Document of The World Bank FOR OFFICIAL USE ONLY Report No. 2342-AR STAFF APPRAISAL REPORT ARGENTINA - PARAGUAY YACYRETA HYDROELECTRIC PROJECT September 21, 1979 Projects Department Latin America and the Caribbean Regional Office This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Currency Equivalents 1/ Currency Unit = Argentine Peso ($a) 1US$ = 1,000 $a Weights and Measures kW = Kilowatt MW = Megawatt (19000 kW) GW = Gigawatt (1,000 MW) kWh = Kilowatt hour MWh = Megawatt hour (1,000 kWh) GWh = Gigawatt hour (1,000 MWh) kv = Kilo volt (1,000 volts) kvA = Kilo volt-ampere MVA = Megavolt-ampere (1,000 kvA) km 2 Kilometer (0.6214 mile) ke = Square kilometer (0.386 sq. mile) m 3 Cubic meter hm3 Cubic hectometer kcal = Kilocalorie (3.968 BTU) t.o.e. = Tons of oil equivalent Glossary of Abbreviations a.c. = Alternating Current d.c. = Direct Current AyEE = Agua y Energia Electrica ANDE = Administracion Nacional de Energia E
Groupe de la Banque mondiale · Staff Appraisal Report
Argentina - Yacyreta Hydroelectric Project
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Staff Appraisal Report
Pays
Argentine
Source
Banque mondiale