Groupe de la Banque mondiale · Procurement Plan

Ethiopia - Rural Capacity Building Project : procurement plan (Vol. 2 of 4) : Procurement plan for Agarfa Atvet college

Éthiopie Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Page 1 Country/ Organis ation: Ethiopia Project/ Program me: Goods Develop ment Inovatio n Grant (Agarfa Atvet College) Descripti on* Package Number Lot Number Estimate Amount in US $'000 Procurem ent Method Pre-or Post Qualificat ion Prior or Post Review If Prequalific ation Sr.N add 7-13 wks 1 1 1 unit Tractor 122 H.P. with Loader & Accessories 1 unit Midibus Capacity of 30 Person 2 2 RCBP/sh/A V02/10 2 14.00 Sh Post Post 100.00 NCB Norm Duration of Proc Steps List of Contracts RCBP/NC B/F01/10 2 BASIC DATA Post Post Referance Books Page 2 3 3 RCBP/sh/A V03/10 5 20.00 Sh Post Post 4 4 Laboratory Equipment RCBP/NC B/AV04/10 Assorted 86.50 NCB Post Post 5 5 RCBP/Sh/ AV05/10 Assorted 31.00 Sh Post Post 6 6 RCBP/Sh/ AV06/10 Assorted 47.00 Sh Post Post 6 7 RCBP//Sh/ AV07/10 5 28.00 Sh Post Post 8 RCBP/NC B/AV08/10 Assorted 4.20 Sh Post Post 9 RCBP/Sh/ AV09/10 Assorted 50.00 Sh Post Post 10 RCBP/Sh/ AV10/10 Assorted 50.00 Sh Post Post 11 RCBP/NC B/AV11/10 Assortd 150.00 NCB Post Post 12 RCBP/NC B/AV12/10 6 89.00 NCB Post Post 13 RCBP/Sh/ AV13/10 Assorted 50.00 Sh Post Post 14 RCBP/sh/A V14/10 Assorted 12.00 Sh Post Post 15 RCBP/Sh// AV15/10 Assorted 41.30 Sh Post Post 16 T Teaching A Aids aids RCBP/Sh /AV16/10 Assorted 3.00 Sh Post Post 17 Animal science materials RCBP/Sh /AV17/1 0 Assorted 38 sh Post Post Books Office Equipment Planting materials Building materials Cafeteria Equipment Clinical materials & Equipment Campus beautificatio n materials Road maintenance materials cutting clubs materials & Sport field Network materials supply and installation Electronics Equipment Office and dining room furniture Audio visual material & Mini media Page 3 Total T^T otal 773 Page 4 Spec Proc Notice Advert Plan vs. Actual Prep & Submissi on by Ex Agency No- objection Date On-line UNDB Gateway Nat Press Bid Invitation Date Bid Closing- Opening Submission Bid Eval Rpt No- objection Date Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks Actual Plan Actual Plan 10-Nov-10 19-Nov-10 26-Nov-10 6-Dec-10 22-Nov-10 Rural Capacity Procurment Plan for the year 2010-11 Draft Bid Documents, including specs and quantities, draft SPN Bidding Period Bid Evaluation 22-Dec-10 Plan 15-Nov-10 22-Nov-10 12-Jan-11 Actual Page 5 Actual plan 22-Nov-10 2-Dec-10 10-Dec-10 17-Dec-10 Actual plan 1-Nov-10 15-Nov-10 15-Nov-10 15-Dec-10 5-Jan-11 Actual Plan 24-Dec-10 31-Dec-10 10-Jan-11 20-Jan-11 Actual Plan 29-Oct-10 5-Nov-10 15-Nov-10 25-Nov-10 Actual Plan 17-Nov-10 24-Nov-10 2-Dec-10 13-Dec-10 Actual Plan 5-Nov-10 12-Nov-10 22-Nov-10 2-Dec-10 Actual Plan 1-Nov-10 8-Nov-10 18-Nov-10 28-Nov-10 Actual Plan 15-Nov-10 22-Nov-10 2-Dec-10 13-Dec-10 Actual Plan 25-Oct-10 24-Nov-10 24-Nov-10 24-Dec-10 14-Jan-11 Actual Plan 15-Oct-10 15-Nov-10 15-Dec-10 14-Jan-11 4-Feb-11 Actual Plan 10-Nov-10 19-Nov-10 29-Nov-10 6-Dec-10 Actual Plan 10-Dec-10 20-Dec-10 27-Dec-10 3-Jan-11 Actual Plan 15-Dec-10 24-Dec-10 3-Jan-11 10-Jan-11 Actual Plan 6-Dec-10 16-Dec-10 23-Dec-10 31-Dec-10 Actual Plan 22-Nov-10 29-Nov-10 9-Dec-10 20-Dec-10 Page 6 Actual Plan Actual Page 7 Contract Implement ation Contrac t Amount in US$'00 0 Date Contract Award Date Contract Signature Opening of Let of Credit Arrival of Goods Inspection Final Acceptance 1 wk 1.5-3 wks 13-Dec-10 20-Dec-10 19-Jan-11 3-Feb-11 Contract Finalization 27-Jan-11 27-Apr-11 18-Jan-11 12-May-11 Page 8 27-Dec-10 6-Jan-11 14-Jan-11 24-Jan-11 12-Jan-11 21-Jan-11 21-Feb-11 8-Mar-11 27-Jan-11 3-Feb-11 23-Feb-11 2-Mar-11 30-Nov-10 7-Dec-10 17-Dec-10 24-Dec-10 Actual Plan 20-Dec-10 27-Dec-10 6-Jan-11 11-Jan-11 Actual 13-Dec-10 21-Dec-10 31-Dec-10 7-Jan-11 5-Dec-10 15-Dec-10 22-Dec-10 27-Dec-10 20-Dec-10 27-Dec-10 3-Jan-11 5-Jan-11 21-Jan-11 4-Feb-11 3-Jun-11 30-Jun-11 11-Feb-11 25-Feb-11 28-Mar-11 12-Apr-11 13-Dec-10 20-Dec-10 30-Dec-10 14-Jan-11 10-Jan-11 17-Jan-11 24-Jan-11 3-Feb-11 17-Jan-11 24-Jan-11 3-Feb-11 10-Feb-11 5-Jan-11 12-Jan-11 27-Jan-11 2-Feb-11 27-Dec-10 3-Jan-11 13-Jan-11 24-Jan-11 Page 9 Page 10 Country/ Organisation: Ethiopia Project/ Programme: Works Development Inovation Grant ( Agarfa Atvet College) Sr No Description* L o t N u m b e r L u m p s u m o r B i l l o f Q u a n t i t i e s P r o c u r e m e n t M e t h o d E s t i m a t e d A m o u n t i n U S $ ' 0 0 0 P r e - o r P o s t Q u a l i f i c a t i o n If Prequalifi cation add 7-13 wks List of Contracts 1 Agarfa/ W/01/10 1 BOQ NCB 53.00 Post Total Cost 53.00 Norm Duration of Proc Steps Construction for Vegitables seedling production Basic Data P a c k a g e N u m b e r Page 11 Spec Proc Notice Advert P r i o r o r P o s t R e v i e w P l a n v s . A c t u a l P r e p & S u b m i s s i o n b y E x A g e n c y N o - o b j e c t i o n D a t e O n - l i n e U N D B G a t e w a y N a t P r e s s B i d I n v i t a t i o n D a t e B i d C l o s i n g - O p e n i n g S u b m i s s i o n B i d E v a l R p t Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 1.5 - 2 wks 6 to 12 wks Actual Post Plan 5-Nov-10 17-Nov-10 17-Nov-10 17-Dec-10 18-Jan-11 Actual Plan Actual Bid Evaluation Bidding Period Draft Bid Documents, including specs and quantities, draft SPN Rural Capacity Building Project Procurment Plan for the year 2010-11 Page 12 N o - o b j e c t i o n D a t e C o n t r a c t A m o u n t i n U S $ ' 0 0 0 D a t e C o n t r a c t A w a r d D a t e C o n t r a c t S i g n a t u r e M o b i l i z a t i o n A d v a n c e P a y m e n t S u b s t a n t i a l C o m p l e t i o n F i n a l A c c e p t a n c e F i n a l C o s t 1.5 - 3 wks 1 wk 1.5-3 wks 25-Jan-11 15-Feb-11 25-Feb-11 25-Jul-11 24-Oct-11 Bid Evaluation Contract Finalization Contract Implementation Page 13 Country/Organisation: Ethiopia Project/Programme: Consultancy If Post-Review, No-objection Dates are not needed Develop ment Inovatio n Grant ( Agarfa Atvet College) Contract Type S e r N o D e s c r i p t i o n * L u m p s u m o r T i m e - B a s e d E s t i m a t e d A m o u n t i n U S $ ' 0 0 0 P r i o r / P o s t R e v i e w P r e p & S u b m i s s i o n b y E x A g Plan 3 - 6 wks Actual List of Contracts Plan Actual Total Cost 0.00 Plan Actual S e l e c t i o n M e t h o d P l a n v s . A c t u a l Preparation Request for Proposals Norm Duration Page 14 N o - o b j e c t i o n D a t e O n - l i n e U N D B G a t e w a y N a t P r e s s L e a d - t i m e b e f o r e s h o r t l i s t S u b m i s s i o n D a t e N o - o b j e c t i o n D a t e I n v i t a t i o n D a t e S u b m i s s i o n / O p e n i n g D a t e S u b m i s s i o n E v a l u a t i o n R e p o r t ( T ) N o - o b j e c t i o n E v a l u a t i o n R e p o r t ( T ) 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks 4 to 12 wks 2 - 3 wks 0.5 - 2 wks Rural Capacity Building Project Procurment Plan for the year 2010-11 Request for Expression of Interest (when required) Preparation Request for Proposals Short List Consultant Proposals Proposal Evaluation Technical (T) & Financial (F) for projects approved before May 2002 Page 15 O p e n i n g F i n a n c i a l P r o p o s a l s S u b m i s s i o n E v a l R e p o r t ( T ) ( F ) N o - o b j e c t i o n E v a l R e p o r t ( T ) ( F ) N e g o t i a t i o n s S u b m i s s i o n D r a f t C o n t r a c t N o - o b j e c t i o n N e g o t i a t i o n s C o n t r a c t A m o u n t i n U S $ ' 0 0 0 C o n t r a c t w a r d C o n t r a c t S i g n a t u r e 2 wks 1 - 2 wks 1 - 1,5 wks 2 wks 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks Proposal Evaluation Technical (T) & Financial (F) for projects approved before May 2002 Negotiations Contract Finalization Page 16 M o b i l i z a t i o n A d v a n c e P a y m e n t D r a f t R e p o r t F i n a l R e p o r t F i n a l C o s t Contract Implementation

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Éthiopie
Source Banque mondiale