Groupe de la Banque mondiale · Staff Appraisal Report

Tunisia - Second Urban Sewerage Project

Tunisie Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Document of The World Bank PY FOR OFFICIAL USE ONLY Report No. 2252-TUN TUNISIA STAFF APPRAISAL REPORT THE SECOND URBAN SEWERAGE PROJECT March 6, 1979 Water Supply and Sewerage Division Europe, Middle East and North Africa Regional Office This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS The exchange rate of the Tunisian dinar is floating. The rate used in this report, which approximates the current rate is: US$1 = DT 0.425 DT 1 = US$2.35 DT 1 million = US$2.35 million MEASURES 1 kilometer (km) = 0.621 miles 1 millimeter (mm) = 0.03937 1 liter (1) = 0.264 US gallons 1 cubic meter (m3) = 264 US gallons 1 hectare (ha) = 2.471 acres 1 square meter (m2) = 10.76 square feet 1 square foot (sq. ft.) = 0.09 square meter GLOSSARY OF ABBREVIATIONS AFH = Agence Fonci

Informations clés
Type de document Staff Appraisal Report
Date d'adoption
Pays Tunisie
Source Banque mondiale