc i at j on (l DA), it was announced today. I DA is the Wor 1d Bank I s aff i 1 i ate for concessionary lending. Demand for fuelwood and forest products has been growing in 1 ine with the steady population growth in Dakar and the major towns ln the Groundnut.Basin. Deforestation in these areas has become a serious problem, making it impossible to meet fut~re needs only from the remaining natural forests. The establishment of tree plintations, improved management of natural forest, and the promotion of better uses of wood and substitutes are, therefore, priorities. • The project, which has a total estimated cost of $17.1 mill ion, will support the establishment and maintenance of 2,000 hectares (ha) of rainfed tree plantations in the forest reserves between Kaffrine and Koumpentoum in Sine Saloum. Rural rainf~d tree plantations (3,000 ha) will also be established in Sine Saloum and Eastern Senegal, and 600 ha of pilot state-managed tree plantations in the Kaffrine forest reserve will be maintained. The IDA credit will help to finance applied forestry research and the establishment of a forestry training center in Kahone/Kaolack. The Planning Division of the Forestry Department in Dakar will be strengthened and three studies -- rural forestry, economic, and project preparation -- complementary to the institµtion- building component, will be undertaken. The Caisse Centrale de Cooperation Economique will contribute $3J million towards the cost of the project. Fonds d'Aide et de Cooperation an~ ~ Government of Senegal will each contribute $1 .8 mill ion, and United Naticns Development Programme/Food and Agriculture Organization (FAO) will contribute $800,000. The FAQ joined the World Bank in identifying and preparing the project under the Bank/FAO Cooperative Programme. The IDA credit is for 50 years, including 10 years of grace. It carries no interest but will bear a service charge of 3/4 of 1% per annum to cover the Association's administrative expenses . • NOTE: !DA credits are denominated in SDRs (Special Drawing Rights), which are valued on the basis of a "basket" of currencies. The U.S. dollar equivalent of the SOR amount of the IDA credit reflects the exchange rates existing at the time of negotiation of the credit. FORM NO. 1121 • (5-76) T ECHN I CA L DAT A PROJECT: Forestry ,' I COUNTRY: Republic of Senegal TOTAL COST: $1 7 . 1 mi 11 ion IDA FINANCING: SOR 7. l million ($9.3 million), standard IDA terms OTHER FINANCING: Ca:sse Centrale de Cooperation Economique $3.4 million; Fonds d'Aide et de CoopEfration, $1.8 mill ion; United Nations Development Programme/Food and Agriculture Organization, $800,000; Government of Senegal, $1 .8 mill ion IMPLEMENTING ORGANIZATION: Forestry Department La Direction Des Eaux et Forets Dakar, Senega 1 PROJECT DESCRIPTION: The project provides for: (i) establishment and maintenance of 2,000 hectares (ha) of state-managed tree plantations • and maintenance of 600 ha of pilot state-managed tree plantations; (ii) establishment of rural rainfed tree plantations of which 1,500 ha will be in family plantations and another 1,500 ha will be in rural community plantations; (iii) improvement in productiv- ify and ·managemint of-about 10,000 ha of existing natu~~1 forests; (iv} fin~ncing an _ ap~lied torestry research program; (v) establishment and operation of a training ce~ter to provide refresher coursesfor forestry agents; (vi) strengthening the Forestry Department by providing a high-level forestry economist and consultants for the Planning Division of the Forestry Department,and establishment at Kaffrine of a Project Operations Unit; and (vii) consulting services for studies. PROCUREMENT: H~avy machinery and tractors ($500,000) will be grou~ed in packages of over $100,000 where possible and will be awarded on the basis of international competitive bidding (ICB) in accordance with IDA guide- lines. Domestically manufactured goods ($400,000) will be allowed a preference of 15% over the c. i .f.price or the applicable level of import duties, whichever is lower. Contracts for these items for less than $100,000 but for more than $25,000 will be procured on the basis of competitive bidding procedures advertised locall~ and contracts for less than $25,000 will be procured by direct shopping on the basis of at least three quotations; these procurement procedures permit foreign participation through local agents. Because of their location and small size, contracts for civil works, (a total ~f $1.6.m111 ion of wh~ch $1 mill ion will be financed by _IDA) are known to be unattrac- tive for international contractors and will, therefore, be awarded on the basis of competitive bidding advertised locally. CONSULTANTS: • The following consultant services will be obtained in accordance with procedures acceptable to IDA: (a) 18 rn.an- mcinths for planning, monitoring, and economic studies; a~d b) ten man-months to support forestry operations. ECONOMIC RATE OF RETURN: 12.8% (for the directly productive components - accounting for 64i of project costs). ESTIMATED COMPLETION DATE: 1985 ... 0 -
Groupe de la Banque mondiale · Announcement
Announcement of IDA Supports Forestry Project in Senegal on February 12, 1981
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Announcement
Pays
Sénégal
Source
Banque mondiale