59782 Revised PROCUREMENT PLAN FOR GOODS(updated as on 10.02.2011) NAME OF PROJECT:- HARYANA POWER SECTOR IMPROVEMENT PROJECT WB LOAN / CREDIT NO. 7748-IN Package No. Description of works / Estimated Method of Design/ Estimate Preparation of Bank's no objection Contract evaluation Bank's No. contract contract No. Name of contractor / WBR No. Date of completion as per Expendture incurred to date INR Goods Contract value procureme Investigation prepared & bid document on bidding document by HVPNL (Date/ objection to signed (Date/ Nationality & ZIP code Procurement Plan in million (Rs. In Millions) nt ICB/NCB completed (date) sanctioned (date (date) (Date) Value/ currency) contract award Value / and value) (date) ** Currency) Awarded Contract Bids As Revised value including taxes & land cost (Rs. In Millions) Invitation (Date) Opened on/ to be opened (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 PF G-01 (A) 400 kV sub-stations 954.00 ICB Nawada with 2 X 315 31.08.2008 15.09.2008 30.09.2008 30.11.2008 4.12.2008 17.02.2009 7.04.2009 28.05.2009 30.06.2009 1/1 31.03.2011 335.7 R1 MVA, 400/220 kV , 2X100 1001.89 Contract No. WB-2/G- M/s Areva T&D India MVA, 220/66 01/Pkg-A/Xen/WB Limited/ Indian kV,1X100MVA,220/33KV dated 16.07.2009 A transformers, 31.08.2008 15.09.2008 20.11.2008 03.12.2008 04.12.2008 17.02.2009 01.05.2009 28.05.2009 13.08.2009 31.10.2011 PF G-01 (B) 400 kV Substation 686.85 ICB Nuhiyawali with 2 X 315 31.08.2008 15.09.2008 30.09.2008 30.11.2008 4.12.2008 17.02.2009 7.04.2009 28.05.2009 30.06.2009 1/2 31.03.2011 492 MVA, 400/220 kV , 2X100 Contract No. WB-1/G- R1 743.00 M/s GET Power Private MVA, 220/132 kV, 01/Xen/WB dated Ltd./Indian 1X16/20MVA132/11KV 01.06.2009 A transformers 31.08.2008 15.09.2008 20.11.2008 03.12.2008 04.12.2008 17.02.2009 01.05.2009 28.05.2009 07.07.2009 22.04.2011 PF G-02 (A) 220 kV sub-stations 371.90 ICB 31.08.2008 15.09.2009 30.11.2008 18.03.2009 08.04.2009 24.06.2009 10.08.2009 10.09.2009 10.10.2009 2/1 10.01.2011 173.6 R1 Rangala Raipur 309.40 (Firozpurizirka) with Contract No. WB-6/G- A M/s EMCO Limited Thane 1X100 MVA, 220/66 kV + 02/Pkg-A/Xen/WB /Indian 1X100 MVA, 220/33 kV 30.01.2009 05.02.2009 18.02.2009 18.03.2009 08.04.2009 24.06.2009 05.08.2009 10.08.2009 15.09.2009 dated 12.08.2009 31.03.2011 transformers PF G-02 (B) 220 kV sub-stations 356.90 ICB 31.08.2008 15.09.2009 30.11.2008 18.03.2009 8.04.2009 24.06.2009 10.08.2009 10.09.2009 10.10.2009 2/2 10.01.2011 183.6 Samain (Tohana) with Contract No. WB-7/G- R1 325.00 M/s EMCO Limited Thane 1X100 MVA, 220/132 kV 02/Pkg-B/Xen/WB /Indian A + 1X100 MVA, 220/33 kV dated 12.08.2009 transformers 30.01.2009 05.02.2009 18.02.2009 18.03.2009 08.04.2009 24.06.2009 05.08.2009 10.08.2009 15.09.2009 31.03.2011 PF G-03 400 kV transmission line 963.05 ICB 30.09.2008 15.10.2008 30.11.2008 26.02.2009 28.04.2009 23.06.2009 8.08.2009 8.09.2009 8.10.2009 M/s K Ramachandra Rao 3 8.07.2011 539.09 for feeding 400 kV sub- Contract No. WB-3/G- Transmission & Projects R1 629.63 station Nuhyawali 03/Xen/WB dated Pvt Ltd (in JV with) M/s A 30.09.2008 15.10.2008 19.01.2009 26.02.2009 28.04.2009 23.06.2009 31.07.2009 05.08.2009 03.09.2009 06.08.2009 Deepak Cables (India) Ltd 22.06.2011 Bangalore/Indian PF G-04(A) 2 No 220 KV Transmision 464.53 ICB lines for feeding 220 KV 31.10.2008 30.11.2008 25.03.2009 12.05.2009 14.05.2009 7.07.2009 30.08.2009 30.09.2009 31.10.2009 31.01.2011 216.1 Substation Samain and Contract No. WB-4/G- M/s National Contracting R1 283.48 04/Pkg-B/Xen/WB Company Saudi 4/1 Masudpur dated 06.08.2009 Arabia/Saudi Arabian A 31.10.2008 30.11.2008 25.03.2009 30.04.2009 14.05.2009 07.07.2009 04.08.2009 05.08.2009 08.09.2009 30.04.2011 PF G-04 (B) 3 Nos. 220 kV 314.97 ICB 31.10.2008 30.11.2008 25.03.2009 12.05.2009 14.05.2009 7.07.2009 30.08.2009 30.09.2009 31.10.2009 31.01.2011 138.31 Transmission lines for Contract No. WB-5/G- M/s National Contracting R1 feeding 220 kV sub- 242.37 04/Pkg-B/Xen/WB Company Saudi Arabia / 4/2 A stations A-5 dated 06.08.2009 Saudi Arabian 31.10.2008 30.11.2008 25.03.2009 30.04.2009 14.05.2009 07.07.2009 04.08.2009 05.08.2009 08.09.2009 30.04.2011 Faridabad,Rangla Raipur PF G-05(A) 2 No 220 KV Substation 716.55 ICB 30.11.2008 31.12.2008 21.04.2009 25.06.2009 1.07.2009 25.08.2009 10.10.2009 10.11.2009 10.12.2009 10.03.2011 247.30 Masudpur with 1X100 R1 MVA, 220/132 kV + 584.65 A 1X100 MVA, 220/33 kV Contract No. WB- transformers and Sagwan 12,WB-13/G-05/Pkg- M/s ABB Limited, 8/1/1 & 8/1/2 with 1X 100 MVA, 220/33 A/Xen/WB dated Chandigarh/Indian + 1x100 MVA 220/132 kV 30.11.2008 03.12.2008 21.05.2009 19.06.2009 25.06.2009 6.10.2009 18.01.2010 29.01.2010 2.03.2010 30.01.2010 18.06.2011 transformers PF G-05(B) 2 No. 220 kV sub-stations 694.80 ICB A-5 Faridabad with 30.11.2008 31.12.2008 21.04.2009 25.06.2009 1.07.2009 25.08.2009 10.10.2009 10.11.2009 10.12.2009 10.03.2011 98.90 2x100MVA 220/66KV R1 469.37 Contract No. WB- S/Stn Transformer and A 14,WB-15/G-05/Pkg- M/s ABB Limited, Raiwali (Panchkula) with 8/2/1 & 8/2/2 B/Xen/WB dated Chandigarh/Indian 2X100 MVA, 220/66 kV 30.01.2010 transformers 30.11.2008 03.12.2008 21.05.2009 19.06.2009 25.06.2009 6.10.2009 18.01.2010 29.01.2010 2.03.2010 18.06.2011 Package No. Description of works / Estimated Method of Design/ Estimate Preparation of Bank's no objection Contract evaluation Bank's No. contract contract No. Name of contractor / WBR No. Date of completion as per Expendture incurred to date INR Goods Contract value procureme Investigation prepared & bid document on bidding document by HVPNL (Date/ objection to signed (Date/ Nationality & ZIP code Procurement Plan in million (Rs. In Millions) nt ICB/NCB completed (date) sanctioned (date (date) (Date) Value/ currency) contract award Value / and value) (date) ** Currency) Awarded Contract Bids As Revised value including taxes & land cost (Rs. In Millions) Invitation (Date) Opened on/ to be opened (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 PF G-06 (A) 2 no.220 kV Transmission 487.19 ICB 30.11.2008 31.12.2008 23.04.2009 9.06.2009 12.06.2009 7.08.2009 30.09.2009 31.10.2009 30.11.2009 Contract No. WB-8,WB- M/s Shyama Power India 28.02.2011 135.60 lines for feeding 220 kV 9/G-04/Pkg-A/Xen/WB Limited in Joint venture with 7/1/1 R1 324.40 substation, A5, Fbd. & dated 02.12.2009 M/s ICCOM Ltd./Indian A 30.11.2008 31.12.2008 21.05.2009 09.06.2009 12.06.2009 1.10.2009 19.11.2009 2.12.2009 28.12.2009 31.05.2011 Rangala Rajpur PF G-06 (B) 3 Nos. 220 kV 311.57 ICB Contract No. WB- M/s Shyama Power India transmission line for 30.11.2008 31.12.2008 23.04.2009 9.06.2009 12.06.2009 7.08.2009 30.09.2009 31.10.2009 30.11.2009 10,WB-11/G-04/Pkg- 28.02.2011 34.8 Limited in Joint venture with 7/2/2 feeding 220 kV sub- A/Xen/WB dated M/s ICCOM Ltd. R1 214.6 station Raiwali, Sagwan 02 12 2009 A 30.11.2008 31.12.2008 21.05.2009 09.06.2009 12.06.2009 1.10.2009 19.11.2009 2.12.2009 28.12.2009 31.05.2011 PF G-07 (A) 2 nos. 132 kV Substation 185.00 ICB Contract No. WB- Sataundi with 2X20/25 30.04.2009 30.06.2009 15.07.2009 15.08.2009 20.08.2009 5.10.2009 15.11.2009 15.12.2009 15.01.2010 M/s Optima-Era Infra 10/1/1 & 10/1/2 15.01.2011 37 16,WB-17/G-07/Pkg- R1 MVA, 132/33 kV 148.4 JV. New Delhi/Russian & A/Xen/WB dated transformers & Kabri with Indian A 30.04.2009 30.06.2009 15.08.2009 17.08.2009 18.08.2009 9.10.2009 08.02.2010 9.02.2010 10.03.2010 10.02.2010 31.05.2011 1X20/25 MVA, 132/33 PF G-07 (B) 3 Nos. 132 kV sub- 298.3 ICB Contract No. WB- M/s Optima-Era Infra stations Kairu with 30.04.2009 30.06.2009 15.07.2009 15.08.2009 20.08.2009 5.10.2009 15.11.2009 15.12.2009 15.01.2010 18,WB-19/G-07/Pkg- JV. New Delhi/Russian & 15.01.2011 66.4 1X20/25 MVA, 132/33 kV B/Xen/WB dated Indian R1 transformers, Nangal 342.30 A Mohanpur with 2X20/25 MVA, 132/33 kV sub- 30.04.2009 30.06.2009 15.08.2009 17.08.2009 18.08.2009 9.10.2009 08.02.2010 9.02.2010 10.03.2010 31.05.2011 stations & Palli PF G-08 (A) 1 no. 220 kV GIS 849.75 30.06.2009 30.06.2009 31.07.2009 31.08.2009 5.09.2009 31.10.2009 15.12.2009 15.01.2010 15.02.2010 15.05.2011 R1 Substation A4 Faridabad 01.03.2011 15.03.2011 15.04.2011 15.07.2012 A with 2X100 MVA, 220/66 30.06.2009 30.06.2009 12.11.2009 25.11.2009 13.01.2010 30.09.2010 kV transformers PF G-08 (B) 1 no.. 66 kV GIS sub- 283.25 ICB 30.06.2009 30.06.2009 31.07.2009 31.08.2009 5.09.2009 31.10.2009 15.12.2009 15.01.2010 15.02.2010 05.02.2011 R1 station Sector-5 01.03.2011 15.03.2011 15.04.2011 15.07.2012 A Panchkula with 2X25/31.5 MVA, 66/11 kV 30.06.2009 30.06.2009 12.11.2009 25.11.2009 13.01.2010 30.09.2010 transformer PF G-09 1800.25 ICB 30.09.2009 15.10.2009 31.10.2009 30.11.2009 10.12.2009 31.01.2010 15.03.2010 15.04.2010 15.05.2010 15.08.2011 R1 G-09 (A) a) Upgradation of 132kV 1441.60 ICB substation Ratia to 220 kV with 1x100 MVA 220/132 kV + 1x100 MVA 220/33 kV b) 220 kV substation Sonta with 2x100 MVA 220/66 kV + 1x12.5/16 MVA 66/11 kV c) 66 kV Substation 30.08.2010 10.09.2010 28.02.2011 15.03.2011 25.03.2011 15.05.2011 15.07.2011 14.08.2011 12.09.2011 12.12.2012 Naneola d) Two 220 kV bays at Durala for accommodating of LILO of second circuit of 220 kV Sahabad

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Inde
Source Banque mondiale