Groupe de la Banque mondiale · Announcement

Announcement of IDA Approves 6.5 Million Dollars for Agriculture in Upper Volta on May 5, 1977

Burkina Faso Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

eWorldBank 1818 H Street, N.W. 1 Washington, D.C. 20433, U.S.A. • Telephone: (202) 393-6360 IDA NEWS RELEASE NO. 77/53 MAY 5 ~ 19]7 IDA APPROVES $6.5 MILLION FOR AGRICULTURE IN UPPER VOLTA The International Development Associatlon (LDA), an affll iate'of the World Bank, has approved two credits totaling $6,Smillton for agricultural development in Upper Volta, One credit of $3.6 mtllion will be made from [DA resources. A second credit of $2.9 mil lion wil 1 be made from Canadian funds administered by IDA. The project is designed to strengthen the permanent secretariat of Comite de Coordination du Developpement Rural through technical assistance and trirough the creation of a financial and technical unit, and provide the Organismes Regionaux de Developpement of Dedougou and Bobo Dioulasso with staff, equipment and transportation .. • The project's main direct economic benefits will be an increase in production. of cotton and cereals. Cotton is one of the country's most important sources of foreign exchange earnings. At ful 1 dev~lopment, the product wil 1 add 9,800 tons of cotton lint~ Some 46,500 families will directly benefit from increased crop pro- duction which will generate higher incomes. Women's conditions in 40 villages in the project area wi 11 be improved through instruction in nutrition, sanitation and functional literacy. The African Development Fund, Canada, and the Swiss Technical Cooperation are participating in the financing of the project. The IDA credit and the !DA-administered credit to Upper Volta are for 50 years, including a 10-year grace period. They are free of interest, except for a service charge of 3/4 of 1% on the amount disbursed and still outstanding to me~t IDA's administrative .costs. Note: Money figures are expressed in U.S. dollar equivalents . • FORM NO. 1121 (5-76) T E C HN I CA~ DA T A PROJECT: COUNTRY: TOTAL COST: West Vo1ti Agricultural Development Project Upper Vo 1ta $ l 7 • 2 mi 11 ion • I DA FI NANC I NG: $3 .·6 m'i 11 ion, standard I DA terms OTHER FINANCING: $5,5 miilion, Afr·ic,in Development Fund (ADF) $2,9 mill ion, Canada $3.6 mil lion, Swiss Technical Cooperation $1.6 million, Government IMPLEMENTING ORGANIZATIONS: Org,nisme Region•l de Developpement (ORD) Dedougou, Uoper Volta Org1nisme Regional de Developpement Bobo Di(){Jlasso, Upper Volta Comite de.Coordination du Developpement Rural (CCDR) Ouagadougou, Upper Volta PROJECT DESCRl~TION: The project wil 1 be carried out over a 5-year period· (1977-1981) and wilt comprise strengthening the Permanent Secretariat of the CCDR through technical ·•ssistance and through th~ creation of a F,inan- cial and Administratfve Unit; providing the O~Ds of Dedougou and Bobo Dioulasso with the staff, equipment and transportation necessary to implement ~n agricultural development • program; providing incremental seasonal inputs (seed, fertilizer and insecticides); con- structing small-scale irrigation schemea total Ing 1,120 hectares; building a 22,000-ton ginnery with storage facl lities~ construction of 75 small village grain sto~es; creating. a training center for project staff ~nd farmers which would c1lso serve the 1 ivestock project at Samorogoan; carrying out studies and $Urveys, followed by pilot projects to help new settlers; and carrying out a pi Lot scheme to improve the situation cf women in about 40 villages. PROCUREMENT: For the components fin1nced from the proceeds of the IDA and 1·0A-administe~ed credits, ~11 contracts over $50,000 for the procurement of vehicles will be obtai~ed through interna- tional competitive bidding in.accordance with ID~ guidelines. Purchases wi 11 be grouped in packages of at least" $50,000 when~ver pos~ible. Contracts for the construction of houses and offices will be awarded on the basis of cQmpetitive bidding advertised locally in accordanc·e with local procedures acce.pt•ble to IDA, as will contracts under $50,000. For contracts under $10,000 local shopp.fng will be employed. Their services of consultants will be obtained in accordance with IDA guJdelines for the use of consultants. Goods financed by ADF and Swiss Technical Cooperation wi.11 be procured in accordance with their procedures, but should not result ~n -highe~ costs tha~ if all procurement were made under IDA procedures. Domestically manuftictured goods will be allowed a preference of 15% or the 1eve 1 of a pp 1 i cab 1e i mport duty , wh I c hev er i s 1owe r . · CONSULTANTS: Thirty~six· man-months of consultants' services wil 1 be required to prepare feas i bi J i ty studies for 1ow-.cos t pi 1;t resettlement projects to control spont•neous migration. Approximately 6 man-months of consultants' services will be required to provide training to extension staff. Total costs of consulting services are estimated at an average of $7,800 per man-month. • ECONOMIC RATE OF RETURN: 30% ESTIMATED COMPLETION DATE: December 1982 - 0 -

Informations clés
Type de document Announcement
Date d'adoption
Source Banque mondiale