Groupe de la Banque mondiale · Environmental Assessment

Indonesia - Geothermal Clean Energy Investment Project : environmental assessment (Vol. 3 of 8) : Ulubelu units three and four draft environmental and social impact assessment (ESIA) report : volume three - appendices

Indonésie Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

E2558 v3 Ulubelu 3&4 Revised ESIA Report - Volume III Appendices February 2011 Pertamina Geothermal Energy Ulubelu 3&4 Revised 265718 RGE GEV 08 C ESIA Report - Volume III F:\PROJECTS\265718 PGE Geothermal ESIAs\(2) Ulubelu\Reports\Submitted Draft\Addressing Comments\Ulubelu 3&4 04 February 2011 Appendices February 2011 Pertamina Geothermal Energy Menara Cakawala 15th floor, Jalan MH, Thamrin No. 09 Jakarta - 10340, Indonesia Mott MacDonald, Victory House, Trafalgar Place, Brighton BN1 4FY, United Kingdom T +44(0) 1273 365 000 F +44(0) 1273 365 100, W www.mottmac.com Ulubelu 3&4 Revised ESIA Report - Volume III Issue and revision record Revision Date Originator Checker Approver Description A 27/08//10 V. Hovland B. Cornet D Boyland Draft for comments B 08/09/10 V. Hovland B. Cornet D Boyland Final Draft C 27/09/10 B. Cornet M. O'Brien D. Boyland Final Draft for Disclosure D 07/12/10 B. Cornet M. O'Brien D. Boyland Revised Report for Disclosure E 09/02/11 M. O'Brien D. Boyland I. Scott Revised Draft ESIA H. White T. Streather F 25/02/11 M. O'Brien D. Boyland D. Boyland Revised ESIA H. White This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission which used for any other purpose. is due to an error or omission in data supplied to us by other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. Mott MacDonald, Victory House, Trafalgar Place, Brighton BN1 4FY, United Kingdom T +44(0) 1273 365 000 F +44(0) 1273 365 100, W www.mottmac.com Ulubelu 3&4 Revised ESIA Report - Volume III Content Chapter Title Page Appendix A. Standards__________________________________________________________________________ 1 A.1. Overview __________________________________________________________________________ 1 A.2. Indonesian Standards ________________________________________________________________ 1 A.3. World Bank Group Guidelines _________________________________________________________ 10 Appendix B. Public Consultation and Disclosure Plan _________________________________________________ 15 B.1. Introduction _______________________________________________________________________ 15 B.2. Project Location and Description _______________________________________________________ 16 B.3. Regulations and Requirements ________________________________________________________ 21 B.4. Previous Public Consultation and Disclosure _____________________________________________ 22 B.5. Project Stakeholders ________________________________________________________________ 25 B.6. Information Disclosure and Community Engagement _______________________________________ 26 B.7. Implementation Timescales and Responsibilities __________________________________________ 28 B.8. Grievance Mechanism _______________________________________________________________ 29 B.9. Confidentiality and Anonymity _________________________________________________________ 30 B.10. Grievance Resolution________________________________________________________________ 30 B.11. Monitoring and Reporting_____________________________________________________________ 31 Appendix C. Land Acquisition and Resettlement Policy Framework ______________________________________ 32 C.1. Introduction _______________________________________________________________________ 32 C.2. Institutional and Legal Policy Framework ________________________________________________ 35 C.3. Land Acquisition and Crop Compensation to Date (as of 1st January 2011) ______________________ 53 C.4. Summary _________________________________________________________________________ 59 C.5. Annex - Requirements of Resettlement Plans _____________________________________________ 61 Appendix D. Technical Appendix

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Indonésie
Source Banque mondiale