Groupe de la Banque mondiale · Procurement Plan

India - Sustainable Urban Transport Project : procurement plan

Inde Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

R A PP Country Project Code Project Name 1 1 S. No. 2 1 Package No. Implementing agency: 3 Description of Services Date of General Procurement Notices Consultant Management Period covered by this procurement plan Appointment of cycle tracks and for Preparation of for development of and Bid document of pedestrian walkways Technical Consultant Contractor and Project Detailed Project Report Bank's approval Date of the procurement plan 4 6 Estimated Cost (Rs. Millions) 5 Method of Selection @ QCBS 6 Prior/ Post Review Prior : India 29.06.1 7 29.06.10 Advertising for Short listing (Date) : P100589 0 06.01.1 8 06.01.11 TOR/Shortlist to be Finalised (Date) 1 27.07.1 RFP Final Draft to be forwarded to the 9 27.07.10 : UNDB On-line Oct 1, 2008 0 Bank (Date)** 06.01.1 No Objection from Bank for 06.01.11 10 1 TOR/Shortlist/Final RFP (Date)** : Naya Raipur Development Authority : Sustainable Urban Transport Project : December 01, 2009 to December 31, 2011 14.01.1 14.01.11 RFP Issued (Date) 11 1 31.03.1 Proposals to Received by the Project 12 1 Authorities (Date) Evaluation to be Finalised : Procurement plan approved by the Bank on __________ 2011 (Technical/#Combined/Draft 13 Contract/Final Contract) (Date) 07.07.11 05.06.11 30.04.11 Procurement Plan For Consultancy services No Objection by the Bank (Technical/#Combined/Draft 14 Contract/Final Contract) (Date)** 22.07.11 15.06.11 21.05.11 WB LOAN/ CREDIT No LN 7818 IN; GEF grant No TF 095549 Contract Number, Value and Currency 15 Name of Consultant/Nationality & Zip 16 Code, if USA Services to be Completed (Date) 17 31.07.12 **WBR No. 18 Expenditure Incurred to Date 19 R R A A PP PP 1 3 2 S. No. 2 2 3 Package No. 3 Description of Services BRTS. monitoring of cycle track and Consultancy for and Bus shelters (i) development of Report specific for impact Assessment Terminal, Bus Depot Project Management supervision & Quality pedestrian walkways. Preaparation of Social (ii) development of Bus 4 Estimated Cost (Rs. Millions) 25 0.6 5 Sss Method of Selection @ QCBS 6 Prior/ Post Review Prior Prior 7 01.01.12 Advertising for Short listing (Date) 8 15.02.12 TOR/Shortlist to be Finalised (Date) RFP Final Draft to be forwarded to the 9 15.02.12 Bank (Date)** No Objection from Bank for 10 15.03.12 TOR/Shortlist/Final RFP (Date)** RFP Issued (Date) 11 21.02.12 Proposals to Received by the Project 12 24.12.09 24.12.09 21.03.12 Authorities (Date) Evaluation to be Finalised (Technical/#Combined/Draft 13 29.12.09 24.12.09 Contract/Final Contract) (Date) 01.07.12 25.05.12 21.04.12 No Objection by the Bank (Technical/#Combined/Draft 14 02.01.10 02.01.10 Contract/Final Contract) (Date)** 22.07.12 10.06.12 07.05.12 1 Contract Number, Value and Currency 15 INR 0.573 Million Million Name of Consultant/Nationality & Zip 16 UP Code, if USA India (p) Ltd,Noida 01/INR M/s Senes 0.573 Consultant Consultant Services to be Completed (Date) 17 Till now progress M/s Senes 20.04.10 30.04.14 India (p) Ltd work is on **WBR No. 18 Applied Expenditure Incurred to Date 19 n) 0.286 (Millio R R R R R A A A A A PP PP PP PP PP 1 8 7 6 4 5 S. No. 2 8 7 6 4 5 Package No. 3 Description of Services Project Project Terminal, Bus setting up Bus Management Monitoring & and bid process management for Bid document & Study of TOD consultant for Appoinment of a Appointment of a Consultant for Transport Planner Appointment of Appointment of Appointment of Appointment of Evaluation of the Designing, Preparing Design Consultant for Consultant for ITS Finalising the contract Depot,and Bus Shelter (Third time advertised) 4 6 6 Estimated Cost (Rs. Millions) 10 10 1.5 5 t- Method of Selection @ ve CQS QCBS QCBS QCBS competiti Individual consultan 6 Prior/ Post Review Prior Prior Prior Prior Prior 7 11 04.04.11 12.05.1103.03.11 03.03.11 20.02.11 24.12.10 24.12.10 Advertising for Short listing (Date) 8 11 18.05.11 11.07.11 18.04.11 23.02.11 23.02.11 07.02.11 07.02.11 TOR/Shortlist to be Finalised (Date) RFP Final Draft to be forwarded to the 9 11 20.05.11 11.07.11 21.04.11 23.02.11 23.02.11 07.02.11 07.02.11 Bank (Date)** No Objection from Bank for 10 11 20.06.11 11.08.11 21.05.11 28.02.11 28.02.11 28.02.11 28.02.11 TOR/Shortlist/Final RFP (Date)** RFP Issued (Date) 11 11 25.06.11 16.08.11 25.05.11 01.03.11 01.03.11 28.02.11 28.02.11 Proposals to Received by the Project 12 11 08.08.11 01.10.11 30.06.11 07.03.11 07.03.11 07.03.11 07.03.11 Authorities (Date) Evaluation to be Finalised (Technical/#Combined/Draft 13 09.03.11 09.03.11 Contract/Final Contract) (Date) 25.10.11 15.11.11 15.10.11 01.09.11 31.12.11 30.11.11 20.10.11 30.09.11 31.08.11 21.07.11 05.04.11 09.03.11 No Objection by the Bank (Technical/#Combined/Draft 14 25.03.11 Contract/Final Contract) (Date)** 15.11.11 07.12.11 25.10.11 30.09.11 31.01.12 10.12.11 15.11.11 15.10.11 15.09.11 15.08.11 15.04.11 20.03.11 Contract Number, Value and Currency 15 Name of Consultant/Nationality & Zip 16 Code, if USA Services to be Completed (Date) 17 31.12.13 15.02.13 31.03.13 31.12.2013 **WBR No. 18 Expenditure Incurred to Date 19 R A PP Note :- 1 S. No. 2 9 9 Package No. 3 raipur. Description of Services Plan for Naya Preparation of Consultant for Regional Mobility from the bank on 02.01.2010 4 Estimated Cost (Rs. Millions) 5 Method of Selection @ 6 Prior/ Post Review 15 QCBS Prior finalised and sent for approval from World Bank. 7 01.05.1 Advertising for Short listing (Date) 8 25.06.1 TOR/Shortlist to be Finalised (Date) RFP Final Draft to be forwarded to the 9 30.06.1 Bank (Date)** No Objection from Bank for 10 31.07.1 TOR/Shortlist/Final RFP (Date)** RFP Issued (Date) 11 16.08.1 Proposals to Received by the Project 12 30.09.1 Authorities (Date) Evaluation to be Finalised (Technical/#Combined/Draft 13 Contract/Final Contract) (Date) No Objection by the Bank (Technical/#Combined/Draft 14 Contract/Final Contract) (Date)** 01.02.12 15.02.12 31.12.11 15.01.12 Contract Number, Value and Currency 15 Name of Consultant/Nationality & Zip 16 Code, if USA Services to be Completed (Date) 17 2. For consultancy package no. 4, the Transport Planner selected earlier did not accept the offer, then re-advertised third time and selection has been **WBR No. 18 Expenditure Incurred to Date 19 1. For package No.3,-Proposal received from M/s Senes Consultants India Ltd through IDFC including financial proposal to which No Objection was received Procurement Plan For Works WB LOAN/ CREDIT No LN 7818 IN;TF 095549 Project Name : Sustainable Urban Transport Project Country : India Project Code : P100589 Implementing agency: : Naya Raipur Development Authority Bank's approval Date of the procurement plan : Procurement plan approved by the Bank on __________ 2011 Date of General Procurement Notices : UNDB On-line Oct 1, 2008 Period covered by this procurement plan : December 01, 2009 to December 31, 2011 (Date/Value/Currency) Bids Date of completion of Bank No Objection to Bank No Objection to Expenditure Incurred Consultant/Nationalit Estimate Prepared & Design/Investigation Estimated Cost (Rs. y & Zip Code, if USA Sanction (Date and Prior/ Post Review Preparation of Bid Documents (Date) completed (Date) Contract Signed Contract Award Contract Award Contract (Date) Recommended Bid Document Description of Procurement Contract No. Package No. **WBR No. Method of ICB/NCB Services Millions) Name of Invitation Opened (Date)** (Date)** to Date Value) S. No. (Date) On (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 *PP Development of Cycle Track 377 NCB Prior 07.02.12 10.02.12 10.03.12 14.03.12 27.4.12 25.05.12 25.06.12 10.07.12 10.08.12 30.12.13 1 1 and Pedestrian Walk ways R A PP Development of Bus Depot, 211 NCB Prior 16.07.12 31.12.13 05.02.12 15.02.12 15.03.12 20.03.12 05.05.12 31.05.12 30.06.12 16.08.12 2 2 Bus Terminal & Bus Shelter R A PP Development of ITS & 100 NCB Prior 5.02.12 31.03.12 30.04.12 9.5.12 24.6.12 25.07.12 25.8.12 21.09.12 21.10.12 20.12.13 3 3 Security Control System R A *PP: Target dates agreed as per Procurement Plan R: revision 1, 2 etc A: actual dates WBR No.: World Bank Reference Number

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Inde
Source Banque mondiale