1 2 4 5 6 7 8 9 10 Estimated Cost Credit Cellings Contract Procurement Review Expected Bid- Ref.No. Contract(Description) Type 4 Duration USD10 USD104 Method by Bank Opening Date (Month) Shibing Shanmu River Cultural and Natural Heritage Protection Project Liangcha river administrative room, Jiangjiatian administrative room,walking path(8km), wharf(Liangcha river), 2 Parking lots, wind and rain bridge at Niejiayan, walking bridge at LiangCha river, entrance road at Niejiayan parking lot (240m), Jiangjiatian scenery bridge, 3 water supplying stations(Jiangjiatian, Before Liangcha river, Niejiayan), drainage channel(2000m at Civil QDNSM/C1.1 Jiangjiatian, 2000m at Liangcha river, 2000m at 212.23 150.87 NCB Prior Jun,2010 18 Adjusting Works 3 Niejiayan), sewage treatment(100m /d in JiangjiaTian, 3 3 50 m /d at Liangcha river,120m /d at Niejiayan), rubbish bin (400), 2 garbage transport stations, 3 Public Toilets ,indication sign boards(200), construction of barbecue stalls along Shan Mu River, Luojiatian 2 sightseeing bus driver’s administrative room(200 m) QDNSM/ Civil construction of parking lot and associated facilities 9.95 Shopping Prior July,2011 12 C1.1.1 Works QDNSM/ Civil construction of parking lot at Niejiayan 9.98 Shopping Post Sep,2011 12 C1.1.2 Works QDNSM/ Civil wind and rain bridge at Niejiayan 52.15 NCB Prior Oct,2012 16 C1.1.3 Works QDNSM/ 2 Civil boat area facilities construction in Jiangjiatian (800 m) 9.92 150.87 Shopping Post Aug,2011 12 C1.1.4 Works After QDNSM/ Adjusting Civil construction of barbecue stalls along Shanmu River 9.85 Shopping Post Jul,2011 12 C1.1.5 Works à à Ã#à 1 2 4 5 6 7 8 9 10 Estimated Cost Credit Cellings Contract Procurement Review Expected Bid- Ref.No. Contract(Description) Type 4 Duration USD10 USD104 Method by Bank Opening Date (Month) QDNSM/ Civil 2 garbage transport stations, public toilets 9.58 Shopping Post Aug,2011 12 C1.1.6 Works QDNSM/ Civil tourist service center 93.28 NCB Prior Oct,2011 16 C1.1.7 Works Sub-total 194.71 150.87 Electronic monitory system, Securing system(including Before Civil QDNSM/C1.2 alarm telephone,armamentarium, broadcasting system 40.98 37 NCB Post Jun,2010 12 Adjusting Works ,hydrological monitoring system and intercom system) Equipment After No QDNSM/C1.2.1 No change Supply and 40.00 No change No change Prior Oct,2011 Adjusting change Installation Community Before Protection of Niejiayan traditional dwelling house (10 Block participation- No QDNSM/C2 30.74 30.9 Post Jun,2010 Adjusting households ) Grants Force change Account After No No change Dec,2011 Adjusting change Before Training QDNSM/C3 Training and Study (many times) 2.31 2.31 SOE Post Jun,2010 24 Adjusting and study After No No change Oct,2011 Adjusting change Total 286.26 221.08 Ã!à Ã#à 11 Remark (Adjustment reason) The component was prepared 5 years ago. Currently, the Jiangjiatian administrative room, drainage channel, sewage treatment and parts of walking path have already been established. Due to many people and cars go to the scenic spot, the current facilities of the spot can not accomodate such passenger flow, so that the parking lot and associated facilities need to be upgraded. The garbage transport station will be revised to a movable style for convenience. The space for boats at Jiangjiatian is insufficient, so the boat area needs to be expanded and upgraded. Due to Liangcha River is a key scenic spot of Karst landform in the county, if the administrative room, wharf and walking bridge was constructed, the scencery would be adversely affected. The reasons for sub-contracting: 1) different construction periods. The garbage transport stations and public toilets will be put into utilization before Feb. of 2013, and the parking lot, boat area facilities in Jiangjiatian and barbecue stalls along Shan Mu River will Ã"à Ã#à 11 Remark (Adjustment reason) barbecue stalls along Shan Mu River will be put into utilization before Sep of 2012; 2) different technical specifications for design; 3) different construction locations. Ã#à Ã#Ã
Groupe de la Banque mondiale · Procurement Plan
China - Guizhou Cultural and Natural Heritage Protection and Development Project : procurement plan (Vol. 1 of 2) : Procurement plan for Shibing Shanmu River
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine
Source
Banque mondiale