Groupe de la Banque mondiale · Environmental Assessment

Indonesia - Geothermal Clean Energy Investment Project : environmental assessment (Vol. 6 of 8) : Lahendong units five and six draft environmental and social impact assessment (ESIA) report : volume three - appendices

Indonésie Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

E2558 v6 REV Lahendong 5&6 Revised ESIA Report - Volume III Appendices February 2011 Pertamina Geothermal Energy Lahendong 5&6 Revised 265718 RGE GEV 08 D ESIA Report - Volume IIIF:\PROJECTS\265718 PGE Geothermal ESIAs\(1) Lahendong\Reports\Submitted Draft\Addressing 16 February 2011 Appendices February 2011 Pertamina Geothermal Energy Menara Cakawala 15th floor, Jalan MH, Thamrin No. 09 Jakarta - 10340, Indonesia Mott MacDonald, Victory House, Trafalgar Place, Brighton BN1 4FY, United Kingdom T +44(0) 1273 365 000 F +44(0) 1273 365 100, W www.mottmac.com Lahendong 5&6 Revised ESIA Report - Volume III Issue and revision record Revision Date Originator Checker Approver Description A 10/09/10 V. Hovland B. Cornet D Boyland Draft B 28/09/10 V. Hovland B. Cornet D Boyland Final Draft for Disclosure C 04/02/11 M. O'Brien D. Boyland I. Scott Revised Draft ESIA H. White T. Streather D. 16/02/11 H. White D. Boyland D. Boyland Revised Final ESIA Report T. Ellis This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission which used for any other purpose. is due to an error or omission in data supplied to us by other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. Mott MacDonald, Victory House, Trafalgar Place, Brighton BN1 4FY, United Kingdom T +44(0) 1273 365 000 F +44(0) 1273 365 100, W www.mottmac.com Lahendong 5&6 Revised ESIA Report - Volume III Content Chapter Title Page Appendix A. Standards _________________________________________________________________________ 1 A.1. Overview __________________________________________________________________________ 1 A.2. Indonesian Standards ________________________________________________________________ 1 A.3. World Bank Group Guidelines_________________________________________________________ 10 Appendix B. Public Consultation and Disclosure Plan ________________________________________________ 15 B.1. Introduction _______________________________________________________________________ 15 B.2. Project Location and Description ______________________________________________________ 15 B.3. Regulations and Requirements________________________________________________________ 21 B.4. Previous Public Consultation and Disclosure _____________________________________________ 23 B.5. Project Stakeholders________________________________________________________________ 26 B.6. Information Disclosure and Community Engagement _______________________________________ 27 B.7. Implementation Timescales and Responsibilities __________________________________________ 29 B.8. Grievance Mechanism ______________________________________________________________ 30 B.9. Confidentiality and Anonymity_________________________________________________________ 31 B.10. Grievance Resolution _______________________________________________________________ 31 B.11. Monitoring and Reporting ____________________________________________________________ 32 Appendix C. Land Acquisition and Resettlement Policy Framework ______________________________________ 33 C.1. Introduction _______________________________________________________________________ 33 C.2. Institutional and Legal Policy Framework ________________________________________________ 36 st C.3. Land Acquisition and Crop Compensation to Date (as of 1 January 2011)______________________ 54 C.4. Summary_________________________________________________________________________ 60 C.5. Annex - Requirements of Resettlement Plans ____________________________________________ 62 Appendix D. Technical Appendix

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Indonésie
Source Banque mondiale